At least 181 records · Page 10

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cost of Floating Offshore Wind Energy in California Between 2019 and 2032

California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.

17 WIND ENERGY↗

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho salmon (O. kisutch), and enhance summer steelhead (O. mykiss). The need for restoration began with agricultural development in the early 1900's that extirpated salmon and reduced steelhead runs (Bureau of Reclamation, BOR 1988). The most notable development was the construction and operation of Three Mile Falls Dam (TMD) and other irrigation projects which dewatered the Umatilla River during salmon migrations. CTUIR and ODFW developed the Umatilla Hatchery Master Plan to restore fisheries to the basin. The plan was completed in 1990 and included the following objectives which were updated in 1999: (1) Establish hatchery and natural runs of Chinook and coho salmon. (2) Enhance existing summer steelhead populations through a hatchery program. (3) Provide sustainable tribal and non-tribal harvest of salmon and steelhead. (4) Maintain the genetic characteristics of salmonids in the Umatilla River Basin. (5) Increase annual returns to Three Mile Falls Dam to 31,500 adult salmon and steelhead. In the past the M&E project conducted long-term monitoring activities as well as two and three-year projects that address special needs for adaptive management. Examples of these projects include adult passage evaluations, habitat assessment surveys (Contor et al. 1995, Contor et al. 1996, Contor et al. 1997, Contor et al. 1998), and genetic monitoring (Currens & Schreck 1995, Narum et al. 2004). The project's goal is to provide quality information to managers and researchers working to restore anadromous salmonids to the Umatilla River Basin. The status of completion of each of BPA's standardized work element was reported in 'Pisces'(March 2008) and is summarized.

13 HYDRO ENERGY↗

Monitoring, Reporting, and Verification (MRV) Plan - Meeting EPA Guidelines for GHGRP and Subpart RR

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report summarizes the steps for successfully submitting a Monitoring, Reporting and Verification (MRV) plan to the U.S. Environmental Protection Agency (EPA). This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the reefs in Northern Niagaran Pinnacle Reef Trend (NNPRT), successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan encompasses ten reefs and provides a reporting plan for future reef development.

01 COAL, LIGNITE, AND PEAT↗

Downhole Microseismic Mapping of More Than 400 Fracturing Stages on a Multiwell Pad at the Hydraulic Fracturing Test Site (HFTS): Discussion of Operational Challenges and Analytic Results

The United States Department of Energy co-funded a joint industry project (JIP) in the Midland basin of Texas. The project was conducted in the Wolfcamp formation to better understand the relationships among horizontal lateral placement, production interference between laterals, effectiveness of completion sequences, and hydraulic fracture geometry in unconventional reservoirs. Downhole microseismic data was acquired from more than 400 fracturing stages during the completion project to better understand the generated hydraulic fracture geometries. Eleven horizontal wells were drilled in the upper Wolfcamp (UW) and middle Wolfcamp (MW) formation in the Permian Basin. The 10,000-ft laterals were drilled in a chevron pattern to help improve inter-well fracture communication and maximize hydrocarbon recovery. The completions sequences were planned to restrain fracture height growth upward into a lower-pressure zone using a combination of zipper fracturing and simultaneous fracturing operations. Downhole microseismic monitoring was used to record more than 95% of the planned fracture stages. Downhole tiltmeters were also used to validate upward fracture height growth. Multiple geophone arrays, both vertical and horizontal, were used during this completion; this paper discusses coordination between maintaining completion efficiency and obtaining microseismic data. Additionally, this paper highlights the completion challenges associated with collecting diagnostic data along with results and findings.

Stegent, Neil A.↗

Building Stronger State Partnerships With the US Dept. Of Energy (Energy Assurance)

From 2007 until 2011, the National Association of Regulatory Utility Commissioners (NARUC) engaged in a partnership with the National Energy Technology Lab (NETL) to improve State-Federal coordination on electricity policy and energy assurance issues. This project allowed State Public Utility Commissioners and their staffs to engage on the most cutting-edge level in the arenas of energy assurance and electricity policy. Four tasks were outlined in the Statement of Performance Objectives: Task 1 - Training for Commissions on Critical Infrastructure Topics; Task 2 - Analyze and Implement Recommendations on Energy Assurance Issues; Task 3 - Ongoing liaison activities & outreach to build stronger networks between federal agencies and state regulators; and Task 4 - Additional Activities. Although four tasks were prescribed, in practice these tasks were carried out under two major activity areas: the critical infrastructure and energy assurance partnership with the US Department of Energy's Infrastructure Security and Emergency Response office, and the National Council on Electricity Policy, a collaborative which since 1994 has brought together State and Federal policymakers to address the most pressing issues facing the grid from restructuring to smart grid implementation. On Critical Infrastructure protection, this cooperative agreement helped State officials yield several important advances. The lead role on NARUC's side was played by our Committee on Critical Infrastructure Protection. Key lessons learned in this arena include the following: (1) Tabletops and exercises work - They improve the capacity of policymakers and their industry counterparts to face the most challenging energy emergencies, and thereby equip these actors with the capacity to face everything up to that point as well. (2) Information sharing is critical - Connecting people who need information with people who have information is a key success factor. However, exposure of critical infrastructure information to bad actors also creates new vulnerabilities. (3) Tensions exist between the transparency-driven basis of regulatory activity and the information-protection requirements of asset protection. (4) Coordination between states is a key success factor - Because comparatively little federal authority exists over electricity and other energy infrastructure, the interstate nature of these energy grids defy centralized command and control governance. Patchwork responses are a risk when addressed at a state-by-state level. Coordination is the key to ensuring consistent response to shared threats. In Electricity Policy, the National Council on Electricity Policy continued to make important strides forward. Coordinated electricity policy among States remains the best surrogate for an absent national electricity policy. In every area from energy efficiency to clean coal, State policies are driving the country's electricity policy, and regional responses to climate change, infrastructure planning, market operation, and new technology deployment depend on a forum for bringing the States together.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control

Distributed energy resources (DERs) are becoming an important part of distribution systems, because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the electric power system, they have the potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Matching and fairness in threat-based mobile sensor coverage

Mobile sensors can be used to effect complete coverage of a surveillance area for a given threat over time, thereby reducing the number of sensors necessary. The surveillance area may have a given threat profile as determined by the kind of threat, and accompanying meteorological, environmental, and human factors. In planning the movement of sensors, areas that are deemed higher threat should receive proportionately higher coverage. We propose a coverage algorithm for mobile sensors to achieve a coverage that will match - over the long term and as quantified by an RMSE metric - a given threat profile. Moreover, the algorithm has the following desirable properties: (1) stochastic, so that it is robust to contingencies and makes it hard for an adversary to anticipate the sensor's movement, (2) efficient, and (3) practical, by avoiding movement over inaccessible areas. Further to matching, we argue that a fairness measure of performance over the shorter time scale is also important. We show that the RMSE and fairness are, in general, antagonistic, and argue for the need of a combined measure of performance, which we call efficacy. We show how a pause time parameter of the coverage algorithm can be used to control the trade-off between the RMSE and fairness, and present an efficient offline algorithm to determine the optimal pause time maximizing the efficacy. Finally, we discuss the effects of multiple sensors, under both independent and coordinated operation. Extensive simulation results - under realistic coverage scenarios - are presented for performance evaluation.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the scan arm creates. Once a model, fiducial, and measurement files are created, a special program, called SScanSS combines the information and by simulation of the sample on the diffractometer can help plan the experiment before using neutron time. Finally, the sample is mounted on the relevant stress measurement instrument and the fiducial points are measured again. In the HFIR beam room, a laser tracker is used in conjunction with a program called CAM2 to measure the fiducial points in the NRSF2 instrument's sample positioner coordinate system. SScanSS is then used again to perform a coordinate system transformation of the measurement file locations to the sample positioner coordinate system. A procedure file is then written with the coordinates in the sample positioner coordinate system for the desired measurement locations. This file is often called a script or command file and can be further modified using excel. It is very important to note that this process is not a linear one, but rather, it often is iterative. Many of the steps in this guide are interdependent on one another. It is very important to discuss the process as it pertains to the specific sample being measured. What works with one sample may not necessarily work for another. This guide attempts to provide a typical work flow that has been successful in most cases.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

13 HYDRO ENERGY↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

Increasing vehicle electrification will require extensive use of extreme fast charging (XFC), especially for larger vehicles. Uncoordinated XFC can create grid challenges, particularly at the distribution level. Two strategies can support widespread XFC: gold-plate the grid (i.e., upgrade all systems to enable worst-case, fully coincident loads) or use integrated planning to codesign a smart system based on advanced controls that leverage load flexibility and distributed energy resources. With the right design and control, XFC can simultaneously support both mobility and grid operations. Fully realizing the potential of XFC, however, will require unprecedented coordination among the charging infrastructure, grid, and vehicles. GEMINI-XFC combines high-fidelity grid and transport modeling at an unprecedented level of resolution and codesigns a smart system based on advanced controls that leverage load flexibility and distributed energy resources to optimize the integration of extreme fast charging (XFC) across a full regional scale with individual customer resolution.

ADVANCED PROPULSION SYSTEMS↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Significance of Dynamic and Transient Analysis in the Design and Operation of Hybrid Energy Systems

Energy systems were historically designed and operated with a specific energy conversion objective, while managing loads and resources. In the recent years, the increased utilization of non-dispatchable renewable sources such as wind and solar has played a role in power quality and the reliability of power systems. In order to mitigate the risk associated with the non-dispatchable resources an integrated approach, such as Hybrid Energy Systems (HES), has to be taken, integrating the loads and resource management between the traditional thermal power plants and the non-dispatchable resources. As our electric energy becomes more diverse in its generation resources, the HES with its operational control system, its real-time view and its dynamic decisions making will become an essential part of the integrated energy systems and improve the overall grid reliability. The operational constraints of the energy sources on both the thermal power plants and the non-dispatchable resources in HES, plays a vital role in the planning and design stage. It is an established fact that the choice of energy source depends on the available natural resources and possible infrastructure. A critical component of decision-making depends on the complementary nature and controllability of the energy sources to supply the load demands with high reliability. Controllability of complex HES to achieve desired performance and flexibility is implemented via coordinated control systems while simultaneously generating electricity and other useful products such as useful heat or hydrogen. These systems are based on instrumentation, signal processing, control theory, and engineering system design. The entire HES along with the control systems are characterized by widely varying time constants. Hence, for a well-coordinated control and operation, we propose physics based modeling of the subsystems to assist in a dynamic and transient analysis. Dynamic and transient analysis in real and non-real time domain of the potential sources is capable of providing satisfactory results at the feasibility analysis stage. A simplified HES consisting of complementary energy sources is used to demonstrate the proposed approach. Suitable real time simulations to perform dynamic and transient analysis will be performed to verify results from the non-real time analysis. The role of such analyses, especially the real time dynamic and transient analysis for manual controls is elaborated. It is also discussed that faster than real time simulation will pave the future for controller rooms and hence manual control procedures. Multiple tools such as Real Time Simulator, Matlab®, Simulink®, PSCAD®, MOOSE, etc. are expected to be used for the HES analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗