Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

A preliminary study of Mars rover/sample return missions

The Solar System Exploration Committee (SSEC) of the NASA Advisory Council recommends that a Mars Sample Return mission be undertaken before the year 2000. Comprehensive studies of a Mars Sample Return mission have been ongoing since 1984. The initial focus of these studies was an integrated mission concept with the surface rover and sample return vehicle elements delivered to Mars on a single launch and landed together. This approach, to be carried out as a unilateral U.S. initiative, is still a high priority goal in an Augmented Program of exploration, as the SSEC recommendation clearly states. With this background of a well-understood mission concept, NASA decided to focus its 1986 study effort on a potential opportunity not previously examined; namely, a Mars Rover/Sample Return (MRSR) mission which would involve a significant aspect of international cooperation. As envisioned, responsibility for the various mission operations and hardware elements would be divided in a logical manner with clearly defined and acceptable interfaces. The U.S. and its international partner would carry out separately launched but coordinated missions with the overall goal of accomplishing in situ science and returning several kilograms of surface samples from Mars. Important considerations for implementation of such a plan are minimum technology transfer, maximum sharing of scientific results, and independent credibility of each mission role. Under the guidance and oversight of a Mars Exploration Strategy Advisory Group organized by NASA, a study team was formed in the fall of 1986 to develop a preliminary definition of a flight-separable, cooperative mission. The selected concept assumes that the U.S. would undertake the rover mission with its sample collection operations and our international partner would return the samples to Earth. Although the inverse of these roles is also possible, this study report focuses on the rover functions of MRSR because rover operations have not been studied in as much detail as the sample return functions of the mission.

Source record↗

Overview of NASA’s Extensible Traffic Management (xTM) Research

NASA’s Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project introduced a new Air Traffic Management (ATM) architecture that utilizes industry’s ability to supply industry-developed, third-party services that work complementarily with the FAA-provided Air Traffic Service (ATS) to exchange relevant air vehicle information among the UAS operations and between the UTM and the conventional ATM system. The UTM architecture was used to successfully demonstrate the feasibility of safe, efficient, and scalable small UAS operations in low altitudes below 400 feet above ground level. Following the success and adoption of UTM architecture, the foundational UTM requirements and core properties were generalized to become Extensible Traffic Management (xTM) requirements to support operations of new entrants beyond small UAS, such as operations in high altitudes over 60,000 feet, designated as upper Class E in the United States National Airspace System (NAS). In this paper, the generalization of UTM to xTM and NASA’s approach for developing an xTM system for upper Class E Traffic Management (ETM) are discussed. The paper also discusses the planned research to examine the potential xTM-Air Traffic Control (ATC) interactions across multiple xTM systems and identify common coordination procedures, ATC roles/responsibilities, and data exchange requirements. This work is one of the steps for improving interoperability between the xTM systems and ATS, which is critical for safe and efficient sharing of the airspace among the new entrants served by the xTM systems and conventional ATS-serviced operations.

air traffic management↗

Overview of NASA’s Extensible Traffic Management (xTM) Work

NASA’s Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project introduced a new Air Traffic Management (ATM) architecture that utilizes industry’s ability to supply industry-developed, third-party services that work complementarily with the FAA-provided Air Traffic Service (ATS) to exchange relevant air vehicle information among the UAS operations and between the UTM and the conventional ATM system. The UTM architecture was used to successfully demonstrate the feasibility of safe, efficient, and scalable small UAS operations in low altitudes below 400 feet above ground level. Following the success and adoption of UTM architecture, the foundational UTM requirements and core properties were generalized to become Extensible Traffic Management (xTM) requirements to support operations of new entrants beyond small UAS, such as operations in high altitudes over 60,000 feet, designated as upper Class E in the United States National Airspace System (NAS). In this paper, the generalization of UTM to xTM and NASA’s approach for developing an xTM system for upper Class E Traffic Management (ETM) are discussed. The paper also discusses the planned research to examine the potential xTM-Air Traffic Control (ATC) interactions across multiple xTM systems and identify common coordination procedures, ATC roles/responsibilities, and data exchange requirements. This work is one of the steps for improving interoperability between the xTM systems and ATS, which is critical for safe and efficient sharing of the airspace among the new entrants served by the xTM systems and conventional ATS-serviced operations.

air traffic management↗

NASA Strategy for Technology Development

At the National Aeronautics and Space Administration (NASA), foresight is a coordinated, iterative, and continual process for making informed decisions. NASA faces diverse and relatively unique challenges and opportunities as the leading U.S. agency for aeronautics development, cutting-edge scientific discovery, and human space exploration. To address these challenges and leverage opportunities, NASA uses foresight to strategically plan technology development across four mission directorates: Aeronautics Research Mission Directorate, Space Technology Mission Directorate, Science Mission Directorate, and Human Exploration and Operations Mission Directorate. The mission directorates leverage a broad community of experts and partners to incorporate technology foresight into mission and program planning. Through this process NASA realizes tangible benefits to the agency’s science, technology, and exploration programs. As an independent office, NASA’s Office of the Chief Technologist (OCT) serves as a trusted authority to inform technology strategy and advocacy at the agency, enabling future missions and advancing U.S. economic competitiveness. Specifically, OCT coordinates and uses inputs from abroad community of experts, both internal and external to NASA, to inform decision making for technology plans, investments, and partnerships. OCT develops the NASA Technology Taxonomy to standardize communication across the agency’s diverse technology portfolio and the related Strategic Technology Investment Plan that integrates priorities and informs technology investment. Through these efforts, OCT has refined elements of foresight-informed strategic planning that may be applicable to other technology-driven industries where foresight is essential for resilience. This chapter describes the processes of foresight for technology development at NASA and provides insight into the value the agency derives from these processes. The chapter further describes the role of OCT as an independent advisory office that supports NASA’s efforts to capitalize on foresight and strategic technology planning. We present these examples with consideration for how organizations in defense, security, and other technology-driven industries can operationalize foresight in their own strategic technology development.

Erica Rodgers↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

Integrated flexible manufacturing program for manufacturing automation and rapid prototyping

The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.

Brooks, S. L.↗

Chemical Hygiene Program

The Chemical Management Team is responsible for ensuring compliance with the OSHA Laboratory Standard. The program at Lewis Research Center (LeRC) evolved over many years to include training, developing Standard Operating Procedures (SOPS) for each laboratory process, coordinating with other safety and health organizations and teams at the Center, and issuing an SOP binder. The Chemical Hygiene Policy was first established for the Center. The Chemical Hygiene Plan was established and reviewed by technical, laboratory and management for viability and applicability to the Center. A risk assessment was conducted for each laboratory. The laboratories were prioritized by order of risk, higher risk taking priority. A Chemical Management Team staff member interviewed the lead researcher for each laboratory process to gather the information needed to develop the SOP for the process. A binder containing the Chemical Hygiene Plan, the SOP, a map of the laboratory identifying the personal protective equipment and best egress, and glove guides, as well as other guides for safety and health. Each laboratory process has been captured in the form of an SOP. The chemicals used in the procedure have been identified and the information is used to reduce the number of chemicals in the lab. The Chemical Hygiene Plan binder is used as a training tool for new employees. LeRC is in compliance with the OSHA Standard. The program was designed to comply with the OSHA standard. In the process, we have been able to assess the usage of chemicals in the laboratories, as well as reduce or relocate the chemicals being stored in the laboratory. Our researchers are trained on the hazards of the materials they work with and have a better understanding of the hazards of the process and what is needed to prevent any incident. From the SOP process, we have been able to reduce our chemical inventory, determine and implement better hygiene procedures and equipment in the laboratories, and provide specific training to our employees. As a result of this program, we are adding labeling to the laboratories for emergency responders and initiating a certified chemical user program.

Mayor, Antoinette C.↗

Developing Collective Training for Small Unmanned Aerial Systems Employment

The projected use of small unmanned aerial systems (SUAS) in military operations will produce training requirements which go beyond current capabilities. The paper describes the development of prototype training procedures and accompanying research simulations to address this need. We initially constructed a testbed to develop simulation-based training for an SUAS operator equipped with a simulated vertical-lift and land SUAS. However, the required training will go beyond merely training an operator how to pilot an SUAS. In addition to tactics, techniques, and procedures for employment of SUASs, collective training methods must be trained. Moreover, the leader of a unit equipped with SUAS will need to learn how to plan missions which incorporate the SUAS, and take into account air space and frequency management considerations. The demands of the task require the leader to allocate personnel to the SUAS mission, communicate and coordinate with those personnel during the mission, and make use of the information provided. To help address these training issues, we expanded our research testbed to include a command and control node (C2 node), to enable communications between a leader and the SUAS operator. In addition, we added a virtual environment in which dismounted infantry missions can be conducted. This virtual environment provides the opportunity for interactions among human-controlled avatars and non-player characters (NPCs), plus authoring tools to construct scenarios. Using these NPCs, a collective exercise involving friendly, enemy, and civilian personnel can be conducted without the need for a human role-player for every entity. We will describe the results of our first experiment, which examined the ability of players to negotiate use of the C2 node and the virtual environment at the same time, in order to see if this is a feasible combination of tools for training development.

Durlach, Paula J.↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require a project team to integrate a variety of contributions from National Aeronautics and Space Administration (NASA) centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the first version of the HDU, the Pressurized Excursion Module (PEM), from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Laboratory, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into HDU PEM are planned to facilitate the integration process. A coordinated effort to establish simplified Computer Aided Design (CAD) standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU design to maximize the efficiency of both integration and field operations.

Gill, Tracy R.↗

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu↗

IHY Operations: How the IHY is facilitated by the IHY Secretariat

In 1957 a program of international research, inspired by the International Polar Years of 1882 and 1932, was organized as the International Geophysical Year (IGY) to study global phenomena of the Earth and geospace. Fifty years later, the world s space science community will again come together for international programs of scientific collaboration: the International Heliophysical Year (MY), the Electronic Geophysical Year (eGY), and the International Polar Year (IPY) 2007. This time, research will extend out into the Heliosphere to focus on solar-terrestrial-plans for the IHY, eGY and IPY incorporate the activities of scientists in 191 nations, as well as the "IGY Gold" Historical Preservation initiative, plus a series of coordinated campaigns involving more than 100 instruments and models, education and public outreach programs, a developing nations instrument development program, and opportunities for supported research worldwide. The presentation will focus on the efforts and operations which will make these activities possible.

Thompson, Barbara J.↗

DSN Resource Scheduling

TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

Wang, Yeou-Fang↗

Assess 2: Spacelab simulation. Executive summary

An Airborne Science/Spacelab Experiments System Simulation (ASSESS II) mission, was conducted with the CV-990 airborne laboratory in May 1977. The project studied the full range of Spacelab-type activities including management interactions, experiment selection and funding, hardware development, payload integration and checkout, mission specialist and payload specialist selection and training, mission control center payload operations control center arrangements and interactions, real time interaction during flight between principal investigators and the flight crew, and retrieval of scientific flight data. ESA established an integration and coordination center for the ESA portion of the payload as planned for Spacelab. A strongly realistic Spacelab mission was conducted on the CV-990 aircraft. U.S. and ESA scientific experiments were integrated into a payload and flown over a 10 day period, with the payload flight crew fully-confined to represent a Spacelab mission. Specific conclusions for Spacelab planning are presented along with a brief explanation of each.

Source record↗

The Satellite Situation Center

Considerations related to the early planning for the International Magnetospheric Study (IMS) took into account the desirability of an establishment of specific entities for generating and disseminating coordination information for both retrospective and predictive periods. The organizations established include the IMS/Satellite Situation Center (IMS/SSC) operated by NASA. The activities of the SSC are related to the preparation of reports on predicted and actually achieved satellite positions, the response to inquiries, the compilation of information on satellite experiments, and the issue of periodic status summaries. Attention is given to high-altitude satellite services, other correlative satellite services, non-IMS activities of the SSC, a summary of the SSC request activity, and post-IMS and future activities.

Teague, M. J.↗

Under Attack

Diversified High Technologies, Inc. (DHT) has supported the Avionics Software Development Environment Pathfinder (ASDEP) program throughout its phases. For the first two years, DHT operated as the technology facilitator providing technical coordination between vendors, contractors, and NASA. This evolved to hands-on technical support such as systems installation, upgrades, and integration. DHT has recently been providing support in secure technology migration path planning and the incorporation of new security technologies in response to evolving program requirements.

Source record↗

OPALS: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In spring 2014, the Optical PAyload for Lasercomm Science (OPALS) will launch to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a 90-day baseline mission, OPALS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) in Wrightwood, California. To achieve mission success, interfaces to the ISS payload operations infrastructure are established. For OPALS, the interfaces facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes such as pointing prediction and data processing satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The tests have provided valuable insight into operational considerations on the ISS.

Abrahamson, Matthew J.↗

Opals: Mission System Operations Architecture for an Optical Communications Demonstration on the ISS

In April of 2014, the Optical PAyload for Lasercomm Science (OPALS) Flight System (FS) launched to the International Space Station (ISS) to demonstrate space-to-ground optical communications. During a planned 90-day baseline mission, the OPALS FS will downlink high quality, short duration videos to the Optical Communications Telescope Laboratory (OCTL) ground station in Wrightwood, California. Interfaces to the ISS payload operations infrastructure have been established to facilitate activity planning, hazardous laser operations, commanding, and telemetry transmission. In addition, internal processes, such as pointing prediction and data processing, satisfy the technical requirements of the mission. The OPALS operations team participates in Operational Readiness Tests (ORTs) with external partners to exercise coordination processes and train for the overall mission. The ORTs have provided valuable insight into operational considerations for the instrument on the ISS.

Technology Demonstration↗

NASA-FAA Technical Interchange Meeting

High level introduction of Digital Information Platform (DIP) objectives as a sub-project under Airspace Traffic Management - Exploration (ATM-X). Important information is emerging in digital form and additional effort is required to utilize this information. DIP will provide the capability to integrate key flight information from multiple sources. DIP is currently in planning phase will take a community-involved, collaborative approach to define and develop the framework. DIP is seeking community and stakeholder input to operational needs, metrics of interest and demonstration contribution. NASA is engaging with the FAA to coordinate feasible operational demonstrations to validate DIP platform and services.

DIP sub-project overview↗