Search NASA⌕ Search

SEARCH · Search NASA

Results for “Dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

LPV Modeling and Control for Active Flutter Suppression of a Smart Airfoil

In this paper, a novel technique of linear parameter varying (LPV) modeling and control of a smart airfoil for active flutter suppression is proposed, where the smart airfoil has a groove along its chord and contains a moving mass that is used to control the airfoil pitching and plunging motions. The new LPV modeling technique is proposed that uses mass position as a scheduling parameter to describe the physical constraint of the moving mass, in addition the hard constraint at the boundaries is realized by proper selection of the parameter varying function. Therefore, the position of the moving mass and the free stream airspeed are considered the scheduling parameters in the study. A state-feedback based LPV gain-scheduling controller with guaranteed H infinity performance is presented by utilizing the dynamics of the moving mass as scheduling parameter at a given airspeed. The numerical simulations demonstrate the effectiveness of the proposed LPV control architecture by significantly improving the performance while reducing the control effort.

Smart Airfoil↗

Stability Assessment and Tuning of an Adaptively Augmented Classical Controller for Launch Vehicle Flight Control

Recently, a robust and practical adaptive control scheme for launch vehicles [ [1] has been introduced. It augments a classical controller with a real-time loop-gain adaptation, and it is therefore called Adaptive Augmentation Control (AAC). The loop-gain will be increased from the nominal design when the tracking error between the (filtered) output and the (filtered) command trajectory is large; whereas it will be decreased when excitation of flex or sloshing modes are detected. There is a need to determine the range and rate of the loop-gain adaptation in order to retain (exponential) stability, which is critical in vehicle operation, and to develop some theoretically based heuristic tuning methods for the adaptive law gain parameters. The classical launch vehicle flight controller design technics are based on gain-scheduling, whereby the launch vehicle dynamics model is linearized at selected operating points along the nominal tracking command trajectory, and Linear Time-Invariant (LTI) controller design techniques are employed to ensure asymptotic stability of the tracking error dynamics, typically by meeting some prescribed Gain Margin (GM) and Phase Margin (PM) specifications. The controller gains at the design points are then scheduled, tuned and sometimes interpolated to achieve good performance and stability robustness under external disturbances (e.g. winds) and structural perturbations (e.g. vehicle modeling errors). While the GM does give a bound for loop-gain variation without losing stability, it is for constant dispersions of the loop-gain because the GM is based on frequency-domain analysis, which is applicable only for LTI systems. The real-time adaptive loop-gain variation of the AAC effectively renders the closed-loop system a time-varying system, for which it is well-known that the LTI system stability criterion is neither necessary nor sufficient when applying to a Linear Time-Varying (LTV) system in a frozen-time fashion. Therefore, a generalized stability metric for time-varying loop=gain perturbations is needed for the AAC.

VanZwieten, Tannen↗

Coding the Computing Continuum: Fluid Function Execution in Heterogeneous Computing Environments

Advances in network technologies have greatly decreased barriers to accessing physically distributed computers. This newfound accessibility coincides with increasing hardware specialization, creating exciting new opportunities to dispatch workloads to the best resource for a specific purpose, rather than those that are closest or most easily accessible. We present Delta, a service designed to intelligently schedule function-based workloads across a distributed set of heterogeneous computing resources. Delta implements an extensible architecture in which different predictors and scheduling algorithms can be integrated to provide dynamically evolving estimates of function execution times on different resources-estimates that can be used to determine the most appropriate location for execution. We describe predictors for function runtime, data transfer time, and cold-start resource provisioning and configuration delay; dynamic learning methods that update predictor models over time; and scheduling strategies that take into account both function and endpoint information. We show that these methods can halve workload makespan when compared with a strategy that selects the fastest resource, and decrease makespan by a factor of five when compared to a round robin strategy, when deployed on a heterogeneous testbed with resources ranging from a Raspberry Pi to a GPU node in an academic cloud.

Computing continuum↗

Final Report for ARPA-E LOCOMOTIVES Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) Project

The Advanced Locomotive Technology and Rail Infrastructure Optimization System (ALTRIOS) is a unique, fully integrated, open-source software tool used to evaluate strategies for cost-effectively deploying advanced locomotive technologies and associated infrastructure. ALTRIOS simulates freight-demand-driven train scheduling, mainline meet-pass planning, locomotive dynamics, train dynamics, energy conversion efficiencies, and energy storage dynamics of line-haul train operations. Because new locomotives represent a significant long-term capital investment and new technologies must be thoroughly demonstrated before deployment, this tool provides guidance on the risk/reward trade-offs and operation integration of different technology rollout strategies. An open, integrated simulation tool is valuable for identifying future research needs and making decisions on technology development, routes, and train selection. This final report details the ALTRIOS software architecture, major modules and components, and data validation process. It demonstrates the software's utility through a 30-year rollout case study targeting high penetration of advanced powertrain technologies by 2050 for two BNSF Railway routes: loaded taconite ore trains from Hibbing, Minnesota, to Superior, Wisconsin, and mixed-freight trains from Superior to Minneapolis, Minnesota.

33 ADVANCED PROPULSION SYSTEMS↗

Automatic generation of efficient orderings of events for scheduling applications

In scheduling a set of tasks, it is often not known with certainty how long a given event will take. We call this duration uncertainty. Duration uncertainty is a primary obstacle to the successful completion of a schedule. If a duration of one task is longer than expected, the remaining tasks are delayed. The delay may result in the abandonment of the schedule itself, a phenomenon known as schedule breakage. One response to schedule breakage is on-line, dynamic rescheduling. A more recent alternative is called proactive rescheduling. This method uses statistical data about the durations of events in order to anticipate the locations in the schedule where breakage is likely prior to the execution of the schedule. It generates alternative schedules at such sensitive points, which can be then applied by the scheduler at execution time, without the delay incurred by dynamic rescheduling. This paper proposes a technique for making proactive error management more effective. The technique is based on applying a similarity-based method of clustering to the problem of identifying similar events in a set of events.

Morris, Robert A.↗

NPSS on NASA's IPG: Using CORBA and Globus to Coordinate Multidisciplinary Aeroscience Applications

Within NASA's High Performance Computing and Communication (HPCC) program, the NASA Glenn Research Center is developing an environment for the analysis/design of aircraft engines called the Numerical Propulsion System Simulation (NPSS). The vision for NPSS is to create a "numerical test cell" enabling full engine simulations overnight on cost-effective computing platforms. To this end, NPSS integrates multiple disciplines such as aerodynamics, structures, and heat transfer and supports "numerical zooming" between O-dimensional to 1-, 2-, and 3-dimensional component engine codes. In order to facilitate the timely and cost-effective capture of complex physical processes, NPSS uses object-oriented technologies such as C++ objects to encapsulate individual engine components and CORBA ORBs for object communication and deployment across heterogeneous computing platforms. Recently, the HPCC program has initiated a concept called the Information Power Grid (IPG), a virtual computing environment that integrates computers and other resources at different sites. IPG implements a range of Grid services such as resource discovery, scheduling, security, instrumentation, and data access, many of which are provided by the Globus toolkit. IPG facilities have the potential to benefit NPSS considerably. For example, NPSS should in principle be able to use Grid services to discover dynamically and then co-schedule the resources required for a particular engine simulation, rather than relying on manual placement of ORBs as at present. Grid services can also be used to initiate simulation components on parallel computers (MPPs) and to address inter-site security issues that currently hinder the coupling of components across multiple sites. These considerations led NASA Glenn and Globus project personnel to formulate a collaborative project designed to evaluate whether and how benefits such as those just listed can be achieved in practice. This project involves firstly development of the basic techniques required to achieve co-existence of commodity object technologies and Grid technologies; and secondly the evaluation of these techniques in the context of NPSS-oriented challenge problems. The work on basic techniques seeks to understand how "commodity" technologies (CORBA, DCOM, Excel, etc.) can be used in concert with specialized "Grid" technologies (for security, MPP scheduling, etc.). In principle, this coordinated use should be straightforward because of the Globus and IPG philosophy of providing low-level Grid mechanisms that can be used to implement a wide variety of application-level programming models. (Globus technologies have previously been used to implement Grid-enabled message-passing libraries, collaborative environments, and parameter study tools, among others.) Results obtained to date are encouraging: we have successfully demonstrated a CORBA to Globus resource manager gateway that allows the use of CORBA RPCs to control submission and execution of programs on workstations and MPPs; a gateway from the CORBA Trader service to the Grid information service; and a preliminary integration of CORBA and Grid security mechanisms. The two challenge problems that we consider are the following: 1) Desktop-controlled parameter study. Here, an Excel spreadsheet is used to define and control a CFD parameter study, via a CORBA interface to a high throughput broker that runs individual cases on different IPG resources. 2) Aviation safety. Here, about 100 near real time jobs running NPSS need to be submitted, run and data returned in near real time. Evaluation will address such issues as time to port, execution time, potential scalability of simulation, and reliability of resources. The full paper will present the following information: 1. A detailed analysis of the requirements that NPSS applications place on IPG. 2. A description of the techniques used to meet these requirements via the coordinated use of CORBA and Globus. 3. A description of results obtained to date in the first two challenge problems.

Lopez, Isaac↗

Locality-Aware Scheduling for Scalable Heterogeneous Environments

Heterogeneous computing promise boost performance of scientific applications by allowing massively parallel execution of computational tasks. However, manually managing extremely heterogeneous, multi-device systems is complicated and may result in sub-optimal performance. Specifically, data management is an extremely challenging problem on multi-device systems. In this work, we introduce two locality-aware schedulers for the Minos Computing Library (MCL), an asynchronous, task-based programming model and runtime for extremely heterogeneous systems. The first scheduler implements a pure locality-aware algorithm to maximize data reuse, though it might incur in ”hot-spots” that limit system utilization. The second scheduler mitigates this drawback by dynamically targeting between locality-awareness and system utilization based on the current workload and available computing devices. Our results show that locality-awareness greatly benefit applications that exhibit data reuse, providing up to 6.9x and 7.9x over the original MCL scheduler and equivalent OpenCL implementations, respectively. Moreover, our schedulers introduce negligible overhead compared with the original MCL scheduler and achieve similar performance for applications that don’t benefit from data locality.

Architecture, co-design, Task-based programming mo↗

Co-scheduling Ensembles of In Situ Workflows

Molecular dynamics (MD) simulations are widely used to study large-scale molecular systems. HPC systems are ideal platforms to run these studies, however, reaching the necessary simulation timescale to detect rare processes is challenging, even with modern supercomputers. To overcome the timescale limitation, the simulation of a long MD trajectory is replaced by multiple short-range simulations that are executed simultaneously in an ensemble of simulations. Analyses are usually co-scheduled with these simulations to efficiently process large volumes of data generated by the simulations at runtime, thanks to in situ techniques. Executing a workflow ensemble of simulations and their in situ analyses requires efficient co- scheduling strategies and sophisticated management of computational resources so that they are not slowing down each other. In this paper, we propose an efficient method to co-schedule simulations and in situ analyses such that the makespan of the workflow ensemble is minimized. We present a novel approach to allocate resources for a workflow ensemble under resource constraints by using a theoretical framework modeling the workflow ensemble’s execution. We evaluate the proposed approach using an accurate simulator based on the WRENCH simulation framework on various workflow ensemble configurations. Results demonstrate the significance of co-scheduling simulations and in situ analyses that couple data together to benefit from data locality, in which inefficient scheduling decisions can lead to slowdown in makespan up to a factor of 30.

Do, Tu Mai Anh↗

Simulation-based assessment on stochastic load scheduling for building cooling systems

Here, to fill knowledge gaps related to stochastic load scheduling, we performed a comprehensive evaluation of the stochastic load scheduling for building cooling systems. Specifically, we studied the common uncertain variables in the load scheduling process for building cooling systems and categorized those variables based on their dynamic patterns. We then developed a generic stochastic load scheduling framework and applied it to building cooling systems that served a simulated community. This community consists of 100 heterogeneous houses and serves as a virtual testbed for evaluating the performance of stochastic load scheduling. In this evaluation, we considered representatives of uncertain variables with different dynamic patterns and included 100 realizations of the considered uncertainty in the evaluation to better catch the probability distribution of the control performance. The evaluation results suggest that deterministic load scheduling can reduce the operating energy cost by 18% but its performance can be affected by uncertainty. Stochastic load scheduling can further decrease the operating energy cost under uncertainty compared to deterministic load scheduling. We also found that the effectiveness of stochastic load scheduling in handling uncertainty is not directly associated with the number of uncertainty scenarios that are considered in its formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The relative influences of hydrologic information and dams’ hydropower scheduling decisions on electricity price forecasts

Price dynamics in wholesale electricity markets are driven by supply and demand. In markets with hydroelectric dams, the timing and amount of hydropower offered can influence prices in similar ways to wind and solar power. Unlike variable renewable energy, however, the supply of hydropower in wholesale markets is a function of both water availability and operational decisions at dams. Dam operators maximize revenues in wholesale markets by aligning generation with the periods of highest expected prices, and these scheduling decisions may in turn influence prices. Here, we examine the relative importance of two types of information in predicting forward electricity prices: a) water availability at dams, in the form of short-to-medium-range hydrological forecasts; and b) hourly scheduling decisions at dams. Using softly coupled hydrologic, hydropower scheduling, and power systems models spanning the U.S. Western Interconnection, we quantify the importance of hydrologic forecast accuracy in correctly predicting wholesale electricity prices and compare this with the influence of dam operators’ own hourly scheduling decisions on realized market prices. We find that aligning hydropower generation schedules with the periods of high forecasted prices causes larger, inadvertent price forecast errors than imperfect hydrologic forecasts. This suggests that knowledge of how water is managed by dam operators within the week is more important than weekly inflow forecast errors when predicting forward electricity prices. Our findings have implications for optimal hydropower scheduling by region. Specifically, accounting for price effects is critical in markets dominated by hydropower capacity.

Electricity markets↗

The evaluation of the OSGLR algorithm for restructurable controls

The detection and isolation of commercial aircraft control surface and actuator failures using the orthogonal series generalized likelihood ratio (OSGLR) test was evaluated. The OSGLR algorithm was chosen as the most promising algorithm based on a preliminary evaluation of three failure detection and isolation (FDI) algorithms (the detection filter, the generalized likelihood ratio test, and the OSGLR test) and a survey of the literature. One difficulty of analytic FDI techniques and the OSGLR algorithm in particular is their sensitivity to modeling errors. Therefore, methods of improving the robustness of the algorithm were examined with the incorporation of age-weighting into the algorithm being the most effective approach, significantly reducing the sensitivity of the algorithm to modeling errors. The steady-state implementation of the algorithm based on a single cruise linear model was evaluated using a nonlinear simulation of a C-130 aircraft. A number of off-nominal no-failure flight conditions including maneuvers, nonzero flap deflections, different turbulence levels and steady winds were tested. Based on the no-failure decision functions produced by off-nominal flight conditions, the failure detection performance at the nominal flight condition was determined. The extension of the algorithm to a wider flight envelope by scheduling the linear models used by the algorithm on dynamic pressure and flap deflection was also considered. Since simply scheduling the linear models over the entire flight envelope is unlikely to be adequate, scheduling of the steady-state implentation of the algorithm was briefly investigated.

Bonnice, W. F.↗

DRAS: Deep Reinforcement Learning for Cluster Scheduling in High Performance Computing

Cluster schedulers are crucial in high-performance computing (HPC). They determine when and which user jobs should be allocated to available system resources. Existing cluster scheduling heuristics are developed by human experts based on their experience with specific HPC systems and workloads. However, the increasing complexity of computing systems and the highly dynamic nature of application workloads have placed tremendous burden on manually designed and tuned scheduling heuristics. More aggressive optimization and automation are needed for cluster scheduling in HPC. In this work, we present an automated HPC scheduling agent named DRAS (Deep Reinforcement Agent for Scheduling) by leveraging deep reinforcement learning. DRAS is built on a hierarchical neural network incorporating special HPC scheduling features such as resource reservation and backfilling. An efficient training strategy is presented to enable DRAS to rapidly learn the target environment. Once being provided a specific scheduling objective given by the system manager, DRAS automatically learns to improve its policy through interaction with the scheduling environment and dynamically adjusts its policy as workload changes. We implement DRAS into a HPC scheduling platform called CQGym. CQGym provides a common platform allowing users to flexibly evaluate DRAS and other scheduling methods such as heuristic and optimization methods. Furthermore, the experiments using CQGym with different production workloads demonstrate that DRAS outperforms the existing heuristic and optimization approaches by up to 50%.

97 MATHEMATICS AND COMPUTING↗

Coordinating space telescope operations in an integrated planning and scheduling architecture

The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

Muscettola, Nicola↗

An Efficient Approach for Scheduling Imaging Tasks Across a Fleet of Satellites

Dynamically retasking satellites in response to scientific alerts is challenging because the tasks and opportunities of one satellite can influence this of another. This abstract focuses on our high-level approach for scheduling imaging tasks across a constellation of satellite, which is subject to orbital and other practical constraints such as finding a feasible up-/down- link schedule. Our approach is inspired by combining insights from two existing approaches about the structure of these problems to create an efficient, new approach. We show that our approach stacks up favorably against two baselines–an optimal solver as well as a naive, greedy approach.

Maillard, Adrien↗

Ares I-X Management Office (MMO) Integrated Master Schedule (IMS)

Objectives: Demonstrate control of a dynamically similar, integrated Ares I/Orion, using Ares I relevant ascent control algorithms. Perform an in-flight separation/staging event between a Ares I-similar First Stage and a representative Upper Stage. Demonstrate assembly and recovery of a new Ares I-like First Stage element at KSC. Demonstrate First Stage separation sequencing, and quantify First Stage atmospheric entry dynamics, and parachute performance. Characterize magnitude of integrated vehicle roll torque throughout First Stage flight.

Heintzman, Keith↗

Status of a NASA Standard and Three NASA Handbooks

NASA-STD-7003 Pyroshock Test Criteria, May 18, 1999, has been revised per direction of NASA Headquarters to make it a mandatory standard and to update it for advances in the discipline since it's initial release. NASA-HDBK-7004B Force Limited Vibration Testing, January 31, 2003, and NASA-HDBK-7005 Dynamic Environmental Criteria, March 13, 2001, are being updated to reflect advances in the disciplines since their last release. Additionally, a new NASA handbook, NASA-HDBK-7008 Spacecraft Structural Dynamics Testing is currently being prepared. This paper provides an overview of each document, summarizes the major revisions for the documents undergoing update, and provides the development schedules.

dynamics environment criteria↗

Numerical Simulation of Rolling-Airframes Using a Multi-Level Cartesian Method

A supersonic rolling missile with two synchronous canard control surfaces is analyzed using an automated, inviscid, Cartesian method. Sequential-static and time-dependent dynamic simulations of the complete motion are computed for canard dither schedules for level flight, pitch, and yaw maneuver. The dynamic simulations are compared directly against both high-resolution viscous simulations and relevant experimental data, and are also utilized to compute dynamic stability derivatives. The results show that both the body roll rate and canard dither motion influence the roll-averaged forces and moments on the body. At the relatively, low roll rates analyzed in the current work these dynamic effects are modest, however the dynamic computations are effective in predicting the dynamic stability derivatives which can be significant for highly-maneuverable missiles.

Murman, Scott M.↗

Inertia estimation for power grids: A review of methods, challenges, and future prospects

The electric power grid is undergoing a significant transformation, shifting from traditional synchronous generators to inverter-based resources (IBRs) such as solar photovoltaics, wind turbines, and energy storage systems. This evolution leads to a reduction in system inertia, a critical attribute for maintaining frequency stability in response to disturbances. Consequently, the ability to monitor and estimate system inertia has become increasingly essential. This paper provides a comprehensive review of existing inertia estimation methodologies, analyzing them from multiple perspectives, including the types of data utilized, underlying estimation principles, operational modes, and system-wide applicability. A comparative summary table is included to distill commonalities and key characteristics across various studies. In addition, the paper examines practical implementations of inertia estimation across several major power systems worldwide, including the U.S. interconnections, the Nordic power system, and the U.K. grid. Key challenges are identified, particularly in estimating contributions from virtual inertia sources and load-induced inertia in increasingly converter-dominated networks. To address these emerging challenges, the paper proposes an integrated framework for real-time inertia estimation and monitoring. This framework encompasses critical components such as data acquisition, inertia estimation from both synchronous and non-synchronous sources, load-induced effects, optimization techniques, forecasting, and virtual inertia scheduling. Collectively, these elements enable dynamic, system-wide monitoring and adaptive control of grid inertia.

Inertia estimation↗