Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTEGRAL OPERATOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Launch operations efficiency

The paper discusses launch operations from a program perspective. Launch operations cost is a significant part of program cost. New approaches to launch operations, integrated with lessons learned, have the potential to increase safety and reliability as well as reduce cost. Operational efficiency must be an initial program goal. Design technology and management philosophy must be implemented early to ensure operational cost goals. Manufacturing cost and launch cost are related to operational efficiency. True program savings can be realized through implementation of launch operations cost saving approaches which do not correspondingly increase cost in other program areas such as manufacturing and software development and maintenance. Launch rate is a key factor in the cost/flight analysis and the determination of launch operations efficiency goals.

Diloreto, Clem↗

Characterizing the negative triangularity reactor core operating space with integrated modeling

Negative triangularity (NT) has received renewed interest as a fusion reactor regime due to its beneficial power-handling properties, including low scrape-off layer power and a larger divertor wetted area that facilitates simple divertor integration. NT experiments have also demonstrated core performance on par with positive triangularity (PT) high confinement mode (H-mode) without edge-localized modes (ELMs), encouraging further study of an NT reactor core. In this work, we use integrated modeling to scope the operating space around two NT reactor strategies. The first is the high-field, compact fusion pilot plant concept Modular, Adjustable, NT ARC (MANTA) and the second is a low field, high aspect ratio concept based on work by Medvedev et al. By integrating equilibrium, core transport, and edge ballooning instability models, we establish a range of operating points with less than 50 MW scrape-off layer power and fusion power comparable to PT H-mode reactor concepts. Heating and seeded impurities are leveraged to accomplish the same fusion performance and scrape-off layer exhaust power for various pressure edge boundary conditions. Scans over these pressure edge conditions accommodate any current uncertainty of the properties of the NT edge and show that the performance of an NT reactor will be extremely dependent on the edge pressure. The high-field case is found to enable lower scrape-off layer power because it is capable of reaching high fusion powers at a relatively compact size, which allows increased separatrix density without exceeding the Greenwald density limit. Adjustments in NT shaping exhibit small changes in fusion power, with an increase in fusion power density seen at weaker NT. Infinite-n ballooning instability models indicate that an NT reactor core can reach fusion powers comparable to leading PT H-mode reactor concepts while remaining ballooning-stable. Seeded krypton is leveraged to further lower scrape-off layer power since NT does not have a requirement to remain in H-mode while still maintaining high confinement. We contextualize the NT reactor operating space by comparing to popular PT H-mode reactor concepts, and find that NT exhibits competitive ELM-free performance with these concepts for a variety of edge conditions while maintaining relatively low scrape-off layer power.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Approach and Landing Test program of the Space Shuttle Orbiter 101

The Approach and Landing Test (ALT) program was conducted in late 1976 through November 1977 to investigate the low speed characteristics of the Orbiter alone. The innovative aspects of the Orbiter are discussed along with the ALT program and the testing methodology used. The Shuttle Transportation System concept is briefly reviewed. The ALT was a first step towards operational missions for the Shuttle. The prime objective of the ALT was to verify the systems design and integrated operation of the Orbiter, and to demonstrate the capability of the Orbiter to safely land at a designated runway. The first free flight of the Orbiter occurred on August 12, 1977. Attention is also given to the results obtained in free-flight two, three, four, and five. Free-flight five was specifically planned to demonstrate a runway landing.

Brice, T. R.↗

Operations Modeling for SSF Evolution

The operations required to support the on-orbit Space Station Freedom activities planned or being studied will be complex. Operational capability to perform tasks will be dependent on many factors such as manpower availability, logistics, other tasks being worked and Space Station configuration. This effort uses information available about these and other factors to perform operations analysis for given missions and determine the feasibility of target configuration concepts to support those missions. Studies have been conducted to determine processing requirements for a number of potential evolutionary missions on the Space Station Freedom. These studies have identified the need for growth of the Space Station in various ways. Some of the studies have dealt with the operational needs for the particular mission that they are concerned with, but none have looked at the total evolutionary operations requirement. In order to pursue the subject of overall on-orbit operations to any appreciable level of detail, data bases of operational on-orbit tasks need to be compiled, and an analysis tool is needed to assist the analyst. A number of existing operations tools have been reviewed, and none have been found to satisfactorily perform the functions needed to analyze integrated operations requirements for the evolutionary Space Station Freedom. However, during the tool review, some existing applications were found to provide subsets of the required functionality, and these are being considered for incorporation into the analysis tool.

Ganoe, George G.↗

Cell Science-02 Payload Overview

The presentation provides an general overview of the Cell Science-02 science and payload operations to the NASA Payload Operations Integrated Working Group. The overview includes a description of the science objectives and specific aims, manifest status, and operations concept.

CS-02↗

BioNutrients-1 (BN-1) Payload Overview POIWG #43

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of BioNutrients-1 operations.

Sims, Kevin↗

Cell Science-03 (CS-03) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-03 operations.

Cell Science↗

Cell Science-02 (CS-02) Payload Overview POIWG #43

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-02 operations.

Cell Science↗

Cell Science-03 (CS-03) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 25th, 2018. It provides a high-level overview of Cell Science-03 operations.

CS-03↗

An Evaluation of Operational Airspace Sectorization Integrated System (OASIS) Advisory Tool

In January 2013, a human-in-the-loop evaluation of the Operational Airspace Sectorization Integrated System (OASIS) was conducted in the Airspace Operations Laboratory of the Human Systems Integration Division (Code TH) in conjunction with the Aviation Systems Division (Code AF). The development of OASIS is a major activity of the Dynamic Airspace Configuration (DAC) research focus area within the Aeronautics Research Mission Directorate (ARMD) Airspace Systems Program. OASIS is an advisory tool to assist Federal Aviation Administration (FAA) En Route Area Supervisors in their planning of sector combinedecombine operations as well as opening closing of Data-side (D-side) control positions. These advisory solutions are tailored to the predicted traffic demand over the next few hours. During the experiment, eight retired FAA personnel served as participants for a part-task evaluation of OASIS functionality, covering the user interface as well as the underlying algorithm. Participants gave positive feedback on both the user interface and the algorithm solutions for airspace configuration, including an excellent average rating of 94 on the tool usability scales. They also suggested various enhancements to the OASIS tool, which will be incorporated into the next tool development cycle for the full-scale human-in-the-loop evaluation to be conducted later this year.

decision support tools↗

BioNutrients-1 (BN-1) Payload Overview

This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 23-25th, 2018. It provides a high-level overview of BioNutrients-1 operations.

Sims, Kevin↗

Boolean integral calculus

The concept of Boolean integration is developed, and different Boolean integral operators are introduced. Given the changes in a desired function in terms of the changes in its arguments, the ways of 'integrating' (i.e. realizing) such a function, if it exists, are presented. The necessary and sufficient conditions for integrating, in different senses, the expression specifying the changes are obtained. Boolean calculus has applications in the design of logic circuits and in fault analysis.

Tucker, Jerry H.↗

Mission Operations Assurance

Integrate the mission operations assurance function into the flight team providing: (1) value added support in identifying, mitigating, and communicating the project's risks and, (2) being an essential member of the team during the test activities, training exercises and critical flight operations.

project tracking↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Propulsion↗

An Overview of the Concept of Operations for Assembly, Integration, Testing and Ground Servicing Developed for the MPCV-ESM Propulsion System

A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.

Ground Servicing↗

Addressing Human Error in International Space Station Flight Control Teams: Advances in Ground Training for Science Operators

In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork. To address these teamwork errors, trainers at the POIC have drawn best practices from high reliability industries as well as from our sister ISS control center at the Johnson Space Center (JSC) in Houston, Texas, to develop and implement a new training program focused specifically on teamwork skills. This training program, called Team Skills Training, is inspired by modern and historical training programs developed by NASA and is specifically tailored to the needs of the payload operations flight control team at the POIC. The program consists of training for both certified and trainee flight controllers, and covers team skills topics such as situational awareness, leadership, and communication skills. To maximize effectiveness, the program uses novel instructional techniques which extend beyond the classroom to encourage students to apply what they have learned to their day to day work. Minimizing operator errors in flight control is an endeavor which requires constant vigilance and continuous improvement. At the POIC, Team Skills Training is an important step in this journey.

Harris, Samantha S.↗