Search NASA⌕ Search

SEARCH · Search NASA

Results for “PRELAUNCH TESTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

An aneroid pressure sensor for constant-level balloons

The pressure sensor for the Tropical Wind Energy conversion and Reference Level Experiment (TWERLE) is described. Key design features of the sensor are: capacitive coupling, reference at midrange, up-down counting, passive oven, storage at flight pressure and prelaunch calibration. Sensor specifications are given which are based on the production results of 440 units. Drift, as estimated from simulated life tests, is 1 mb per 6 months. The overall weight of the sensor, including thermal package, is 180 g.

Levanon, N.↗

Flight elements: Advanced avionics systems architectures

Space transportation objectives are associated with transporting material from Earth to orbit, interplanetary travel, and planetary landing. The objectives considered herein are associated with Earth to orbit transportation. Many good avionics architectural features will support all phases of space transportation, but interplanetary transportation poses significantly different problems such as long mission time with high reliability, unattended operation, and many different opportunities such as long nonoperational flight segments that can be used for equipment fault diagnosis and repair. Fault tolerance can be used to permit continued operation with faulty units, not only during launch but also, and perhaps with more impact, during prelaunch activities. Avionics systems are entering a phase of development where the traditional approaches to satisfactory systems based on engineering judgement and thorough testing will alone no longer be adequate to assure that the required system performance can be obtained. A deeper understanding will be required to make the effects of obscure design decisions clear at a level where their impact can be properly judged.

Source record↗

In-house welding studies supporting the prelaunch assessment of the STS-6 main engines

Welding studies were undertaken as a result of problems with the Challenger engines. The process used to perform these welds on heat exchanger coils, and sample test data, are described. Recommendations for process improvement are included. Effort to simulate problem welds, as well as good welds, test data, and conclusions for the high pressure fuel turbopump are also are discussed.

Hawkins, L. L.↗

Prelaunch absolute radiometric calibration of the reflective bands on the LANDSAT-4 protoflight Thematic Mapper

The results of the absolute radiometric calibration of the LANDSAT 4 thematic mapper, as determined during pre-launch tests with a 122 cm integrating sphere, are presented. Detailed results for the best calibration of the protoflight TM are given, as well as summaries of other tests performed on the sensor. The dynamic range of the TM is within a few per cent of that required in all bands, except bands 1 and 3. Three detectors failed to pass the minimum SNR specified for their respective bands: band 5, channel 3 (dead), band 2, and channels 2 and 4 (noisy or slow response). Estimates of the absolute calibration accuracy for the TM show that the detectors are typically calibrated to 5% absolute error for the reflective bands; 10% full-scale accuracy was specified. Ten tests performed to transfer the detector absolute calibration to the internal calibrator show a 5% range at full scale in the transfer calibration; however, in two cases band 5 showed a 10% and a 7% difference.

Barker, J. L.↗

GOES-R Geostationary Lightning Mapper Performance Specifications and Algorithms

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR imager/optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series will carry a GLM that will provide continuous day and night observations of lightning. The mission objectives for the GLM are to: (1) Provide continuous, full-disk lightning measurements for storm warning and nowcasting, (2) Provide early warning of tornadic activity, and (2) Accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997- present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms and applications. The science data will consist of lightning "events", "groups", and "flashes". The algorithm is being designed to be an efficient user of the computational resources. This may include parallelization of the code and the concept of sub-dividing the GLM FOV into regions to be processed in parallel. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama, Oklahoma, Central Florida, and the Washington DC Metropolitan area) are being used to develop the prelaunch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution.

Mach, Douglas M.↗

Lunar Atmosphere and Dust Environment Explorer Integration and Test

Integration and test (I&T) of the Lunar Atmosphere and Dust Environment Explorer (LADEE) is presented. A collaborative NASA project between Goddard Space Flight Center and Ames Research Center, LADEE's mission is to explore the low lunar orbit environment and exosphere for constituents. Its instruments include two spectrometers, a dust detector, and a laser communication technology demonstration. Although a relatively low-cost spacecraft, LADEE has I&T requirements typical of most planetary probes, such as prelaunch contamination control, sterilization, and instrument calibration. To lead to a successful mission, I&T at the spacecraft, instrument, and observatory level must include step-by-step and end-to-end functional, environmental, and performance testing. Due to its compressed development schedule, LADEE I&T planning requires adjusting test flows and sequences to account for long-lead critical-path items and limited spares. A protoflight test-level strategy is also baselined. However, the program benefits from having two independent but collaborative teams of engineers, managers, and technicians that have a wealth of flight project experience. This paper summarizes the LADEE I&T planning, flow, facilities, and probe-unique processes. Coordination of requirements and approaches to I&T when multiple organizations are involved is discussed. Also presented are cost-effective approaches to I&T that are transferable to most any spaceflight project I&T program.

Wright, Michael R.↗

Determination of the NOAA-20 VIIRS TEB RVS from Emissive Radiation Measurements During the Pitch Maneuver

The Visible Infrared Imaging Radiometer Suite (VIIRS) is a key sensor carried on the newly launched (November 18, 2017) Joint Polar Satellite System-1 (JPSS-1), now transitioned to NOAA-20, and the Suomi National Polar-orbiting Partnership (SNPP) satellite. The two VIIRS sensors are nearly identical in design. Its on-board calibration components include a solar diffuser (SD) and a solar diffuser stability monitor (SDSM) for the reflective solar bands (RSB), a V-groove blackbody for the thermal emissive bands (TEB), and a space view (SV) port for background subtraction. These on-board calibrators are located at fixed scan angles. The VIIRS response versus scan angle (RVS) was characterized prelaunch in lab ambient conditions and is currently used to calibrate the on-orbit response for all scan angles relative to the calibrator's scan angle. A spacecraft level pitch maneuver was scheduled during the initial intensive Cal/Val testing for both the NOAA-20 and SNPP. The pitch maneuver provided a rare opportunity for VIIRS to make observations of deep space over the entire scan angle range, which can be used to characterize the TEB RVS. This study provides our analysis of the NOAA-20 pitch maneuver data and assessment of the derived TEB RVS. A comparison between the RVS determined by the pitch maneuver observations and prelaunch lab measurements is conducted for each band, detector, and mirror side of the half angle mirror.

VIIRS↗

DSN support of Mars Observer

This article provides a summary of the DSN prelaunch, launch, and cruise support of the Mars Observer through Trajectory Correction Maneuver 2 (TCM-2) on 8 Feb. 1993. This summary includes planning, implementation, testing, DSN special configurations and DSN operational problems, and successes and challenges to date.

Traxler, M. R.↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higginbotham, KSC Payload Manager, and Ed Priselac, Shuttle Weather Officer. Mr. Spaulding discusses the successful countdown thus far and some of the prelaunch activities. Mr. Higginbotham describes the stow operations and possible changes in the payload configuration. Mr. Priselac forecasts good weather for the upcoming launch. The men then answer questions from the press.

Source record↗

Determination of Response Versus Scan Angle for the NOAA-20 Visible Infrared Imaging Radiometer Suite Thermal Emissive Bands from Emissive Radiation Measurements During the Pitch Maneuver

The visible infrared imaging radiometer suite (VIIRS) is a key sensor onboard the newly launched (November 18, 2017) NOAA-20 satellite and the early launched Suomi National Polar-orbiting Partnership (SNPP) satellite. The two VIIRS sensors are nearly identical in design. Its onboard calibration components include a solar diffuser (SD) and a SD stability monitor for the reflective solar bands, a V-grooved blackbody for the thermal emissive bands (TEBs),and a space view port for background subtraction. These onboard calibrators are located at fixed scan angles. The response versus scan angle (RVS) of the VIIRS scan mirror was characterized prelaunch in lab-ambient conditions and is currently used to calibrate the on-orbit response for all scan angles relative to the calibrator's scan angle. A spacecraft-level pitch maneuver was scheduled during the initial intensive calibration and validation testing for both the NOAA-20 and SNPP. The pitch maneuver provided a rare opportunity for VIIRS to make observations of deep space over the entire range of the scan angle, which can be used to characterize the TEBRVS. We analyze the NOAA-20 pitch maneuver data and assess the derived TEB RVS. A comparison between the RVS determined by the pitch maneuver observations and prelaunch lab measurements is conducted for each band, detector, and mirror side of the half-angle mirror.

Wu, Aisheng↗

Contamination control program for the Extreme Ultraviolet Explorer instruments

A contamination-control program has been instituted for the optical components of the EUV Explorer satellite, whose 80-900 A range performance is easily degraded by particulate and molecular contamination. Cleanliness requirements have been formulated for the design, fabrication, and test phases of these instruments; in addition, contamination-control steps have been taken which prominently include the isolation of sensitive components in a sealed optics cavity. Prelaunch monitoring systems encompass the use of quartz crystal microbalances, particle witness plates, direct flight hardware sampling, and optical witness sampling of EUV scattering and reflectivity.

Ray, David C.↗

STS-97 Countdown Status

Joel Wells, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, David Flowers, P-6 Truss Integration Engineer, and Ed Priselac, Shuttle Weather Officer. Mr. Altemus describes the successful countdown thus far, and some of the prelaunch activities. Mr. Flowers gives an overview of the P-6 Truss and its role on the International Space Station (ISS). Mr. Priselac gives a forecast for good launching weather. The men then answer questions from the press.

Source record↗

Artemis I Prelaunch Flight Readiness Analysis

The Prelaunch loads analysis traditionally captures the vehicle and Mobile Launcher (ML) loads associated with stacking in the Vehicle Assembly Building (VAB), rollout to the pad, and high-speed winds while out on the pad prior to liftoff. The following paper details the methodology used in this analysis for loads for the Artemis Flight Readiness assessment. This paper focuses on the stacking and assembly loads, the loads induced by fueling, and the load seen during rollout to the pad. Methods for integrating multiple structural models in dynamic simulations using interface forces, constraint modes, and residual vectors is discussed. Both linear and nonlinear responses are addressed. Simulation results are compared to measured data from the Dynamic Rollout Test (DRT) and Wet Dress Rehearsal (WDR).

SLS↗

A Nimbus G pre-launch field experiment in the Gulf of Mexico, October 1977

A large scale field experiment, which was arranged in support of the Nimbus G - Coastal Zone Color Scanner (CZCS) project was studied. The experiment was to provide three air and two shipborne platforms simultaneously to members of the Nimbus G Experiment Team (NET) and to other scientists in order to collect data from common test sites. Besides establishing fundamental relations between the light in the sea and the biochemical properties of water, the data will be used mainly for the development of algorithms during the prelaunch phase of Nimbus G.

Vanderpiepen, H.↗

STS-106 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Jeff Spaulding, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities and the payload status are described. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

STS-106 Countdown Status Briefing

George Diller, NASA Public Affairs, introduces Steve Altemus, NASA Test Director, Scott Higgenbotham, Kennedy Space Center Payload Manager, and Ed Priselac, Shuttle Weather Officer, who give an overview of the successful countdown for the STS-106 Atlantis mission thus far. Prelaunch activities are described, such as the engine preparations, the communications systems power up, final flight close outs, and payload status. The weather forecast for the upcoming launch is given. The men then answer questions from the press.

Source record↗

Scattered light in the echelle modes of the Goddard high-resolution spectrograph aboard the Hubble Space Telescope. I - Analysis of prelaunch calibration data

A study of scattered light in the echelle mode of the Goddard high-resolution spectrograph (GHRS), one of the first-generation science instruments aboard the Hubble Space Telescope, is reported. The data analyzed are from the GHRS ground-based test program and include observations with the 500 channel Digicon detectors through the small science aperture of UV emission-line sources, continuum sources, and continuum sources viewed through molecular absorption cells. The two largest contributors to scattered light are the echelle and cross-disperser, the effects of which have been quantified. A computer simulation using the derived scattering functions demonstrates that the combined effects of these sources of scattered light adequately explain the observed level of interorder light when viewing UV continuum sources. Observing strategies and data reduction algorithms for measuring and removing the effects of the scattered light are discussed.

Cardelli, Jason A.↗

Design improvement, qualification testing, purge and vent investigation, fabrication, and documentation of a GAC-9 insulation system

Results of the research and development program to determine the purge and vent characteristics of the GAC-9 insulation system are summarized. The work scope comprised: (1) literature survey; (2) design improvement and insulation effort; (3) testing; and (4) evaluation of test results. Program objectives to be realized are: (1) definition of purge gas flow characteristics of the GAC-9 insulation system through laboratory measurements; and (2) demonstration of insulation effectiveness as a system for prelaunch purging and launch venting of the 76-cm diameter calorimeter, which is a subscale model simulating a realistic type of GAC-9 insulation application.

Shriver, C. B.↗