Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Using virtual reality for science mission planning: A Mars Pathfinder case

NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.

Kim, Jacqueline H.↗

DC-8 mission planning

A number of tasks needed to be performed to operate the DC-8 aircraft in the Arctic Ozone Expedition during 1989. These included development of improved navigational computer programs and performing advanced planning for flight tracks. The missions required further work in the field to plan flight tracks and to establish a data archive. The DC-8 aircraft was operated during the deployment phase of the Arctic Ozone Expedition. Data were collected revealing the presence of extensive systems of polar stratospheric clouds. The data also showed the evolution of the chlorine and nitrogen chemistry within the Arctic vortex. A navigational computer code was improved so that the DC-8 navigators could perform their function more efficiently.

Toon, Owen B.↗

Interactive mission planning for a Space Shuttle flight experiment - A case history

Scientific experiments which use the Space Shuttle as a platform require the development of new operations techniques for the command and control of the instrument. Principal among these is the ability to simulate the complex maneuvers of the orbiter's path realistically. Computer generated graphics provide a window into the actual and predicted performance of the instrument and allow sophisticated control of the instrument under varying conditions. In October of 1984 the Shuttle carried a synthetic aperture radar built by JPL for the purpose of recording images of the earth surface. The mission deviated from planned operation in almost every conceivable way and provided an exacting test bed for concepts of interactive mission planning.

Harris, H. M.↗

Mars Sample Return Mission Planning

This presentation considers the decisions which go into planning the Mars Sample Return Mission (i.e. spacecraft design) and how these choices affect concerns about the safe handling of any sample returns. Topics covered include: 'being there' trades, 'getting home' trades, quantitative functions and risk assessments.

Beaty, David↗

Mars Observer mission plan

The paper describes plans devised for operating the Mars Observer mission during its five phases of activity: the launch, the cruise, the orbit insertion, the mapping, and the Mars 1994 support. The latter phase is to provide a data relay for a Sovier mission to Mars which will be launched in 1994. These plans will be used to plan detailed sequencing strategies for the Mars Observer mission. The low-altitude orbit and a full Martian year of observations will provide, both in temporal and spatial coverage and resolution, the most comprehensive study of an extraterrestrial planet to date.

Blume, William H.↗

Multi-Objective Hybrid Optimal Control for Interplanetary Mission Planning

Preliminary design of low-thrust interplanetary missions is a highly complex process. The mission designer must choose discrete parameters such as the number of flybys, the bodies at which those flybys are performed, and in some cases the final destination. Because low-thrust trajectory design is tightly coupled with systems design, power and propulsion characteristics must be chosen as well. In addition, a time-history of control variables must be chosen which defines the trajectory. There are often may thousands, if not millions, of possible trajectories to be evaluated. The customer who commissions a trajectory design is not usually interested in a point solution, but rather the exploration of the trade space of trajectories between several different objective functions. This can be a very expensive process in terms of the number of human analyst hours required. An automated approach is therefore very desirable. This work presents such an approach by posing the mission design problem as a multi-objective hybrid optimal control problem. The method is demonstrated on hypothetical mission to the main asteroid belt and to Deimos.

Low Thrust↗

Multi-Objective Hybrid Optimal Control for Interplanetary Mission Planning

Preliminary design of low-thrust interplanetary missions is a highly complex process. The mission designer must choose discrete parameters such as the number of flybys, the bodies at which those flybys are performed, and in some cases the final destination. Because low-thrust trajectory design is tightly coupled with systems design, power and propulsion characteristics must be chosen as well. In addition, a time-history of control variables must be chosen which defines the trajectory. There are often many thousands, if not millions, of possible trajectories to be evaluated. The customer who commissions a trajectory design is not usually interested in a point solution, but rather the exploration of the trade space of trajectories between several different objective functions. This can be very expensive process in terms of the number of human analyst hours required. An automated approach is therefore very desirable. This work presents such an approach by posing the mission design problem as a multi-objective hybrid optimal control problem. The methods is demonstrated on hypothetical mission to the main asteroid belt and to Deimos.

Trajectory Design↗

Multi-Objective Hybrid Optimal Control for Interplanetary Mission Planning

Preliminary design of low-thrust interplanetary missions is a highly complex process. The mission designer must choose discrete parameters such as the number of flybys, the bodies at which those flybys are performed and in some cases the final destination. In addition, a time-history of control variables must be chosen which defines the trajectory. There are often many thousands, if not millions, of possible trajectories to be evaluated. The customer who commissions a trajectory design is not usually interested in a point solution, but rather the exploration of the trade space of trajectories between several different objective functions. This can be a very expensive process in terms of the number of human analyst hours required. An automated approach is therefore very diserable. This work presents such as an approach by posing the mission design problem as a multi-objective hybrid optimal control problem. The method is demonstrated on a hypothetical mission to the main asteroid belt.

Optimization↗

An Unmanned Spacecraft Subsystem Cost Model for Advanced Mission Planning

As a NASA center, the Jet Propulsion Laboratory (JPL) is committed to the concept of developing and launching a continuously improving series of smaller robotic space exploration missions in shorter intervals of time (faster, better, cheaper).

NASA JPL Unmanned Spacecraft Spacecraft Subsystem ↗

Assessment and Mission Planning Capability For Quantitative Aerothermodynamic Flight Measurements Using Remote Imaging

High resolution calibrated infrared imagery of vehicles during hypervelocity atmospheric entry or sustained hypersonic cruise has the potential to provide flight data on the distribution of surface temperature and the state of the airflow over the vehicle. In the early 1980 s NASA sought to obtain high spatial resolution infrared imagery of the Shuttle during entry. Despite mission execution with a technically rigorous pre-planning capability, the single airborne optical system for this attempt was considered developmental and the scientific return was marginal. In 2005 the Space Shuttle Program again sponsored an effort to obtain imagery of the Orbiter. Imaging requirements were targeted towards Shuttle ascent; companion requirements for entry did not exist. The engineering community was allowed to define observation goals and incrementally demonstrate key elements of a quantitative spatially resolved measurement capability over a series of flights. These imaging opportunities were extremely beneficial and clearly demonstrated capability to capture infrared imagery with mature and operational assets of the US Navy and the Missile Defense Agency. While successful, the usefulness of the imagery was, from an engineering perspective, limited. These limitations were mainly associated with uncertainties regarding operational aspects of data acquisition. These uncertainties, in turn, came about because of limited pre-flight mission planning capability, a poor understanding of several factors including the infrared signature of the Shuttle, optical hardware limitations, atmospheric effects and detector response characteristics. Operational details of sensor configuration such as detector integration time and tracking system algorithms were carried out ad hoc (best practices) which led to low probability of target acquisition and detector saturation. Leveraging from the qualified success during Return-to-Flight, the NASA Engineering and Safety Center sponsored an assessment study focused on increasing the probability of returning spatially resolved scientific/engineering thermal imagery. This paper provides an overview of the assessment task and the systematic approach designed to establish confidence in the ability of existing assets to reliably acquire, track and return global quantitative surface temperatures of the Shuttle during entry. A discussion of capability demonstration in support of a potential Shuttle boundary layer transition flight test is presented. Successful demonstration of a quantitative, spatially resolved, global temperature measurement on the proposed Shuttle boundary layer transition flight test could lead to potential future applications with hypersonic flight test programs within the USAF and DARPA along with flight test opportunities supporting NASA s project Constellation.

Horvath, Thomas↗

Request Generation 2 mission planning and scheduling

Request Generation II (ReGe II) is a PC-based prototype knowledge based system intented to assist USAF personnel in planning and scheduling satellite operations for their Mission Control Complexes (MCC). It aids MCC personnel in producing weekly Program Action Plans (PAPs) for each of the satellite vehicles an MCC is responsible for monitoring and maintaining. The PAPs are input to the Resource Control Complex (RCC) which schedules all satellite support requests for usage of the network.

Greenhut, Darlene D.↗