Search NASA⌕ Search

SEARCH · Search NASA

Results for “Logistics Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Managing Complexity in the MSL/Curiosity Entry, Descent, and Landing Flight Software and Avionics Verification and Validation Campaign

The complexity of the Mars Science Laboratory (MSL) mission presented the Entry, Descent, and Landing systems engineering team with many challenges in its Verification and Validation (V&V) campaign. This paper describes some of the logistical hurdles related to managing a complex set of requirements, test venues, test objectives, and analysis products in the implementation of a specific portion of the overall V&V program to test the interaction of flight software with the MSL avionics suite. Application-specific solutions to these problems are presented herein, which can be generalized to other space missions and to similar formidable systems engineering problems.

Stehura, Aaron↗

Technical Report Series on Global Modeling and Data Assimilation, Volume 41 : GDIS Workshop Report

The workshop "An International Global Drought Information System Workshop: Next Steps" was held on 10-13 December 2014 in Pasadena, California. The more than 60 participants from 15 countries spanned the drought research community and included select representatives from applications communities as well as providers of regional and global drought information products. The workshop was sponsored and supported by the US National Integrated Drought Information System (NIDIS) program, the World Climate Research Program (WCRP: GEWEX, CLIVAR), the World Meteorological Organization (WMO), the Group on Earth Observations (GEO), the European Commission Joint Research Centre (JRC), the US Climate Variability and Predictability (CLIVAR) program, and the US National Oceanic and Atmospheric Administration (NOAA) programs on Modeling, Analysis, Predictions and Projections (MAPP) and Climate Variability & Predictability (CVP). NASA/JPL hosted the workshop with logistical support provided by the GEWEX program office. The goal of the workshop was to build on past Global Drought Information System (GDIS) progress toward developing an experimental global drought information system. Specific goals were threefold: (i) to review recent research results focused on understanding drought mechanisms and their predictability on a wide range of time scales and to identify gaps in understanding that could be addressed by coordinated research; (ii) to help ensure that WRCP research priorities mesh with efforts to build capacity to address drought at the regional level; and (iii) to produce an implementation plan for a short duration pilot project to demonstrate current GDIS capabilities. See http://www.wcrp-climate.org/gdis-wkshp-2014-objectives for more information.

GEO↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars.

exploration↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

Spacecraft Dormancy Autonomy Analysis for a Crewed Martian Mission

Current concepts of operations for human exploration of Mars center on the staged deployment of spacecraft, logistics, and crew. Though most studies focus on the needs for human occupation of the spacecraft and habitats, these resources will spend most of their lifetime unoccupied. As such, it is important to identify the operational state of the unoccupied spacecraft or habitat, as well as to design the systems to enable the appropriate level of autonomy. Key goals for this study include providing a realistic assessment of what "dormancy" entails for human spacecraft, exploring gaps in state-of-the-art for autonomy in human spacecraft design, providing recommendations for investments in autonomous systems technology development, and developing architectural requirements for spacecraft that must be autonomous during dormant operations. The mission that was chosen is based on a crewed mission to Mars. In particular, this study focuses on the time that the spacecraft that carried humans to Mars spends dormant in Martian orbit while the crew carries out a surface mission. Communications constraints are assumed to be severe, with limited bandwidth and limited ability to send commands and receive telemetry. The assumptions made as part of this mission have close parallels with mission scenarios envisioned for dormant cis-lunar habitats that are stepping-stones to Mars missions. As such, the data in this report is expected to be broadly applicable to all dormant deep space human spacecraft.

Badger, Julia↗

GeneLab Analysis Working Group Kick-Off Meeting

Goals to achieve for GeneLab AWG - GL vision - Review of GeneLab AWG charter Timeline and milestones for 2018 Logistics - Monthly Meeting - Workshop - Internship - ASGSR Introduction of team leads and goals of each group Introduction of all members Q/A Three-tier Client Strategy to Democratize Data Physiological changes, pathway enrichment, differential expression, normalization, processing metadata, reproducibility, Data federation/integration with heterogeneous bioinformatics external databases The GLDS currently serves over 100 omics investigations to the biomedical community via open access. In order to expand the scope of metadata record searches via the GLDS, we designed a metadata warehouse that collects and updates metadata records from external systems housing similar data. To demonstrate the capabilities of federated search and retrieval of these data, we imported metadata records from three open-access data systems into the GLDS metadata warehouse: NCBI's Gene Expression Omnibus (GEO), EBI's PRoteomics IDEntifications (PRIDE) repository, and the Metagenomics Analysis server (MG-RAST). Each of these systems defines metadata for omics data sets differently. One solution to bridge such differences is to employ a common object model (COM) to which each systems' representation of metadata can be mapped. Warehoused metadata records are then transformed at ETL to this single, common representation. Queries generated via the GLDS are then executed against the warehouse, and matching records are shown in the COM representation (Fig. 1). While this approach is relatively straightforward to implement, the volume of the data in the omics domain presents challenges in dealing with latency and currency of records. Furthermore, the lack of a coordinated has been federated data search for and retrieval of these kinds of data across other open-access systems, so that users are able to conduct biological meta-investigations using data from a variety of sources. Such meta-investigations are key to corroborating findings from many kinds of assays and translating them into systems biology knowledge and, eventually, therapeutics.

GeneLab↗

Design and Application of the Exploration Maintainability Analysis Tool

Conducting human exploration missions beyond Low Earth Orbit (LEO) will present unique challenges in the areas of supportability and maintainability. The durations of proposed missions can be relatively long and re-supply of logistics, including maintenance and repair items, will be limited or non-existent. In addition, mass and volume constraints in the transportation system will limit the total amount of logistics that can be flown along with the crew. These constraints will require that new strategies be developed with regards to how spacecraft systems are designed and maintained. NASA is currently developing Design Reference Missions (DRMs) as an initial step in defining future human missions. These DRMs establish destinations and concepts of operation for future missions, and begin to define technology and capability requirements. Because of the unique supportability challenges, historical supportability data and models are not directly applicable for establishing requirements for beyond LEO missions. However, supportability requirements could have a major impact on the development of the DRMs. The mass, volume, and crew resources required to support the mission could all be first order drivers in the design of missions, elements, and operations. Therefore, there is a need for enhanced analysis capabilities to more accurately establish mass, volume, and time requirements for supporting beyond LEO missions. Additionally, as new technologies and operations are proposed to reduce these requirements, it is necessary to have accurate tools to evaluate the efficacy of those approaches. In order to improve the analysis of supportability requirements for beyond LEO missions, the Space Missions Analysis Branch at the NASA Langley Research Center is developing the Exploration Maintainability Analysis Tool (EMAT). This tool is a probabilistic simulator that evaluates the need for repair and maintenance activities during space missions and the logistics and crew requirements to support those activities. Using a Monte Carlo approach, the tool simulates potential failures in defined systems, based on established component reliabilities, and then evaluates the capability of the crew to repair those failures given a defined store of spares and maintenance items. Statistical analysis of Monte Carlo runs provides probabilistic estimates of overall mission safety and reliability. This paper will describe the operation of the EMAT, including historical data sources used to populate the model, simulation processes, and outputs. Analysis results are provided for a candidate exploration system, including baseline estimates of required sparing mass and volume. Sensitivity analysis regarding the effectiveness of proposed strategies to reduce mass and volume requirements and improve mission reliability is included in these results.

Stromgren, Chel↗

Space Station ground processing

The architecture of the Station, the system requirements, and the operational capabilities for ground and flight operations are described. The proposed Space Station design is dual keel and the components of the Station are listed. The initial ground processing activities are to reflect the on-orbit assembly sequence; the four phases of the assembly are examined. The planning and analysis for the ground processing of the Station with an emphasis on cost are discussed. The logistics resupply elements aspect of the ground processing sequence is considered. An example testing the capabilities of the ground processing sequence is presented. Diagrams of the Shuttle, its modules, and ground facilities and equipment are provided.

Scully, E. J.↗

Space Operations Center system analysis. Volume 3, book 2: SOC system definition report, revision A

The Space Operations Center (SOC) orbital space station program operations are described. A work breakdown structure for the general purpose support equipment, construction and transportation support, and resupply and logistics support systems is given. The basis for the design of each element is presented, and a mass estimate for each element supplied. The SOC build-up operation, construction, flight support, and satellite servicing operations are described. Detailed programmatics and cost analysis are presented.

Source record↗

Application of Different Statistical Techniques in Integrated Logistics Support of the International Space Station Alpha

The process to predict the values of the maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle cost spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability, and maintenance support costs. It is the objective of this report to identify the magnitude of the expected enhancement in the accuracy of the results for the International Space Station reliability and maintainability data packages by providing examples. These examples partially portray the necessary information hy evaluating the impact of the said enhancements on the life cycle cost and the availability of the International Space Station.

Sepehry-Fard, F.↗

Study of solid rocket motor for space shuttle booster, volume 2, book 3, appendix A

A systems requirements analysis for the solid propellant rocket engine to be used with the space shuttle was conducted. The systems analysis was developed to define the physical and functional requirements for the systems and subsystems. The operations analysis was performed to identify the requirements of the various launch operations, mission operations, ground operations, and logistic and flight support concepts.

Source record↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Extraterrestrial processing and manufacturing of large space systems, volume 2, chapters 7-14 and appendices

Production and support equipment specifications are described for the space manufacturing facility (SMF). Defined production equipment includes electromagnetic pumps for liquid metal, metal alloying furnaces, die casters, electron beam welders and cutters, glass forming for structural elements, and rolling. A cost analysis is presented which includes the development, the aquisition of all SMF elements, initial operating cost, maintenance and logistics cost, cost of terrestrial materials, and transportation cost for each major element. Computer program listings and outputs are appended.

Miller, R. H.↗

Anomaly Resolution in the International Space Station

Topics include post flight 2A status, groundrules, anomaly resolution, Early Communications Subsystem anomaly and resolution, Logistics and Maintenance plan, case for obscuration, case for electrical short, and manual fault isolation, and post mission analysis. Photographs from flight 2A.1 are used to illustrate anomalies.

Evans, William A.↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗

Recovery from Missed Thrust During Low Thrust Insertion of NASA's Gateway into a Near Rectilinear Halo Orbit

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

low thrust↗