Overview od STS ground operations/orbiter turnaround STS-1 through STS-7

A review of STS-1 processing is presented as a reference for Shuttle processing time and the magnitude of the associated modifications, discrepancies, technical requirements, and ground systems activities. STS-1 processing provided the basis from which a plan to perform operational turnaround was established. Turnaround processing for Launch and Landing are treated separately to depict more clearly the progress made to reduce turnaround time and manhours expended. Turnaround time was reduced from 187 days for STS-2 to 60 days for STS-7 and landing turnaround was reduced from 14 days to 5 days. Modifications were reduced from 114 to 51. Requirements changes for launch readiness verification were reduced from 536 to 107. Special tests or inspections were reduced from 292 to 52. Anomalies resolved concurrent with processing were reduced from 13,000 to 4,000. Integration in the Vehicle Assembly Building (VAB) is about 10 percent of the flow, and Launch Pad operations comprise 40 percent of the turnaround. The work force has matured and has demonstrated the capability to perform planned and contingency operations. The turnaround program is fast approaching the goal of becoming operational.

Schwartz, R.↗

STS-35: Mission Highlights Resource Tape

Live footage shows the crewmembers of STS-35, Commander Vance D. Brand, Pilot Guy S. Gardner, Mission Specialists Jeffrey A. Hoffman, John M. Lounge, and Robert A. Parker, and Payload Specialists Samuel T. Durrance, and Ronald A. Parise, participating in the traditional breakfast prior to launch. The crew is seen suiting up, and walking out to the Astro-Van for their 1 a.m. launch. Also shown are some beautiful panoramic shots of the shuttle on the launch pad, main engine start, ignition, liftoff, and various shots of the Launch Control Center (LCC). The crew is also shown during flight performing some routine functions such as operating the trash compactor, eating, and getting into and out of their sleeping quarters. The crew is seen taking part in a conversation with the Secretary of State, and the Foreign Minister of the Soviet Union. Footage also includes the landing of Columbia, its rollout on the runway, and its crew as they depart from the vehicle.

Source record↗

STS-101 Meal - Suit Up - Depart O&C Launch - On Orbit - Landing - Crew Depart

The STS-101 Space Shuttle Atlantis Assembly Flight International Space Station (ISS) -2A-2a mission begins with Commander Jim Halsell, and mission specialists Jeff Williams and Yuri Usachev talking briefly to the media. Pilot Scott Horowitz, and Mission Specialists Susan Helms, James Voss, and Mary Ellen Weber are shown arriving later to take crew photos. Footage of the entire STS-101 crew is shown getting suited and departing the Operations and Checkout (O&C) Building. Views of the actual launch of the Space Shuttle Atlantis are presented from the vehicle assembly building (VAB), PAD-A, Tower 1, Universal Camera Sites (UCS) 15 and 23 and Press sites. Jeff Williams and James Voss are shown on orbit performing a single space walk to complete maintenance to the International Space Station. A nighttime touchdown of the Space Shuttle Atlantis is also presented.

Source record↗

Lightning at Kennedy Space Center

Kennedy Space Center (KSC) is situated in an area that experiences one of the world's highest rates of cloud-ground lightning strikes, about 600-2000 strikes per summer. Two lightning detection systems have been implemented, the Launch Pad Lightning Warning System (LPLWS) and the Lightning Location and Protection system (LLP). The LPLWS consists of field mills of eight vertically oriented stator sections mounted 10 in. above ground and alternately covered and uncovered as the rotor turns. Differential voltages between covered and uncovered sections furnish electric field amplitude and polarity data. Ten samples per second are telemetered to a central processing facility. The system is used during launch and landing. The LLP has high and low gain components, the former being two direction finder antennas with 100 m strike position finding accuracy, the latter featuring medium gain antennas for 500 m accuracy in locating strikes. The LLP system is used primarily to warn personnel of strike conditions and to lift warnings to avoid lost work time. Several experimental programs have been initiated for triggering lightning strikes and controlling their locations.

Gibbons, W. C.↗

Mission safety evaluation report for STS-39, postflight edition

After a delay of approximately 2 months due to a rollback from the pad to replace the External Tank door lug housing, Space Shuttle Discovery was launched from NASA-Kennedy at 7:33 a.m. Eastern Daylight Time on 28 April 1991. STS-39 was the first unclassified DoD Shuttle mission. On 28 April, countdown proceeded normally through the T-20 minute hold. No significant problems were encountered except for the Operations Sequence-2 recorder starting unexpectedly; it was stopped by an uplink command. Discovery landed on KSC runway 15 at 2:55 p.m. EDT on 6 May 1991. This was the second time in 6 months that the Space Shuttle was diverted to KSC for landing because of high winds at Edwards AFB, Calif. This was also the 7th of 40 Shuttle missions to land at KSC in the history of the Space Shuttle Program. The Main Landing Gear outer right tire shredded 3 of the 16 cords due to either an uneven landing or a maximum force breaking test during rollout. Contributing factors to the tire cord shredding were the development of last minute crosswinds and reluctance of the ground controllers to distract the Shuttle pilots with warnings of the low flight path. As a corrective action, communication procedures will be modified for future flights.

Hardie, Kenneth O.↗

Ascent abort capability for the HL-20

The HL-20 has been designed with the capability for rescue of the crew during all phases of powered ascent from on the launch pad until orbital injection. A launch-escape system, consisting of solid rocket motors located on the adapter between the HL-20 and the launch vehicle, provides the thrust that propels the HL-20 to a safe distance from a malfunctioning launch vehicle. After these launch-escape motors have burned out, the adapter is jettisoned and the HL-20 executes one of four abort modes. In three abort modes - return-to-launch-site, transatlantic-abort-landing, and abort-to-orbit - not only is the crew rescued, but the HL-20 is recovered intact. In the ocean-landing-by-parachute abort mode, which occurs in between the return-to-launch-site and the transatlantic-abort-landing modes, the crew is rescued, but the HL-20 would likely sustain damage from the ocean landing. This paper describes the launch-escape system and the four abort modes for an ascent on a Titan III launch vehicle.

Naftel, J. C.↗

An Engineering Guide to Lunar Geotechnical Properties

The renewed interest in returning human and robotic explorers to the lunar surface has identified a need for a renewed understanding of lunar geotechnical properties related to landing, exploration, excavation, and construction activities on the lunar surface. This paper summarizes measurements conducted during US and Russian/Soviet landed missions as well as experiments performed on returned samples to establish fundamental geotechnical properties such as particle size distribution, particle shape, bulk density, shear strength, cohesion and bearing strength. While many of these properties are well known, how they vary with increased lunar soil depth is less understood, and those properties that vary significantly as a function of depth are explored in additional detail. Selected examples discuss mechanical excavation forces, rocket exhaust erosion forces, and the preparation of launch/landing pad surfaces, with the goal of a better understanding of lunar soil geotechnical properties that apply to large-scale exploration of the lunar surface and dictate the design of future exploration systems.

Lunar Soil↗

The Orion Pad Abort 1 Flight Test A Highly Successful Test

The Orion Pad Abort 1 (PA-1) flight test was designed as an early demonstration of the Launch Abort System (LAS) for the Orion capsule. The LAS was designed developed and manufactured by the Lockheed Martin/Orbital Sciences team. At inception it was realized that recovery of the Orion Capsule simulator would be useful from an engineering analysis and data recovery point of view. Additionally this test represented a flight opportunity for the Orion parachute system, which in a real abort would provide final landing deceleration. The Orion parachute program is named CPAS (CEV Parachute Assembly System). Thus CPAS became a part of the PA-1 flight, as a secondary test objective. At program kick off, the CPAS system was in the design state described below. Airbag land landing of the spacecraft was the program baseline. This affected the rigging of the parachutes. The system entry deployment conditions and vehicle mass have both evolved since that original design. It was decided to use the baseline CPAS Generation 1 (Gen 1) parachute system for the recovery of the PA-1 flight. As CPAS was a secondary test objective, the system would be delivered in its developmental state. As the PA-1 program evolved, the parachute recovery system (CPAS) moved from a secondary objective to a more important portion of the program. Tests were added, weights and deployment conditions changed and some hardware portions of the CPAS configuration were not up to the new challenges. Additional tests were added to provide confidence in the developmental system. This paper will review a few of these aspects with the goal of showing some preliminary and qualitative results from what we believe was a highly successful test.

Sinclair, Robert↗

Abort performance for a winged-body single-stage to orbit vehicle

Optimal control theory is employed to determine the performance of abort to orbit (ATO) and return to launch site (RTLS) maneuvers for a single-stage to orbit vehicle. The vehicle configuration examined is a seven engine, winged-body vehicle, that lifts-off vertically and lands horizontally. The abort maneuvers occur as the vehicle ascends to orbit and are initiated when the vehicle suffers an engine failure. The optimal control problems are numerically solved in discretized form via a nonlinear programming (NLP) algorithm. A description highlighting the attributes of this NLP method is provided. ATO maneuver results show that the vehicle is capable of ascending to orbit with a single engine failure at lift-off. Two engine out ATO maneuvers are not possible from the launch pad, but are possible after launch when the thrust to weight ratio becomes sufficiently large. Results show that single engine out RTLS maneuvers can be made for up to 180 seconds after lift-off and that there are scenarios for which RTLS maneuvers should be performed instead of ATP maneuvers.

Lyon, Jeffery A.↗

STS-108-Endeavour/ISS UF-1/Pre-Launch/Launch/On Orbit/Landing/Crew Egress

This video shows footage from throughout the STS-108 mission. The crew of Space Shuttle Enveavour (Commander Dominic Gorie, Pilot Mark Kelly, and Mission Specialists Linda Godwin and Daniel Tani) together with the International Space Station (ISS) Expedition 4 crew (Commander Yuri Onufrienko and Flight Engineers Carl Walz and Daniel Bursch) are shown at their pre-flight meal, putting on flight suits, and boarding Endeavour. A special segment shows maintainance performed on Endeavour prior to the orbiter reaching the launch pad. Endeavour is shown arriving at Kennedy Space Center mounted on a 747, and is prepared for launch in the Orbiter Processing Facility. The mating of the External Tank and the Solid Rocket Boosters in shown in the Vehicle Assembly Building (VAB). The Raffaello Multi-Purpose Logistics Module (MPLM) and the Starshine satellite are shown being loaded into Endeavour's payload bay. Launch views include: Beach Tracker, VAB, Pad-B, Tower-1, DLTR-3, Grandstand, DOAMS, Playalinda DOAMS (with a close-up of the Endeavour's main engine, and UCS-23. On-orbit tasks include: docking with the ISS, greetings and enthusiastic crew transfer with the Expedition 3 crew (Commander Frank Culbertson, Jr. and Flight Engineers Mikhail Turin and Vladimir Dezhurov), Mission Control and crew reflections upon the 9/11 attacks, Raffaello docking with and being removed from the ISS, and an extravehicular activity (EVA) by Godwin and Tani. Landing views include: VAB, Tower-1, Mid-Field, South End SLF, North End SLF, Tower-2, Playalinda DOAMS, and Pilot Point of View (PPOV). Each of the four Endeavour crew members gives a short speech after landing.

Source record↗

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand↗

STS-97 Mission Highlights Resource Tape

Various clips give an overview of the STS-97 Endeavour mission. Footage includes Endeavour on the launch pad, the crew of STS-97 (Commander Brent W. Jett, Pilot Michael J. Bloomfield, and Mission Specialists Joseph R. Tanner, Carlos I. Noriega, and Marc Garneau) suiting up, replays of the nighttime launch, Launch Control Center at Kenendy Space Center during countdown, and the activities of flight days one through three. The activities of flight days four through six can be seen on 'STS-97 Mission Highlights Resource Tape, Part 2 of 3' (document ID 20010020282). The activities of flight days seven through eleven and Endeavour's landing can be found on 'STS-97 Mission Highlights Resource Tape, Part 3 of 3' (document ID 20010020283).

Source record↗

STS-113 Post Flight Presentation

The STS-113 post-flight presentation begins with a view of Mission Specialists Michael E. Lopez-Alegria and John B. Herrington getting suited for the space mission. The STS-113 crew consists of: Commander James D. Wetherbee, Pilot Paul Lockhart, Mission Specialists Michael Lopez-Alegria and John Herrington. Cosmonauts Valery Korzun, and Sergei Treschev, and astronaut Peggy Whitson who are all members of the expedition five crew, and Commander Kenneth Bowersox, Flight Engineers Nikolai Budarin and Donald Pettit, members of Expedition Six. The main goal of this mission is to take Expedition Six up to the International Space Station and Return Expedition Five to the Earth. The second objective is to install the P(1) Truss segment. Three hours prior to launch, the crew of Expedition Six along with James Wetherbee, Paul Lockhart, Michael Lopez-Alegria and John Herrington are shown walking to an astrovan, which takes them to the launch pad. The actual liftoff is presented. Three Extravehicular Activities (EVA)'s are performed on this mission. Michael Lopez-Alegria and John Herrington are shown performing EVA 1 and EVA 2 which include making connections between the P1 and S(0) Truss segments, and installing fluid jumpers. A panoramic view of the ISS with the Earth in the background is shown. The grand ceremony of the crew exchange is presented. The astronauts performing everyday duties such as brushing teeth, washing hair, sleeping, and eating pistachio nuts are shown. The actual landing of the Space Shuttle is presented.

Source record↗

Curation planning and facilities for asteroid Bennu samples returned by the OSIRIS-REx mission

NASA's OSIRIS-REx spacecraft collected samples from carbonaceous near-Earth asteroid (101955) Bennu on October 20, 2020, and will deliver them to the Earth on September 24, 2023. The samples will be processed at the NASA Johnson Space Center (JSC), where most of the sample collection will be subsequently curated in a new cleanroom suite. The spacecraft collected loose regolith two ways: in a bulk sample chamber capable of holding up to 2 kg, and on industrial Velcro “contact pads” intended to collect small particles at the surface. Included in the JSC collection will be the bulk sample, the contact pads, contamination-monitoring witness plates, and supporting hardware. Planning for the curation of the samples and hardware started at the earliest phase of proposal development and continued in parallel with project development and execution. Because a major mission goal is characterization of organic compounds in the Bennu samples, extra effort was spent in the design stage to ensure a clean curation environment. Here, we describe the preparations to receive the sample, including the design, construction, outfitting, and monitoring of the cleanrooms at JSC; the planned recovery of the sample-containing capsule when it lands on Earth; and the approach to characterizing and cataloging the samples. These curation efforts will result in the distribution of pristine Bennu samples from JSC to the OSIRIS-REx science team, international partners, and the global scientific community for years to come.

curation↗

STS-76 Mission Highlights Resource Tape

The flight crew of the STS-76 mission, Cmdr. Kevin P. Chilton, Pilot Richard A. Searfoss, and Mission Specialists Shannon W. Lucid, Linda M. Godwin, Michael R. Clifford, and Ronald M. Sega, present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Once in orbit, various view of the Mir Space Station can be seen as the shuttle begins its approach and docking. There several views of Godwin and Clifford as they spent six hours spacewalking in Atlantis's cargo bay and on the exterior of the Mir's docking module. The mission ending re-entry and landing can also be seen.

Source record↗

STS-77 Post Flight Presentation

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor. The crew than answers questions from the press.

Source record↗

STS-77 Mission Highlights Resource Tape

The flight crew of the STS-77 mission, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., present a video mission over-view of their space flight. Images include: pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. Following an on-time launch, the crew of Endeavor are shown setting up a variety of experiments that will operate for much of the mission. Also seen is the deployment and inflation of the Spartan Satellite, experiments being conducted in the Spacehab module, thruster firing to stabilized the shuttle, and the mission ending re-entry and landing of the shuttle Endeavor.

Source record↗

Foam on Tile Impact Modeling for the Space Shuttle Program

Following the breakup of the Space Shuttle Columbia during reentry a NASA-wide investigation team was formed to examine the probable damage inflicted on Orbiter Thermal Protection System (TPS) elements by impact of External Tank insulating foam projectiles. Our team was to apply rigorous, physics-based analysis techniques to help determine parameters of interest for an experimental test program, utilize validated codes to investigate the full range of impact scenarios, and use analysis derived models to predict aero-thermal-structural responses to entry conditions. We were to operate on a non-interference basis with the j Team, and were to supply significant findings to that team and to the Orbiter Vehicle Engineering Working Group, being responsive to any solicitations for support from these entities. The authors formed a working sub-group within the larger team to apply the Smooth Particle Hydrodynamics code SPHC to the damage estimation problem. Numerical models of the LI-900 TPS tiles and of the BX-250 foam were constructed and used as inputs into the code. Material properties needed to properly model the tiles and foam were obtained from other working sub-groups who performed tests on these items for this purpose. Two- and three- dimensional models of the tiles were constructed, including the glass outer layer, the densified lower layer of LI-900 insulation, the Nomex felt Strain Isolation Pad (SIP) mounting layer, and the underlying aluminum 2024 vehicle skin. A model for the BX-250 foam including porous compression, elastic rebound, and surface erosion was developed. Code results for the tile damage and foam behavior were extensively validated through comparison with the Southwest Research Institute (SwRI) foam-on-tile impact experiments carried out in 1999. These tests involved small projectiles striking individual tiles and small tile arrays. Following code and model validation we simulated impacts of larger ET foam projectiles on the TPS tile systems used on the wings of the orbiter. Tiles used on the Wing Acreage, the Main Landing Gear Door, and the Carrier Panels near the front edge of the wing were modeled. Foam impacts shot for the CAB investigation were modeled, as well as impacts at larger angles, including rapid rotation of the projectile, and with varying foam properties. General results suggest that foam impacts on tiles at about 500 mph could cause appreciable damage if the impact angle is greater than about 20 degrees. Some variations of the foam properties, such as increased brittleness or increased density could increase damage in some cases. Rapid (17 rps) rotation failed to increase the damage for the two cases considered. This does not rule out other cases in which the rotational energy might lead to an increase in tile damage, but suggests that in most cases rotation will not be an important factor. Similar models will be applied for other impacting materials, other velocities, and other geometries as part of the Return to Flight process.

Stellingwerf, R. F.↗