At least 181 records · Page 10

Comparative performance tests on the Mod-2, 2.5-mW wind turbine with and without vortex generators

A test program was conducted on the third Mod-2 unit at Goldendale, Washington, to systematically study the effect of vortex generators (VG's) on power performance. The subject unit was first tested without VG's to obtain baseline data. Vortex generators were then installed on the mid-blade assemblies, and the resulting 70% VG configuration was tested. Finally, vortex generators were mounted on the tip assemblies, and data was recorded for the 100% VG configuration. This test program and its results are discussed in this paper. The development of vortex generators is also presented.

Miller, G. E.↗

Test Report for NASA MSFC Support of the Linear Aerospike SR-71 Experiment (LASRE)

The Linear Aerospike SR-71 Experiment (LASRE) was performed in support of the Reusable Launch Vehicle (RLV) program to help develop a linear aerospike engine. The objective of this program was to operate a small aerospike engine at various speeds and altitudes to determine how slipstreams affect the engine's performance. The joint program between government and industry included NASA!s Dryden Flight Research Center, The Air Force's Phillips Laboratory, NASA's Marshall Space Flight Center, Lockheed Martin Skunkworks, Lockheed-Martin Astronautics, and Rocketdyne Division of Boeing North American. Ground testing of the LASRE engine produced two successful hot-fire tests, along with numerous cold flows to verify sequencing and operation before mounting the assembly on the SR-71. Once installed on the aircraft, flight testing performed several cold flows on the engine system at altitudes ranging from 30,000 to 50,000 feet and Mach numbers ranging from 0.9 to 1.5. The program was terminated before conducting hot-fires in flight because excessive leaks in the propellant supply systems could not be fixed to meet required safety levels without significant program cost and schedule impacts.

Elam, S. K.↗

Human Machine Interface Programming and Testing

Human Machine Interface (HMI) Programming and Testing is about creating graphical displays to mimic mission critical ground control systems in order to provide NASA engineers with the ability to monitor the health management of these systems in real time. The Health Management System (HMS) is an online interactive human machine interface system that monitors all Kennedy Ground Control Subsystem (KGCS) hardware in the field. The Health Management System is essential to NASA engineers because it allows remote control and monitoring of the health management systems of all the Programmable Logic Controllers (PLC) and associated field devices. KGCS will have equipment installed at the launch pad, Vehicle Assembly Building, Mobile Launcher, as well as the Multi-Purpose Processing Facility. I am designing graphical displays to monitor and control new modules that will be integrated into the HMS. The design of the display screen will closely mimic the appearance and functionality of the actual modules. There are many different field devices used to monitor health management and each device has its own unique set of health management related data, therefore each display must also have its own unique way to display this data. Once the displays are created, the RSLogix5000 application is used to write software that maps all the required data read from the hardware to the graphical display. Once this data is mapped to its corresponding display item, the graphical display and hardware device will be connected through the same network in order to test all possible scenarios and types of data the graphical display was designed to receive. Test Procedures will be written to thoroughly test out the displays and ensure that they are working correctly before being deployed to the field. Additionally, the Kennedy Ground Controls Subsystem's user manual will be updated to explain to the NASA engineers how to use the new module displays.

Foster, Thomas Garrison↗

International R&M/Safety Cooperation Lessons Learned Between NASA and JAXA

Presented are a number of important experiences gained and lessons learned from the collaboration of the National Aeronautics and Space Administration (NASA) and the Japanese Aerospace Exploration Agency (JAXA) on the CoNNeCT (Communications, Navigation, and Networking re-Configurable Testbed) project. Both space agencies worked on the CoNNeCT Project to design, assemble, test, integrate, and launch a communications testbed facility mounted onto the International Space Station (ISS) truss. At the 2012 RAMS, two papers about CoNNeCT were presented: one on Ground Support Equipment Reliability & System Safety, and the other one on combined application of System Safety & Reliability for the flight system. In addition to the logistics challenges present when two organizations are on the opposite side of the world, there is also a language barrier. The language barrier encompasses not only the different alphabet, it encompasses the social interactions; these were addressed by techniques presented in the paper. The differences in interpretation and application of Spaceflight Requirements will be discussed in this paper. Although many, but definitely not all, of JAXA's Spaceflight Requirements were inspired by NASA, there were significant and critically important differences in how they were interpreted and applied. This paper intends to summarize which practices worked and which did not for an international collaborative effort so that future missions may benefit from our experiences. The CoNNeCT flight system has been successfully assembled, integrated, tested, shipped, launched and installed on the ISS without incident. This demonstrates that the steps taken to facilitate international understanding, communication, and coordination were successful and warrant discussion as lessons learned.

Fernandez, Rene↗

Design Evolution and Verification of the A-3 Chemical Steam Generator

Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

Kirchner, Casey K.↗

Microbiological Characterization of the International Space Station Water Processor Assembly External Filter Assembly S/N 01

The External Filter Assembly (EFA) S/N 01 is a mesh screen filter with a pore size of approximately 300 micron that was installed in the International Space Station (ISS) Water Processor Assembly (WPA) between the Waste Tank and the Mostly Liquid Separator (MLS) on February 11, 2010 to protect clearances in the MLS solenoid valve SV_1121_3. A removal & replacement of the EFA Filter was performed on March 22, 2011 in response to increasing pressure across the Waste Tank solenoid valve SV_1121_1 and the EFA Filter. The EFA Filter was returned on ULF6 and received in the Boeing Huntsville Laboratory on June 13, 2011. The filter was aseptically removed from the housing, and the residual water was collected for enumeration and identification of bacteria and fungi. Swab samples of the filter surface were also collected for microbiological enumeration and identification. Sample analyses were performed by Boeing Huntsville Laboratory and NASA Johnson Space Center Microbiology for comparison. Photographic documentation of the EFA filter was performed using a stereo microscope and environmental scanning electron microscope. This paper characterizes the amount and types of microorganisms on the filter surface and in the residual water from the filter housing following 1 year of utilization in the ISS WPA.

Weir, Natalee↗

Coordinated Self-Assembly of Networked Microgrids Using Irving’s Algorithm

Abstract— Microgrid installations have regained significant interest, driven by the increasing adoption of distributed energy resources, decentralized controls, and ongoing technological advancements. While the number of microgrids increases, there are opportunities to coordinate networks of microgrids. In this study, Irving’s algorithm is applied to a framework for the coordinated self-assembly of networked microgrids. Compared with the authors’ previous work, this new study relaxes the constraint on participated microgrids to have a single global objective. Thus, each microgrid can rank others according to its local preference. This reduces the amount of shared information, improves the privacy, and enhances the flexibility. The adaptability to that proposed framework is also maintained. Examples are presented to illustrate the networking processes and self-assembly operations.

Xie, Jing↗

Spacecraft Power Source Installation at Launch Complex

For certain space missions, an assembly must be integrated onto the spacecraft as late as possible in the launch vehicle processing flow. 12This late integration can be driven for a variety of reasons including thermal or hazardous materials constraints. This paper discusses the process of integrating an assembly onto a spacecraft as late as one week prior to the opening of the launch window. Consideration is given to achieving sufficient access for hardware integration, methods of remotely securing hardware to the spacecraft, maintaining spacecraft cleanliness throughout the integration process, and electrically integrating the component to the spacecraft. Specific examples are taken from the remote mechanical, electrical, and fluid cooling system integration of the power source onto the Mars Science Laboratory (MSL) Rover at the Atlas V Vertical Integration Facility (VIF) at Cape Canaveral Air Force Station, Florida.

Lytal, Paul↗

External Wireless Communications (EWC) Coverage Expansion Boom Interface Control Document (ICD)

This document defines and controls the physical and functional interfaces between the External Wireless Communications Coverage Expansion (EWCCE) boom and any payload that is planned to be installed on the scarred locations on the boom. The hardware will be referenced as EWCCE boom or simply boom in this document. The boom is comprised of two short boom sections,the upper boom and the lower boom, an Active Worksite Interface (AWIF) and two mounting plates. The boom will be launched soft stowed in a bag and assembled in the Internation Space Station (ISS) via IVA. The assembly will include two sections of the boom and a built-to-print AWIF. The installation of the final assembly to the ISS Truss location is designated as a free-float EVA worksite activity. Once installed on the truss, the interfaces on the Long Boom may be used for attachment of future Orbital Replacement Units (ORUs) to either the Television Camera (TVC) Mounting Slide interface (e.g., an External High Definition Camera [EHDC] or similar ORU) or to future On-orbit Installed Hand-rails (OIHs) installed at the seat track interfaces. Compliance with this Interface Control Document (ICD) will ensure compatibility and successful integration of the hardware.

Vidyasagar, Sagar↗

An 8.4-GHz dual-maser front-end system for Parkes reimplementation

An 8.4-GHz front-end system consisting of a feedhorn, a waveguide feed assembly, dual masers, and downconverters was reimplemented at Parkes as part of the Parkes Canberra Telemetry Array for the Voyager Neptune encounter. The front-end system was originally assembled by the European Space Agency and installed on the Parkes antenna for the Giotto project. It was also used on a time-sharing basis by the Deep Space Network as part of the Parkes Canberra Telemetry Array to enhance the data return from the Voyager Uranus encounter. At the conclusion of these projects in 1986, part of the system was then shipped to JPL on loan for reimplementation at Parkes for the Voyager Neptune encounter. New design and implementation required to make the system operable at Parkes included new microwave front-end control cabinets, closed-cycle refrigeration monitor system, noise-adding radiometer system, front-end controller assembly, X81 local oscillator multiplier, and refurbishment of the original dual 8.4-GHz traveling-wave masers and waveguide feed system. The front-end system met all requirements during the encounter and was disassembled in October 1989 and returned to JPL.

Trowbridge, D. L.↗

Flow field characteristics of a 127-pin rod bundle with hexagonal spacer grids

A determination of nominal flow phenomena in liquid metal fast reactor (LMFR) fuel assemblies is critical toward generation-IV reactor development. Axially positioned spacer grids are used to maintain the geometry of hexagonal rod bundles and simultaneously introduce perturbations in the flow. Three-dimensional (3D) printed asymmetric honeycomb spacer grids were installed in a prototypical 127-pin LMFR fuel assembly model to study complex fluid dynamics interactions induced by the spacer grid and rods. To characterize flow dynamics in this intricate geometry, time-resolved particle image velocimetry (TR-PIV) using the matched-index-of-refraction method was employed to obtain non-intrusive velocity measurements for three axial planes (one near-wall and two interior planes) at a Reynolds number of 6000. The statistical TR-PIV results compared sub-channel-dependent normalized time-averaged velocity, velocity fluctuations, Reynolds stress, vorticity, and turbulence kinetic energy distributions. TR-PIV line profiles characterized downstream spacer grid flow dynamics. Two-point spatial and spatial–temporal cross-correlation fields revealed local coherent structures and quantified convection velocities of traveling vortices. Spatial–temporal decomposition using dynamic mode decomposition (DMD) applied to the near-wall vorticity fields extracted turbulent structures and flow instabilities in the wake region of the spacer grid, along with their decay and frequency rates. Reduced-order velocity fields from DMD reconstructions identified the most energy-containing coherent structures persistent in the near-wall region. This research provides experimental data sets and analyses of flow behavior in rod bundles with hexagonal spacer grids. In conclusion, the results are critical toward LMFR design and geometry optimization, crucial for the validation of computational fluid dynamics and reduced-order flow models.

42 ENGINEERING↗

Fatigue Test Result for High Burnup Pressurized Water Reactor Rods

The High Burnup Spent Fuel Data Project, sponsored by DOE-NE, is focused on understanding the effects of long-term storage and transportation on high burnup (HBU) (>45 gigawatt days per metric ton uranium) light water reactor fuel. The experiment includes 32 HBU spent nuclear fuel (SNF) assemblies that will be stored in a typical Independent Spent Fuel Storage Installation (ISFSI) and 25 sister rods - nine SNF rods that were removed from the fuel assemblies prior to insertion to the ISFSI and 16 SNF rods removed from similar HBU assemblies. The sister rods provide a baseline of the condition of the HBU rods prior to loading, drying, and long-term dry storage. Destructive examinations of the sister rods are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding will be tested to derive material properties. While the data generated can be used for multiple purposes, a primary goal of the sister rod PIE data and associated measured mechanical properties is to support existing fuel storage licensing and relicensing activities by addressing identified knowledge gaps, and enhance the technical basis for post-storage transportation, handling, and consolidation activities. Fatigue tests of HBU M5-clad, ZIRLO-clad, Zircaloy-4, and low tin Zircaloy-4 segments have been completed using ORNL’s Cyclic Integral Reversible Fatigue Tester (CIRFT). This is the first time ZIRLO-clad rods have been tested. Some of the segments were heat-treated to understand the effects of thermal transients such as those encountered during dry storage vacuum drying on the fatigue lifetime. This paper presents results of the fatigue tests obtained to date and discusses planned future tests.

Montgomery, Rose↗

Technical Evaluation Motor no. 5 (TEM-5)

Technical Evaluation Motor No. 5 (TEM-5) was static test fired at the Thiokol Corporation Static Test Bay T-97. TEM-5 was a full scale, full duration static test fire of a high performance motor (HPM) configuration solid rocket motor (SRM). The primary purpose of TEM static tests is to recover SRM case and nozzle hardware for use in the redesigned solid rocket motor (RSRM) flight program. Inspection and instrumentation data indicate that the TEM-5 static test firing was successful. The ambient temperature during the test was 41 F and the propellant mean bulk temperature (PMBT) was 72 F. Ballistics performance values were within the specified requirements. The overall performance of the TEM-5 components and test equipment was nominal. Dissembly inspection revealed that joint putty was in contact with the inner groove of the inner primary seal of the ignitor adapter-to-forward dome (inner) joint gasket; this condition had not occurred on any previous static test motor or flight RSRM. While no qualification issues were addressed on TEM-5, two significant component changes were evaluated. Those changes were a new vented assembly process for the case-to-nozzle joint and the installation of two redesigned field joint protection systems. Performance of the vented case-to-nozzle joint assembly was successful, and the assembly/performance differences between the two field joint protection system (FJPS) configurations were compared.

Cook, M.↗

Prism Assembly for Roman Space Telescope Wide Field Instrument Slit-less Spectroscopy

The Roman Space Telescope (RST) is a three mirror anastigmat design with a 2.4 m primary mirror. RST will be based in L2 orbit, from where it will provide science information on exoplanets and dark energy using the Coronagraph Instrument (CGI) and Wide Field Instrument (WFI). The WFI features a 300 megapixel near-infrared detector array which provides a field of view 100 times larger than that of Hubble Space Telescope. The Prism Assembly is a small add-on instrument to the Roman Space Telescope’s Wide Field Instrument (WFI), installed in a slot in WFI’s element wheel. The Prism assembly has a passband from 0.75 µm to 1.8 µm, enabling a survey of redshifts in the range 0.2 to 1.7 µm. It provides low resolution slit-less spectroscopy with a spectral resolution R > 70 for all wavelengths, and R < 170 for λ > 0.8 µm across the full field. The Prism Assembly has the potential to provide more supernova spectra than ground-based spectroscopy during the mission lifetime. Being a late add-on to the RST mission, the Prism Assembly has had restrictions on size, weight and geometry, and a challenging schedule, which has dictated much of the implementation. Despite these challenges, the Prism Assembly is a pocket-sized high-performance spectrographic element, implemented as a refractive, all-spherical optical design using only two elements, one S-TIH-1 glass and one CaF2. This presentation will give an overview of the Prism Assembly, from design and implementation, through alignment, test and calibration. (100 words): The Roman Space Telescope is a three mirror anastigmat design with a 2.4 m primary mirror, which will provide science information on dark energy and exoplanets. The Prism Assembly is a small add-on instrument to the telescope’s Wide Field Instrument, enabling low resolution slit-less spectroscopy with a spectral resolution 70 < R < 170 across the full field from λ= 0.75 µm to 1.8 µm. The Prism Assembly is a refractive, all-spherical optical design using a glass and a CaF2 element. This presentation will give an overview of the Prism Assembly, from design and implementation, through alignment, test and calibration.

Space Instrumentation↗

Upgrades to the International Space Station Urine Processor Assembly

Since November 2008, the ISS Urine Processor Assembly (UPA) has successfully generated distillate from crew urine. Several rounds of modifications and upgrades have also been implemented to improve overall system performance throughout the years. The Distillation Assembly (DA) is the latest upgraded unit available, installed in September 2020. This unit has shown immediate performance improvements and redesign success. Most significant upgrades have been a redesigned drive train to eliminate belt slips, improved sealing to reduce leak paths and improve wear, and a redesigned liquid level sensor. The Purge Pump and Separator Assembly (PPSA) technology demonstration is the next available upgraded unit and has finished ground assembly and testing and is targeted for ISS delivery within the coming year. Most recent ground studies have identified areas to focus future UPA upgrade considerations with exploration missions in mind, specifically for better fault detection and isolations approaches as well as potential hardware redesigns to facilitate successful dormancy operations.

Urine Processor Assembly↗

Self-assembly of wood-based shape memory composites triggered by solar-thermal energy

Transporting and assembling large, complex structures poses significant challenges due to their size, geometry, and cost. Additionally, the installation sites are often inaccessible or hazardous for humans, necessitating self-assembling capabilities in these structures. To mitigate these challenges, we propose using 3D printing materials with shape memory effect (SME) for both transport and construction. This approach involves developing 3D modular components into flat sheets for easier transportation, and then self-assembling into 3D structures on-site using solar energy. To gain a deeper understanding of the factors influencing material memory performance, we have chosen a composite PLA/WF, which is polylactic acid (PLA) with 20 wt% wood flour (WF) for this purpose, leveraging its high tensile modulus at 0.966 GPa, low cost, and sustainability. Printed shapes with this material can maintain a recovery ratio over 90% after 3 cycles. While traditional composites fillers (e.g. glass or carbon fiber) are added to enhance mechanical and thermal properties, the addition of bio-based fillers like WF accomplish similar goals without compromising sustainability. We conducted multiple experiments to demonstrate how environmental conditions (i.e. temperature) maximize the material’s SME. Although still at an early stage, this study provides initial insights into bridging the gap between the small-scale nature of shape memory polymers (SMPs) and their potential for large-scale additive manufacturing, addressing a critical need for efficient and sustainable construction. In the long term, we hope our study contributes to the design vision of utilizing SMPs for transportation, assembly, and deployment of complex structures, providing a new pathway for sustainable construction and transportation of large-scale structures to hard-to-access locations such as disaster-affected areas and remote deserts, etc.

4D printing↗

The Manufacturing Process for the NASA Composite Crew Module Demonstration Structure

This paper will describe the approaches and methods selected in fabrication of a carbon composite demonstration structure for the Composite Crew Module (CCM) Program. The program is managed by the NASA Safety and Engineering Center with participants from ten NASA Centers and AFRL. Multiple aerospace contractors are participating in the design development, tooling and fabrication effort as well. The goal of the program is to develop an agency wide design team for composite habitable spacecraft. The specific goals for this development project are: a).To gain hands on experience in design, building and testing a composite crew module. b) To validate key assumptions by resolving composite spacecraft design details through fabrication and testing of hardware. This abstract is based on Preliminary Design data..The final design will continue to evolve through the fall of 2007 with fabrication mostly completed by conference date. From a structures perspective, the.CCM can be viewed as a pressure module with variable pressure time histories and a series of both impact and quasi-static, high intensity point, line, and area distributed loads. The portion of the overall space vehicle being designed and. fabricated by the CCM team is just the pressure module and primary loading points. The heaviest point loads are applied and distributed to the pressure module at.an aluminum Service Module/Alternate Launch Abort System (SM/ALAS) fittings and at Main and Drogue Chute fittings. Significant line loads with metal to metal impact is applied at.the Lids ring. These major external point and line loads as well as pressure impact loads (blast and water landing) are applied to the lobed floor though the reentry shield and crushable materials. The pressure module is divided into upper and lower. shells that mate together with a bonded belly band splice joint to create the completed structural assembly. The benefits of a split CCM far outweigh the risks of a joint. These benefits include lower tooling cost and less manufacturing risk. Assembly of the top and bottom halves of the pressure shell will allow access to the interior of the shell throughout remaining fabrication sequence and can also potentially permit extensive installation of equipment and .crew facilities prior to final assembly of the two shell halves. A Pi pre-form is a woven carbon composite material which is provided in pre-impregnated form and frozen for long term storage. The cross-section shape allows the top of the pi to be bonded to a flat or curved surface with a second flat plate composite section bonded between two upstanding legs of the Pi. One of the regions relying on the merits of the Pi pre-form is the backbone. All connections among plates of the backbone structure, including the upper flanges, and to the lobe base of the pressure shell are currently joined by Pi pre-forms. The intersection of backbone composite plates is formed by application of two Pi pre-forms, top flanges and lobed surfaces are bonded with one Pi pre-form. The process of applying the pre-impregnated pi-preform will be demonstrated to include important steps like surface preparation, forming, application of pressure dams, vacuum bagging for consolidation, and curing techniques. Chopped carbon fiber tooling was selected over other traditional metallic and carbon fiber tooling. The requirement of schedule and cost economy for a moderate reuse cure tool warranted composite tooling options. Composite tooling schedule duration of 18 weeks compared favorably against other metallic tooling including invar tooling. Composite tooling also shows significant cost savings over low CTE metallic options. The composite tooling options were divided into two groups and the final decision was based on the cost, schedule, tolerance, temperature, and reuse requirements.

Pelham, Larry↗

RG217 V2-V2 Coaxial Cable Assembly Procedure

The ECSE Solid State Pulsed Power unit is a high-current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the assembly procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This assembly procedure describes the process used to install cable connectors properly onto the cable.

42 ENGINEERING↗