Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Pilgrim Hot Springs Building Dimensions and Energy Modeling

This dataset was created to model the anticipated heating load of a geothermal project in development for the historical site of Pilgrim Hot Springs, and adds to the history of geothermal studies at the site. Models include an historical building (Nun's Quarters), existing modern buildings (Caretaker's Cabin, Igloo, Visitor's Cabin, Staff Shower Hut), and planned building projects (Changing Room, Greenhouse). Modeling results were used to determine feasible geothermal system typologies. The previous study linked below ("Village of Solomon Development of Energy Efficiency Building Standards for New Construction") feeds in to this project. The dataset includes DWG drawings and AKwarm energy models (.hm2) of a subset of existing buildings at the site of Pilgrim Hot Springs. All buildings were modeled in their current state, and some were additionally modeled with improvements to the building envelope. Energy modeling results exported from AKwarm include .htm and .png images.

AKwarm↗

Delivery of a Solar-Powered Forward Osmosis Seawater Desalination Plant: Trevi’s 500 m3/day Zero-Carbon FO Seawater Desalination Plant at NELHA

This paper presents an account of Trevi’s delivery of a 500 m3/day solar powered forward osmosis (FO) seawater desalination plant at the Ocean Science and Technology Park of the Natural Energy Laboratory of Hawaii Authority (NELHA). The project aimed to demonstrate the viability of solar thermal-powered desalination for agricultural applications through the integration of a 2MW micro-dish solar thermal array with a state-of-the-art FO system. Highlighted in the paper are the three distinct project phases; Planning and Design, System Construction, Installation & Testing followed finally by System Operation and Optimization. Results and decisions which led to the final plant design will be shared, highlighting how Trevi Systems succeeded in producing a zero-carbon FO seawater desalination plant with a projected Levelized Cost of Water (LCOW) estimate competitive with existing carbon-intensive RO technologies (based on some assumptions and the cost of heat which is required for FO.

14 SOLAR ENERGY↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

Preload Characterization of Short Models of MQXF the Nb 3 Sn Low-β Quadrupole for the Hi-Lumi LHC

MQXF is the Nb3Sn Low-β Quadrupole magnet that the HL-LHC project is planning to install in the LHC interaction regions in 2026 as part of an upgrade to increase the LHC inte-grated luminosity by about a factor of ten. The magnet will be fab-ricated in two different lengths: 4.2 m for MQXFA, built in the US by the Accelerator Upgrade Project (AUP), and 7.15 m for MQXFB, fabricated by CERN. In order to qualify the magnet de-sign and characterize its performance with different conductors, cable geometries and pre-load configuration, five short model magnets, called MQXFS, were fabricated, assembled and tested. The latest model, MQXFS6, uses a new powder-in-tube (PIT) su-perconducting wire, featuring a bundle barrier surrounding the filaments. The coil and the support structure were equipped with strain gauges and optical fibres to monitor strain during assembly, cool-down and excitation. In this paper we further develop the conventional azimuthal preload analysis and introduce a new set of tools for MQXF coil pack characterization which we use to an-alyse the behaviour of MQXFS6 room temperature preload and to reanalyse all the short models tested at CERN. A comparison is made between all the studied magnets revealing new characteriz-ing preload parameters.

43 PARTICLE ACCELERATORS↗

Modernizing Fermilab's Accelerator Control Hardware

Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory's accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available.The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The ACORN project is planning to replace Fermilab s obsolete CAMAC crate-and-card controls hardware with modern MicroTCA hardware. There are over 2,000 CAMAC cards and over 250 CAMAC crates serving various functions in Fermilab s control system. We will review the existing CAMAC hardware and provide updates on the status of the ACORN project, which includes the conceptual design of the MicroTCA replacement hardware and software tools for supporting the installation of hundreds of MicroTCA crates.

43 PARTICLE ACCELERATORS↗

Selection of Global Climate Model Data for Downscaling With Generative Machine Learning and Use in the Power Planning for Alignment of Climate and Energy Systems Project

The range of results from climate models and scenarios is important to the understanding of uncertainty in power planning analysis. A U.S. Department of Energy-funded analytic project called Power Planning for Alignment of Climate and Energy Systems is developing data and analytic methods to reflect the effects of climate change on key variables for power system planning, as part of the Grid Modernization Lab Consortium. This project will select and prepare global climate model results for use in power system planning models. A related report (Evaluation of Global Climate Models for Use in Energy Analysis) assesses the performance of various global climate models from the Coupled Model Intercomparison Project Phase 6 data archive for their historical skill with respect to energy system performance and for their future projections under multiple climate change scenarios. Building from that report, we describe the selection of a climate scenario (Shared Socioeconomic Pathway [SSP] 2-4.5) and five climate models: TaiESM1, EC-Earth3-CC, GFDL-CM4, EC-Earth3-Veg, and MPI-ESM1-2-HR. We describe the model selection criteria, which were based on the quality of the match between model results under historical conditions and on the representation of the range of future values for several variables. These results will be downscaled via an open-source generative machine learning method called Super-Resolution for Renewable Energy Resource Data with Climate Change Impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LA100 Equity Strategies. Chapter 4: Lessons Learned and Options for Community Engagement in Los Angeles

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Building on the community-identified problems and solutions, and the analysis of the 11 strategies described in Chapter 3, this chapter continues to focus on the solution space through the lens of recognition and procedural justice. It centers the role of community engagement in energy utility planning and project development with a specific focus on how the Los Angeles Department of Water and Power (LADWP) can engage and work equitably with Los Angeles communities to cocreate a clean and just energy future for LA. LA100 Equity Strategies is rooted in the crucial role community engagement plays in restructuring the energy systems of cities, states, and nations. Scholarship on wind, solar, and other transitional energy technologies and projects has documented that such engagement is commonly used as a top-down mechanism for adapting social practices to fit new technological innovations. Yet, understanding how the clean energy transition - with related changes in technologies, infrastructures, practices, and costs - will fit equitably into the existing socio-political context is a challenge that requires substantive collaboration with local communities. Any form of community engagement opens up government officials and utilities to opposition from their public. Meaningful engagement methods turn such dissent into a strength, embracing critical feedback - particularly from communities historically excluded from decision-making - as contributing to more grounded design and effective implementation. Leveraging this collaborative model to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of LA, this chapter presents options and methods to support LADWP in launching a just and equitable clean energy transition. We approach community engagement as a critical process linking recognition, procedural, and distributional justice, outlining how LADWP could learn from past engagement, coordinate such knowledge organization-wide, and use engagement as a key tool for achieving energy justice and equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LA100 Equity Strategies. Chapter 5: Low-Income Energy Bill Equity and Affordability

The LA100 Equity Strategies project synthesizes community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. Grounded in the analysis of past and ongoing energy inequities and engagement with underserved communities, the project presents community-guided strategies that aim to operationalize recognition and procedural justice. Building on the community-identified problems and solutions, and the analysis of the 11 strategies described in Chapter 3, this chapter continues to focus on the solution space through the lens of recognition and procedural justice. It centers the role of community engagement in energy utility planning and project development with a specific focus on how the Los Angeles Department of Water and Power (LADWP) can engage and work equitably with Los Angeles communities to cocreate a clean and just energy future for LA. LA100 Equity Strategies is rooted in the crucial role community engagement plays in restructuring the energy systems of cities, states, and nations. Scholarship on wind, solar, and other transitional energy technologies and projects has documented that such engagement is commonly used as a top-down mechanism for adapting social practices to fit new technological innovations. Yet, understanding how the clean energy transition - with related changes in technologies, infrastructures, practices, and costs - will fit equitably into the existing socio-political context is a challenge that requires substantive collaboration with local communities. Any form of community engagement opens up government officials and utilities to opposition from their public. Meaningful engagement methods turn such dissent into a strength, embracing critical feedback - particularly from communities historically excluded from decision-making - as contributing to more grounded design and effective implementation. Leveraging this collaborative model to further rectify past and ongoing inequities in the social, cultural, and institutional scaffolding of LA, this chapter presents options and methods to support LADWP in launching a just and equitable clean energy transition. We approach community engagement as a critical process linking recognition, procedural, and distributional justice, outlining how LADWP could learn from past engagement, coordinate such knowledge organization-wide, and use engagement as a key tool for achieving energy justice and equity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigation of Non-Nuclear Plowshare and Vela Uniform Sites - 20447

The Plowshare Program was initiated by the Atomic Energy Commission, a predecessor agency to the US Department of Energy (DOE), to investigate peaceful uses of nuclear devices. 'Vela Uniform,' part of the broader Project Vela, was designed to use nuclear and other explosions to increase the capability of the United States to detect nuclear tests through seismicity. There were underground nuclear tests conducted off the Nevada National Security Site (NNSS) as part of the Plowshare Program (e.g., the Gnome-Coach, New Mexico, Site) and the Vela Uniform Program (e.g., Project Shoal, Nevada, Site) at which the DOE Office of Legacy Management (LM) has been conducting long-term surveillance and maintenance since fiscal year (FY) 2006. There are many additional locations, particularly for the Plowshare Program, that were considered for nuclear tests or used for non-nuclear tests off the NNSS. Some were only named on paper, but at 30 sites, field work such as drilling test wells and conducting tests using conventional explosives was done. A Plowshare nuclear explosion had been proposed at Project Chariot but was canceled in 1962. In 1992, the discovery of soils contaminated with radionuclides from tracer experiments led to a cleanup by the DOE Office of Environmental Management (EM) of the Project Chariot, Alaska, Site, which was completed in 1994. Following the cleanup of the Project Chariot site, EM was concerned that there might be environmental liabilities at other Plowshare or Vela Uniform sites where field investigations were done, even if the nuclear test was never conducted. The EM Program at the Nevada Site Office began examining records and visiting selected locations that were evaluated for Plowshare and Vela Uniform non-nuclear tests. In total, 161 Plowshare and 14 Vela Uniform sites or proposed projects were identified. The Desert Research Institute (DRI) created summaries of the work carried out at these sites and developed a collection of unclassified documents for them. Preliminary investigations had been conducted at these sites by both LM and EM since the early 2000's. In 2016, in preparation for accepting responsibility for the sites, LM started a program to determine if there were any environmental or safety liabilities associated with them. In 2019, LM formally accepted responsibility for these sites off the NNSS where non-nuclear explosive tests were conducted or where underground nuclear tests were proposed as part of the Plowshare and Vela Uniform programs but were never conducted. LM responsibilities will include maintaining institutional knowledge of the sites, responding to public inquiries, and addressing any concerns at each site. To minimize risk associated with site management, LM has archived all historical records compiled by DRI and has performed limited investigations at sites identified by the prior studies as having a higher potential liability. Preserving records related to site operations reduces the risk of doing unnecessary site investigations in the future caused by the loss of institutional knowledge. During the investigations, some maintenance needs were identified and will be addressed by the end of FY 2021. At the end of FY 2021, investigations, maintenance, and archiving activities will be complete. Remnants of test activities found at sites include craters, mud pits, debris, and open boreholes. Open boreholes are being plugged and abandoned in accordance with state regulatory standards. Other issues are being addressed in accordance with land owner requests and preferences as well as state regulations. Archiving activities include the development of project summaries identifying key operational details and current condition to allow site managers to be easily briefed. The LM experience at non-nuclear Plowshare and Vela Uniform sites applies to other programs where there is the potential for liability associated with the non-nuclear aspects of nuclear programs. This may include support activities or early phases of planned nuclear projects. Preserving institutional knowledge enables land managers to adequately address any concerns associated with operations and lowers risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assembly and Pre-Loading Specifications for the Series Production of the Nb 3 Sn MQXFA Quadrupole Magnets for the HL-LHC

We report the High Luminosity LHC (HL-LHC) Project is planning to install 16 cold-masses made with Nb 3 Sn quadrupole magnets in the LHC Interaction Regions to significantly increase its luminosity. Half of these cold masses are fabricated at BNL, FNAL, and LBNL under the US Accelerator Research Program (AUP). Each cold mass includes two identical Nb 3 Sn quadrupole magnets, called MQXFA with a magnetic length of 4.2 m. Currently, the AUP project has completed the fabrication and test of the first 5 pre-series magnets, and is working on the following 16 magnets for the series production. The brittleness and strain sensitivity of the Nb 3 Sn superconducting material requires a careful definition of the allowable maximum stress in the windings during magnet assembly and pre-load, and a tight control of their variation within the whole coil length. Therefore, a series of assembly and pre-load specifications have been defined with the goals of minimizing the risk of conductor degradation and providing the mechanical support required to reach the nominal current during powering. In this paper we present the specifications defined for the MQXFA magnets and applied during the different assembly phases and during the pre-load process of the first 5 pre-series magnets.

43 PARTICLE ACCELERATORS↗

Transportation Energy Analytics Dashboard (TEAD)

The investment decisions within the nation’s transportation sector have traditionally been prioritized and measured against safety and travel efficiency goals. Increasingly, federal, state, and local policies are requiring consideration of energy use and emissions in the design of our transportation infrastructure. Yet the processes, analytics, and knowledge to include these new metrics into transportation decisions are lacking. Although targeted studies and before and after analysis are performed from time to time, no comprehensive real-time monitoring systems provide energy and emissions to the same level as congestion and safety. To address this gap, the Center for Advanced Transportation Technology (CATT Lab) and the Maryland Transportation Institute (MTI) at the University of Maryland (UMD), in partnership with the National Renewable Energy Laboratory (NREL), have developed a Transportation Energy Analytics Dashboard, or TEAD, to raise awareness of the energy and emission impacts to the same level of observability as that of safety and mobility concerns. The overall goal of this project was to develop and demonstrate an online tool to monitor transportation energy use and emissions in real-time and to archive this data for retrospective analysis. By combining surface transportation energy and emissions evaluation capability with more traditional safety, mobility and reliability system evaluation, our goal is for TEAD to create a dynamic new paradigm in transportation systems management and performance analyses, for both real-time traffic operations, and longer-term planning for project and program investment decision-making.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measuring Irradiance for Bifacial PV Systems

The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.

bifacial↗

Measuring Irradiance for Bifacial PV Systems: Preprint

The advent of bifacial PV systems drives new requirements for irradiance measurement at PV projects for monitoring and assessment purposes. While there are several approaches, there is still no uniform guidance for what irradiance parameters to measure and for the optimal selection and placement of irradiance sensors at bifacial arrays. Standards are emerging to address these topics but are not yet available. In this paper we review approaches to bifacial irradiance monitoring which are being discussed in the research literature and pursued in early systems, to provide a preliminary guide and framework for developers planning bifacial projects.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE Data Days (Q4 FY2021 Report)

During the FY21Q4 the DOE Data Days (D3) leftover funds from D3 2020 were rolled-over to a new project task and project lead was transferred from Stan Ruppert to Rebecca Rodd. This project will be a continuation of previous DOE Data Day Conferences that were funded through the EOS project. The following are high-level accomplishments: Wrote a draft life-cycle plan for FY22 project for continuation of D3, Sought feedback from previous D3 committees to begin selection of FY22 planning committee, and Project management transitioned from Stan Ruppert to Rebecca Rodd in anticipation of Stan’s retirement at the end of FY21.

99 GENERAL AND MISCELLANEOUS↗