Search NASA⌕ Search

SEARCH · Search NASA

Results for “Humans to Mars”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Lagrange-Based Options for Relay Satellites to Eliminate Earth-Mars Communications Outages During Solar Superior Conjunctions

Recent conjunction class Mars human mission plans have generally assumed that there will inevitably be periods of communications outages between Earth and Mars. This has significant cost and risk implications for not only Mars missions, but also precursor missions in the lunar environment. But are there ways to avoid these outages? The potential exists for communications to be interrupted by Solar Superior Conjunctions (SSCs). Depending on the communications system, used, there can be communications outages up to as many as 78 days. The higher bandwidth systems experience the greatest outage. If these communications channels are interrupted due to an SSC, there are of course resulting challenges to mission operations. An outage of a few days to a few weeks could allow minor disturbances to become major concerns or even trigger subsystems failures. An inability to consult with the ground at the wrong time could result in loss of mission, loss of an element, or loss of life. Each planet in the solar system has a set of five Lagrange points associated with it and the Sun. At any given point in time, a planet or either its L4 or L5 point is visible to any other planet in the solar system, regardless of the position of the sun relative to the two. Thus, L4 and L5 have high value as relay systems to prevent communications outages. There are four sets of solar Lagrange points that may be of potential use in this study: Mars-Sun L4 and L5 points, Earth-Sun L4 and L5, Venus-Sun L4 and L5, and Mercury-Sun L4 and L5. A candidate relay satellite system will be identified, with consideration of both new technology developments and existing telecommunications satellites. This system may have implications for not only the Mars human mission architectures, but also Gateway and human lunar surface architectures as these other studies are tasked with paving the way to human Mars missions. If Mars communications outages can be eliminated, then the degree of autonomy necessary in Mars and precursor systems may be reduced.

Relay Satellite↗

Humans to Mars, But How Many? Using Training Qualification Modeling to Inform Number of Crew

Missions to Mars will differ from all previous human spaceflight missions in that the crew of astronauts will be required to operate in an Earth-independent manner due to the long communication delays, making the decision on crew size critical to mission success. To support National Aeronautics and Space Administration (NASA) decision makers, NASA’s Engineering and Safety Center (NESC) developed a quantitative methodology for assessing the number of crew necessary to meet primary mission objectives and respond to unforeseen failures based on modeling of NASA’s crew training qualifications. We present results of a custom-built model of a Mars crew qualification and responsibility matrix (CQRM) and discuss the implications on trade space analysis of Mars mission crew size.

Mars↗

Humans to Mars, But How Many? Using Training Qualifications Modeling to Inform Number of Crew

Missions to Mars will differ from all previous human spaceflight missions in that the crew of astronauts will be required to operate in an Earth-independent manner due to the long communication delays, making the decision on crew size critical to mission success. To support National Aeronautics and Space Administration (NASA) decision makers, NASA’s Engineering and Safety Center (NESC) developed a quantitative methodology for assessing the number of crew necessary to meet primary mission objectives and respond to unforeseen failures based on modeling of NASA’s crew training qualifications. We present results of a custom-built model of a Mars crew qualification and responsibility matrix (CQRM) and discuss the implications on trade space analysis of Mars mission crew size.

Mars↗

The Challenges of Landing on Mars

Humans have been fascinated with the idea of exploring Mars since the very beginning of the space age. Largely due to the belief that life may have at one time existed in some form, surface exploration has been the ultimate ambition of this exploration. Unfortunately engineers and scientists discovered early on that landing a spacecraft on the surface of Mars was to become one of the most difficult and treacherous challenges of robotic space exploration. At arrival to Mars, a spacecraft will be traveling at velocities between 4 and 7 km/s. 100% of this kinetic energy (KE) must be safely removed for a lander to deliver its payload to the surface. Fortunately Mars has an atmosphere substantial enough to allow the combination of a high drag heatshield and a parachute to remove 99% and 0.98% respectively of this kinetic energy. Unfortunately the atmosphere is not substantial enough to bring a lander to a safe touchdown. This means that an additional landing system is required to remove the remaining kinetic energy. On all previous successful missions the landing system has consisted of 2 major elements, a propulsion subsystem to remove an additional 0.002% (approx.50 - 100 m/s ) of the original KE and a final dedicated touchdown system. The first generation Mars landers used legs to accomplish touchdown. The second generation of Mars lander touchdown systems used airbags to mitigate the last few meters per second of residual velocity. NASA is currently developing a third generation landing system in an effort to reduce cost, mass and risk while simultaneously increasing performance as measured by payload fraction to the surface and accessible terrain roughness.

sky cranes↗

Humans to Mars, but How Many? Trade Space Analyses for Mars Mission Crew Size

Missions to Mars will differ from previous human spaceflight missions in that the crew of astronauts will be required to operate in an Earth-independent manner due to the long communication delays. Without a systematic, repeatable process to determine the number and composition of crew necessary to successfully accomplish these missions, NASA increases the risk that crew sizes may be too small to meet primary mission objectives under nominal conditions and, more consequentially, that crewmembers may not have the expertise needed to successfully respond to unforeseen failures without the real-time expertise of the Mission Control Central (MCC) team NASA currently relies upon. The NASA Engineering and Safety Center (NESC) developed a methodology for assessing the trade space of factors that affect the number of crew for Mars missions based on human performance and expertise modeling. This methodology includes the consideration of results from three human performance models developed using the Improved Performance Research and Integration Tool (IMPRINT) modeling platform as well as a custom-built model on expertise trained within the crew based on NASA’s crew qualification and responsibilities matrix (CQRM). We present example model results and discuss implications on trade space analyses for Mars mission crew size.

Mars Mission↗

Overview of a Generalized Numerical Predictor-Corrector Targeting Guidance with Application to Human-Scale Mars Entry, Descent, and Landing

Recent advances in planetary entry guidance algorithms are motived by precision landing criteria for human-scale Mars missions and improved in-space computing capabilities. An NPC targeting guidance algorithm, originally developed for the Mars Surveyor Program 2001 Missions, has been modified and extended to permit a fully generalized, flexible, and robust approach to spacecraft aerocapture and EDL guidance design. This paper describes this generalized targeting NPC guidance (NPCG) and how its modifications enable its use in precision targeting for human missions. System modeling, trajectory propagation, and guidance segment definition and design are described. Finally, the NPCG capability and performance is demonstrated using a human-scale Mars entry, descent, and landing mission simulation.

Rafael A Lugo↗

A Water Rich Mars Surface Mission Scenario

In an on-going effort to make human Mars missions more affordable and sustainable, NASA continues to investigate the innovative leveraging of technological advances in conjunction with the use of accessible Martian resources directly applicable to these missions. One of the resources with the broadest utility for human missions is water. Many past studies of human Mars missions assumed a complete lack of water derivable from local sources. However, recent advances in our understanding of the Martian environment provides growing evidence that Mars may be more "water rich" than previously suspected. This is based on data indicating that substantial quantities of water are mixed with surface regolith, bound in minerals located at or near the surface, and buried in large glacier-like forms. This paper describes an assessment of what could be done in a "water rich" human Mars mission scenario. A description of what is meant by "water rich" in this context is provided, including a quantification of the water that would be used by crews in this scenario. The different types of potential feedstock that could be used to generate these quantities of water are described, drawing on the most recently available assessments of data being returned from Mars. This paper specifically focuses on sources that appear to be buried quantities of water ice. (An assessment of other potential feedstock materials is documented in another paper.) Technologies and processes currently used in terrestrial polar regions is reviewed. One process with a long history of use on Earth and with potential application on Mars - the Rodriguez Well - is described and results of an analysis simulating the performance of such a well on Mars are presented. These results indicate that a Rodriguez Well capable of producing the quantities of water identified for a "water rich" human mission are within the capabilities assumed to be available on the Martian surface, as envisioned in other comparable Evolvable Mars Campaign assessments. The paper concludes by capturing additional findings and describing additional simulations and tests that should be conducted to better characterize the performance of the identified terrestrial technologies for accessing subsurface ice, as well as the Rodriguez Well, under Mars environmental conditions.

Hoffman, Stephen J.↗

A Water Rich Mars Surface Mission Scenario

In an on-going effort to make human Mars missions more affordable and sustainable, NASA continues to investigate the innovative leveraging of technological advances in conjunction with the use of accessible Martian resources directly applicable to these missions. One of the resources with the broadest utility for human missions is water. Many past studies of human Mars missions assumed a complete lack of water derivable from local sources. However, recent advances in our understanding of the Martian environment provides growing evidence that Mars may be more "water rich" than previously suspected. This is based on data indicating that substantial quantities of water are mixed with surface regolith, bound in minerals located at or near the surface, and buried in large glacier-like forms. This paper describes an assessment of what could be done in a "water rich" human Mars mission scenario. A description of what is meant by "water rich" in this context is provided, including a quantification of the water that would be used by crews in this scenario. The different types of potential feedstock that could be used to generate these quantities of water are described, drawing on the most recently available assessments of data being returned from Mars. This paper specifically focuses on sources that appear to be buried quantities of water ice. (An assessment of other potential feedstock materials is documented in another paper.) Technologies and processes currently used in terrestrial Polar Regions are reviewed. One process with a long history of use on Earth and with potential application on Mars - the Rodriguez Well - is described and results of an analysis simulating the performance of such a well on Mars are presented. These results indicate that a Rodriguez Well capable of producing the quantities of water identified for a "water rich" human mission are within the capabilities assumed to be available on the Martian surface, as envisioned in other comparable Evolvable Mars Campaign assessments. The paper concludes by capturing additional findings and describing additional simulations and tests that should be conducted to better characterize the performance of the identified terrestrial technologies for accessing subsurface ice, as well as the Rodriguez Well, under Mars environmental conditions.

Hoffman, Stephen J.↗

Scientific Goals and Objectives for the Human Exploration of Mars: 1. Biology and Atmosphere/Climate

To prepare for the exploration of Mars by humans, as outlined in the new national vision for Space Exploration (VSE), the Mars Exploration Program Analysis Group (MEPAG), chartered by NASA's Mars Exploration Program (MEP), formed a Human Exploration of Mars Science Analysis Group (HEM-SAG), in March 2007. HEM-SAG was chartered to develop the scientific goals and objectives for the human exploration of Mars based on the Mars Scientific Goals, Objectives, Investigations, and Priorities.1 The HEM-SAG is one of several humans to Mars scientific, engineering and mission architecture studies chartered in 2007 to support NASA s plans for the human exploration of Mars. The HEM-SAG is composed of about 30 Mars scientists representing the disciplines of Mars biology, climate/atmosphere, geology and geophysics from the U.S., Canada, England, France, Italy and Spain. MEPAG selected Drs. James B. Garvin (NASA Goddard Space Flight Center) and Joel S. Levine (NASA Langley Research Center) to serve as HEMSAG co-chairs. The HEM-SAG team conducted 20 telecons and convened three face-to-face meetings from March through October 2007. The management of MEP and MEPAG were briefed on the HEM-SAG interim findings in May. The HEM-SAG final report was presented on-line to the full MEPAG membership and was presented at the MEPAG meeting on February 20-21, 2008. This presentation will outline the HEM-SAG biology and climate/atmosphere goals and objectives. A companion paper will outline the HEM-SAG geology and geophysics goals and objectives.

Levine, Joel S.↗

The Search for Extant Life on Mars: A Human Exploration Objective

A search for evidence of extant life on Mars should be conducted prior to and as part of human exploration missions. Potentially habitable environments for modern life occur on Mars. Despite a vigorous campaign of exploration of the surface over the last 3 decades, no mission has attempted to search for signatures of extant life since the Viking landers in 1976. Finding an example of extant life beyond Earth would be one of the greatest scientific discoveries of all time. This is especially important because (once discovered) the biochemistry and metabolism of the life form can be studied. Earth and Mars exchange materials over geologic time because impacts eject rock and crustal materials into space that are eventually deposited on other planets and moons [1]. Therefore, Earth and Mars could share life with a common origin and similar biochemistry; if this is the case, life on Mars likely experienced billions of years of evolution in isolation from Earth. Alternatively, Mars may host a distinct genesis of life which could be evident from its different biochemistry. Either discovery would change our understanding of life in the solar system and beyond. The Mars 2020/Perseverance sample collection mission is not optimized for finding extant life because the site for sample collection, Jezero Crater, was chosen for its ancient habitability and likelihood to host fossil evidence of life. Furthermore, the samples collected will not be returned for at least a decade. Within that period, technology development for human exploration will likely be underway and it is possible that humans will land on Mars without an updated knowledge of extant life on Mars, which may pose a risk both to those mission crews and to Earth when they return. Thus, it is important to perform a search for extant life on Mars prior to humans landing at a site where life may persist. Salts and shallow ground ice are particularly important environments to evaluate for extant life prior to human missions because they may be encountered and interacted with by human crews.

C.R. Stoker↗

Humans to Mars, But How Many? A Historical Review of Crew Size Determinations for Mars Missions

Three-quarters of a century have passed since the first engineering study of a human mission to Mars in 1948. During that time, dozens of study teams at NASA, its contractors, and other organizations in the U.S. and abroad have confronted what NASA mission architect John Connolly and his colleagues have called “the ultimate systems challenge.” This historical review of those studies focuses on the question of crew size and its relationship to crew workload.

Human Mars Missions↗

Transportation: Destination Mars

As the agency space transportation lead center, Marshall Space Flight Center has been conducting transportation assessments for future robotic and human Mars missions to identify critical technologies. Five human Mars options are currently under assessment with each option including all transportation requirements from Earth to Mars and return. The primary difference for each option is the propulsion source from Earth to Mars. In case any of the options require heavy launch capability that is not currently projected as available, an in-house study has been initiated to determine the most cost effective means of providing such launch capability. This assessment is only considering launch architectures that support the overall human Mars mission cost goal of $25B. The guidelines for the launch capability study included delivery of 80 metric ton (176 KLB) payloads, 25 feet diameter x 92 feet long, to 220 nmi orbits at 28.5 degrees. The launch vehicle concept of the study was designated "Magnum" to differentiate from prior heavy launch vehicle assessments. This assessment along with the assessment of options for all transportation phases of a Mars mission are on-going.

Eoff, Bill↗

Recommendations Emerging from an Analysis of NASA's Deep Space Communications Capacity

During 2016-2017, NASA’s Space Communications and Navigation (SCaN) Office chartered a study of Deep Space Network (DSN) communications capacity relative to projected future-mission demand over the next 30 years. In this paper, we briefly describe the methodology used to analyze capacity vs. demand over such a broad timeframe, summarize key findings emerging from the analysis, and discuss the associated recommendations. Performing the analysis entailed: identifying key factors shaping the anticipated future mission set, identifying several alternative future mission set scenarios consistent with these factors, and then analyzing each mission set scenario in terms of required antenna capacity, downlink and uplink capabilities, and spectrum as a function of time. On the basis of these aggregate requirements, DSN loading simulations were then conducted that examined how well each of the postulated mission sets could load up onto the the DSN’s “in-plan” architecture. To the extent that capacity shortfalls emerged during these baseline simulations, architectural solutions to the shortfalls were then postulated and tested via additional simulations. In general, the trend analyses and baseline loading simulations indicated a significant progression in challenges over the next three decades. In the current decade, the DSN appeared to be operating very close to capacity. The first human exploration mission and its secondary payload launch opportunities for cubesats traveling beyond GEO contributed to this loading. As a consequence, the main challenge appeared to be managing peak assetcontention periods. In the next decade, the DSN continued to operate close to capacity but also began transitioning to more frequent human mission support. Upgrading for, and operating, a human-rated system while continuing to meet robotic mission customer requirements emerged as the key challenge. In the 2030’s and beyond, simulations suggested a need for fundamentally new capability and capacity. The high data rates and long link distances characteristic of human Mars exploration drove requirements far beyond what is currently “in plan.” The key challenge then became determining the most cost-effective combination of RF and optical assets for communicating with the postulated human Mars assets while still providing for the needs of all the other missions across the solar system. Various link budget, visibility, and loading analyses ultimately suggested that the human Mars exploration demands of the 2030’s could best be addressed with two cross-linked RF-optical areostationary relays (or an areostationary relay and deep space habitat) providing a dual “trunk link” to an array of 2-to-3 additional 34m beam waveguide antennas and an ~8.5m optical antenna at each DSN Complex. The dual “trunk link” would enable the same amount of total data return to Earth as a single trunk link at twice the data rate, but with only half the required array size on the ground, assuming use of Multiple Spacecraft Per Antenna (MSPA) techniques. MSPA techniques, including a Multiple Uplink Per Antenna (MUPA) technique currently under investigation, also showed promise for reducing asset contention in the decades prior to human Mars exploration.

Lee, Carlyn-Ann↗

Humans to Mars in 1999

A set of vehicle designs and a mission architecture that was developed to send humans to Mars in the 1990's are discussed. Launching, landing, a 500 day stay on Mars, and a return to Earth are discussed. The plan is not merely a one shot expedition, but puts into place immediately an economical method of Earth-Mars transportation, real surface exploratory mobility, and significant base capabilities that can rapidly evolve into a mostly self-sufficient Mars colony. Since the plans call for the use of a combination of off the shelf technology and new technology that can be easily developed, the authors argue that there is no reason to postpone the exploration of Mars until several decades after a lunar base build-up.

Zubrin, Robert↗

Effect of Earth and Mars departure delays on human missions to Mars

This study determines the impact on the initial mass in low-Earth orbit (IMLEO) for delaying departure from Mars and Earth by 5, 15, and 30 days, once a nominal mission to Mars has been selected. Additionally, the use of a deep space maneuver (DSM) is attempted to alleviate the IMLEO penalties. Three different classes of missions are analyzed using chemical and nuclear thermal propulsion systems in the 2000-2025 time-frame: opposition, conjunction, and fast-transfer conjunction. The results indicate that Mars and Earth delays can lead to large IMLEO penalties. Opposition and fast-transfer conjunction class missions have the highest IMLEO penalties, upwards of 432.4 mt and 1977.3 mt, respectively. Conjunction class missions, on the other hand, tend to be insensitive to Mars and Earth delays having IMLEO penalties under 103.5 mt. As expected, nuclear thermal propulsion had significantly lower IMLEO penalties as compared to chemical propulsion. The use of a DSM is found not to have a significant impact on reducing the IMLEO penalties. Through this investigation, the effect of off-nominal departure conditions on the overall mission (i.e., IMLEO) can be gained, enabling mission designers to incorporate the influence of off-nominal departure conditions of the interplanetary trajectory in the overall conceptual design process of a Mars transfer vehicle.

Desai, Prasun N.↗

Methane Propulsion Elements for Mars

Human exploration beyond LEO relies on a suite of propulsive elements to: (1) Launch elements into space, (2) Transport crew and cargo to and from various destinations, (3) Provide access to the surface of Mars, (4) Launch crew from the surface of Mars. Oxygen/Methane propulsion systems meet the unique requirements of Mars surface access. A common Oxygen/Methane propulsion system is being considered to reduce development costs and support a wide range of primary & alternative applications.

Percy, Tom↗

Developing a Crew Time Model for Human Exploration Missions to Mars

Candidate human missions to Mars require mission lengths that could extend beyond those that have previously been demonstrated during crewed Lunar (Apollo) and International Space Station (ISS) missions. The nature of the architectures required for deep space human exploration will likely necessitate major changes in how crews operate and maintain the spacecraft. The uncertainties associated with these shifts in mission constructs - including changes to habitation systems, transit durations, and system operations - raise concerns as to the ability of the crew to complete required overhead activities while still having time to conduct a set of robust exploration activities. This paper will present an initial assessment of crew operational requirements for human missions to the Mars surface. The presented results integrate assessments of crew habitation, system maintenance, and utilization to present a comprehensive analysis of potential crew time usage. Destination operations were assessed for a short (approx. 50 day) and long duration (approx. 500 day) surface habitation case. Crew time allocations are broken out by mission segment, and the availability of utilization opportunities was evaluated throughout the entire mission progression. To support this assessment, the integrated crew operations model (ICOM) was developed. ICOM was used to parse overhead, maintenance and system repair, and destination operations requirements within each mission segment - outbound transit, Mars surface duration, and return transit - to develop a comprehensive estimation of exploration crew time allocations. Overhead operational requirements included daily crew operations, health maintenance activities, and down time. Maintenance and repair operational allocations are derived using the Exploration Maintainability and Analysis Tool (EMAT) to develop a probabilistic estimation of crew repair time necessary to maintain systems functionality throughout the mission.

Battfeld, Bryan↗

Humans to Mars, but How Many? Using Training Requirements Modeling to Inform Crew Size

Missions to Mars will differ from previous human spaceflight missions in that the onboard crew of astronauts will be required to operate in an Earth-independent manner due to the long communication delays. Without a systematic, repeatable process to determine the number and composition of crew necessary to successfully accomplish these missions, NASA increases the risk that crew sizes may be too small to meet primary mission objectives under nominal conditions and, more consequentially, that crewmembers may not have the expertise needed to successfully respond to unforeseen failures without the real-time expertise of the Mission Control Central (MCC) team NASA currently relies upon. The NASA Engineering and Safety Center (NESC) is developing a methodology for assessing the trade space of factors that affect the number of crew for future missions. This methodology includes the consideration of results from three human performance models developed using the Improved Performance Research and Integration Tool (IMPRINT) modeling platform as well as a custom-built model on expertise trained within the crew. The IMPRINT results will be presented in the modeling and simulation sub-tag. Here we present results of a model based on NASA’s crew qualification and responsibility matrix (CQRM), a tool used to identify the crew qualifications for each area of responsibility (operation, system, and payload) for a mission. The model outputs an optimized allocation of training assignments along with a flight-assigned CQRM that can be used to consider the expertise that can be trained within a crew of a given size. We discuss the CQRM model result implications on the trade space for Mars mission crew size.

Mars↗