Search NASA⌕ Search

SEARCH · Search NASA

Results for “MAINTENANCE - AIRPLANES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A health maintenance facility for space station freedom

We describe a health care facility to be built and used on an orbiting space station in low Earth orbit. This facility, called the health maintenance facility, is based on and modeled after isolated terrestrial medical facilities. It will provide a phased approach to health care for the crews of Space Station Freedom. This paper presents the capabilities of the health maintenance facility. As Freedom is constructed over the next decade there will be an increase in activities, both construction and scientific. The health maintenance facility will evolve with this process until it is a mature, complete, stand-alone health care facility that establishes a foundation to support interplanetary travel. As our experience in space continues to grow so will the commitment to providing health care.

Health Promotion/organization & administration/sta↗

ISS ECLSS: 3 Years of Logistics for Maintenance

The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) is designed to be maintainable. During the 3 years since the ISS US Lab became operational, there have been numerous ECLSS Orbital Replacement Units (ORUs) launched and returned to Maintain the ECLSS operation in the US segments. The maintenance logistics have provided tools for maintenance, replaced limited life ORUs and failed ORUs, upgraded ECLSS hardware to improve reliability and placed critical spares onboard prior to need. In most cases, the removed ORUs have been returned for either failure analysis and repair or refurbishment. This paper describes the ECLSS manifesting history and maintenance events and quantifies the numbers of ECLSS items, weights, and volumes.

Shkedi, Brienne↗

Evaluation of Hands-Free Devices for Space Habitat Maintenance Procedures

Currently, International Space Station (ISS) crews use a laptop computer to display procedures for performing onboard maintenance tasks. This approach has been determined to be suboptimal. A heuristic evaluation and two studies have been completed to test commercial off-the-shelf (COTS) "near-eye" heads up displays (HUDs) for support of these types of maintenance tasks. In both studies, subjects worked through electronic procedures to perform simple maintenance tasks. As a result of the Phase I study, three HUDs were down-selected to one. In the Phase II study, the HUD was compared against two other electronic display devices - a laptop computer and an e-book reader. Results suggested that adjustability and stability of the HUD display were the most significant acceptability factors to consider for near-eye displays. The Phase II study uncovered a number of advantages and disadvantages of the HUD relative to the laptop and e-book reader for interacting with electronic procedures.

Hoffman, R. B.↗

Analysis of Envisat Orbit Maintenance Strategies to Improve/Increase Envisat ASAR Interferometry Opportunities

The biggest and most advanced Earth Observation Satellite in-orbit, developed by the European Space Agency (ESA) and its member states, is Envisat. It was launched on March 1, 2002 by an Ariane V from French Guyana and holds a total of 10 multi-disciplinary Earth observation instruments, among which an Advanced Synthetic Aperture Radar (ASAR). The ASAR user community requested the Flight Dynamics division of the European Space Operations Centre (ESOC) to investigate how the orbit control maintenance strategy for Envisat could be changed to optimize ASAR interferometry opportunities overall and in addition support the International Polar Year 2007/2008 initiative. The Polar Regions play a pivotal role in understanding our planet and our impact on it as they are recognized as sensitive barometers of environmental change. One of the main themes of the International Polar Year 2007/2008 is therefore the study of Earth s changing ice and snow, and its impact on our planet and our lives. Naturally, ESA would like to support this very important initiative. This paper presents the investigations that have been conducted to support these requests in the best possible way. It discusses the orbit maintenance strategy that has been in place since its launch, ensuring the actual orbit to be within 1 km of a so-called reference orbit, and presents the new orbit maintenance strategy that is aimed at improving/increasing the opportunities for Envisat ASAR interferometry, while preserving the fuel on board the spacecraft. The hydrazine on-board Envisat happens to be a precious resource as only approximately 300 kg of it was available at launch, like ERS-2. The difference being however that the mass of Envisat is approximately 3.2 times that of ERS-2.

Kuijper, D.↗

A Minimum (Delta)V Orbit Maintenance Strategy for Low-Altitude Missions Using Burn Parameter Optimization

Orbit maintenance is the series of burns performed during a mission to ensure the orbit satisfies mission constraints. Low-altitude missions often require non-trivial orbit maintenance (Delta)V due to sizable orbital perturbations and minimum altitude thresholds. A strategy is presented for minimizing this (Delta)V using impulsive burn parameter optimization. An initial estimate for the burn parameters is generated by considering a feasible solution to the orbit maintenance problem. An example demonstrates the dV savings from the feasible solution to the optimal solution.

Brown, Aaron J.↗

A Minimum Delta V Orbit Maintenance Strategy for Low-Altitude Missions Using Burn Parameter Optimization

Orbit maintenance is the series of burns performed during a mission to ensure the orbit satisfies mission constraints. Low-altitude missions often require non-trivial orbit maintenance Delta V due to sizable orbital perturbations and minimum altitude thresholds. A strategy is presented for minimizing this Delta V using impulsive burn parameter optimization. An initial estimate for the burn parameters is generated by considering a feasible solution to the orbit maintenance problem. An low-lunar orbit example demonstrates the Delta V savings from the feasible solution to the optimal solution. The strategy s extensibility to more complex missions is discussed, as well as the limitations of its use.

Brown, Aaron J.↗

Design and Evaluation of a Water Recirculation Loop Maintenance Device for the Advanced Spacesuit Water Membrane Evaporator

A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The bed design further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a clear demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.

Steele, John W.↗

Design and Evaluation of a Water Recirculation Loop Maintenance Device for the Advanced Spacesuit Water Membrane Evaporator

A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high-capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit Transport Water Loop. The bed design further leverages a sorbent developed for the ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System. The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of crewed spaceflight Environmental Control and Life Support System hardware.

Steele, John W.↗

Performance of a Water Recirculation Loop Maintenance Device and Process for the Advanced Spacesuit Water Membrane Evaporator

A dual-bed device to maintain the water quality of the Advanced Spacesuit Water Membrane Evaporation (SWME) water recirculation loop has been designed and is undergoing testing. The SWME is a heat rejection device under development at the NASA Johnson Space Center to perform thermal control for advanced spacesuits. One advantage to this technology is the potential for a significantly greater degree of tolerance to contamination when compared to the existing Sublimator technology. The driver for the development of a water recirculation maintenance device is to further enhance this advantage through the leveraging of fluid loop management lessons-learned from the International Space Station (ISS). A bed design that was developed for a Hamilton Sundstrand military application, and considered for a potential ISS application with the Urine Processor Assembly, provides a low pressure drop means for water maintenance in a recirculation loop. The bed design is coupled with high capacity ion exchange resins, organic adsorbents, and a cyclic methodology developed for the Extravehicular Mobility Unit (EMU) Transport Water loop. The bed design further leverages a sorbent developed for ISS that introduces a biocide in a microgravity-compatible manner for the Internal Active Thermal Control System (IATCS). The leveraging of these water maintenance technologies to the SWME recirculation loop is a unique demonstration of applying the valuable lessons learned on the ISS to the next generation of manned spaceflight Environmental Control and Life Support System (ECLSS) hardware.

Steele, John W.↗

Reliability Centered Maintenance - Methodologies

Journal article about Reliability Centered Maintenance (RCM) methodologies used by United Space Alliance, LLC (USA) in support of the Space Shuttle Program at Kennedy Space Center. The USA Reliability Centered Maintenance program differs from traditional RCM programs because various methodologies are utilized to take advantage of their respective strengths for each application. Based on operational experience, USA has customized the traditional RCM methodology into a streamlined lean logic path and has implemented the use of statistical tools to drive the process. USA RCM has integrated many of the L6S tools into both RCM methodologies. The tools utilized in the Measure, Analyze, and Improve phases of a Lean Six Sigma project lend themselves to application in the RCM process. All USA RCM methodologies meet the requirements defined in SAE JA 1011, Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes. The proposed article explores these methodologies.

Kammerer, Catherine C.↗

Future of Condition Based Maintenance at Stennis

This study seeks to understand the current state of condition based maintenance (CBM) at Stennis Space Center and set a bench mark for the future expansion of the CBM program. Condition based maintenance is the idea of maintaining an asset upon decreasing performance or when a failure is impending instead of at some arbitrary time regardless of condition. Special attention was paid to remote sensing and monitoring of assets around the center to cut maintenance costs and extend overall operational lifetime of those assets. It was found that 55 percent of the categories of assets which could actually utilize a remote CBM program are currently being partially monitored. CBM solutions that have been investigated and proposed for future deployment cover areas such as building integrity, oil analysis, power line and water pipe inspection.

George, Cory A.↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Computational Risk Analysis of Propane Releases in Maintenance Facilities

Liquefied petroleum gas (LPG) is a viable, cleaner alternative to traditional diesel fuel used in busses and other heavy-duty vehicles and could play a role in helping the US meet its lower emission goals. While the LPG industry has focused efforts on developing vehicles and fueling infrastructure, we must also establish safe parameters for maintenance facilities which are servicing LPG fueled vehicles. Current safety standards aid in the design of maintenance facilities, but additional quantitative analysis is needed to prove safeguards are adequate and suggest improvements where needed. In this report we aim to quantify the amount of flammable mass associated with propane releases from vehicle mounted fuel vessels within enclosed garages. Furthermore, we seek to qualify harm mitigation with variable ventilations and facility layout. To accomplish this we leverage validated computational resources at Sandia National Laboratories to simulate various release scenarios representative of real world vehicles and maintenance facilities. Flow solvers are used to predict the dynamics of fuel systems as well as the evolution of propane during release events. From our simulated results we observe that both inflow and outflow ventilation locations play a critical role in reducing flammable cloud size and potential overpressure values during a possible combustion event.

03 NATURAL GAS↗

Fault Characterization and Diagnostics Supporting Condition-Based Operation and Maintenance of Gas Turbine Engines

Condition-Based Operation and Maintenance (CBOM) is the state-of-the-art in maintenance approaches for gas turbine engines. CBOM applies engine sensor information to the optimization of future operation and maintenance procedures; this technique reduces costs for engine operators by minimizing unplanned outages and catastrophic engine degradation. However, due to the complexities of gas turbine operation and the lack of available engine sensors, further development is required to fully realize the benefits of CBOM. In the turbine section, rotating components interact with high temperature flows, which creates intense thermal and mechanical stresses. As a result, there are numerous mechanisms of component degradation in the turbine section. Furthermore, turbine components – like stator vanes and rotor blades – are among the most expensive in the engine because they are complex to design and manufacture. For these reasons, this dissertation addresses two main questions: (i) which parameters or faults within the turbine section are most important to monitor, and (ii) how can these parameters or faults be monitored in an engine-relevant environment? Although many turbine parameters and faults have been investigated in the open literature, there are some faults that are still not well understood. Rotor-casing eccentricity, which causes a non-constant blade tip clearance around the annulus, has not been investigated in terms of its effects on turbine efficiency. Therefore, the first study in this dissertation quantifies overall and local turbine efficiency for varying levels of rotor-casing eccentricity. Results showed negligible variations to overall turbine efficiency, meaning rotor-casing eccentricity only becomes relevant to CBOM when its severity causes rotordynamic issues. Purge flow is critical to turbine hardware longevity because it prevents ingestion of hot main gas path (MGP) flow into the under-platform regions. Despite its importance, there are currently no methods for monitoring purge flow performance in an engine environment. Therefore, the second study in this dissertation develops a predictive model for sealing effectiveness using inputs from two fast-response pressure sensors. Results exhibited low prediction errors across a full range of purge flow rates, which supports the viability of the modelling approach for CBOM. The final two studies in this dissertation address blade coolant flow monitoring. This cooling flow is responsible for protecting the turbine blades from the MGP flow, which exits the combustor at temperatures greater than the blade melting point. These studies showed that temperature measurements on the blade surface can be used to accurately predict blade coolant flow rate, and that defining the candidate features relative to the coolant trajectory is important for maintaining accuracy as coolant flow rate degradation occurs. This work enables blade coolant flow monitoring, which is currently not possible through existing condition monitoring techniques.

condition-based, gas turbines, diagnostics,↗

Condition-Based Maintenance of a Circulating Water System of a Canadian Nuclear Power Plant using Machine Learning and Statistical Tools

Canada Deuterium Uranium pressurized-heavy-water reactors (PHWR) are a type of nuclear power plant that generate clean and reliable energy. The scope of this work is to automate data analysis methodologies to inform a condition-based maintenance strategy of a circulating water system (CWS) of a PHWR. The multiunit CWS provides a continuous supply of water to cool steam condensers, even during transient scenarios, thereby improving the thermal efficiency. This work aims to develop a machine learning (ML) based approach to detect anomalies in heterogeneous data of a CWS in a PHWR to help inform a predictive maintenance strategy. The heterogeneous data include textual and numeric time series data for a PHWR. Natural-language-processing (NLP)-based models are used to analyze textual data contained in work orders and operator logs and an event-timeseries correlation detection method is applied to assist anomalies diagnoses for CWS. An ML model Robust Linear Model (RLM) is also used to remove the seasonal variations in the system variable distributions based on distributions of environmental variables. A machine learning model, Density-Based Spatial Clustering of Applications with Noise (DBSCAN), trained on both original data and data without any seasonal variations will then be used to detect if an anomaly exists. Thus, by moving to an automated methodology to detect, classify, and forecast anomalies, the maintenance strategy would be based on component condition instead of a time-based schedule.

97 - MATHEMATICS AND COMPUTING↗

Maintenance Modernization in the Era of Artemis An RCM Journey

The NASA Artemis Program mission to return humans to the moon requires it ground test facilities to meet today’s performance and throughput demands. The NASA Ames Arc Jet Complex (AJC) at Ames Research Center is the Agency’s sole ground test facility supporting reentry thermal protection system testing and was developed to support Apollo era spacecraft. The research and development required to meet current and future mission demands continually grows, but the maintenance upkeep to ensure safe and reliable operations holds stagnant. This paper presents the journey and subsequent industry relatable story that includes the challenges, lessons learned, and testimonials to the AJC’s approach to the modernization of maintenance using RCM at NASA.

Reliability Centered Maintenance↗

Generative large language models for predictive maintenance planning

Maintenance planning and the generation of necessary components for tasks can prove time-consuming and complex. Automating the creation of recurring or similar tasks by leveraging previous planning packages and data, while uncovering insights to automate planning package generation, presents an opportunity to conserve valuable time and resources. This work aims to harness the textual and probabilistic capabilities of large language models (LLMs) to automate the generation of planning packages. Utilizing diverse data sources ranging from raw data to handwritten text, both singular and collaborative LLMs are trained and tested. Results demonstrate their capability to generate essential planning package components, effectively replicating the statistical patterns in the data. This demonstrates the use of these tools inside a digital asset for automated planning. This work outlines a methodology for constructing datasets, a training suite, and evaluation methods for LLM-based textual and conversational planning tools utilized in an asset digital twin. Results indicate that the fine-tuned models generate estimated planning information within the statistical ranges observed in real maintenance data. The models achieve high accuracy (>90%) in document question-answering and instruction generation tasks. Furthermore, the conversational retrieval-augmented generation (RAG) assistant system achieves 100% document retrieval accuracy, while conversational information capture exceeds 98% across the majority of work-package assistant modules.

97 MATHEMATICS AND COMPUTING↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗