Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated resource planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Requirements Development for the NASA Advanced Engineering Environment (AEE)

The requirements development process for the Advanced Engineering Environment (AEE) is presented. This environment has been developed to allow NASA to perform independent analysis and design of space transportation architectures and technologies. Given the highly collaborative and distributed nature of AEE, a variety of organizations are involved in the development, operations and management of the system. Furthermore, there are additional organizations involved representing external customers and stakeholders. Thorough coordination and effective communication is essential to translate desired expectations of the system into requirements. Functional, verifiable requirements for this (and indeed any) system are necessary to fulfill several roles. Requirements serve as a contractual tool, configuration management tool, and as an engineering tool, sometimes simultaneously. The role of requirements as an engineering tool is particularly important because a stable set of requirements for a system provides a common framework of system scope and characterization among team members. Furthermore, the requirements provide the basis for checking completion of system elements and form the basis for system verification. Requirements are at the core of systems engineering. The AEE Project has undertaken a thorough process to translate the desires and expectations of external customers and stakeholders into functional system-level requirements that are captured with sufficient rigor to allow development planning, resource allocation and system-level design, development, implementation and verification. These requirements are maintained in an integrated, relational database that provides traceability to governing Program requirements and also to verification methods and subsystem-level requirements.

Rogers, Eric↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Competing Interests and Creating Value - Balancing Durable and Enforceable Institutional Controls with Beneficial Reuse - 20320

US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantifying the Financial Impacts of Electric Vehicles on Utility Ratepayers and Shareholders [Slides]

Widespread electric vehicle (EV) adoption is critical for meeting economy-wide decarbonization goals and, as a result, states are considering enabling policies and rate designs to accelerate EV deployment. EVs can provide possible financial upside to electric utilities and ratepayers in several ways. For example, from the utility perspective, EVs could drive increased electricity sales and new earnings opportunities through increased capital investments. From the ratepayer perspective, increased electric loads from EVs could reduce average all-in retail rates. The degree to which there are net benefits or costs to shareholders and/or ratepayers depends on how EVs are integrated and managed through enabling grid investments and charging strategies. Using Berkeley Lab’s Financial Impacts of Distributed Energy Resources (FINDER) model that mimics the electric utility investment planning and ratemaking processes, we estimate the utility earnings and customer rate impacts of EVs using a bookend approach of “managed” (i.e., best case) and “mismanaged” (i.e., worst case) charging strategies for a generic summer-peaking, investor-owned, and vertically integrated utility. The analysis also examines the sensitivity of results to different assumptions of EV deployment characteristics, EV impacts on retail electricity sales, incremental distribution system costs, EV charging location, and utility EV enablement costs (i.e., utility costs to invest in EV charging, controls, and communication to deliver and administer EV programs). The results are intended to inform EV policies and deployment strategies that maximize utility system benefits and minimize ratepayer costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

(abstract) Science-Project Interaction in the Low-Cost Mission

Large, complex, and highly optimized missions have performed most of the preliminary reconnaisance of the solar system. As a result we have now mapped significant fractions of its total surface (or surface-equivalent) area. Now, however, scientific exploration of the solar system is undergoing a major change in scale, and existing missions find it necessary to limit costs while fulfilling existing goals. In the future, NASA's Discovery program will continue the reconnaisance, exploration, and diagnostic phases of planetary research using lower cost missions, which will include lower cost mission operations systems (MOS). Historically, one of the more expensive functions of MOS has been its interaction with the science community. Traditional MOS elements that this interaction have embraced include mission planning, science (and engineering) event conflict resolution, sequence optimization and integration, data production (e.g., assembly, enhancement, quality assurance, documentation, archive), and other science support services. In the past, the payoff from these efforts has been that use of mission resources has been highly optimized, constraining resources have been generally completely consumed, and data products have been accurate and well documented. But because these functions are expensive we are now challenged to reduce their cost while preserving the benefits. In this paper, we will consider ways of revising the traditional MOS approach that might save project resources while retaining a high degree of service to the Projects' customers. Pre-launch, science interaction can be made simplier by limiting numbers of instruments and by providing greater redundancy in mission plans. Post launch, possibilities include prioritizing data collection into a few categories, easing requirements on real-time of quick-look data delivery, and closer integration of scientists into the mission operation.

mission operation science community interaction co↗

Clean Grid Vision: A U.S. Perspective - Chapter 2. Distribution Issues and Tools

The continued growth in distributed energy resources is fundamentally changing the way the distribution system is operated and planned. Additionally, an increasing number of grid issues are being regularly experienced by distribution engineers within an increasing number of utilities. Fortunately, these fundamental changes and increasingly regular issues are being addressed via continual improvements in existing distribution system modeling tools—for both tools used by industry and researchers—and via novel modeling methods, which are combining transmission and distribution system modeling to investigate new, often complex, system interactions at the transmission/distribution power system interface. As DERs continue to increase more and more utilities, regulators, and developers are finding usable solutions in the deployment of smart inverters with ever more capable functionalities. This increase in functionality is welcome but comes at the cost of more complex analysis when determining what specific settings should be used for an individual interconnection. With more time, experience, and likely the further development of advanced analysis tools, even higher levels of DER integration will result in a reliable, resilient, low-cost, and safely operating grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Simplifying operations with an uplink/downlink integration toolkit

The Operations Engineering Lab (OEL) at JPL has developed a simple, generic toolkit to integrate the uplink/downlink processes, (often called closing the loop), in JPL's Multimission Ground Data System. This toolkit provides capabilities for integrating telemetry verification points with predicted spacecraft commands and ground events in the Mission Sequence Of Events (SOE) document. In the JPL ground data system, the uplink processing functions and the downlink processing functions are separate subsystems that are not well integrated because of the nature of planetary missions with large one-way light times for spacecraft-to-ground communication. Our new closed-loop monitoring tool allows an analyst or mission controller to view and save uplink commands and ground events with their corresponding downlinked telemetry values regardless of the delay in downlink telemetry and without requiring real-time intervention by the user. An SOE document is a time-ordered list of all the planned ground and spacecraft events, including all commands, sequence loads, ground events, significant mission activities, spacecraft status, and resource allocations. The SOE document is generated by expansion and integration of spacecraft sequence files, ground station allocations, navigation files, and other ground event files. This SOE generation process has been automated within the OEL and includes a graphical, object-oriented SOE editor and real-time viewing tool running under X/Motif. The SOE toolkit was used as the framework for the integrated implementation. The SOE is used by flight engineers to coordinate their operations tasks, serving as a predict data set in ground operations and mission control. The closed-loop SOE toolkit allows simple, automated integration of predicted uplink events with correlated telemetry points in a single SOE document for on-screen viewing and archiving. It automatically interfaces with existing real-time or non real-time sources of information, to display actual values from the telemetry data stream. This toolkit was designed to greatly simplify the user's ability to access and view telemetry data, and also provide a means to view this data in the context of the commands and ground events that are used to interpret it. A closed-loop system can prove especially useful in small missions with limited resources requiring automated monitoring tools. This paper will discuss the toolkit implementation, including design trade-offs and future plans for enhancing the automated capabilities.

Murphy, Susan C.↗

GRAF-Plan for Vietnam

Evaluates the reserve requirements for power system balancing areas based on variability and uncertainty of load as well as wind and solar generation scenarios. The tool uses minute‐by‐minute site‐specific generation and load information, as well as information from generation and load forecasting algorithms used in the balancing areas. The Balancing‐Plan Tool can be used directly by utility planners and operators to aid in the integration of intermittent renewable resources. The tool provides reserve requirements of various kinds, such as day‐ahead, load following and regulation, as well as estimates the capacity of the generation fleet to provide the require reserves.

Campbell, Allison↗

Beyond DERMS: Platform Development, Flexibility, Prediction, and Value Measurements

This report describes the results from the “Beyond DERMS” project that aims to build, deploy, and demonstrate - at megawatt scale with thousands of devices - a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. The results demonstrate how emerging ‘internet of energy’ technologies can be leveraged to simultaneously solve the grid problems of today and prepare for the challenges of tomorrow in a way that goes beyond the capabilities of existing distributed energy resource management systems (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of DER Adoption Forecasting into Distribution Planning: Cooperative Research and Development Final Report, CRADA Number CRD-11-00430 (Project H)

The objective of this project is to improve distributed energy resources (DER) technology, time, and locational impact analysis by incorporating customer adoption intentions and preferences into distribution planning and operations. The National Renewable Energy Laboratory (NREL) shall collaborate with EPRI staff to contribute to the development of methodology, literature review, analysis, and write-up for two sections of a report "Identification and Overview of Methods for Mapping DER Adoption Forecasts” and “Comparative Analysis of Methods for Mapping DER Adoption Forecasts."

14 SOLAR ENERGY↗

Interconnection of Distributed Energy Resources in the Indian Context: IEEE 1547-2018 Adaptation for Locally-Appropriate Grid Code Development

The rapid growth of distributed energy resources (DERs) in India and ambitious renewable energy goals set forth by the Indian government have created the need for appropriate distribution interconnection standards to ensure continued system stability, reliability, and resilience. Existing DER interconnection codes in India, at the time of publishing this report, lack many of the critical grid support functionalities for DERs which may protect bulk system stability, such as event ride-through provisions, frequency droop control, or appropriate trip thresholds given the increasing importance of distributed generation. The formal adoption of IEEE 1547-2018 by the Bureau of Indian Standards (BIS) marks a significant step towards achieving appropriate interconnection of DERs, though the implementation of such a standard must be accompanied with careful consideration of the current codes, regulations, and operation of the Indian power system. Studies on the performance of the functionalities within 1547-2018, which properly incorporate local operating conditions, can inform decisions related to the adoption and adaptation of the clauses present in the standard. This report outlines several of these key considerations for stakeholders and provides analyses illustrating the performance of grid support functionalities on typical Indian distribution feeders.

1547↗

Integrated Workforce Planning Model: A Proof of Concept

Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.

Guruvadoo, Eranna K.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Development of Integrated Mechanical Pods

This presentation highlights early wins, updated progress, and upcoming developments on ‘national-scale shared development platform’ for rapid prototyping, testing and validation of various integrated Mechanical Pod solutions and form factors. Such pod solutions consist of a set of all-electric heat pump mechanical equipment that have integrated functionalities through built-in controls, with heating, cooling, hot water, ventilation (including energy recovery), electrical management, and battery storage within a single package. The presentation draws inspiration from the success of bathroom pods in the US modular construction industry, UK’s efforts with unitizing mechanical systems as ‘utility cupboards’, and VEIC’s early wins in design-build of all-electric Mechanical Pod solutions in Vermont. The presentation includes researchers and partners involved with NREL in Design for Manufacturing and Assembly (DfMA), Virtual Design and Construction (VDC), and digital twin based process optimization modeling of integrated Mechanical Pod solutions. The presentation aims to highlight early wins from such a platform and how various physical and virtual tools are currently being employed as part of NREL’s ongoing multi-year project funded by US DOE. Streamlined procurement, coordination, installation, and O&M of Mechanical Pods such that the majority of work is delegated to the off-site modular factory implies monetary savings. Such a seemingly basic shift in location of the construction process leads to great reduction in complexity, first cost, lead time, and waste, and greater opportunities for innovative compartmentalization and integration of mechanical systems appropriately sized for each apartment or hotel guest room. However, past studies on unitized combination systems show that high installation costs, maintenance issues, challenges with system integration, limitations in existing electrical infrastructure, and lack of architecturally appealing solutions are key barriers. NREL and partners aim to address key barriers through DfMA approach, rapid prototyping and testing, and digital twin process optimization modeling. The presentation is also a call for interested entities to partner with NREL as part of the national-scale development platform, help drive both product and process innovation, and encourage open source sharing of learnings. Learning objectives include (1) learn about the vision of national-scale shared development platform for process-product innovation on integrated mechanical pod solutions and how to get involved, (2) gain an understanding of the components of an all-electric, high performance home, design characteristics and equipment included in an all-electric mechanical pod, integration of mechanical systems within a modular factories’ assembly line, and the system’s commissioning, operation and maintenance. The pre-planning and coordination with the factory and sub-contractors are also highlighted, (3) gain an understanding of using process modeling tools to quantify resource-constrained performance of operations (such as integration of energy efficiency strategies) to manufacture modules of varying design, (4) gain insights on virtual design, rapid prototyping, and emulated testing of various form factors across different climatic conditions. The need for such preliminary testing with open source sharing of learnings will also be highlighted.

30 DIRECT ENERGY CONVERSION↗