Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar Architecture Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

Mars Surface Habitat Concept Design

An initial Mars Surface Habitat (MSH) concept design study was conducted as part of the National Aeronautics and Space Administration (NASA) Habitation Systems Development Office’s effort to inform NASA crewed Mars architecture decisions. The study assessed the unique challenges, risks, and benefits of a surface habitation element within the Mars architecture trade space. The goal of the study was to identify unique functional capabilities necessary to support a crewed mission on the Martian surface, the unique challenges and risks associated with such an architecture, and the areas of further analysis required to make such a mission possible. Continuing NASA’s development and execution of the Moon to Mars lunar surface missions, attention will continue progressing toward the initial crewed Mars mission. To prepare for this, NASA’s Exploration Systems Development Mission Directorate (ESDMD) has established a strategic analysis cycle (SAC) where an architectural trade space is identified and evaluated. Given that the Mars architecture and mission profile are still in this trade space, the architecture and mission considered for this study is SAC21. In addition, reference conceptual designs are being refined for the Mars Transit Habitat (TH) and MSH systems which will enable crew to safely travel to and inhabit the surface of Mars. The NASA Mars architectures trade space includes the use of a Pressurized Rover (PR) to address both crew habitation and mobility needs. This study assesses the use of a dedicated habitat via the MSH and an unpressurized terrain vehicle for crew mobility and exploration in lieu of the PR. Determining the optimum mission architecture will require continued analysis by ESDMD teams and this study is intended to support of such a study. The MSH concept design team aims to explore this area of the Mars habitation trade space, and in doing so, inform and highlight the considerations associated with a MSH in the surface architecture. It is not the intention of this study to make specific habitation or architecture decisions, but instead to provide a habitation element concept compatible with the Mars architecture trade space.

Mars Surface Habitat↗

Mars Surface Habitat (MSH) Concept Design

An initial Mars Surface Habitat (MSH) concept design study was conducted as part of the National Aeronautics and Space Administration (NASA) Habitation Systems Development Office’s effort to inform NASA crewed Mars architecture decisions. The study assessed the unique challenges, risks, and benefits of a surface habitation element within the Mars architecture trade space. The goal of the study was to identify unique functional capabilities necessary to support a crewed mission on the Martian surface, the unique challenges and risks associated with such an architecture, and the areas of further analysis required to make such a mission possible. Continuing NASA’s development and execution of the Moon to Mars lunar surface missions, attention will continue progressing toward the initial crewed Mars mission. To prepare for this, NASA’s Exploration Systems Development Mission Directorate (ESDMD) has established a strategic analysis cycle (SAC) where an architectural trade space is identified and evaluated. Given that the Mars architecture and mission profile are still in this trade space, the architecture and mission considered for this study is SAC21. In addition, reference conceptual designs are being refined for the Mars Transit Habitat (TH) and MSH systems which will enable crew to safely travel to and inhabit the surface of Mars. The NASA Mars architectures trade space includes the use of a Pressurized Rover (PR) to address both crew habitation and mobility needs. This study assesses the use of a dedicated habitat via the MSH and an unpressurized terrain vehicle for crew mobility and exploration in lieu of the PR. Determining the optimum mission architecture will require continued analysis by ESDMD teams and this study is intended to support of such a study. The MSH concept design team aims to explore this area of the Mars habitation trade space, and in doing so, inform and highlight the considerations associated with a MSH in the surface architecture. It is not the intention of this study to make specific habitation or architecture decisions, but instead to provide a habitation element concept compatible with the Mars architecture trade space.

Ryan Hughes↗

Desert Research and Technology Studies (D-RATS) 2022 Test Report

The primary purpose of the 2022 Desert Research and Technology Studies (D-RATS 22) analog mission field test was to provide data and recommendations regarding how pressurized rover (PR) design, cabin configuration, driving modes, timeline constraints, and mission operations can be acceptably implemented to support future Artemis missions that include a PR. The goal of these evaluations was to provide first order feedback and data on design concepts currently being traded as options for future pressurized rover flight prototypes. The Japan Aerospace Exploration Agency (JAXA) may provide a PR for future Artemis missions. One of the primary objectives of D-RATS 2022 was to share with the JAXA PR team the processes and protocols by which NASA has learned to successfully evaluate rover concepts through integrated HITL evaluations over the past 20+ years, so that JAXA could apply any applicable lessons learned to their PR design, development, testing, and evaluation.

analog↗

An EVACS simulation with nested transactions

Documented here is the recent effort of the MISSION Kernel Team on an Extra-Vehicular Activity Control System (EVACS) simulation with nested transactions. The team has implemented the EVACS simulation along with a design for nested transactions. The EVACS simulation is a project wide aid to exploring Mission and Safety Critical (MASC) applications and their support software. For this effort it served as a trial scenario for demonstrating nested transactions and exercising the transaction support design. The EVACS simulation is a simulation of some aspects of the Extra-Vehicular Activity Control System, in particular, just the selection of communication frequencies. Its current definition is quite narrow, serving only as a starting point for prototyping purposes. (EVACS itself may be supplanted in a larger scenario of a lunar outpost with astronauts and a lunar rover.) Initially the simulation of frequency selection was written without consideration of nested transactions. This scenario was then modified to embed its processing in nested transactions. To simplify the prototyping effort, only two aspects of the general design for transaction support have been implemented: the basic architecture and state recovery. The simulation has been implemented in the programming language Smalltalk. It consists of three components: (1) a simulation support code which provides the framework for initiating, interacting and tracing the system; (2) the EVACS application code itself, including its calls upon nested transaction support; and (3) a transaction support code which implements the logic necessary for nested transactions. Each of these components deserves further description, but for now only the transaction support is discussed.

Auty, David↗

Genesis lunar outpost criteria and design

This design study--the third in the space architecture series--focused on the requirements of an early stage lunar outpost. The driving assumptions of the scenario was that the base would serve as a research facility and technology testbed for future Mars missions, a habitat supporting 12 persons for durations of up to 20 months, and would sustain the following five experimental facilities: Lunar surface mining and production analysis facility, construction technology and materials testbed, closed environmental life support system (CELSS) test facility, lunar farside observatory, and human factors and environment-behavior research facility. Based upon the criteria set forth in a previous programming document, three preliminary lunar base designs were developed. Each of the three schemes studied a different construction method and configuration. The designs were then evaluated in terms of environmental response, human habitability, transportability, constructability, construction dependability and resilience, and their suitability in carrying out the desired scientific research. The positive points of each scheme were then further developed by the entire project team, resulting in one integrated lunar outpost design.

Hansmann, Timothy↗

An Altair Overview: Designing a Lunar Lander for 21st Century Human Space Exploration

Altair, the lunar lander element of NASA's Constellation program, was conducted in a different design environment than many other NASA projects of similar scope. Because of this relatively unique approach, there are a number of significant success stories that should be considered during the development of any future lunar landers or human spacecraft. This paper is divided into two separate themes; the first is the approach used during the conceptual design studies, including the systematic analysis cycles and the decision making process associated with each: and the second is a summary of the resulting lessons learned that were compiled after looking back at the lifetime of the Project. Altair was terminated before entering Phase B of its design, and was often criticized for being a very heavy and very large vehicle. While there was specific rationale for all of the decisions that led up to that configuration, future design cycles were specifically planned to re-address the mass challenge. Had the project continued, the deliberate, stepwise design process would have converged on an optimized lander design that balanced mass, risk, cost and capabilities. Some of the specific items that will be addressed in this paper include project development strategy, organizational approach and team dynamics, risk-informed design process, mission architecture constraints, mission key driving requirements, model-based systems engineering process, configuration studies, contingency considerations, subsystem overviews and key trade studies. The paper will conclude with a summary of the lessons identified during the Altair project and make suggestions for application to future studies.

Brown, Kendall K.↗

Three Dimensional Computer Graphics Federates for the 2012 Smackdown Simulation

The Simulation Interoperability Standards Organization (SISO) Smackdown is a two-year old annual event held at the 2012 Spring Simulation Interoperability Workshop (SIW). A primary objective of the Smackdown event is to provide college students with hands-on experience in developing distributed simulations using High Level Architecture (HLA). Participating for the second time, the University of Alabama in Huntsville (UAHuntsville) deployed four federates, two federates simulated a communications server and a lunar communications satellite with a radio. The other two federates generated 3D computer graphics displays for the communication satellite constellation and for the surface based lunar resupply mission. Using the Light-Weight Java Graphics Library, the satellite display federate presented a lunar-texture mapped sphere of the moon and four Telemetry Data Relay Satellites (TDRS), which received object attributes from the lunar communications satellite federate to drive their motion. The surface mission display federate was an enhanced version of the federate developed by ForwardSim, Inc. for the 2011 Smackdown simulation. Enhancements included a dead-reckoning algorithm and a visual indication of which communication satellite was in line of sight of Hadley Rille. This paper concentrates on these two federates by describing the functions, algorithms, HLA object attributes received from other federates, development experiences and recommendations for future, participating Smackdown teams.

Fordyce, Crystal↗

Space Launch System Payload Stage Capability for Ultra-High Characteristic Energy Missions

The Space Launch System (SLS) vehicle is NASA’s cornerstone capability for a new era of human and robotic exploration of deep space. The unrivalled performance of SLS provides the capability to launch the first woman and next man to walk on the lunar surface and to support development of a sustained human presence in cislunar space, and ultimately human missions to Mars. As an evolvable capability with unique launch performance, the opportunities enabled by SLS also include game-changing benefits for science missions, including probes to the outer solar system and beyond. For the last two years, the SLS Program has worked with the Interstellar Probe team at the Johns Hopkins University Applied Physics Laboratory(APL) to provide data that describe how SLS could support a mission that would break through the boundary of the heliosphere and into pristine interstellar space only a decade after launch, enabling earlier science return and greatly increasing spacecraft life in the interstellar medium. In record-breaking time, the ISP as launched on SLS may answer questions raised by the extended mission of NASA’s Voyager spacecraft. While SLS and its efficient Exploration Upper Stage (EUS) offer benefits for exploration of the outer planets, adding one or more additional stages to this architecture makes it even more capable for missions beyond our solar system, offering more realistically appealing flight times that would allow the mission scientists to reap the rewards of exploration. During the time the SLS Program has been working with the Interstellar Probe team, it has identified an expedited path to the Block 2 capability planned for the Interstellar Probe mission, and further matured performance numbers for diverse multi-stage configurations using a combination of commercially available liquid hydrogen (LH2)/liquid oxygen (LOX) upper stages and solid motor kick stages. That work has demonstrated the SLS payload stage capability provides significant benefits and opens trade space for multiple missions in consideration during planning for the next Planetary Science and Astrobiology Decadal Survey. This presentation details the significant benefits SLS can provides for very high characteristic (C3) energy missions by coupling the capabilities of SLS to current commercial rocket propulsion stage systems. These capabilities are explored specifically in the context of an Interstellar Probe architecture in which a small, capable science probe, coupled with carefully tailored mission design trajectories, could be used to explore the outer solar system and the interstellar medium. The presentation will also address the operational logistics of integrating such a mission, explaining the options available for “non-standard” SLS payloads, including processing those with radioisotope power generators or additional propulsion stages. An SLS system overview and capabilities will be presented, along with vehicle configuration and orbit performance capability studies, explaining how SLS is enabling for a variety of high-energy science mission profiles, including launching an exploratory probe bound for interstellar space only a decade after launch.

Rob Stough↗

Science Operations for the 2008 NASA Lunar Analog Field Test at Black Point Lava Flow, Arizona

Surface science operations on the Moon will require merging lessons from Apollo with new operation concepts that exploit the Constellation Lunar Architecture. Prototypes of lunar vehicles and robots are already under development and will change the way we conduct science operations compared to Apollo. To prepare for future surface operations on the Moon, NASA, along with several supporting agencies and institutions, conducted a high-fidelity lunar mission simulation with prototypes of the small pressurized rover (SPR) and unpressurized rover (UPR) (Fig. 1) at Black Point lava flow (Fig. 2), 40 km north of Flagstaff, Arizona from Oct. 19-31, 2008. This field test was primarily intended to evaluate and compare the surface mobility afforded by unpressurized and pressurized rovers, the latter critically depending on the innovative suit-port concept for efficient egress and ingress. The UPR vehicle transports two astronauts who remain in their EVA suits at all times, whereas the SPR concept enables astronauts to remain in a pressurized shirt-sleeve environment during long translations and while making contextual observations and enables rapid (less than or equal to 10 minutes) transfer to and from the surface via suit-ports. A team of field geologists provided realistic science scenarios for the simulations and served as crew members, field observers, and operators of a science backroom. Here, we present a description of the science team s operations and lessons learned.

Garry W. D.↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Integrated Docking Simulation and Testing with the Johnson Space Center Six-Degree of Freedom Dynamic Test System

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Constellation Program; this is carried as one of the CEV Project top risks. The Exploration Technology Development Program (ETDP) AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation. One of the project activities is a series of "pathfinder" testing and simulation activities to integrate relative navigation sensors with the Johnson Space Center Six-Degree-of-Freedom Test System (SDTS). The SDTS will be the primary testing location for the Orion spacecraft s Low Impact Docking System (LIDS). Project team members have integrated the Orion simulation with the SDTS computer system so that real-time closed loop testing can be performed with relative navigation sensors and the docking system in the loop during docking and undocking scenarios. Two relative navigation sensors are being used as part of a "pathfinder" activity in order to pave the way for future testing with the actual Orion sensors. This paper describes the test configuration and test results.

Mitchell, Jennifer D.↗

Lessons Learned from the Flight Unit Testing of the Near Earth Asteroid Scout Flight System

The Near Earth Asteroid Scout flight mission is set to launch on the maiden voyage of the Space Launch System as a secondary payload. The spacecraft will be jettisoned in cis-lunar space and embark on an ambitious 2.5 year mission to image an asteroid. The spacecraft is uniquely equipped with an 85m2 solar sail as the main propulsion system. The monolithic sail system is designed to package within a 6U volume for launch and then deploy during flight. The NEA Scout team has presented in the past to the International Symposium on Solar Sailing topics related to the engineering development unit and design efforts to achieve flight hardware build. This paper will focus on the lessons learned from building and testing the NEA Scout flight system. Focus will be on the mechanical, software, and electrical interfaces as well as preparation for subsystem environmental tests, including thermal vacuum. Due to the unique design of the spacecraft, the solar sail subsystem was required to be located in the center of the spacecraft. This requirement lead to design challenges such as designing and accommodating critical cable harnesses to run through the center of the sail subsystem, packaging and deployment design of the sail subsystem, and integrated testing efforts through an avionics test bed to verify and validate a complete system architecture.

Lockett, Tiffany Russell↗

A Densified Liquid Methane Delivery System for the Altair Ascent Stage

The Altair Lunar Lander is currently carrying options for both cryogenic and hypergolic ascent stage propulsion modules. The cryogenic option uses liquid methane and liquid oxygen to propel Altair from the lunar surface back to rendezvous with the Orion command module. Recent studies have determined that the liquid methane should be densified by subcooling it to 93 K in order to prevent over-pressurization of the propellant tanks during the 210 day stay on the lunar surface. A trade study has been conducted to determine the preferred method of producing; loading, and maintaining the subcooled, densified liquid methane onboard Altair from a ground operations perspective. The trade study took into account the limitations in mass for the launch vehicle and the mobile launch platform as well as the historical reliability of various components and their thermal efficiencies. Several unique problems were encountered, namely delivering a small amount of a cryogenic propellant to a flight tank that is positioned over 350 ft above the launch pad as well as generating the desired delivery temperature of the methane at 93 K which is only 2.3 K above the methane triple point of 90.7 K. Over 20 methods of subcooled liquid methane production and delivery along with the associated system architectures were investigated to determine the best solutions to the problem. The top four cryogenic processing solutions were selected for further evaluation and detailed thermal modeling. This paper describes the results of the preliminary trade analysis of the 20 plus methane densification methods considered. The results of the detailed analysis will be briefed to the Altair Project Office and their propulsion team as well as the Ground Operations Project Office before the down-select is made between cryogenic and hypergolic ascent stages in August 2010.

Tomsik, Thomas M.↗

Communication Delays in Cislunar Space: A Lab Study Examining Human System Integration Architecture (HSIA) and Team Risk Concerns

BACKGROUND: Communication delays are an inherent challenge of space missions to the Moon and beyond. Past research studies showed that 50+ second delays adversely affected individual well-being, team cohesion, and overall task performance (Kintz et al., 2016; Larson et al., 2019). However, there is a dearth of research on the effects of shorter delays (on the order of 4-12 seconds one-way) that may present a more immediate challenge during the upcoming Artemis missions. Even these shorter delays could make it difficult or infeasible for ground control to provide real-time support to Artemis astronauts, especially in complex and time-critical tasks such as extra-vehicular activities (EVAs). Results from studies on longer or Mars-like delays cannot be directly applied to Artemis-like delays, due to the large differences in delay magnitude and task types between these mission categories. For example, real-time oversight and guidance from ground control is impossible under Mars-like delays but may be performed under Artemis-like delays, albeit with potentially high workload and communication difficulty. Thus, a better understanding of the effects of Artemis-like communication delays on collaborative task performance is needed. Additionally, there is a need to develop reliable task paradigms that can be used in future studies on communication delays. METHODS: This project will study the effects of Artemis-like communication delays on collaborative task performance in a simulated space-to-ground team task via a lunar Gateway-like interface prototype. Teams of two astronaut-like participants - one serving as “crewmember” and one as “flight controller” - will perform a spaceflight-relevant task under six delay conditions (i.e., 0, 4, 6, 8, 10, and 12 seconds). Audio, video, texting, and file transfer will be delayed between the participants to mimic lunar-like communication delays. Measures related to workload, situation awareness, system usability, task performance, team cohesion, well-being, and communication strategies will be collected. These measures will be compared across delay levels, participant roles, and off-nominal and nominal tasks. Participants will be given the choice to use any combination of video and text communication in order to study preferences in interaction modality. RESEARCH AIMS: One aim is to identify a delay level or range of levels at which there may be significant decrements in individual and team-based measures. Identifying such ranges may help design novel workload management or communication countermeasures for future space missions. Also, the spaceflight-relevant research tasks and corresponding communication delay technology developed as part of this effort may be used for future studies on communication delays. Results from this work are also expected to inform study scenarios in the Human Exploration Research Analog (HERA) Campaign.

S Upasani↗