STS-103 Discovery on Pad 39B
Live footage of the fully assembled Discovery Orbiter on the Launch Pad 39B before the 6:50 p.m. lift off is shown.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Live footage of the fully assembled Discovery Orbiter on the Launch Pad 39B before the 6:50 p.m. lift off is shown.
The primary objective of the STS-37 mission was to deploy the Gamma Ray Observatory. The mission was launched at 9:22:44 am on April 5, 1991, onboard the space shuttle Atlantis. The mission was led by Commander Steven R. Nagel. The crew was Pilot Kenneth D. Cameron and Mission Specialists Jerry Ross, Jay Apt, and Linda Godwing. This videotape shows the shuttle being rolled out to the launch pad.
The STS-33 at Pad B Integrated Electronic Assembly (I.E.A.) is shown. The STS-32 I.E.A. removal in the Vehicle Assembly Building (V.A.B) High Bay 1 (H.B.1) is also presented. The change out of the short they found in boosters is the purpose for the video.
This video presentation shows the STS-71 after lightning struck Pad 39A.
Live footage shows some beautiful panoramic views of STS-37 on the pad. Scenes include the narration of simulated auto sequence start, engine start, engine firing and cut-off. Also shown is the crew emergency egress procedure. This is tape 3 of 3. Tape 1 has a report # of NONP-NASA-VT-2000013416, and tape 2 has a report # of NONP-NASA-VT-2000013417.
Live footage shows the remaining two crewmembers of STS-37, Mission Specialists Jerry L. Ross, and Jay Apt, entering the White Room, putting on their life preservation vest, and then entering the launch vehicle. Video playbacks, of the crew during the earlier stage of the Terminal Countdown and Demonstration Test, and the processing of the primary payload (Gamma Ray Observatory) are shown. Scenes showing the arrival of Ross at Kennedy Space Center in the T-38 aircraft, the crew on the launch complex during familiarization activities, and training with the M113 vehicle are presented. Also shown are some beautiful panoramic views of the shuttle on the pad. This is tape 2 of 3. Tape 1 has a report # of NONP-NASA-VT-2000013416, and tape 3 has a report # of NONP-NASA-VT-2000013418.
Footage shows night shots of the erected Atlas GEOS-J on the launch pad, and work being done.
This NASA Kennedy Space Center video presents live footage of the installation of the XTE (X-Ray Timing Explorer) Solid Rocket Motor at Launch Pad 17-A. The installation takes place at Cape Canaveral Air Station, Florida.
Live footage shows the rollout preparations of the SRB/MLP. Also shown is the rollout of SRB/MLP to Pad B.
Footage is shown of the slow rollout of Discovery onto pad A. Different close-up and panoramic shots of the orbiter are also shown.
Footage is shown of the slow rollback of Atlantis, travelling from pad A to the Vehicle Assembly Building (VAB).
Footage is shown of the slow rollout of Atlantis on pad A. Different close-up and panoramic shots of the orbiter are shown against a backdrop of the sunset.
Footage shows the removal of Engine 2 from the the Endeavour Orbiter at Pad B.
Footage shows the rollout of the Discovery Orbiter to the launching pad.
Footage shows close-up shots of the Tracking and Data Relay Satellite (TDRS) in the Endeavour Orbiter's cargo bay at Launch Pad B.
The results of an in-flight investigation of the feasibility of conducting a successful landing following a launch-pad abort of a vertically-launched lifting body are presented. The study attempted to duplicate the abort-to-land-ing trajectory from the point of apogee through final flare and included the steep glide and a required high-speed, low-altitude turn to the runway heading. The steep glide was flown by reference to ground-provided guidance. The low-altitude turn was flown visually with a reduced field- of-view duplicating that of the simulated lifting body. Results from the in-flight experiment are shown to agree with ground-based simulation results; however, these tests should not be regarded as a definitive due to performance and control law dissimilarities between the two vehicles.
The STS-114 Space Shuttle Discovery Terminal Countdown Demonstration Test (TCDT) flight crew is shown at Pad 39-B. Eileen Collins, Commander introduces the astronauts. Andrew Thomas, mission specialist talks about his primary responsibility of performing boom inspections, Wendy Lawrence, Mission Specialist 4 (MS4) describes her role as the robotic arm operator supporting Extravehicular Activities (EVA), Stephen Robinson, Mission Specialist 3 (MS3) talks about his role as flight engineer, Charlie Camarda, Mission Specialist 5 (MS5) says that his duties are to perform boom operations, transfer operations from the space shuttle to the International Space Station and spacecraft rendezvous. Soichi Noguchi, Mission Specialist 1 (MS1) from JAXA, introduces himself as Extravehicular Activity 1 (EVA1), and Jim Kelley, Pilot will operate the robotic arm and perform pilot duties. Questions from the news media about the safety of the external tank, going to the International Space Station and returning, EVA training, and thoughts about the Space Shuttle Columbia crew are answered.
Current results of a program for analysis of the compression pad cavities on the Orion heatshield are reviewed. The program was supported by experimental tests, engineering modeling, and applied computations with an emphasis on the latter presented in this paper. The computational tools and approach are described along with calculated results for wind tunnel and flight conditions. Correlations of the computed results are shown which can produce a credible prediction of heating augmentation due to cavity disturbances. The models developed for use in preliminary design of the Orion heatshield are presented.