Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric Power Research Institute”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Wave Energy Converter Power Take-Off Modeling and Validation From Experimental Bench Tests

This article describes the implementation of a new numerical model of the power take-off system installed in the Monterey Bay Aquarium Research Institute wave energy converter, a device developed to provide power to various oceanic research missions. The simultaneous presence of hydraulic, pneumatic, and electrical subsystems in the power take-off system represents a significant challenge in forging an accurate model able to replicate the main dynamic characteristics of the system. The validation of the new numerical model is addressed by comparing simulations with the measurements obtained during a series of bench tests. Data from the bench tests show good agreement with the numerical model. The validated model provides deeper insights into the complex nonlinear dynamics of the power take-off system and will support further performance improvements in the future.

16 TIDAL AND WAVE POWER↗

Measurement of the phase between strong and electromagnetic amplitudes in the decay J/ψ → ϕη

The first direct measurement of the relative phase between the strong and electromagnetic amplitudes for a J/ψ decaying into a vector-pseudoscalar final state is performed using 26 energy points of e + e − annihilation data between 3.00 GeV and 3.12 GeV. The data sets were collected by the BESIII detector with a total integrated luminosity of 452 pb −1 . By investigating the interference pattern in the cross section lineshape of e + e − → ϕη, the relative phase between the strong and electromagnetic amplitudes of J/ψ decay is determined to be within [133°, 228°] at 68% confidence level.

QCD↗

Reducing Methane Emissions with an Engine Fuel Reformer

Southwest Research Institute (SwRI) designed and demonstrated a compact, plasma-based fuel reformer designed to reduce methane leaks from natural-gas engines used in pipeline compression and industrial power applications. The system uses pulsed electrical discharges to convert a small portion of methane (CH4) into hydrogen (H2) and light hydrocarbons, promoting more complete combustion and reducing unburned methane in the exhaust. The reformer was evaluated through bench-scale testing, high-flow facility testing, and engine-integration testing on representative low-speed and high-speed natural-gas engines. Measured methane-leak reductions ranged from 1 to 27 percent, depending on engine type and operating condition, while reformer energy consumption remained below one percent of total engine output. Design refinements addressed thermal and electrical challenges, resulting in reliable operation with minimal impact on engine control systems. The project achieved all performance objectives within budget and schedule, produced a patentable pulsed-power system design, and established a scalable, energy-efficient pathway for mitigating methane leaks from existing natural-gas engine infrastructure.

03 NATURAL GAS↗

Pitch Bearing Rating and Service Life Analysis

Pitch bearings are an essential component in wind turbines used to connect the blade root to the hub. They support the resulting simultaneous radial, axial, and overturning moment loads while allowing relative rotation of the blade to the hub. The most recent evidence indicates the replacement rate for pitch bearings on 3+ MW turbines can be several percent per year, reaching 10% by year 5. This is a far higher replacement rate than both older 1.5 to 2 MW turbines and 2 to 3 MW turbines, which only reach a 10% replacement rate by 14 to 24 years compared to the expected design life of at least 20 years. Typical pitch bearing replacements require the use of a large, expensive crane and removal of the blade(s) or rotor, with a significant amount of downtime. Given the most recent developments in pitch bearing reliability and the publication of the updated NREL and Fraunhofer IWES pitch bearing design guide, the purpose of this report is to update the performance and rating analysis of the example 1.9-meter diameter pitch bearing representative of that installed on a 1.5 MW wind turbine, compare the rating life to the observed service life of similar pitch bearings, and validate the service life modification factor with this large population of bearings. The report will also summarize the pitch bearing contact conditions, thereby serving as a guide for planned bench-level fretting wear tests at Argonne National Laboratory.

17 WIND ENERGY↗

Pioneer WEC concept design report

The "Pioneer WEC" project is targeted at developing a wave energy generator for the Coastal Surface Mooring (CSM) system within the Ocean Observatories Initiative (OOI) Pioneer Array. The CSM utilizes solar photovoltaic and wind generation systems, along with rechargeable batteries, to power multiple sensors on the buoy and along the mooring line. This approach provides continuous power for essential controller functions and a subset of instruments, and meets the full power demand roughly 70% of the time. Sandia has been tasked with designing a wave energy system to provide additional electrical power and bring the CSM up-time for satisfying the full-power demand to 100%. This project is a collaboration between Sandia and Woods Hole Oceanographic Institution (WHOI), along with Evergreen Innovations, Monterey Bay Aquarium Research Institute (MBARI), Eastern Carolina University (ECU), Johns Hopkins University (JHU), and the National Renewable Energy Laboratory (NREL). This report captures Phase I of an expected two phase project and presents project scoping and concept design results.

16 TIDAL AND WAVE POWER↗

Towards an open model intercomparison platform for integrated assessment models scenarios

The majority of scenarios in the IPCC database are generated by integrated assessment models (IAMs) and come from model intercomparison projects. However, the way in which the current model intercomparison projects are organized is not open to all IAM teams worldwide. Here we propose a transparent and inclusive platform that is open to anyone with an IAM regarding protocols development, scenario submissions and results evaluation. We discuss the challenges of this approach, particularly human resources and financial support. Here, we identify diversity in the level of model capability and quality of model output as possibly critical issues. Despite such challenges, the IAM community and its scientific activities can improve and benefit from the proposed platform, ultimately contributing to better climate policymaking.

IAM↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Williston Basin Carbon Ore, Rare Earths, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this task. Partners include the University of North Dakota’s Energy & Environmental Research Center, College of Engineering and Mines Research Institute, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more. This presentation will focus on the current status and results to date of the Williston Basin CORE-CM Program, with a focus on core sample characterization for REE and CM content.

Folkedahl, Bruce C.↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s Office of Fossil Energy awarded 13 CORE-CM programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and critical minerals (CMs) from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will catalyze economic growth and job creation through a coalition team of private industry, university, and state, local, and federal government entities. A coalition team of nearly 30 private industry, university, and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Williston Basin Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) Program

The U.S. Department of Energy’s (DOE’s) Office of Fossil Energy awarded 13 Carbon Ore, Rare-Earth and Critical Minerals (CORE-CM) programs as part of the CORE-CM Initiative, designed to develop the technology and upstream and midstream supply chains to extract rare-earth elements (REEs) and CMs from the nation’s coal supplies. The intent is to catalyze regional economic growth and job creation while strengthening the use of domestic resources. The Williston Basin CORE-CM Program aims to drive the expansion and transformation of coal and coal-based resource usage within the Williston Basin to produce REEs, CMs, and nonfuel carbon-based products (CBPs). The work constitutes Phase 1 of a long-term program. The objectives of Phase 1 are to identify the existing knowledge base and gaps and to develop a series of assessments/plans, including an initial basinal assessment; a characterization and data acquisition plan; a waste stream reuse plan; a basinal strategies assessment for infrastructure, industries, and business; a technology assessment, development, and field-testing plan; a technology innovation center plan(s); and a stakeholder outreach and education plan. Originally, the CORE-CM programs were to do little if any sample collection as part of the Phase 1 program. As part of the ongoing interactions with DOE regarding the progress of the 13 CORE-CM programs, DOE has decided to extend Phase 1 with additional funding to allow all of the Phase 1 CORE-CM programs to collect and characterize more samples that have potential to be sources of REEs and CMs. The goal of this project is to initiate the development of a new industry in the resource-rich Williston Basin that will generate economic growth and job creation through a coalition team of private industry; university; and state, local, and federal government entities. A coalition team of nearly 30 private industry; university; and state, local, and federal government partners was formed for this program. Partners include the University of North Dakota Energy & Environmental Research Center, Institute for Energy Studies, and Nistler College; North Dakota State University; Montana Tech University; Pacific Northwest National Laboratory; Critical Materials Institute; North Dakota Geological Survey; South Dakota Geological Survey; U.S. Geological Survey; North American Coal Corporation; BNI Energy; Basin Electric Power Cooperative; Minnkota Power Cooperative; and many more.

Kay, John P.↗

Clear Sky Toolkit: Decision Support User Guide

The Clear Sky Decision Support Template is a Microsoft Excel-based resource that enables users to screen and prioritize critical facilities for the addition of solar + storage. The Decision Support Template consolidates and streamlines the most relevant resources from the emergency management discipline, the electric utility sector, and national energy research institutions to assist in further site analysis and decision-making. The Decision Support Template is intended for use by local government and private sector decision-makers who aim to mitigate the effects of power outages on critical infrastructure, understand the potential for deploying photovoltaic (PV) and storage solutions on critical facilities, and align emergency management planning processes and utility needs with community resilience objectives. The Decision Support Template is divided into five modules that provide a structured, step-by-step approach users can follow and apply to unique circumstances. This process guides a more thorough and accurate assessment of a site's potential to accommodate a solar + storage system, provide grid benefits to utilities, and support community resilience and disaster mitigation for the broader region. After identifying potentially viable and preferred sites for solar + storage using the Decision Support Template, users should conduct a more detailed evaluation and consultation with a solar professional.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Accelerating Transitions to Zero Carbon Power Systems

As power systems evolve, becoming increasingly renewable, distributed, dynamic, and digital, managing them becomes ever more challenging and complex. System operators serve as the "air traffic controllers" for electricity grids, working to balance supply and demand, manage evolving electricity markets, and ensure the safety and reliability of electricity systems. To adapt to the rapidly changing energy landscape and support the transition to modern, zero carbon power systems, system operators must develop and adopt new technologies, approaches, and frameworks. The Global Power System Transformation (G-PST) Consortium is a network of system operators, research institutions, and industry partners working to accelerate and scale the technical solutions required to transform our world's power systems. By developing and sharing robust models and tools, research and demonstration results, knowledge, and innovation, the G-PST Consortium is empowering system operators to transition to 100% renewable energy while ensuring the reliability, safety, and cost-effectiveness of grid operations.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Consolidated Hydropower Data Repository: Value and Opportunities

Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.

13 HYDRO ENERGY↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Highly Integrated WBG Power Module for Next Generation Plug-In Vehicles

Current inverter technologies used in electric vehicles (EVs) are bulky, heavy, and expensive. The performance of the inverter is also limited by the traditional Si-based semiconductor and packaging technology. These constraints are responsible for extra weight and volume in the vehicle that reduces the driving range along with usable space within the vehicle. Moreover, operating temperature restrictions, and boundaries on the inverter location within the vehicle drastically reduces the inverter performance. Thus an improved inverter design is required for next generation electric vehicles. The objective of this project was to research, develop and demonstrate a highly integrated WBG power module targeting the next generation of plugin hybrid electric vehicles (PHEVs). This power module needed to be functionally and mechanically optimized for General Motors (GM) traction inverter architecture. General Motors was the prime contractor, led the project, and oversaw the design, build, and test of the integrated power module. Virginia Polytechnic Institute and State University (VT) performed modeling and simulation tasks as well as power module design support. Monolith Semiconductor, Inc provided SiC dies and consulted on devices for the inverter. Oak Ridge National Laboratory (ORNL) performed power module technology evaluations, design evaluations of interconnect options, and performed material analysis and cross-sectioning of die activities.

33 ADVANCED PROPULSION SYSTEMS↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Grid-Scale Electricity Storage at Lowest Possible Cost Enabled by Pumped Heat Electricity Storage (Final Report)

Grid-scale energy storage technologies that can provide greater than 10 hours of electricity at full power address a critical need for full penetration of renewables on electricity grids worldwide, minimize renewable curtailment, and maximize grid security and reliability. Pumped Heat Energy Storage (PHES) systems can store energy thermally in any location at the low costs necessary for displacing fossil fuels, reducing foreign fuel imports, and reducing emissions to maintain the energy security of the United States. The award allowed Southwest Research Institute® (SwRI®) and Malta, Inc. (Malta) to advance the PHES concept to a proof-of-concept demonstration for a kW-scale system. The project focused on system operation and integration. The main project objectives were: 1. Address first implementation challenges 2. Explore system control strategies and operation 3. Translate lessons learned to the full-scale system Through these objectives the project completes a first demonstration of this technology and reduces the technical risk associated with a full-scale system.

25 ENERGY STORAGE↗

Analysis on Evaluations of Monterey Bay Aquarium Research Institute’s Wave Energy Converter’s Field Data Using WEC-Sim and Gazebo: A Simulation Tool Comparison

Although many studies have validated wave energy converter (WEC) numerical models against scaled prototype experimental data, there remains a notable lack of validation using data from full-scale deployed WECs. This paper compares two numerical models of Monterey Bay Aquarium Research Institute’s Wave Energy Converter (MBARI-WEC), a two-body point absorber with an electro-hydraulic power take-off system (PTO). The models are implemented in WEC-Sim/Simscape and Gazebo Simulator. A statistical analysis of the models was performed, and field results were obtained to compare the models’ accuracy in predicting the RMS piston velocity, RMS motor speed, and mean electric power compared to field data for 56 observations across varying sea states. The Gazebo model demonstrated a closer agreement across all three parameters for a majority of the observations. When compared to the field data, the Gazebo and WEC-Sim models exhibited average mean electric power overestimations of 13% and 22%, respectively.

16 TIDAL AND WAVE POWER↗