NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi-Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the life-cycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reachback support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-ofthe- art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

NASA Space Launch System Operations Outlook

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center (MSFC), is working with the Ground Systems Development and Operations (GSDO) Program, based at the Kennedy Space Center (KSC), to deliver a new safe, affordable, and sustainable capability for human and scientific exploration beyond Earth's orbit (BEO). Larger than the Saturn V Moon rocket, SLS will provide 10 percent more thrust at liftoff in its initial 70 metric ton (t) configuration and 20 percent more in its evolved 130-t configuration. The primary mission of the SLS rocket will be to launch astronauts to deep space destinations in the Orion Multi- Purpose Crew Vehicle (MPCV), also in development and managed by the Johnson Space Center. Several high-priority science missions also may benefit from the increased payload volume and reduced trip times offered by this powerful, versatile rocket. Reducing the lifecycle costs for NASA's space transportation flagship will maximize the exploration and scientific discovery returned from the taxpayer's investment. To that end, decisions made during development of SLS and associated systems will impact the nation's space exploration capabilities for decades. This paper will provide an update to the operations strategy presented at SpaceOps 2012. It will focus on: 1) Preparations to streamline the processing flow and infrastructure needed to produce and launch the world's largest rocket (i.e., through incorporation and modification of proven, heritage systems into the vehicle and ground systems); 2) Implementation of a lean approach to reach-back support of hardware manufacturing, green-run testing, and launch site processing and activities; and 3) Partnering between the vehicle design and operations communities on state-of-the-art predictive operations analysis techniques. An example of innovation is testing the integrated vehicle at the processing facility in parallel, rather than sequentially, saving both time and money. These themes are accomplished under the context of a new cross-program integration model that emphasizes peer-to-peer accountability and collaboration towards a common, shared goal. Utilizing the lessons learned through 50 years of human space flight experience, SLS is assigning the right number of people from appropriate backgrounds, providing them the right tools, and exercising the right processes for the job. The result will be a powerful, versatile, and capable heavy-lift, human-rated asset for the future human and scientific exploration of space.

Hefner, William Keith↗

Raising Nuclear Thermal Propulsion (NTP) Technology Readiness Above 3

NTP development is currently supported by the NASA program office "Advanced Exploration Systems". The concept is a main propulsion option being considered for human missions to Mars in the 2030's. Major NTP development took place in the 1960's and 1970's under the Rover/NERVA program. The technology had matured to TRL 6 and was preparing to go to TRL 7 with a prototype flight engine before the program was cancelled. Over the last 40 years, a variety of continuations started, but only lasted a few years each. The Rover/NERVA infrastructure is almost all gone. The only remains are a few pieces of hardware, final reports and a few who worked the Rover/NERVA. Two types of nuclear fuel are being investigated to meet the current engine design specific impulse of 900 seconds compared to approximately 850 seconds demonstrated during Rover/NERVA. One is a continuation of composite fuel with new coatings to better control mid-band corrosion. The other type is a CERMET fuel made of Tungsten and UO2. Both fuels are being made from Rover/NERVA lessons learned, but with slightly different recipes to increase fuel endurance at higher operating temperatures. The technology readiness level (TRL) of these current modified reactor fuels is approximately TRL 3. To keep the development cost low and help mature the TRL level past 4 quickly, a few special non-nuclear test facilities have been made to test surrogate fuel, with depleted uranium, as coupons and full length elements. Both facilities utilize inductive heating and are licensed to handle depleted uranium. TRL 5 requires exposing the fuel to a nuclear environment and TRL 6 requires a prototype ground or flight engine system test. Currently, three different NTP ground test facility options are being investigated: exhaust scrubber, bore hole, and total exhaust containment. In parallel, a prototype flight demonstration test is also being studied. The first human mission to Mars in the 2030's is currently 2033. For an advanced propulsion concept to be seriously considered for use, the engine development plans need to show it is feasible and affordable to reach TRL 8 by 2027 and can be qualified for human mission use.

Gerrish, Harold P., Jr.↗

Configuring the Orion Guidance, Navigation, and Control Flight Software for Automated Sequencing

The Orion Crew Exploration Vehicle is being designed with greater automation capabilities than any other crewed spacecraft in NASA s history. The Guidance, Navigation, and Control (GN&C) flight software architecture is designed to provide a flexible and evolvable framework that accommodates increasing levels of automation over time. Within the GN&C flight software, a data-driven approach is used to configure software. This approach allows data reconfiguration and updates to automated sequences without requiring recompilation of the software. Because of the great dependency of the automation and the flight software on the configuration data, the data management is a vital component of the processes for software certification, mission design, and flight operations. To enable the automated sequencing and data configuration of the GN&C subsystem on Orion, a desktop database configuration tool has been developed. The database tool allows the specification of the GN&C activity sequences, the automated transitions in the software, and the corresponding parameter reconfigurations. These aspects of the GN&C automation on Orion are all coordinated via data management, and the database tool provides the ability to test the automation capabilities during the development of the GN&C software. In addition to providing the infrastructure to manage the GN&C automation, the database tool has been designed with capabilities to import and export artifacts for simulation analysis and documentation purposes. Furthermore, the database configuration tool, currently used to manage simulation data, is envisioned to evolve into a mission planning tool for generating and testing GN&C software sequences and configurations. A key enabler of the GN&C automation design, the database tool allows both the creation and maintenance of the data artifacts, as well as serving the critical role of helping to manage, visualize, and understand the data-driven parameters both during software development and throughout the life of the Orion project.

Odegard, Ryan G.↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

Safety-Critical Partitioned Software Architecture: A Partitioned Software Architecture for Robotic

The flight software on virtually every mission currently managed by JPL has several major flaws that make it vulnerable to potentially fatal software defects. Many of these problems can be addressed by recently developed partitioned operating systems (OS). JPL has avoided adopting a partitioned operating system on its flight missions, primarily because doing so would require significant changes in flight software design, and the risks associated with changes of that magnitude cannot be accepted by an active flight project. The choice of a partitioned OS can have a dramatic effect on the overall system and software architecture, allowing for realization of benefits far beyond the concerns typically associated with the choice of OS. Specifically, we believe that a partitioned operating system, when coupled with an appropriate architecture, can provide a strong infrastructure for developing systems for which reusability, modifiability, testability, and reliability are essential qualities. By adopting a partitioned OS, projects can gain benefits throughout the entire development lifecycle, from requirements and design, all the way to implementation, testing, and operations.

(Avionics Application Standard Software Interface ↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Exploration Mission ? 1( now referred to as Artemis 1), programmatically referred to as the Integrated vehicle modal test. The Integrated vehicle modal test of the Exploration Mission - 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the ML while inside the Vehicle Assembly Building, which is currently scheduled for the late spring or early summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Exploration Mission ? 1 test vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and SLS during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of being able to successfully complete the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis and the unique challenges faced due to the Mobile Launcher's size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

Space Launch System Mobile Launcher Modal Pretest Analysis

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation from the Vehicle Assembly Building out to the launch pad, and provides the launch platform at the launch pad. The previous Saturn/Apollo and Space Shuttle programs had integrated vehicle ground vibration tests of their integrated launch vehicles performed with simulated free-free boundary conditions to experimentally anchor and validate structural and flight controls analysis models. For the Space Launch System program, the Mobile Launcher will be used as the modal test fixture for the ground vibration test of the first Space Launch System flight vehicle, Artemis 1, programmatically referred to as the integrated vehicle modal test. The integrated vehicle modal test of the Artemis 1 integrated launch vehicle will have its core and second stages unfueled while mounted to the Mobile Launcher while inside the Vehicle Assembly Building, which is currently scheduled for the summer of 2020. The Space Launch System program has implemented a building block approach for dynamic model validation. The modal test of the Mobile Launcher is an important part of this building block approach in supporting the integrated vehicle modal test since the Mobile Launcher will serve as a structurally dynamic test fixture whose modes will couple with the modes of the Artemis 1 integrated vehicle. The Mobile Launcher modal test will further support understanding the structural dynamics of the Mobile Launcher and Space Launch System during rollout to the launch pad, which will play a key role in better understanding and prediction of the rollout forces acting on the launch vehicle. The Mobile Launcher modal test is currently scheduled for the summer of 2019. Due to a very tight modal testing schedule, this independent Mobile Launcher modal pretest analysis has been performed to ensure there is a high likelihood of successfully completing the modal test (i.e. identify the primary target modes) using the planned instrumentation, shakers, and excitation types. This paper will discuss this Mobile Launcher modal pretest analysis for its three test configurations and the unique challenges faced due to the Mobile Launcher’s size and weight, which are typically not faced when modal testing aerospace structures.

Akers, James C.↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System: Deep-Space Delivery for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, an uncrewed test of the Orion spacecraft into distant retrograde orbit around the moon, accompanying Orion on SLS will be 13 small-satellite secondary payloads, which will deploy in cislunar space. These secondary payloads will include not only NASA research, but also spacecraft from industry and international partners and academia. The payloads also represent a variety of disciplines including, but not limited to, studies of the moon, Earth, sun, and asteroids. The Space Launch System Program is working actively with the developers of the payloads toward vehicle integration. Following its first flight and potentially as early as its second, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO, and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from those on the first launch, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for small satellites. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for small satellites, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018 and a discussion of future capabilities.

Robinson, Kimberly F.↗

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Developing An Autonomy Infusion Infrastructure for Robotic Exploration

Future robotic exploration missions will require autonomy in order to accomplish mission goals for operational efficiency and science return. For example, it will require three communication cycles for the Mars Exploration Rovers, Spirit and Opportunity, to place an instrument on a science target. Reducing this time necessitates highly accurate navigation, obstacle avoidance, target tracking, target analysis, manipulation, and fault diagnosis. Technologies to address these and other operational elements are currently being developed at NASA and within academia. However, infusion into missions has always been a difficult task for researchers. In order to keep risk down, mission managers are reluctant to include new technologies unless they have undergone extensive testing and verification under flight-realistic conditions. Furthermore, infusion of new technologies into missions is made more difficult by the variety of software frameworks under which these technologies are developed. Missions would like to see competing solutions demonstrated on a common platform so that they can compare performance and choose the solution best suited to their application.

Bualat, Maria G.↗

Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.

Technology Demonstration↗

Support of Helicopter 'Free Flight' Operations in the 1996 Olympics

The microcosm of activity surrounding the 1996 Olympic Games provided researchers an opportunity for demonstrating state-of-the art technology in the first large-scale deployment of a prototype digital communication/navigation/surveillance system in a confined environment. At the same time it provided an ideal opportunity for transportation officials to showcase the merits of an integrated transportation system in meeting the operational needs to transport time sensitive goods and provide public safety services under real-world conditions. Five aeronautical CNS functions using a digital datalink system were chosen for operational flight testing onboard 91 aircraft, most of them helicopters, participating in the Atlanta Short-Haul Transportation System. These included: GPS-based Automatic Dependent Surveillance, Cockpit Display of Traffic Information, Controller-Pilot Communications, Graphical Weather Information (uplink), and Automated Electronic Pilot Reporting (downlink). Atlanta provided the first opportunity to demonstrate, in an actual operating environment, key datalink functions which would enhance flight safety and situational awareness for the pilot and supplement conventional air traffic control. The knowledge gained from such a large-scale deployment will help system designers in development of a national infrastructure where aircraft would have the ability to navigate autonomously.

Branstetter, James R.↗

Experimental Validation: Subscale Aircraft Ground Facilities and Integrated Test Capability

Experimental testing is an important aspect of validating complex integrated safety critical aircraft technologies. The Airborne Subscale Transport Aircraft Research (AirSTAR) Testbed is being developed at NASA Langley to validate technologies under conditions that cannot be flight validated with full-scale vehicles. The AirSTAR capability comprises a series of flying sub-scale models, associated ground-support equipment, and a base research station at NASA Langley. The subscale model capability utilizes a generic 5.5% scaled transport class vehicle known as the Generic Transport Model (GTM). The AirSTAR Ground Facilities encompass the hardware and software infrastructure necessary to provide comprehensive support services for the GTM testbed. The ground facilities support remote piloting of the GTM aircraft, and include all subsystems required for data/video telemetry, experimental flight control algorithm implementation and evaluation, GTM simulation, data recording/archiving, and audio communications. The ground facilities include a self-contained, motorized vehicle serving as a mobile research command/operations center, capable of deployment to remote sites when conducting GTM flight experiments. The ground facilities also include a laboratory based at NASA LaRC providing near identical capabilities as the mobile command/operations center, as well as the capability to receive data/video/audio from, and send data/audio to the mobile command/operations center during GTM flight experiments.

Bailey, Roger M.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

NASA IV&V's Cyber Range for Space Systems

A cyber range is a virtual environment that is used for cyberwarfare training and cyber technology development. It provides tools that help strengthen the stability, security and performance of cyber infrastructures and IT systems. NASA IV&V has created an adaptable virtual environment that is representative of a typical NASA mission system of systems environment that serves multiple purposes: Training of network defenders. Ability to perform simulated red vs blue training events. Ability to deploy mission specific technologies in a cyber contested environment. Ability to demonstrate vulnerabilities and their impact to ground and space systemsThe overall system is comprised of more than 70 virtual machines and physical infrastructure to demonstrate real-world cyber attacks against: email users, wireless networks, and physically implanted devices with command and control call-back. The cyber range was built to emulate a NASA precipitation satellite infrastructure.This presentation will give an overview of the virtual cyber range and how it was used to conduct a simulate red vs blue exercise with the goal of compromising the simulated spacecraft that utilizes real NASA flight software.

test and evaluation DT&E↗