Search NASA⌕ Search

SEARCH · Search NASA

Results for “Legacy wells”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Auto-Generated Semantic Processing Services

Auto-Generated Semantic Processing (AGSP) Services is a suite of software tools for automated generation of other computer programs, denoted cross-platform semantic adapters, that support interoperability of computer-based communication systems that utilize a variety of both new and legacy communication software running in a variety of operating- system/computer-hardware combinations. AGSP has numerous potential uses in military, space-exploration, and other government applications as well as in commercial telecommunications. The cross-platform semantic adapters take advantage of common features of computer- based communication systems to enforce semantics, messaging protocols, and standards of processing of streams of binary data to ensure integrity of data and consistency of meaning among interoperating systems. The auto-generation aspect of AGSP Services reduces development time and effort by emphasizing specification and minimizing implementation: In effect, the design, building, and debugging of software for effecting conversions among complex communication protocols, custom device mappings, and unique data-manipulation algorithms is replaced with metadata specifications that map to an abstract platform-independent communications model. AGSP Services is modular and has been shown to be easily integrable into new and legacy NASA flight and ground communication systems.

Davis, Rodney↗

Robust Method to Identify Groundwater Affected By Redox Conditions at Los Alamos National Laboratory Legacy Cleanup Site - 20497

To facilitate the mission of the Department of Energy's (DoE's) Environmental Management Program at Los Alamos National Laboratory (LANL), a significant number of groundwater monitoring wells with depths ranging from 152-396 meter were completed for characterization and monitoring. Groundwater at Los Alamos tends to be oxygen saturated with very low concentrations of organic matter. Drilling fluids can introduce residual carbon causing an increase in microbial activity and local reducing conditions around the well, potentially impacting representativeness of groundwater data quality for redox sensitive constituents. We assert that the redox state of the wells can robustly be identified by aqueous solution concentrations of iron and manganese. An automated review process has been built into a computer-based data management system enabling an efficient screening process for identifying reducing conditions that are not caught using standard data-validation protocol, and ensures that important data quality issues are thoroughly identified and addressed in an efficient and timely manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Velocity reconstruction in the era of DESI and Rubin/LSST. II. Realistic samples on the light cone

Reconstructing the galaxy peculiar velocity field from the distribution of large-scale structure plays an important role in cosmology. On one hand, it gives us an insight into structure formation and gravity; on the other, it allows us to selectively extract the kinetic Sunyaev-Zel’dovich (kSZ) effect from cosmic microwave background maps. In this work, we employ high-accuracy synthetic galaxy catalogs on the light cone to investigate how well we can recover the velocity field when utilizing the three-dimensional spatial distribution of the galaxies in a modern large-scale structure experiment such as the Dark Energy Spectroscopic Instrument (DESI) and the Rubin Observatory Legacy Survey of Space and Time. In particular, we adopt the standard technique used in baryon acoustic oscillation analysis for reconstructing the Zel’dovich displacements of galaxies through the continuity equation, which yields a first-order approximation to their large-scale velocities. We investigate variations in the number density, bias, mask, area, redshift noise, and survey depth, as well as modifications to the settings of the standard reconstruction algorithm. Since our main goal is to provide guidance for planned kSZ analysis between DESI and the Atacama Cosmology Telescope, we apply velocity reconstruction to a faithful representation of DESI spectroscopic and photometric targets. We report the cross-correlation coefficient between the reconstructed and the true velocities along the line of sight. For the DESI Y1 spectroscopic survey, we expect the correlation coefficient to be r ≈ 0.64, while for a photometric survey with δ z /(1+z) = 0.02, as is approximately the case for the Legacy Survey used in the target selection of DESI galaxies, r shrinks by half to r ≈ 0.31. Here, we hope the results in this paper can be used to inform future kSZ stacking studies and other velocity reconstruction analyses planned with the next generation of cosmology experiments.

79 ASTRONOMY AND ASTROPHYSICS↗

Finding Multiply Lensed and Binary Quasars in the DESI Legacy Imaging Surveys

The time delay between multiple images of strongly lensed quasars is a powerful tool for measuring the Hubble constant ( H 0 ). To achieve H 0 measurements with higher precision and accuracy using the time delay, it is crucial to expand the sample of lensed quasars. We conduct a search for strongly lensed quasars in the Dark Energy Spectroscopic Instrument (DESI) Legacy Imaging Surveys. The DESI Legacy Surveys comprise 19,000 deg 2 of the extragalactic sky observed in three optical bands ( g , r , and z ), making it well suited for the discovery of new strongly lensed quasars. We apply an autocorrelation algorithm to ~5 million objects classified as quasars in the DESI Quasar Sample. These systems are visually inspected and ranked. Here, we present 436 new multiply lensed and binary quasar candidates, 65 of which have redshifts from Sloan Digital Sky Survey Data Release 16. We provide redshifts for an additional 18 candidates from the SuperNova Integral Field Spectrograph.

79 ASTRONOMY AND ASTROPHYSICS↗

Advanced Mixed Waste Treatment Project Overcomes Challenges to Complete Treatment of Debris Waste - 20616

The Advanced Mixed Waste Treatment Project (AMWTP), operated by Fluor Idaho for the Department of Energy Idaho Operations Office, completed the last of its debris waste treatment in the fall of 2019. Concluding that work-scope was certainly not without its challenges. Fluor Idaho and its employees had to adapt to treating extremely challenging waste types, such as high-fissile gram materials and potentially pyrophoric and reactive wastes coming down the stretch. It also had to complete the sizing of large waste boxes from Mound Laboratories in inner-contamination enclosures designed to capture the extremely fine, 'flighty' plutonium-238 in its high-efficiency particulate air filters. Very few waste treatment facilities in the DOE Complex have completed their missions. In fact, most large-scale waste treatment facilities are still under construction with many months or years remaining before 'hot operations' begin. AMWTP is unique because it functioned as a 'one-stop shop.' Transuranic and low-level waste characterization, treatment, certification, and shipping all occurred there. AMWTP concluded the most challenging part of its mission and will continue to ship material out of the state of Idaho for the next decade. This paper will provide a background of the AMWTP mission, and the adaptations to its operating permit, equipment, or treatment processes to address challenging waste types. AMWTP will leave behind a legacy of being one of the most successful waste treatment facilities in the history of the DOE Complex. The facility was well-conceived, well-constructed, and well-executed; it was done right from start to finish. During the course of its waste treatment mission, the facility was required to adapt to changing conditions by treating extremely challenging waste types. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

CSEWG Meeting Minutes

Work has been done at LANL to validate various updated evaluations from ENDF/BVIII.1b0 including: Fe, Cu, Si, U, Pu. Continuous energy tables were processed with NJOY2016 and output to ACE files. For non-Pu legacy critical benchmarks, all calculations were within the experimental benchmark uncertainty, with some benchmarks having shown lower bias using ENDF/B-VIII.1b0. In HST systems, ENDF/B-VIII.0 shows reasonable results above the thermal leakage fraction. ENDF/B-VIII.0.1 is doing slightly worse than ENDF/B- VIII.0. b0.2 and it also includes a new 19 F evaluation, so more work is needed to examine its impact. 233 U thermal and intermediate bare and water-reflected benchmarks agree well with ENDF/B-VIII.0. From ENDF/B-VIII.0 to ENDF/B-VIII.0b0.1, HMF-007 C/E are increasing and the new 19 F evaluation is helping the HMF-007 cases containing Teflon which have historically had high C/E. The Pu legacy benchmark suite is within experimental uncertainty with the exception of THOR. The INDEN evaluation followed by LANL gave the lowest mean absolute bias, but it remains difficult to make a determination on which Pu evaluation is the best. INDEN performs slightly better for the JEZEBEL series, while the LANL Pu evaluation is better for THOR and flattop benchmarks. For the PMI benchmark series INDEN outperforms the LLNL evaluation. For the PST benchmark series ENDF/B-VIII.0 and LLNL Pu evaluations are better than the INDEN evaluation. C/E ratios for Jezebel and Godiva reaction rate ratios show all the Pu evaluations are very close to one another, making it again difficult to say which is best. When examining neutron reactor kinetics parameters, each Pu evaluation is once again very close. Each individual Pu evaluation seems to have advantages in their own applications.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Using CFD as a Rocket Injector Design Tool: Recent Progress at Marshall Space Flight Center

New programs are forcing American propulsion system designers into unfamiliar territory. For instance, industry s answer to the cost and reliability goals set out by the Next Generation Launch Technology Program are engine concepts based on the Oxygen- Rich Staged Combustion Cycle. Historical injector design tools are not well suited for this new task. The empirical correlations do not apply directly to the injector concepts associated with the ORSC cycle. These legacy tools focus primarily on performance with environment evaluation a secondary objective. Additionally, the environmental capability of these tools is usually one-dimensional while the actual environments are at least two- and often three-dimensional. CFD has the potential to calculate performance and multi-dimensional environments but its use in the injector design process has been retarded by long solution turnaround times and insufficient demonstrated accuracy. This paper has documented the parallel paths of program support and technology development currently employed at Marshall Space Flight Center in an effort to move CFD to the forefront of injector design. MSFC has established a long-term goal for use of CFD for combustion devices design. The work on injector design is the heart of that vision and the Combustion Devices CFD Simulation Capability Roadmap that focuses the vision. The SRL concept, combining solution fidelity, robustness and accuracy, has been established as a quantitative gauge of current and desired capability. Three examples of current injector analysis for program support have been presented and discussed. These examples are used to establish the current capability at MSFC for these problems. Shortcomings identified from this experience are being used as inputs to the Roadmap process. The SRL evaluation identified lack of demonstrated solution accuracy as a major issue. Accordingly, the MSFC view of code validation and current MSFC-funded validation efforts were discussed in some detail. The objectives of each effort were noted. Issues relative to code validation for injector design were discussed in some detail. The requirement for CFD support during the design of the experiment was noted and discussed in terms of instrumentation placement and experimental rig uncertainty. In conclusion, MSFC has made significant progress in the last two years in advancing CFD toward the goal of application to injector design. A parallel effort focused on program support and technology development via the SCIT Task have enabled the progress.

Tucker, Kevin↗

Encke-Beta Predictor for Orion Burn Targeting and Guidance

The state vector prediction algorithm selected for Orion on-board targeting and guidance is known as the Encke-Beta method. Encke-Beta uses a universal anomaly (beta) as the independent variable, valid for circular, elliptical, parabolic, and hyperbolic orbits. The variable, related to the change in eccentric anomaly, results in integration steps that cover smaller arcs of the trajectory at or near perigee, when velocity is higher. Some burns in the EM-1 and EM-2 mission plans are much longer than burns executed with the Apollo and Space Shuttle vehicles. Burn length, as well as hyperbolic trajectories, has driven the use of the Encke-Beta numerical predictor by the predictor/corrector guidance algorithm in place of legacy analytic thrust and gravity integrals.

Robinson, Shane↗

NASA's Geoscience Training Program for Astronauts

Geoscientists have been training and preparing astronauts to observe the Earth from space and explore other planetary surfaces with a legacy that reaches back to the early days of the space program. Continuing this legacy and critical function, a core NASA team has been closely coordinating with the Johnson Space Center (JSC) Flight Operations Directorate (FOD) as well as academic, institute, and other governmental partners to conduct a comprehensive geoscience training program that ranges from initial astronaut candidate training to preparing crew for Artemis missions. Described below are the three program training phases, along with recent program highlights and forward planning.

Graff, T. G.↗

LUNAR SURFACE GEOSCIENCE TRAINING FOR ASTRONAUTS

Geoscientists have been training and preparing astronauts to observe the Earth from space and explore other planetary surfaces with a legacy that reaches back to the early days of the space program. Continuing this legacy and critical function, a core NASA team has been closely coordinating with the Johnson Space Center (JSC) Flight Operations Directorate (FOD) as well as academic, research institutions, and other governmental partners to conduct a comprehensive geoscience training program that ranges from initial astronaut candidate training to preparing assigned crew for future lunar surface missions. Described below are the three program training phases (summarized in Figure 1), along with recent program highlights and forward planning. Given NASA’s increased planning and development efforts regarding near-term lunar surface science activities, we welcome ideas, concepts, capabilities, collaborations, and innovations to this astronaut training program.

T. G. Graff↗

The eROSITA Final Equatorial-Depth Survey (eFEDS)

In 2019, the eROSITA telescope on board the Russian-German satellite Spectrum-Roentgen-Gamma (SRG) began to perform a deep all-sky X-ray survey with the aim of identifying ~100 000 clusters and groups over the course of four years. As part of its performance verification phase, a ~140 deg 2 survey, called eROSITA Final Equatorial-Depth Survey (eFEDS), was performed. With a depth typical of the all-sky survey after four years, it allows tests of tools and methods as well as improved predictions for the all-sky survey. As part of this effort, a catalog of 542 X-ray selected galaxy group and cluster candidates was compiled. Here, in this paper, we present the optical follow-up, with the aim of providing redshifts and cluster confirmation for the full sample. Furthermore, we aim to provide additional information on the dynamical state, richness, and optical center of the clusters. Finally, we aim to evaluate the impact of optical cluster confirmation on the purity and completeness of the X-ray selected sample. We used optical imaging data from the Hyper Suprime-Cam Subaru Strategic Program and from the Legacy Survey to identify optical counterparts to the X-ray detected cluster candidates. We make use of the multi-component matched filter cluster confirmation tool (MCMF), as well as of the optical cluster finder CAMIRA to derive cluster redshifts and richnesses. MCMF provided the probabilities with which an optical structure would be a chance superposition with the X-ray candidate. These probabilities were used to identify the best optical counterpart as well as to confirm an X-ray candidate as a cluster. The impact of this confirmation process on catalog purity and completeness was estimated using optical to X-ray scaling relations as well as simulations. The resulting catalog was furthermore matched with public group and cluster catalogs. Optical estimators of the cluster dynamical state were constructed based on density maps of the red-sequence galaxies at the cluster redshift. By providing redshift estimates for all 542 candidates, we construct an optically confirmed sample of 477 clusters and groups with a residual contamination of 6%. Of these, 470 (98.5%) are confirmed using MCMF, and 7 systems are added through cross-matching with spectroscopic group catalogs. Using observable-to-observable scaling and the applied confirmation threshold, we predict that 8 ± 2 real systems have been excluded with the MCMF cut required to build this low-contamination sample. This number agrees well with the 7 systems found through cross-matching that were not confirmed with MCMF. The predicted redshift and mass distribution of this catalog agree well with simulations. Thus, we expect that these 477 systems include >99% of all true clusters in the candidate list. Using an MCMF-independent method, we confirm that the catalog contamination of the confirmed subsample is 6 ± 3%. Application of the same method to the full candidate list yields 17 ± 3%, consistent with estimates coming from the fraction of confirmed systems of ~17% and with expectations from simulations of ~20%. We also present a sample of merging cluster candidates based on the derived estimators of the cluster dynamical state.

79 ASTRONOMY AND ASTROPHYSICS↗

All-purpose, all-sky photometric redshifts for the Legacy Imaging Surveys Data Release 8

ABSTRACT In this paper, we present photometric redshift (photo-z) estimates for the Dark Energy Spectroscopic Instrument (DESI) Legacy Imaging Surveys, currently the most sensitive optical survey covering the majority of the extragalactic sky. Our photo-z methodology is based on a machine-learning approach, using sparse Gaussian processes augmented with Gaussian mixture models (GMMs) that allow regions of parameter space to be identified and trained separately in a purely data-driven way. The same GMMs are also used to calculate cost-sensitive learning weights that mitigate biases in the spectroscopic training sample. By design, this approach aims to produce reliable and unbiased predictions for all parts of the parameter space present in wide area surveys. Compared to previous literature estimates using the same underlying photometry, our photo-zs are significantly less biased and more accurate at z > 1, with negligible loss in precision or reliability for resolved galaxies at z < 1. Our photo-z estimates offer accurate predictions for rare high-value populations within the parent sample, including optically selected quasars at the highest redshifts (z > 6), as well as X-ray or radio continuum selected populations across a broad range of flux (densities) and redshift. Deriving photo-z estimates for the full Legacy Imaging Surveys Data Release 8, the catalogues provided in this work offer photo-z estimates predicted to be of high quality for ≳9 × 108 galaxies over ${\sim}19\, 400\, \text{deg}^{2}$ and spanning 0 < z ≲ 7, offering one of the most extensive samples of redshift estimates ever produced.

79 ASTRONOMY AND ASTROPHYSICS↗

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning system (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had so many problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities..

Gomez, Susan↗

Three Years of Global Positioning System Experience on International Space Station

The International Space Station global positioning systems (GPS) receiver was activated in April 2002. Since that time, numerous software anomalies surfaced that had to be worked around. Some of the software problems required waivers, such as the time function, while others required extensive operator intervention, such as numerous power cycles. Eventually, enough anomalies surfaced that the three pieces of code included in the GPS unit have been re-written and the GPS units were upgraded. The technical aspects of the problems are discussed, as well as the underlying causes that led to the delivery of a product that has had numerous problems. The technical aspects of the problems included physical phenomena that were not well understood, such as the affect that the ionosphere would have on the GPS measurements. The underlying causes were traced to inappropriate use of legacy software, changing requirements, inadequate software processes, unrealistic schedules, incorrect contract type, and unclear ownership responsibilities.

Gomez, Susan↗

Modeling the Water Cycle With the NASA Ames FV3-Based Mars Global Climate Model

It is widely recognized that water ice clouds critically affect the current weather and climate of Mars. Simulating clouds and the water cycle in climate models remains challenging, however, due to the highly sensitive nature of cloud formation to several microphysical parameters that are not well known for Mars and the strong radiative feedbacks that can occur. We have recently ported our cloud microphysics package from the NASA Ames Legacy Mars Global Climate Model (MGCM) to our new MGCM based on the NOAA/GFDL cubed-sphere finite volume (FV3) dynamical core. Here we report on the status of our water cycle simulations and show how our reference simulation compares to observations.

M A Kahre↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗