Search NASA⌕ Search

SEARCH · Search NASA

Results for “ELECTRIC INSPECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗

Low-cost, Risk-Reduction Testing of Class D Spacecraft Photovoltaic Systems

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A low-cost, portable, and end-to-end photovoltaic-system test appropriate for NASAs new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metal-halide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, high-fidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility.At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendors panel-level data and periodic inspection, the method ensures system integrity from Integration and Test (IT) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

photovoltaic↗

Improved Method of Locating Defects in Wiring Insulation

An improved method of locating small breaches in insulation on electrical wires combines aspects of the prior dielectric withstand voltage (DWV) and time-domain reflectometry (TDR) methods. The method was invented to satisfy a need for reliably and quickly locating insulation defects in spacecraft, aircraft, ships, and other complex systems that contain large amounts of wiring, much of it enclosed in structures that make it difficult to inspect. In the DWV method, one applies a predetermined potential (usually 1.5 kV DC) to the wiring and notes whether the voltage causes any arcing between the wiring and ground. The DWV method does not provide an indication of the location of the defect (unless, in an exceptional case, the arc happens to be visible). In addition, if there is no electrically conductive component at ground potential within about 0.010 in. (approximately equal to 0.254 mm) of the wire at the location of an insulation defect, then the DWV method does not provide an indication of the defect. Moreover, one does not have the option to raise the potential in an effort to increase the detectability of such a defect because doing so can harm previously undamaged insulation. In the TDR method as practiced heretofore, one applies a pulse of electricity having an amplitude of less than 25 V to a wire and measures the round-trip travel time for the reflection of the pulse from a defect. The distance along the wire from the point of application of the pulse to the defect is then calculated as the product of half the round-trip travel time and the characteristic speed of a propagation of an electromagnetic signal in the wire. While the TDR method as practiced heretofore can be used to locate a short or open circuit, it does not ordinarily enable one to locate a small breach in insulation because the pulse voltage is too low to cause arcing and thus too low to induce an impedance discontinuity large enough to generate a measurable reflection. The present improved method overcomes the weaknesses of both the prior DWV and the prior TDR method.

Greulich, Owen R.↗

Inexpensive high-temperature furnace for thermocouple calibration

New furnace calibrates unknown thermocouple by comparing its electrical output to a reference thermocouple /previously calibrated by optical pyrometry/, as both are heated simultaneously. Thermocouples may be radioactive, thus heat source must be accessible by remote manipulation and inspection measurements. Advantages of furnace operation are cited.

Gracey, C. M.↗

Observations and Lessons Learned in Residential Roofing Integrated Photovoltaics

The data file includes field observations of residential roofing integrated photovoltaics installation that happened between July 2021 and June 2022 in California. There are 21 observations - 2 in the re-roofing category and 19 in the new construction category. The file includes two time and motion forms (Re-Roofing & New Construction) we used to capture the time it takes for each activity in the rooftop solar and electrical installation process. You will see the duration for detailed steps along with activities that are included for total installation time for the paper. There are three parts to the time and motion form - Part 1 has project and crew characteristics, product information, and inspection and permitting data and can be filled before the installation. Part 2 has the actual installation time stamps and related notes. Part 3 has the crew information and can be filled on-site or off-site, but this section is optional. The re-roofing form has pre-solar activities and gutters and vents section in Part 2 of the form, whereas new construction form includes a section for capturing the time it took for rough wiring. The re-roofing form does not include rough wiring but instead includes the final electrical wiring process. These are the key differences in both the forms. Each day/step/installation activity needs to include the crew break time as they happen and there is space available to capture the crew breaks duration. In Table 1 below, the different terms used in the time and motion form are defined and their corresponding unit of measurement stated. We also highlight the optional sections. The data is captured in total mins, total hours, person mins, person hours. You can use this form or make edits to the form to recreate the study or make your own observations. The data herein was reviewed but may not be comprehensive. NREL invites questions and inputs to improve the data, including to: Correct erroneous information Fill in missing/updated information Clarifications on data and variables Updated information may be submitted to Sushmita Jena at sushmita.jena@nlr.gov.

14 SOLAR ENERGY↗

Power Quality and Load Capacity Evaluations of an Electric Vehicle for Multi-Robot System Applications

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

Electric vehicle↗

IEEE SusTech 2025 Presentation

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6\% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

42 - ENGINEERING↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Electric Propulsion↗

Thermal cycling testing to failure of a ceramic column grid array package for space applications

Ceramic column grid array (CCGA) packages have been used increasingly in logic and microprocessor functions, telecommunications, flight avionics boards, payload electronics boards, engineering navigational and science cameras, electronic assemblies, and other applications, because of their inherent advantages such as high electrical interconnect density, very good thermal and electrical performance, and compatibility with standard surface-mount technology (SMT) packaging assembly processes. Because these advanced electronic packages tend to have less solder-joint strain-relief than do leaded flat-pack electronic packages, the reliability of CCGA packages in challenging thermal environments is a very important consideration for their short- and long-term use in JPL-NASA space missions. In this study, we assembled daisy chains of polyimide printed wiring boards from CCGA-interconnect packages, inspected the boards nondestructively, and then subjected them to thermal cycling to assess their reliability in thermal environments from +125°C to -40°C±25°C. The test hardware consists of a CCGA 1752 package (CN version). The package was divided into four daisy-chained sections that were electrically monitored for their continuity during thermal cycling. The CCGA 1752 package is roughly 45 mm × 45 mm with a 42-mm × 42-mm array of 80%/20% Pb/Sn columns on a 1.00-mm pitch. The resistance of the daisy-chained CCGA interconnects was continuously monitored during thermal cycling in a gaseous nitrogen environment. Electrical continuity resistance measurements as a function of thermal cycling are reported here; tests to date have shown significant change to an open circuit in daisy-chain resistance as a function of thermal cycling. The change in interconnect resistance becomes increasingly noticeable with increasing number of thermal cycles. This paper describes the experimental thermal-cycling test results of CCGA 1752 package reliability testing under an extremely wide temperature range. The first failure was observed at 1479th thermal cycle. We report the thermal-cycle reliability test data for ~2500 thermal cycles.

Ramesham, Rajeshuni↗

Initial tests of large format sensors for the ATLAS ITk strip tracker

For the construction of the Inner Tracker (ITk) as part of the phase-II upgrade programme of the ATLAS detector for the High-Luminosity (HL) LHC, batches of Long Strip (LS) and Short Strip (SS) n + -in-p type micro-strip sensors have been produced by Hamamatsu Photonics and Infineon. The full size sensors measure approximately 98 × 98 mm 2 and are designed and engineered for tolerance against the 9.7 × 10 14 1 MeV n eq /cm 2 fluence expected at the HL-LHC, including a safety factor of 1.5. Each sensor has 2 or 4 columns of 1280 individual channels arranged at 75.5 μ m horizontal pitch. To ensure the sensors comply with their specifications, a Quality Control (QC) procedure has been implemented, comprising measurements on every individual sensor as well as on a sample basis. Every sensor is subjected to an initial visual inspection, after which the full surface of the sensor is captured with very high resolution by an automated camera setup. Non-contact metrology is performed to obtain the sensor surface profile. Electrical measurements establishing the reverse bias leakage current and depletion voltage are then conducted automatically. Sample sensors from every batch are subjected to 40 h of leakage stability checks in controlled atmosphere, and tests on every channel measuring leakage current, coupling capacitance and bias resistance are done. The recorded results are uploaded to a production database following data quality checks. In this paper, QC test validation data and the compiled results for the first batches of production grade sensors are presented. The QC protocol was validated, and the first production sensors were confirmed to be within specification. The results are compared to those from the previous generation of prototype sensors.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Digitally Optimized Autonomous Robotic System for Hanford Waste Tank Handling [Slides]

Idaho National Laboratory (INL) is developing a robotic system and digital twin to perform monitoring, inspection, and mapping of underground tank pits at the Hanford Site, operated by the U.S. Department of Energy (USDOE). The Autonomous Pit Exploration System (APES) will consist of four primary components: an electric vehicle truck with a robotic system developed by INL to deploy payloads into the tanks through small diameter preexisting risers, a robotic arm developed by Florida International University (FIU) for the purposes of deploying a variety of payloads into the tank pit environment, and a small robotic COTS crawler platform for examining the bottom of the pits.

42 - ENGINEERING↗

Nonmetallic Materials Handbook

A handbook compilation of chemical and physical property tests data obtained during qualification and receiving inspection testing of nonmetallic materials for the Viking Lander is introduced. Data cover the following materials: sealants, potting compounds, lubricants, paints and finishes, inks, films, encapsulants, elastomers, structural plastics, ablatives, adhesives, and electrical and thermal insulation. Thermochemical data showing degradation as a function of temperature, from room to 500 C, are included.

Source record↗

Voyager 0.2-lbf thruster valve assembly short pulse test report

The short pulse width testing completed on the Voyager 0.2-lbf thruster value assemblies (T/VA's) and the disassembly and inspection of T/VA S/N 020 is reported. The purpose for performing the short pulse width testing on Voyager 0.2-lbf thruster valve assemblies (T/VA's) was to determine: (1) impulse bit versus electrical pulse width; (2) impulse bit variations versus electrical pulse width; and (3) whether the short pulses decrease thruster life.

Johnson, D. R.↗

Controlling hazardous energy sources (lockout/tagout)

The minimum requirements as established by the Occupational Safety and Health Administration (OSHA) standard 29 CFR 1910.147 are discussed for preventing the unexpected operation of equipment or release of energy which could cause injury to personnel, damage to equipment, harm to the environment, or loss or compromise of test data. Safety requirements both for government and contractor personnel are explained for potentially hazardous energy sources during work operations at LeRC (Cleveland and Plum Brook Stations). Basic rules are presented to ensure protection against harmful exposures, and baseline implementation requirements are discussed from which detailed lockout/tagout procedures can be developed for individual equipment items. Examples of energy sources covered by this document include electrical, pneumatic, mechanical, chemical, cryogenic, thermal, spring tension/compression suspended or moving loads, and other potentially hazardous sources. Activities covered by this standard include, but are not limited to, construction, maintenance, installation, calibration, inspection, cleaning, or repair.

Dominguez, Manuel B.↗

Spacecraft Conceptual Design for Returning Entire Near-Earth Asteroids

In situ resource utilization (ISRU) in general, and asteroid mining in particular are ideas that have been around for a long time, and for good reason. It is clear that ultimately human exploration beyond low-Earth orbit will have to utilize the material resources available in space. Historically, the lack of sufficiently capable in-space transportation has been one of the key impediments to the harvesting of near-Earth asteroid resources. With the advent of high-power (or order 40 kW) solar electric propulsion systems, that impediment is being removed. High-power solar electric propulsion (SEP) would be enabling for the exploitation of asteroid resources. The design of a 40-kW end-of-life SEP system is presented that could rendezvous with, capture, and subsequently transport a 1,000-metric-ton near-Earth asteroid back to cislunar space. The conceptual spacecraft design was developed by the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at the Glenn Research Center in collaboration with the Keck Institute for Space Studies (KISS) team assembled to investigate the feasibility of an asteroid retrieval mission. Returning such an object to cislunar space would enable astronaut crews to inspect, sample, dissect, and ultimately determine how to extract the desired materials from the asteroid. This process could jump-start the entire ISRU industry.

asteroid retrieval↗

Surface electrical properties experiment study phase, volume 3

The reliability and quality assurance system and procedures used in developing test equipment for the Lunar Experiment projects are described. The subjects discussed include the following: (1) documentation control, (2) design review, (3) parts and materials selection, (4) material procurement, (5) inspection procedures, (6) qualification and special testing, and failure modes and effects analysis.

Source record↗

Length mode piezoelectric ultrasonic transducer for inspection of solid objects

The transducer is constructed from individual transducer elements arranged in an array and configured to exhibit a predominant, longitudinal mode transversely to the array. The elements are interconnected through thin flexible sheets. Each element is individually damped, and the transducer as a whole is electrically damped through resonance with the clamped capacitance and dissipation. Electrical control permits inphase operation of all transducer elements or control with preselected phase differences.

Thompson, R. B.↗

Advanced Photovoltaic Module Characterization: Using Image Transformers for Current–Voltage Curve Prediction From Electroluminescence Images

Individual photovoltaic (PV) module health monitoring can be a daunting task for operation and maintenance of solar farms. Modules can be inspected through luminescence, thermal imaging, and current–voltage (I–V) curve analyzes for identification of damage and power loss. I–V curves provide easily interpretable data to determine module health as they directly provide electrical performance metrics. However, in order to obtain these curves, modules must be disconnected from the array and either removed to a solar simulator or characterized in situ with corrections for module temperature, the incident solar spectrum, and intensity. Luminescence or thermal images of a module are relatively easy to acquire in situ. Electroluminescence (EL) images highlight physical defects in the modules but do not provide easily interpretable features to correlate with electrical performance. This work presents a SWin transformer network to predict I–V curves for PV modules from their corresponding EL images. The predicted I–V curves allow the accurate prediction of the maximum power point (MPP), short-circuit current I sc , and open-circuit voltage V oc with a mean error less of than 1%. Comparing single diode model (SDM) parameters extracted from the predicted curves to those extracted from the true curves, the series resistance R s demonstrates a mean error of 5.19%, and the photocurrent I a mean error of 0.197%. The shunt resistance R sh and dark current Io parameters are predicted with larger errors because of their sensitivity to small changes in the I–V curve.

Byford, Brandon K. [New Mexico State Univ., Las Cr↗