Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Surveyor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Intercalibration of Mars Global Surveyor Datasets

The calibration and validation of satellite soundings of atmospheric variables is always a difficult prospect, but this difficulty is greatly magnified when the measurements are made at a different planet, whose meteorology is poorly known and poorly constrained, and for which there are virtually no prospects of obtaining ground truth. The Mars Global Surveyor which has been circling Mars in its mapping orbit since early 1999 includes a variety of instruments capable of making atmospheric observations: the Thermal Emission Spectrometer (TES) which takes more than 100,000 nadir-view infrared spectra per day (although these observations are confined to the 2am - 2pm time of the sun-fixed orbit); much less frequent TES limb scans (still only at 2am and 2pm); the Mars Horizon Sensor Assembly measures side-looking broadband 15 micrometer radiation; Radio Science occultations at favorable seasons give high resolution temperature profiles; the Mars orbiter Camera and Mars Orbiter Laser Altimeter have made water, dust, and carbon dioxide cloud detections. These observations are now being supplemented by high-resolution 15 micron measurements by THEMIS on Mars Odyssey. Thus, all of these observations are made at different times and places. Data assimilation techniques are being used to fuse this vast array of observations into a single dataset that best represents our understanding of the Martian atmosphere, its current meteorological state, and the relevant instrumental properties.

Houben, Howard↗

Review of NASA's Planned Mars Program

The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX) designated Mars as one of four scientific targets for emphasis in future studies. It was against this background that the Space Studies Board charged COMPLEX to review whether the Mars Pathfinder and Surveyor programs, as presently conceived, satisfy the highest priorities for understanding Mars as provided in its report, An Integrated Strategy for the Planetary Sciences: 1995-2010. The present document is COMPLEX's assessment of the scientific potential of NASA's new approach to Mars exploration. This assessment considers how well the scientific objectives of the Mars Surveyor program match those of the Integrated Strategy; it also addresses some advantages and disadvantages of the smaller-faster-cheaper approach to the exploration of Mars. The capabilities of the various instruments are not discussed in detail since the Mars Observer instruments, all of which are scheduled for reflight, have already been assessed by COMPLEX2 and later instruments are, in general, not yet well defined.

Source record↗

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

Due to a post launch failure of a part a new plan for the Mars Global Surveyor was developed. This new plan involved the addition of many deep thermal cycles to the Power Shunt Assemblies (PSA's). This new plan exceeds the previous acceptance cold level, and fatigue life on packaging design. This presentation reviews the experiments that were used to test the capabilities of the PSA to function in the new situation. It also reviews the analyses preformed to verify the most likely failure mechanism, and the likelihood that these failures would impact the new mission requirements.

Gibbel, Mark↗

Surface Dust Redistribution on Mars as Observed by the Mars Global Surveyor

The global redistribution of dust by the atmosphere is geologically and climatologically important. Dust deposition and removal at the surface represents ongoing sedimentary geology: a vestige of aeolian processes responsible for the concentration of vast dustsheets and potentially for ancient layered units at various locations on Mars. The varying amount of dust on the surface has also long been hypothesized as a factor in determining whether regional or global dust storms occur in a given year. Indeed, the atmosphere has a very short, sub-seasonal time-scale (or memory) and as such, any inter-annual variability in the climate system that is not simply ascribable to stochastic processes, must involve changing conditions on the surface. An excellent, multi-year dataset is provided by the Mars Global Surveyor (MGS) Thermal Emission Spectrometer (TES) and the Mars Orbiter Camera Wide Angle imager (MOC-WA). This dataset allows investigation into the degree to which surface dust deposits on Mars really change: over decadal time scales, over the course of the annual cycle, and as a result of global and regional dust storms. The MGS mapping orbit data set extends over almost 3 Martian years at the time of writing. These data sets include one global dust storm and smaller regional storms (one in the first TES mapping year and two in the third).

Szwast, M. A.↗

Status of the Dust Accumulation and Removal Technology Experiment for the Mars 2001 Surveyor Lander

The Dust Accumulation and Removal Technology (DART) experiment is designed to quantify the nature of dust settling out of the Martian atmosphere. DART is part of the Mars in-situ propellant precursor (MIP) experiment which is a payload on the Mars 2001 Surveyor Lander. At the time of this writing, high fidelity development hardware has been integrated in to the MIP experiment and completed Mars environment testing. Additional information is contained in the original extended abstract.

Jenkins, P. P.↗

The Removal of Periodic Gravitational Perturbations from Mars Global Surveyor's Science Phasing Orbits Applied to the Study of the Martian Exosphere

The martian exosphere and upper atmosphere exert measurable drag on the Mars Global Surveyor (MGS) spacecraft. Using the Goddard Space Flight Center's GEODYN orbit determination software, the science phasing orbits (SPO) were analyzed to determine the atmospheric drag and hence, measure the average density near the orbits' perifocus (170-180 km altitude above high northern latitudes). Future work will include the gravity calibration and mapping periods as well. Additional information is contained in the original extended abstract.

Tracadas, P. W.↗

The Mars Global Surveyor Spacecraft Test Laboratory

The spacecraft testbed is a crucial part of the spacecraft development and operations phase. Given the aggressive schedule of the Mars Global Surveyor spacecraft, the Spacecraft Test Laboratory will play a crucial part during the MGS development phase in support of flight software testing, fault protection testing, sequence testing, and other areas to meet the November, 1996 launch date.

MGS↗

Failure Engineering Study and Accelerated Stress Test Results for the Mars Global Surveyor Spacecraft's Power Shunt Assemblies

An Engineering-of-Failure approach to designing and executing an accelerated product qualification test was performed to support a risk assessment of a "work-around" necessitated by an on-orbit failure of another piece of hardware on the Mars Global Surveyor spacecraft. The proposed work-around involved exceeding the previous qualification experience both in terms of extreme cold exposure level and in terms of demonstrated low cycle fatigue life for the power shunt assemblies. An analysis was performed to identify potential failure sites, modes and associated failure mechanisms consistent with the new use conditions. A test was then designed and executed which accelerated the failure mechanisms identified by analysis. Verification of the resulting failure mechanism concluded the effort.

Gibbel, Mark↗

2005 Earth-Mars Round Trip

This paper presents, in viewgraph form, the 2005 Earth-Mars Round Trip. The contents include: 1) Lander; 2) Mars Sample Return Project; 3) Rover; 4) Rover Size Comparison; 5) Mars Ascent Vehicle; 6) Return Orbiter; 7) A New Mars Surveyor Program Architecture; 8) Definition Study Summary Result; 9) Mars Surveyor Proposed Architecture 2003, 2005 Opportunities; 10) Mars Micromissions Using Ariane 5; 11) Potential International Partnerships; 12) Proposed Integrated Architecture; and 13) Mars Exploration Program Report of the Architecture Team.

Source record↗

Following the water, the new program for Mars exploration

In the wake of the loss of Mars Climate Orbiter and Mars Polar Lander in late 1999, NASA embarked on a major review of the failures and subsequently restructured all aspects of what was then called the Mars Surveyor Program--now renamed the Mars Exploration Program. This paper presents the process and results of this reexamination and defines a new approach which we have called "Program System Engineering". Emphasis is given to the scientific, technological, and programmatic strategies that were used to shape the new Program. A scientific approach known as "follow the water" is described, as is an exploration strategy we have called "seek--in situ--sample". An overview of the mission queue from continuing Mars Global Surveyor through a possible Mars Sample Return Mission launch in 2011 is provided. In addition, key proposed international collaborations, especially those between NASA, CNES and ASI are outlined, as is an approach for a robust telecommunications infrastructure. c2002 Published by Elsevier Science Ltd.

Water↗