Search NASA⌕ Search

SEARCH · Search NASA

Results for “FNAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Latest Results from the ICARUS Experiment at the SBN Program

The ICARUS Collaboration is now entering its fifth year of continuing operations of the 760-ton liquid argon T600 detector. The T600 was overhauled at CERN after operations at the LNGS underground laboratory in Italy and moved to its present location at FNAL - as part of the Short-Baseline Neutrino (SBN) program - where it successfully completed its commissioning phase in June 2022. At FNAL ICARUS collects neutrino interactions from both the Booster Neutrino Beam (BNB) and off-axis from the Main Injector Neutrino beam (NuMI). To date, ICARUS has accumulated approximately $7.5\cdot 10^20$ protons on target (POT) with the BNB and about $6.2\cdot 10^20$ POT with NuMI. Within the SBN program ICARUS will search for evidence of short-baseline oscillations, potentially explained by eV-scale sterile neutrinos, jointly with the Short-Baseline Near Detector (SBND). In addition, ICARUS is performing stand-along oscillation searches in disappearance mode and measuring neutrino cross sections on argon with both the BNB and NuMI beams. It is also performing searches for additional Beyond the Standard Model signatures. Preliminary results from the ICARUS experiment, using data from the BNB and NuMI neutrino beams, will be presented.

Ricci, Alessandro Maria [U. Pisa (main); INFN, Pis↗

DUSEL-related Science at LBNL -- Program and Opportunities

The National Science Foundation is advancing the design of a Deep Underground Science and Engineering Laboratory (DUSEL) at the former Homestake mine in South Dakota. UC Berkeley and LBNL are leading the design effort for the facility and coordinating the definition and integration of the suite of experiments to be coupled to the facility design in the creation of an MREFC (Major Research Equipment and Facility Construction) proposal. The State of South Dakota has marshaled $120M to prepare the site and begin a modest science program at the 4850 ft level. The first physics experiment is anticipated to begin installation in 2009. The current timetable calls for the MREFC Preliminary Design to be assembled by 2010 to be presented to the National Science Board in 2011. This, in turn, indicates that the earliest DUSEL construction start would be FY2013. The MREFC is estimated (before the inclusion of the long baseline neutrino components) at $500--600M, roughly divided evenly between the experimental program and support for the facility. Construction was estimated at 6--8 years. The DOE and NSF are establishing a Joint Oversight Group (JOG) to coordinate the experimental programs and participation in DUSEL. It is anticipated that the JOG would mirror the similar function for the NSF and DOE participation in the LHC, and that DOE-HEP, DOE-NP, and NSF will all participate in the JOG. In parallel with the NSF efforts, DOE-HEP plans to develop a long baseline neutrino program with neutrino beams created at FNAL and aimed at DUSEL. In the P5 report the focus of the program is to pursue CP violation in the lepton sector. The same detectors can also be used for nucleon decay experiments. DOE has indicated that FNAL would be the ''lead lab'' for the long baseline neutrino program and be charged with designing and implementing the neutrino beamline. BNL is to be charged with designing and implementing the detector. The P5 report also emphasizes the importance of dark matter and neutrinoless double beta decay searches. The Nuclear Physics Long Range Plan strongly endorses DUSEL and the associated nuclear physics programs. It mentions, in particular, neutrinoless double beta decay, and accelerator-based nuclear astrophysics measurements as key elements of the DUSEL nuclear physics experimental program. There are numerous fundamental scientific questions that experiments which can naturally be sited at DUSEL can address. LBNL has a long tradition and track record of successful experiments in all of these areas: neutrino physics, dark matter searches, and nuclear astrophysics. Clearly, DUSEL presents many scientific opportunities, and the committee was charged to present a roadmap for LBNL participation, the impact that LBNL is likely to have on experiments at the present level of effort, the value of additional manpower, and opportunities for synergistic Detector R&D activities. The Berkeley community is already deeply involved in a number of experiments and/or proposals, shown in Table 1, that will be relevant to science at DUSEL. The approximate time lines for all projects considered in this report are shown in Table 2. For the DUSEL-related experiments the depth at which they would be located is also shown. Section 2 of this report deals with nuclear astrophysics. Section 3 discusses neutrinoless double beta decays. Section 4 focuses on neutrino oscillations, including the search for CP violation and proton decay. Section 5 deals with dark matter searches. In each section we give a brief overview of that field, review the present Berkeley efforts, and discuss the opportunities going into the future. Section 6 contains our recommendations.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A search for sterile neutrinos at the MINOS experiment

MINOS is a long baseline neutrino oscillation experiment based at the Fermi National Accelerator Laboratory in Illinois, USA. The experiment was designed to study neutrino oscillation phenomena. The v μ beam produced by the NuMI beam facility at FNAL is used along with two functionally identical detectors. The Near Detector at FNAL and a Far Detector 735 km away in the Soudan Underground Laboratory in northern Minnesota. Comparison of the observed spectra of neutrinos at the two detectors provides the evidence for neutrino oscillations. This thesis presents work on the postulated phenomena of sterile neutrinos. Oscillations between active and sterile neutrinos will lead to a deficit in the expected rate of measured Neutral Current interactions at the Far Detector. A technique for selecting Neutral Current events utilizing an Artificial Neural Network is presented with resulting overall efficiency of 91.1% and purity of 66.0%. A method of predicting the expected Charged and Neutral Current energy spectra at the Far Detector given the data recorded at the Near Detector is presented. A model to search for oscillations between sterile and active neutrinos is developed. Sources of systematic uncertainty that can effect the results of the analysis are discussed. The analysis developed is applied to a Standard Model 3 flavour oscillation model as a cross check under the scenarios with and without v e appearance. The oscillation parameters measured by this model are Δm 32 2 = (2.39 -0.15 +0.23 ) x 10 -3 eV 2 and θ 23 = 0.727 -0.11 +0.22 for the no v e appearance result. An analysis of the resulting prediction reveals no evidence for active neutrino disappearance. The analysis is then performed using the 4 flavour neutrino oscillation model developed. Again this is done under the 2 scenarios of v e appearance and no v e appearance. The results of this analysis are Δm 31 2 = 2.44 -0.14 +0.23 x 10 -3 eV 2 , θ 23 = 0.755 -0.12 +0.19 and θ 34 = 0.00 +0.35 for no v e appearance and Δm 31 2 = (2.46 -0.14 +0.21 ) x 10 -3 eV 2 , θ 23 = 0.849 -0.19 +0.12 and θ 34 = 0.00 +0.60 for v e appearance. This is consistent with no oscillations between active and sterile neutrinos.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Shielding experiments by the JASMIN Collaboration at Fermilab (II) - radioactivity measurement induced by secondary particles from the anti-proton production target

The JASMIN Collaboration has performed an experiment to conduct measurements of nuclear reaction rates around the anti-proton production (Pbar) target at the Fermi National Accelerator Laboratory (FNAL). At the Pbar target station, the target, consisting of an Inconel 600 cylinder, was irradiated by a 120 GeV/c proton beam from the FNAL Main Injector. The beam intensity was 3.6 x 10 12 protons per second. The samples of Al, Nb, Cu, and Au were placed near the target to investigate the spatial and energy distribution of secondary particles emitted from it. After irradiation, the induced activities of the samples were measured by studying their gamma ray spectra using HPGe detectors. The production rates of 30 nuclides induced in Al, Nb, Cu, Au samples were obtained. These rates increase for samples placed in a forward (small angle) position relative to the target. The angular dependence of these reaction rates becomes larger for increasing threshold energy. These experimental results are compared with Monte Carlo calculations. The calculated results generally agree with the experimental results to within a factor of 2 to 3.

36 MATERIALS SCIENCE↗

European Contributions to Fermilab Accelerator Upgrades and Facilities for the DUNE Experiment

The Proton Improvement Plan (PIP-II) to the FNAL accelerator chain and the Long-Baseline Neutrino Facility (LBNF) will provide the world's most intense neutrino beam to the Deep Underground Neutrino Experiment (DUNE) enabling a wide-ranging physics program. This document outlines the significant contributions made by European national laboratories and institutes towards realizing the first phase of the project with a 1.2 MW neutrino beam. Construction of this first phase is well underway. For DUNE Phase II, this will be closely followed by an upgrade of the beam power to > 2 MW, for which the European groups again have a key role and which will require the continued support of the European community for machine aspects of neutrino physics. Beyond the neutrino beam aspects, LBNF is also responsible for providing unique infrastructure to install and operate the DUNE neutrino detectors at FNAL and at the Sanford Underground Research Facility (SURF). The cryostats for the first two Liquid Argon Time Projection Chamber detector modules at SURF, a contribution of CERN to LBNF, are central to the success of the ongoing execution of DUNE Phase I. Likewise, successful and timely procurement of cryostats for two additional detector modules at SURF will be critical to the success of DUNE Phase II and the overall physics program. The DUNE Collaboration is submitting four main contributions to the 2026 Update of the European Strategy for Particle Physics process. This paper is being submitted to the 'Accelerator technologies' and 'Projects and Large Experiments' streams. Additional inputs related to the DUNE science program, DUNE detector technologies and R&D, and DUNE software and computing, are also being submitted to other streams.

43 PARTICLE ACCELERATORS↗

Shielding experiments by the JASMIN collaboration at Fermilab (II) - Radioactivity measurement induced by secondary particles from the anti-proton production target

The JASMIN Collaboration has performed an experiment to conduct measurements of nuclear reaction rates around the anti-proton production (Pbar) target at the Fermi National Accelerator Laboratory (FNAL). At the Pbar target station, the target, consisting an Inconel 600 cylinder, was irradiated by a 120 GeV/c proton beam from the FNAL Main Injector. The beam intensity was 3.6 x 10{sub 12} protons per second. Samples of Al, Nb, Cu, and Au were placed near the target to investigate the spatial and energy distribution of secondary particles emitted from it. After irradiation, the induced activities of the samples were measured by studying their gamma ray spectra using HPGe detectors. The production rates of 30 nuclides induced in Al, Nb, Cu, Au samples were obtained. These rates increase for samples placed in a forward (small angle) position relative to the target. The angular dependence of these reaction rates becomes larger for increasing threshold energy. These experimental results are compared with Monte Carlo calculations. The calculated results generally agree with the experimental results to within a factor of 2 to 3.

43 PARTICLE ACCELERATORS↗

Status of the mechanical design of the 650 MHz cavities for Project X

In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

43 PARTICLE ACCELERATORS↗

OPTIMIZING CENTRIFUGAL BARREL POLISHING FOR MIRROR FINISH SRF CAVITY AND RF TESTS AT JEFFERSON LAB

We performed Centrifugal Barrel Polishing (CBP) on a 1.3 GHz fine grain TESLA single cell cavity and 1.5 GHz fine grain CEBAF high gradient superconducting radio frequency (SRF) single cell cavity following a modified recipe originally developed at Fermi National Accelerator Lab (FNAL). We were able to obtain a mirror like surface similar to that obtained at FNAL, while reducing the number of CBP steps and total processing time. This paper will discuss the change in surface and subsequent cavity performance post CBP, after a 800 C bake (no pre-bake chemistry) and minimal controlled electro-polishing (10 micron). In addition to Q vs. E{sub ACC} thermometry mapping with preheating characteristics and optical inspection of the cavity after CBP will also be shown.

43 PARTICLE ACCELERATORS↗

Project X RFQ EM Design

Project X is a proposed multi-MW proton facility at Fermi National Accelerator Laboratory (FNAL). The Project X front-end would consist of an H- ion source, a low-energy beam transport (LEBT), a CW 162.5 MHz radio-frequency quadrupole (RFQ) accelerator, and a medium-energy beam transport (MEBT). Lawrence Berkeley National Laboratory (LBNL) and FNAL collaboration is currently developing the designs for various components in the Project X front end. This paper reports the detailed EM design of the CW 162.5 MHz RFQ that provides bunching of the 1-10 mA H- beam with acceleration from 30 keV to 2.1 MeV.

43 PARTICLE ACCELERATORS↗

Quench Performance of the First Twin-aperture 11 T Dipole for LHC upgrades

FNAL and CERN are developing a twin-aperture 11 T $Nb_{3}Sn$ dipole suitable for installation in the LHC. A single-aperture 2-m long dipole demonstrator and two 1-m long dipole models have been fabricated and tested at FNAL in 2012-2014. The two 1 m long collared coils were then assembled into the first twin-aperture $Nb_{3}Sn$ demonstrator dipole and tested. Test results of this twin-aperture $Nb_{3}Sn$ dipole model are reported and discussed.

Zlobin, A. V.↗

Operation of an SRF Cavity Tuner Submerged into Liquid Helium

There are several projects is going at FNAL that required to tune bare (undressed) SRF cavities when they sub-merged into superfluid Helium. We have used LCLS II tuner [1] mounted on the special mechanical structure to tune single cell 1.3 GHz cavity. To precisely control the resonance of 1.3GHz SRF cavi-ties during testing at the FNAL’s Vertical Test Facility, we install for the first time a double lever tuner and operate it when submerged into the liquid He bath. Both active com-ponents of the tuner: electromechanical actuator (stepper motor) and piezo-actuators are operated inside superfluid helium. Accuracy in controlling the SRF cavity resonance frequency will be presented. Specifics of the tuner opera-tion when submerged into liquid He will be discussed.

43 PARTICLE ACCELERATORS↗

Striped Data Analysis Framework

Traditionally, High Energy data analysis is based on the model where data are stored in files and analyzed by running multiple analysis processes, each reading one or more of the data files. This process involves repeated data reduction step, which produces smaller files, which is time consuming and leads to data duplication. We propose an alternative approach to data storage and analysis, based on the Big Data technologies. The idea is to store each element of data once and only once in a distributed scalable database and analyze data by reading only "interesting" pieces of data from the database. To make this approach possible, we developed columnar Striped Data Representation Format as the basis of the framework. Traditional columnar approach allows for efficient analysis of complex data structures. While keeping all the benefits of columnar data representation, striped mechanism goes further by enabling efficient parallelization of computations and flexible dist ribution of data analysis. The framework includes scalable and elastic data storage, compute and user analysis backend components. The framework uses off-the shelf web services and data caching technologies as the compute/data co-location mechanism. Flexible architecture allows the framework run in the cloud using container technologies. The framework offers Python/Jupyter as the user analysis backend platform, but can also run in command line or batch mode. In the article, we will present the results of the FNAL-LDRD-2016-032 FNAL LDRD project, the design, implementation, features and performance characteristics of the Striped Data Analysis Framework.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, Frank↗

LCLS-II SRF Cavity Processing Protocol Development and Baseline Cavity Performance Demonstration

The ”Linac Coherent Light Source-II” Project will construct a 4 GeV CW superconducting RF linac in the first kilometer of the existing SLAC linac tunnel. The baseline design calls for 280 1.3 GHz nine-cell cavities with an average intrinsic quality factor Q0 of 2.7·1010 at 2K and 16 MV/m accelerating gradient. The LCLS-II high Q0 cavity treatment protocol utilizes the reduction in BCS surface resistance by nitrogen doping of the RF surface layer, which was discovered originally at FNAL. Cornell University, FNAL, and TJNAF conducted a joint high Q0 R&D program with the goal of (a) exploring the robustness of the N-doping technique and establishing the LCLS-II cavity high Q0 processing protocol suitable for production use, and (b) demonstrating that this process can reliably achieve LCLS-II cavity specification in a production acceptance testing setting. In this paper we describe the LCLS-II cavity protocol and analyze combined cavity performance data from both vertical and horizontal testing at the three partner labs, which clearly shows that LCLS-II specifications were met, and thus demonstrates readiness for LCLS-II cavity production.

Liepe, M.↗

Improvements for LCLS-II Cryomodule Transportation

The Linear Coherent Light Source (LCLS-II) is currently being constructed at the SLAC National Laboratory. A total of 35 cryomodules will be fabricated at Jefferson Lab (JLab) in Virginia and Fermi National Laboratory (FNAL) in Illinois and transported via road to SLAC. A shipping frame with an inner bed isolated by springs was designed to protect the CMs from shocks and vibrations during shipments. Successful road testing of the JLab prototype paved the way for production CM shipments. The initial production shipments lead to several catastrophic failures in beamline vacuum in the cryomodules. The failures were determined to be due to fatigue in Fundamental Power Coupler (FPC) bellows due to excessive motion during shipment. A series of instrumented CM shipping tests and component tests were undertaken to develop a solution. A modified spring layout was tested and implemented, which reduced shocks on the CMs. FPC coupler bellows restraints were tested on a shaker table and on a CM during shipping; they were able to reduce bellows motion by a factor of three. The updated shipping system is currently in use and has successfully delivered six cryomodules to SLAC from JLab and FNAL.

Huque, N. A.↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, F.↗

Construction of the S1-Global Cryomodules for ILC

In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1] is a cryomodule being constructed by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1- Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules started in January 2010, and was just completed in May. In this paper, construction experience of the S1-Global cryomodule is presented.

43 PARTICLE ACCELERATORS↗

Implementation of H - Intrabeam Stripping into TRACK

H - intrabeam stripping has been presented in Reference [1] as potentially harmful to MW scale H - linacs. If not taken properly into account, intrabeam stripping of the H - beam could lead to losses in excess of the 1 W/m limit and result in non-tolerable beamline elements activation. This paper describes the implementation of the H - intrabeam stripping effect into the beam dynamics code TRACK [2]. Simulation results and numerical applications are presented for the FNAL 3 GeV CW linac, the FNAL 8 GeV Pulsed linac and for the SNS 1 GeV linac.

43 PARTICLE ACCELERATORS↗