Search NASA⌕ Search

SEARCH · Search NASA

Results for “PARKING ORBIT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Effects of ascent trajectory mode and tank disposal method on shuttle payload accommodation

The effects of external tank disposal by retrorocket versus passive tank drop, and targeting the main engine burn for high apogee versus the baseline parking orbit ascent method on shuttle payload accommodation capability were investigated. Missions launched from Eastern Test Range were investigated over a range of orbit altitudes to determine tank disposal requirements including footprint dispersions and alternate impact locations, performance, and orbital maneuvering system requirements. Passive tank drop also proved to be advantageous from a payload accommodation standpoint. Direct insertion was shown to be a means of accommodating long payloads at higher altitudes than permitted by the baseline ascent method.

Blair, J. C.↗

Space tug geosynchronous mission simulation

Near-optimal three dimensional trajectories from a low earth park orbit inclined at 28.5 deg to a synchronous-equatorial mission orbit were developed for both the storable (thrust = 28,912 N (6,500 lbs), I sub sp = 339 sec) and cryogenic (thrust = 44,480 N (10,000 lbs), I sub sp = 470 sec) space tug using the iterative cost function minimization technique contained within the modularized vehicle simulation (MVS) program. The finite burn times, due to low thrust-to-weight ratios, and the associated gravity losses are accounted for in the trajectory simulation and optimization. The use of an ascent phasing orbit to achieve burnout in synchronous orbit at any longitude is investigated. The ascent phasing orbit is found to offer the additional advantage of significantly reducing the overall delta velocity by splitting the low altitude burn into two parts and thereby reducing gravity losses.

Lang, T. J.↗

User's guide to four-body and three-body trajectory optimization programs

A collection of computer programs and subroutines written in FORTRAN to calculate 4-body (sun-earth-moon-space) and 3-body (earth-moon-space) optimal trajectories is presented. The programs incorporate a variable step integration technique and a quadrature formula to correct single step errors. The programs provide capability to solve initial value problem, two point boundary value problem of a transfer from a given initial position to a given final position in fixed time, optimal 2-impulse transfer from an earth parking orbit of given inclination to a given final position and velocity in fixed time and optimal 3-impulse transfer from a given position to a given final position and velocity in fixed time.

Pu, C. L.↗

Automated Mars surface sample return mission concepts for achievement of essential scientific objectives

Mission concepts were investigated for automated return to Earth of a Mars surface sample adequate for detailed analyses in scientific laboratories. The minimum sample mass sufficient to meet scientific requirements was determined. Types of materials and supporting measurements for essential analyses are reported. A baseline trajectory profile was selected for its low energy requirements and relatively simple implementation, and trajectory profile design data were developed for 1979 and 1981 launch opportunities. Efficient spacecraft systems were conceived by utilizing existing technology where possible. Systems concepts emphasized the 1979 launch opportunity, and the applicability of results to other opportunities was assessed. It was shown that the baseline missions (return through Mars parking orbit) and some comparison missions (return after sample transfer in Mars orbit) can be accomplished by using a single Titan III E/Centaur as the launch vehicle. All missions investigated can be accomplished by use of Space Shuttle/Centaur vehicles.

Weaver, W. L.↗

Shuttle-launched multi-comet mission 1985

A low-cost multi-comet intercept mission with a launch in March 1985 is proposed. Two cometary spacecraft of identical design will be placed into a low earth parking orbit using a single Shuttle launch vehicle. Solid kick stages will then be used to boost each spacecraft into its required interplanetary trajectory. It is planned to have one spacecraft intercept comet Giacobini-Zinner in September 1985 and then go on to comet Borrelly with an encounter in December 1987. Earth swingby maneuvers will be used to achieve the double cometary intercept. The other spacecraft will be targeted for a pre-perihelion encounter with Halley's comet in December 1985.

Farquhar, R. W.↗

Switchboard in the sky

Geostationary parking orbits for the present generation of communications satellites, e.g., Intelsat, Westar, Molniya, Navsat, etc., are becoming crowded. It is noted that the C-band over North America will in future be subject to still less attenuation with the introduction of smaller (4.5 m) antennas for earth-bound receive-only applications. It is suggested, at least for the present, that more bands be added, e.g., K-, Ku-, and S-bands. To handle the potential market for communications satellite services during the years after 1985, much larger facilities will be needed. The fabrication of large platforms using the STS is discussed as the most practical solution, stressing that virtually every geosynchronous communications antenna for U.S. domestic use can be assembled on one platform positioned at an especially favorable location.

Fordyce, S. W.↗

A demonstration of the value of general purpose, on-board satellite computers

Failure of the solar panels to erect and spin stabilize the TRANSIT Improvement Program (TIP) satellites is discussed, with emphasis on how the flight computer was reprogrammed to perform various control functions in order to achieve a partial mission success. These functions include: (1) power management to avoid troublesome spacecraft blackouts; (2) achieve enough spin stability to fire the OATS thruster; (3) raise the parking orbit to a workable altitude; (4) remove a high tumble rate which was the indirect result of the failure; and (5) deploy the gravity-gradient boom successfully on TIP-3.

Jenkins, R. E.↗

Formulation of consumables management models. Volume 2: Mission planning processor user guide

A user guide for the MPP (Mission Planning Processor) is presented. The MPP is used in the evaluation of particular missions, with appropriate display and storage of related consumables data. Design goals are accomplished by the use of an on-line/demand mode computer terminal Cathode Ray Tube Display. The process is such that the user merely adds specific mission/flight functions to a skeleton flight and/or alters the skeleton. The skeleton flight includes operational aspects from prelaunch through ground support equipment connect after rollout as required to place the STS (Space Transportation System) in a parking orbit, maintain the spacecraft and crew for the stated on-orbit period and return.

Daly, J. K.↗

Launch vehicles for communications satellites

After giving brief development histories of the Delta and the Atlas Centaur launch vehicles, attention is given to the operational characteristics of the ascent, parking orbit, transfer orbit, and orbital insertion phases of the delivery of a communications satellite to a geostationary orbit by means of a Delta launch vehicle. NASA plans to employ Delta vehicles for as long as they are needed during the transition period to the Space Shuttle. NASA planning for Atlas Centaur includes launches through 1985 for INTELSAT-VA, and through 1986 for FLTSATCOM satellites.

Mahon, J. B.↗

Space transportation

The physical laws governing launch vehicles are reviewed, together with the performance of launch vehicles thus far used and expected developments in space transportation systems. Launches are generally made in the direction of earth rotation to take advantage of the initial velocity in that direction, which can amount to about 0.46 km/sec at the equator. Spacecraft usually attain a parking orbit, where spacecraft conditions are assessed before moving on to final orbit or interplanetary trajectory. Rocket batteries were first used in a battle near Beijing in 1232, and manned space flight began with the Vostok flight in 1961, followed by the Apollo lunar landings in the later 1960s. Rocket thrust performance is analyzed, together with the thrust/mass ratio for ascent and descent. The Shuttle, capable of placing 29.5 t in LEO, will be or is equipped to also carry IUS and PAM engines for transferring payloads from LEO to GEO. Parallel burn boosters may be added to increase the payload capability, and Shuttle-derived launch vehicles may be developed to carry construction materials to space and return to earth for a runway landing. Alternatively, the Shuttle engines may be modularized in order to develop a heavy-lift launch vehicle for unmanned cargo ascents.

Davis, H.↗

Earth vicinity trades and options

The options for recovering a returned manned Mars spacecraft are surveyed. Earth parking orbits from libration point to low circular are discussed, with a 500 km perigee, 24 hour period elliptical orbit chosen as a baseline for further calculation. Several techniques for recovering up to 100 metric tons of returned spacecraft are investigated, including recovery by a low Earth orbit (LEO) based orbit transfer vehicle (OTV) pushing the spacecraft to LEO, and OTV transporting and aerobrake to the spacecraft, and an OTV delivering propellant to the spacecraft. Methods utilizing OTVs results in less total mass in LEO, but may not be the minimum cost solutions if significant development and testing are required.

William R Stump↗

A get started approach for resource processing

A low-risk, high-value approach to implementing resource processing is presented. The design utilizes processing plants at Deimos and Mars, a fueling depot in a Mars parking orbit, and small shuttles transferring crew and cargo between sites. The system fuels Mars ascent and descent states and the earth-return stage. Fueling at Mars reduces launch requirements by 25 percent, or, alternatively, enables the substitution of payload for fuel on a near 1:1 basis and thereby triples the payload delivered to Mars.

Giudici, Bob↗

MIDAS - Mission design and analysis software for the optimization of ballistic interplanetary trajectories

A patched conic trajectory optimization program MIDAS is described that was developed to investigate a wide variety of complex ballistic heliocentric transfer trajectories. MIDAS includes the capability of optimizing trajectory event times such as departure date, arrival date, and intermediate planetary flyby dates and is able to both add and delete deep space maneuvers when dictated by the optimization process. Both powered and unpowered flyby or gravity assist trajectories of intermediate bodies can be handled and capability is included to optimize trajectories having a rendezvous with an intermediate body such as for a sample return mission. Capability is included in the optimization process to constrain launch energy and launch vehicle parking orbit parameters.

Sauer, Carl G., Jr.↗

Aerodynamic requirements of a manned Mars aerobraking transfer vehicle

In this investigation, entry corridor analyses are performed to identify the aerodynamic requirements of a manned Mars aerobraking transfer vehicle. The major emphasis is on identifying the required aerobrake hypersonic L/D to insure a successful aerocapture. Aerobraking entry requirements are also imposed on a set of interplanetary mission opportunities to demonstrate their effect on mission flexibility. Based on the requirements of a 1 deg corridor width, deceleration into a parking orbit witn an apoapsis altitude of 32,972 km, and a 5-g deceleration limit, a manned Mars aerobrake characterized by an L/D of at least 1.5 is required for entry velocities as high as 10.0 km/sec. Limiting the Mars entry velocity to values below 8.5 km/sec is shown to induce a minor restriction on mission flexibility while alleviating aerothermodynamic and vehicle packaging concerns; hence, Mars entry velocities in the range of 6.0-8.5 km/sec are suggested, and a manned Mars aerobrake characterized by an L/D between 0.3 and 0.5 is recommended.

Braun, Robert D.↗

Minimum fuel trajectories for a low-thrust power-limited mission to the moon and to Lagrange points L4 and L5

Minimum fuel trajectories from a low earth parking orbit to Lagrange points L4 or L5 and to the moon are obtained for a low-thrust limited-power spacecraft, with thrust acceleration levels of the order of 0.001 G. The procedure to find a trajectory to the libration point starts from an analytical description of a slightly elliptical spiral, given by Breakwell and Rauch. The earth moon trajectory is found by matching an earth spiral to a moon spiral on the sphere of influence. Earth oblateness effect is considered.

Breakwell, John V.↗

Minimum fuel lunar trajectories for a low-thrust power-limited spacecraft

Minimum-fuel trajectories from a low earth parking orbit to a low moon orbit are obtained for a low-thrust power-limited spacecraft with thrust acceleration levels of the order of 0.001 G. The trajectories are found by matching an earth spiral to a moon spiral at some intermediate distance. Results are given for the planar case and for the three-dimensional case where the moon orbit is polar.

Breakwell, John V.↗

Performance impact on nuclear thermal propulsion of piloted Mars missions with short transit times

The requirements of nuclear thermal propulsion (NTP) are examined with respect to a specific mission scenario derived from Stafford Committee recommendations. The recommended mission scenario is a split/sprint opposition mission which includes a piloted vehicle and a cargo vehicle, and the baseline mission is developed from a reference trajectory. Key mision parameters are developed from the baseline mission, including engine-thrust levels, mission opportunity, and engine burn-time requirements. The impact of engine failure is also considered in terms of burn-time requirements, and other mission-performance issues considered include propulsion-technology assumptions, triple-perigee earth-departure burns, and Mars parking-orbit selection. The engine requirements call for a 50-75-klb engine-thrust level, maximum single burn time of 0.6 hours, and a maximum total-mission burn time of 1.7 hours. For a crew of 6, a 475-day total-mission trip with a 90-day stay at Mars is possible.

Wickenheiser, T. J.↗

The effect of multi-periapse burns on planetary escape and capture

The use of multiple periapse burns to transfer between a planetocentric parking orbit and a hyperbolic trajectory with a high thrust propulsion system having constant, finite thrust is investigated. Such multiple burns offer propellant savings as a consequence of reduced velocity losses which accrue over the finite burn time of thrusting maneuvers. Velocity losses for an earth escape phase are calculated for an optimum steering program over a range of parameters that are typical of a Mars mission. These numerically integrated results are compared to velocity losses evaluated with a leading analytic approximation to establish boundaries within which the accuracy of the analytic approximation is adequate for preliminary mission planning purposes. Finally, results of the investigation are used to define typical benefits of the multi-periapse burn concept for Mars exploration missions.

Horsewood, Jerry L.↗