Search NASA⌕ Search

SEARCH · Search NASA

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

AI-Enhanced Co-Design for Next-Generation Microelectronics: Innovating Innovation (Workshop Report)

The Artificial Intelligence Enhanced Co-Design for Next Generation Microelectronics virtual workshop was held April 4-5, 2023, and attended by subject matter experts from universities, industry, and national laboratories. This was the third in a series of workshops to motivate the research community to identify and address major challenges facing microelectronics research and production. The 2023 workshop focused on a set of topics from materials to computing algorithms, and included discussions on relevant federal legislation and such as the Creating Helpful Incentives to Produce Semiconductors and Science Act (CHIPS Act) which was signed into law in the summer of 2022. Talks at the workshop included edge computing in radiation environments, new materials for neuromorphic computing, advanced packaging for microelectronics, and new AI techniques. We also received project updates from several of the Department of Energy (DOE) microelectronics co-design projects funded in the fall of 2021, and from three of the Energy Frontier Research Centers (EFRCs) that had been funded in the fall of 2022. The workshop also conducted a set of breakout discussions around the five principal research directions (PRDs) from the 2018 Department of Energy workshop report: 1) define innovative material, device, and architecture requirements driven by applications, algorithms, and software; 2) revolutionize memory and data storage; 3) re-imagine information flow unconstrained by interconnects; 4) redefine computing by leveraging unexploited physical phenomena; 5) reinvent the electricity grid through new materials, devices, and architectures. We tasked each breakout group to consider one primary PRD (and other PRDs as relevant topics arose during discussions) and to address questions such as whether the research community has embraced co-design as a methodology and whether new developments at any level of innovation from materials to programming models requires the research community to reevaluate the PRDs developed back in 2018.

97 MATHEMATICS AND COMPUTING↗

Test Report for the Regulatory Testing of the Welded Isotek-SFC-W-3 Special Form Capsule

Two prototypes the welded ISOTEK-SFC-W-3 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the two welded ISOTEK-SFC-W-3 capsules. The test units were designated as TU-1 and TU-2. TU-1 was subjected to leak testing, percussion testing, and impact testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test on TU-1 was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). TU-2 was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in American National Standards Institute (ANSI) N14.5-2014. The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Proposed Classifications of Remote Operations for Nuclear Reactors Based on Physical and Cybersecurity Considerations

The incorporation of remote operations into reactor operations is a topic of high interest among advanced and small modular reactor (A/SMR) vendors, with some considering it essential to the success of their business models. However, remote operations are a concept novel to the nuclear industry. While various technical aspects of remote operations have been explored, a significant gap remains in understanding the security implications of integrating remote operations into reactor designs, particularly concerning the security requirements for remote-operations facilities and infrastructure. This report aims to address this gap by first defining classes of remote operation based on the extent of remote access to reactor control systems and grounded in the existing regulatory framework with compatible terminology. Secondly, the report outlines the physical and cybersecurity requirements applicable to remote-operations facilities and infrastructure at each defined class. These requirements are based on existing licensing frameworks provided by 10 Code of Federal Regulations (CFR) Part 50 and 10 CFR Part 52, as well as the upcoming A/SMR licensing framework in the proposed Part 53. The assessment focuses specifically on security regulations, such as 10 CFR Part 73, which includes provisions for both cybersecurity (§ 73.54) and physical security (§ 73.55). This report proposes five classes of remote reactor operations. Class 1 involves remote monitoring only, with no control over reactor systems. Class 2 allows for the remote issuance of allowlisted commands to the reactor facility. Class 3 extends control to non-safety-significant, non-safety-related, or not important to safety systems and equipment. Class 4 permits remote control of safety-significant systems. Finally, Class 5 allows remote control of safety-related systems. It is important to note that these classes were defined purely with functionality in mind, without considering the practicality or feasibility of implementation for each class under current or upcoming regulatory guidance. The intention behind this approach is to enable an assessment of which security requirements apply to each class, allowing readers to evaluate the implementation possibilities for their specific use cases. Following the definition of remote-operation classes, the report assesses the specific physical and cybersecurity requirements applicable to the remote-operations facility and infrastructure within each defined class. This includes defining the types and locations of operators that are possible at each class of operation and, based on operator type and location, as well as functionality within each class, outlining the physical and cybersecurity requirements. By detailing the security requirements by class, the report provides readers with the information needed to determine the type of security program they may need to implement for their desired concept of operation. The next contribution of this report was to assess the practicality of implementing each proposed class of remote operations based upon the security requirement assessment. In short, three of the five proposed remote-operation classes were found to possibly have a practical path forward to implementation under the U.S. regulatory framework. Class 1 remote operations are currently in use in the U.S. while Class 2 and 3 remote operations may be logistically possible to implement under the U.S. regulatory framework. The final two Classes, 4 and 5, would likely be logistically difficult, if not infeasible to implement within the current U.S. physical- and cybersecurity regulatory framework. Given the results of the feasibility assessment, an example architecture is proposed for both Class 2, remote allowlisted commands, and Class 3, remote control of non-safety systems as well as security implication assessments of each architecture. These example implementations are not meant to be prescriptive in terms of how Class 2 or Class 3 remote operations should be deployed; instead, they are intended to be informative to stakeholders on how Class 2 or Class 3 could potentially be applied in order to inform their system design. An example architecture for Class 1 remote monitoring was not provided as Class 1 in already in use in U.S. nuclear operations. Example architectures for Class 4 and Class 5 were not provided due to their assessment of being likely infeasible to implement. The final contribution is an assessment of the physical- and cybersecurity implications of introducing autonomous operations into an A/SMR. What was found was that the security implications can be separated into two cases. Autonomous operations supported by SSCs located only at the reactor site, and autonomous operations supported by SSCs outside of the reactor site. For the first case, the introduction of autonomous systems will likely not change the facility’s requirement to comply with existing cyber and physical security regulation

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Paths to superheavy nuclei

This document summarizes the discussions and outcomes of the Facility for Rare Isotope Beams (FRIB) Theory Alliance topical program ‘The path to Superheavy Isotopes’ held in June 2024 at FRIB. Its content is non-exhaustive, reflecting topics chosen and discussed by the participants. The program aimed to assess the current status of theory in superheavy nuclei (SHN) research and identify necessary theoretical developments to guide experimental programs and determine fruitful production mechanisms. This report details the intersection of SHN research with other fields, provides an overview of production mechanisms and theoretical models, discusses future needs in theory and experiment, explores other potential avenues for SHN synthesis, and highlights the importance of building a strong theory community in this area.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Selection Algorithm for electron neutrino charged current interactions in SBND

The Short Baseline Neutrino (SBN) program at Fermilab is a joint proposal by three experimental collaborations primarily for the investigation of the cause behind the low-energy electron-like event excess observed by the MiniBoone experiment. This dissertation focuses on the near detector of the project, named the Short Baseline Near Detector (SBND), a Liquid Argon Time Projection Chamber apparatus which will conduct searches for sterile neutrinos in the mass range of 1 ${eV}^2/{c}^4$, as well as provide cross-section measurements for neutrino interactions in argon and perform other beyond the standard model studies.\\ \indent As is the case for all detectors in the program, the SBND will use the Booster Neutrino Beam as its source, which will provide it with both muon and electron neutrinos. Given that the ability to discern between the neutrino flavors will be crucial to the fulfillment of the detector's physics goals, the objective of this work is to provide the collaboration with a tool capable of doing so. As such, we here present the development process for an inclusive selection algorithm for the identification of electron neutrino charged current (CC) events regardless of their interaction channel. This is done through a combination of traditional techniques, such as the implementation of cuts on the reconstructed interaction properties, with the use of the Convolutional Visual Network, a machine learning algorithm capable of classifying particle interactions through the analysis of the topology of their final states. With this approach, we have developed a selection process that is capable of identifying $\nu_e$ CC interactions across a wide range of topologies with 34.4\% efficiency, as well as a purity of 91.2\%, making it especially promising for use in cross section studies.

Freire, Hector Moya [ABC Federal U.] (ORCID:000900↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Apomixis in Farmers’ Fields: Overview, Case Studies from Forage Grasses and Considerations for Future Apomictic Crops

Apomixis occurs naturally in several commercially important species from diverse plant families. While in some of these species apomixis is yet to be exploited in breeding schemes aimed at fixing heterosis, genetic progress and cultivar development, in other species apomixis has been integrated at different stages of breeding. Some of the most relevant examples come from the subfamily Panicoideae, the second largest subfamily of the Poaceae, and are the main focus of this review. The subfamily encompasses many tropical and sub-tropical grasses and grains of worldwide economic importance. Apomictic tropical forages are prime examples of how apomixis can be used and exploited in the development of marketable cultivars, which are essential to the meat and milk production industries globally. The main commercial forages used as grass pastures covering millions of hectares in tropical and sub-tropical regions are polyploids exhibiting gametophytic apomixis that belong to the genus Urochloa spp. (brachiariagrasses) and to the species Megathyrsus maximus (guineagrass). Buffel grass (Cenchrus ciliaris) and Paspalum spp. are other important apomictic forages bred and used in these regions. Breeding involves large germplasm collections from the centers of origin of the species, and for most of them, sexually reproducing diploid plants have been found. Chromosomically duplicated plants that maintain sexual reproduction are used in crosses with apomictic genotypes for the development and selection of cultivars to be marketed or used as progenitors in subsequent breeding cycles. The peculiarities of each genus/species breeding programs, the cultivars obtained from these programs, and the impact of use of marker assisted selection in cultivar development are presented. In addition, the test or implementation of new technologies such as high throughput phenotyping, and the use of machine learning methods for trait prediction and genomic selection are positively impacting the selection and speed of development of new polyploid apomictic cultivars. Furthermore, genetic transformation techniques, including genome editing, provide an additional layer for design of tailor-made, customer-oriented cultivars.

Cenchrus↗

DOE Repository Metadata Profile (DRMP): A Metadata Framework for Advancing Interoperability and AI Readiness Across Scientific Repositories

The Department of Energy (DOE) funds a diverse and distributed ecosystem of repositories that steward scientific data, publications, and software across its research programs, user facilities, and national laboratories. While significant progress has been made in standardizing dataset-level metadata, the metadata describing repositories themselves (their identity, governance, access interfaces, policies, and technical capabilities) remains inconsistent and fragmented across DOE-funded systems. This variability limits discoverability, interoperability, automated validation, and AI-driven analysis, all of which are increasingly essential for modern scientific workflows. To address this gap, the DOE Data Curation Working Group (DCWG) developed the DOE Repository Metadata Profile (DRMP). The DRMP is a practical, community-driven framework that defines how repositories can describe themselves in a consistent, machine-actionable, and scalable manner. The DRMP is not a new metadata schema. Instead, it is a mapping profile and structured element set capturing the essential characteristics of DOE repositories. It harmonizes repository-level metadata across six widely adopted community schemas: RE3Data; DCAT-US v3; Schema.org; Dublin Core; DataCite 4.6; and PREMIS 3.0. This harmonization eliminates reinvention and enables interoperability within DOE and across the broader scientific ecosystem. A core objective of the DRMP is to reduce burden on repositories by allowing them to reuse their existing metadata through a Rosetta-style crosswalk rather than redesigning local implementations. The profile introduces a three-level conformance model that supports incremental adoption: • Level 1 – Minimum Viable Record (MVR): foundational identification elements required for workflows, project registration, and basic repository presence. • Level 2 – Interoperable: structured metadata enabling alignment with national and international discovery systems. • Level 3 – AI-Ready: enhanced provenance, policy transparency, fixity, semantic context, and capabilities that support automated reasoning, model training governance, and machine-assisted curation. To support implementation, the DRMP includes JSON Schema definitions, OpenAPI patterns, and MCP templates that allow repositories to publish machine-readable metadata directly within existing platforms. These resources are modular and lightweight, enabling adoption without major architectural change. Adopting the DRMP enables repositories to: • Enhance discoverability and interoperability by aligning identifiers, classifications, and descriptive elements across widely used schema standards. • Support federated discovery and cross-registration across DOE systems, Data.gov, and international catalogs. • Enable AI agents and workflow orchestration systems to interpret repository-level metadata within the American Science Cloud (AmSC) through Model Context Protocol (MCP)-based context publication. • Demonstrate alignment with DOE’s open science, stewardship, and FAIR data priorities. This guidance represents a community-driven step forward. Through voluntary adoption and continued feedback, the DRMP advances a cohesive, machine-actionable description of DOE repositories that supports FAIR data practices, preparing the infrastructure for AI-enabled research, and strengthening the discoverability and reuse of DOE’s scientific outputs.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The BigBite Calorimeter for the Super Bigbite Spectrometer Program at Jefferson Lab

Here, we report features of the design, construction, installation, and performance of the BigBite Calorimeter (BBCal), a lead-glass electromagnetic calorimeter constructed as part of the BigBite Spectrometer (BBS), which served as the electron arm for the Super Bigbite Spectrometer (SBS) program of high-precision neutron electromagnetic form factor measurements in Hall A at Jefferson Lab. As a total-absorption calorimeter, BBCal provided the primary electron trigger for BBS, detecting quasi-elastically scattered electrons in the 1–4 GeV energy range with an energy resolution of approximately 6.2%, position resolution of 1.2 cm, and timing resolution of 0.5 ns.

BBCal↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Field Validation of MVA Technology for Offshore CCS: Novel Ultra-High-Resolution 3D Marine Seismic Technology (P-Cable) (Final Report)

The objectives of the proposed study were to deploy and validate a specific monitoring technology, high-resolution 3D marine seismic (HR3D), appropriate for large-demonstration and commercial-scale offshore CCS sites. The project accomplished successful acquisition two HR3D seismic surveys. The first HR3D dataset was over the offshore injection site of the Tomakomai, Japan integrated pilot CCS project, which at the time of survey acquisition was actively injecting CO 2 . The first survey also represented a successful international collaboration between the DOE NETL program and Japan’s national CCS program and was the first successful acquisition and use of HR3D over an active CO 2 injection site (Meckel, Feng et al. 2019). The Tomakomai HR3D survey successfully tested a novel 4-streamer HR3D system array in which, for the first time, no cross-cable (aka “P-Cable”) was utilized and only four GeoEel streamers were used instead of the standard 12-streamer configuration. Consequently, this was not, strictly speaking, a deployment of the “P-Cable” system of (Planke and Berndt 2004) but rather a modified version, thereof, and it is the first known demonstration of the modified system configuration. One very positive outcome from the Japanese collaboration earlier in the project was the ability to learn from the Japanese how they used tail buoys with GPS to determine the position of the seismic source and receivers in time and space. Based on that experience, GCCC designed and built six GPS receivers that could be used to position the streamer receivers and the seismic source via tail buoys. A fundamental advance that was made on the original design, was the ability to directly power the tail buoy GPS units and transfer data through the streamers (i.e., vs. the batteries used at Tomakomai). The bulkiness of the GPS batteries caused drag and episodic surging of the buoys, which affected data quality by lifting up the tail end of the streamers so the receivers were not at the same depth. The units were tested onshore for accuracy and functionality, and the design was subsequently and successfully tested in marine acquisition mode during the SLP survey acquisition. The marine acquisition test and survey satisfied Subtasks 2.2.2, Novel Positioning Technology Selection and Subtask 2.2.3, Novel Positioning Technology Deployment. Results of the novel positioning technology selection (Subtask 2.2.2) were considered successful and will be incorporated in future HR3D seismic acquisition projects to reduce costs, improve deployment safety at sea, and integrate both seismic and data recording via a single data transfer through the streamers to the recording system. The project also established a permitting process through NETL NEPA compliance, which included an Environmental Assessment in a marine setting and is required for conducting these types of surveys using Federal funding. The permitting process charted a “boilerplate,” which can allow future surveys related to other funded projects to move forward more expeditiously. Future improvements that could be considered are more robust seals on the GPS module and stronger materials (especially joints) on tail buoy fabrication. These would increase fixed costs, but would be advisable and probably more economic long-term if multiple HR3D surveys are planned. Project Accomplishments include: • Pre-survey Sensitivity Study • Marine geochemistry methods and data analysis • Successful HR3D seismic dataset acquired @ Tomakomai active CO 2 injection marine site • Developed advanced seismic processing techniques • No NRMS anomalies detected in overburden; Demonstration of containment • Repeatability study • Second survey collected @ San Luis Pass, TX • 4D application using positioning techniques developed in the project for monitoring were successful

3D seismic GPS positioning↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Optimizing resource allocation in Miscanthus breeding via sparse testing designs for genomic prediction

Phenotyping high-biomass perennial crops is laborious and the rate of genetic gain in conventional perennial crop breeding programs is typically low. So, it is especially important to identify methods that produce efficiency gains in the breeding process. Miscanthus is a C4 perennial grass with favorable characteristics for producing biomass as a feedstock for biofuels and diverse bio-based products. Increasing biomass yield will increase profitability and environmental benefits, so it is a key target for Miscanthus breeding. In addition, the identification of well-adapted genotypes across a wide range of environmental conditions requires the establishment of multi-environment trials (METs). Sparse testing is a genomic prediction-based strategy that reduces the phenotyping costs in METs by selecting a subset of genotypes to evaluate in a subset of environments and then predicts the performance of the unobserved genotype-environment combinations. A Miscanthus sacchariflorus (MSA) population comprising 336 genotypes observed across three environments was analyzed implementing sparse testing designs. Three prediction models considering main effects (environments, genotypes, genomic) and interaction effects (genotype-by-environment; G×E interaction) were implemented for forecasting dry biomass yield (YDY), total culm (TCM), average internode length (AIL), and culm node number (CNN). Multiple calibration sets based on different compositions and sizes were considered to evaluate performance in terms of the predictive ability (PA) and the mean square error (MSE) for a fixed testing set size. The training set size ranged from 52 to 112 to predict a fixed set of 224 unobserved genotypes across all three environments. The results showed that the model accounting for G×E interaction consistently presented the highest PA and the lowest MSE: for CNN (PA: ~0.77, MSE: ~0.5) and YDY (PA: ~0.70, MSE: ~1.3) while for TCM and AIL these ranged from ~0.28 to 0.41 and ~1.3 to 4.3, respectively. Overall, varying training sets and allocation strategies did not affect PA and MSE, with 52 non-overlapping and 0 overlapping genotypes per environment as the optimal cost-effective allocation framework. This suggests that implementing sparse testing designs could significantly reduce phenotyping costs by fivefold, without compromising PA in breeding programs for perennial crops such as Miscanthus.

Miscanthus sacchariflorus (MSA)↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds Developed lands Areas >0.8 km (0.5 miles) from developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗

COLUMBUS─An Efficient and General Program Package for Ground and Excited State Computations Including Spin–Orbit Couplings and Dynamics

The COLUMBUS program system provides the tools for performing high-level multireference (MR) computations, including the multireference configuration interaction (MRCI) method and its multireference averaged quadratic coupled cluster (MR-AQCC) extension, allowing computations on a wide range of fascinating atomic and molecular systems, including the treatment of open-shells and complicated excited state phenomena. The inclusion of spin−orbit coupling (SOC) directly within the MRCI step enables the description of systems containing heavy elements, such as lanthanides and actinides, whose properties are strongly influenced by SOC. Analytic energy gradients and nonadiabatic couplings at the correlated MRCI level provide the foundation for a variety of dynamics studies, giving insight into ultrafast photochemistry. New and ongoing method developments in COLUMBUS include the computation of spin densities, improved descriptions of ionic states, enhancements to the AQCC method, and the porting of COLUMBUS to graphical processing units (GPUs). New external interfaces enable an enhanced description of electronic resonances and molecules in strong laser fields. This work highlights these new developments while providing a detailed account of the diverse applications of COLUMBUS in recent years.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Package Data for CERF-Data Centers

This dataset contains sample input 100m resolution raster files for running the CERF-DC python package (see https://github.com/IMMM-SFA/cerf_data_centers) at the state level across the CONUS. Due to data availability constraints, some of the items included in this dataset are proxies or assumptions for siting factors used in the model. These are individually noted in the item descriptions and can be exchanged with more detailed information upon availability. Data Descriptions The following raster files are included in the data download: state_siting_region.tif — State areas identified by state FIPS code composite_siting_suitability.tif — Value of 1 indicates suitable siting location, 0 otherwise. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands land_value_dollar_per_sqft.tif — USD per square foot (sqft) derived from USDA $/acre land cost personal_property_tax_rate.tif — Personal property tax rate by state. Uses an assumed 0.0125 personal property tax rate for states with personal property tax, 0 for states without personal property tax. real_property_tax_rate.tif — Real property tax rate. Based on county level residential real estate property tax rates. sales_tax_rate.tif — Sales tax rate by state. mechanical_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through mechanical processes based on local water stress and humidity levels. water_cooling_fraction.tif — Fraction of year (values between 0 and 1, inclusive) that the data center would be cooled through evaporative (water cooled) processes based on local water stress and humidity levels. distance_to_substation.tif — Distance to nearest substation in hundreds of meters (i.e., value of 1 equals a distance of 100m). Offshore areas have a value of 0. industrial_electricity_rates_dollar_per_kwh.tif — USD/kWh industrial electricity rates. Represents the average industrial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. commercial_electricity_rates_dollar_per_kwh.tif — USD/kWh commercial electricity rates. Represents the average commercial rate across all utilities that operate within a given county. Values are derived from the US Utility Rate Database. data_center_market_locations.tif — Grid cells with positive values represent the centroid of existing data center market clusters. The value of non-zero grid cells represents the number of data centers in the market cluster. All other grid cells have a value of 0. Geospatial Metadata CRS: Albers Equal Area Conic (ESRI:102003) Extent: -2415585.0000000023283064,-1441981.2605773280374706 : 2384414.9999999976716936,1708018.7394226719625294 Dimensions: X: 48000 Y: 31500 Bands: 1 Origin: -2415585.0000000023283064,1708018.7394226719625294 Pixel Size: 100,-100 Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall↗