Status on NGST Mirror Technology

The NGST primary mirror is anticipated to be a segmented deployable optic with segment size being in the range of 1 - 3 m depending on the details of the architecture. The secondary mirror will likely be a monolith similar in size to one of the primary mirror segments. Over the past 4 years the NGST program has initiated and implemented an aggressive lightweight cryogenic mirror technology program. The program was designed to challenge and excite the optical community in reaching a new standard in production of lightweight optics. The goal was to develop optics at less than 15 kg/sq m, operational at approx. 40 K and meeting the overall NGST observatory requirement for diffraction limited performance at 2 microns. In order to meet the NGST needs, technology efforts were initiated to investigate and develop mirrors in a variety of materials, which held promise for the program. The basic technology approaches have initially targeted the production of large mirrors in the 1.2 - 2.0 m diameter range (or side-to-side distance in the case of hexagonal optics). Although this size may not be the final size of an NGST primary mirror segment, it was felt that a 1.2 - 2.0 m optic would be of sufficient size to understand the mirror material and fabrication processes which drive the cost and schedule of mirror production. The ultimate goals of the technology program are both to demonstrate mirrors meeting, the NGST performance requirements, and to establish cost and schedule credibility for producing and implementing the mirrors for the NGST flight system. Establishing cost and schedule credibility is essential to NGST which is a cost capped mission, with past program experience demonstrating that the optics will be a large portion of the total cost of the program. The first two years of the program were dedicated to understanding; the various applicable materials, funding those materials to various levels of maturity and implementing the first large mirror procurement, the NGST Mirror System Demonstrator (NMSD), in order to establish a benchmark for the state-of-the-art in lightweight optics and to establish credibility that the goals of NGST could be achieved. The past two years of the program has seen major steps in the development of several mirror materials, which not only might have NGST applicability but could also support other programs for other customers. Additionally, a second large mirror procurement, the Advanced Mirror System Demonstrator (AMSD), has been implemented providing a focal point to complete the mirror technology development and lead ultimately to the production of mirrors that will fly on NEXUS (the NGST flight experiment- discussed below) and NGST. This talk will focus on the mirror technology developed over the past 4 years on the NGST program.

Jacobson, David↗

A Review of Engine Seal Performance and Requirements for Current and Future Army Engine Platforms

Sand ingestion continues to impact combat ground and air vehicles in military operations in the Middle East. The T-700 engine used in Apache and Blackhawk helicopters has been subjected to increased overhauls due to sand and dust ingestion during desert operations. Engine component wear includes compressor and turbine blades/vanes resulting in decreased engine power and efficiency. Engine labyrinth seals have also been subjected to sand and dust erosion resulting in tooth tip wear, increased clearances, and loss in efficiency. For the current investigation, a brief overview is given of the history of the T-700 engine development with respect to sand and dust ingestion requirements. The operational condition of labyrinth seals taken out of service from 4 different locations of the T-700 engine during engine overhauls are examined. Collaborative efforts between the Army and NASA to improve turbine engine seal leakage and life capability are currently focused on noncontacting, low leakage, compliant designs. These new concepts should be evaluated for their tolerance to sand laden air. Future R&D efforts to improve seal erosion resistance and operation in desert environments are recommended

Delgado, Irebert R.↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Sensitivity of Space Station alpha joint robust controller to structural modal parameter variations

The photovoltaic array sun tracking control system of Space Station Freedom is described. A synthesis procedure for determining optimized values of the design variables of the control system is developed using a constrained optimization technique. The synthesis is performed to provide a given level of stability margin, to achieve the most responsive tracking performance, and to meet other design requirements. Performance of the baseline design, which is synthesized using predicted structural characteristics, is discussed and the sensitivity of the stability margin is examined for variations of the frequencies, mode shapes and damping ratios of dominant structural modes. The design provides enough robustness to tolerate a sizeable error in the predicted modal parameters. A study was made of the sensitivity of performance indicators as the modal parameters of the dominant modes vary. The design variables are resynthesized for varying modal parameters in order to achieve the most responsive tracking performance while satisfying the design requirements. This procedure of reoptimization design parameters would be useful in improving the control system performance if accurate model data are provided.

Kumar, Renjith R.↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Guidelines for Verification Strategies to Minimize RISK Based on Mission Environment, -Application and -Lifetime (MEAL)

There is a trend of compromising verification testing to address the cost and schedule constraints, which poses a high-risk posture for programs/projects. Current and emerging aerospace scientific and/or human exploration programs continue to pose new technological challenges. These technological challenges combined with finite budgets and truncated schedules are forcing designers, scientists, engineers, and managers to push technologies to their physical limits. In addition, budget and schedule pressures challenge how those technologies/missions are verified. A clear understanding of the different verification processes is needed to ensure the proper verification of the technology within the mission (i.e., capabilities, advantages, and limitations). The goal of verification is to prove through test, analysis, inspection, and/or demonstration that a product provides its required function while meeting the performance requirements. It is important that verification yield understanding of representative performance under worst-case conditions so that margins to failure can be evaluated for proposed applications. The capabilities, advantages, and limitations of the testing and inspection performed at each level are different, and the risk incurred by omitting a verification step depends on the level of integration as well as Mission, Environment, Application and Lifetime (MEAL). This paper focuses on verification processes. The goal of the verification process is to ensure the given avionics technology could be safely implemented on the given MEAL consistent with the program/project risk posture.

Gonzalez, Oscar↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emerging Pathways to Upgrade the US Housing Stock: A Review of the Home Energy Upgrade Literature

The residential buildings sector is responsible for about 20% of total US energy use. In order to achieve climate goals, we need ways to reduce carbon emissions and energy use in this sector. In addition, resiliency, electric grid stability, emergency survivability and other energy and building-related issues are becoming increasingly important challenges. New homes in most of the US meet various energy codes and are reasonably energy efficient. However, the vast majority of energy use is from existing homes that were not required to conform to energy performance requirements. It is becoming imperative to reach as many of these existing homes as possible and find ways to improve their energy-related performance. This must be done in such a way that it meets the needs and desires of homeowners and building occupants, as well as those of the contractors and design professionals engaged in doing the upgrades themselves. Energy retrofits of homes started in the 1970’s in response to the energy crisis, however, these retrofits were very limited in scope and relatively few homes were upgraded. Those homes that have been upgraded generally still have much scope for improvement. A huge effort is needed to get to scale to address the energy use in housing. The target population is effectively every home in the country, whether a large suburban single-family home, or a small downtown apartment. In order to provide a framework for analysis and the basis for plans to get to large-scale retrofits of homes, this literature review summarizes the state-of-the art in the US buildings industry. It identifies where more research, engineering, or technology is needed, as well as relevant industry trends, such as electrification, one-stop shop program design and others. It also examines other key topics, such as availability of financing, minimizing household disruption, and engaging home owners and occupants. This literature review builds on a similar review from several years ago (Less and Walker, 2014). The current review focuses on efforts in the intervening years. This literature review is part of a larger DOE study of deep energy upgrades that includes industry surveys and development of cost-stack analyses. For this review, we gathered data not just from the published literature, but also from practitioners in conjunction with other aspects of the larger DOE study. In some cases, we refer to comments from specific individuals or companies, or refer to specific products by name. This is not intended as an endorsement, but rather to provide clarity on sources of information and examples of relevant technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Team Dynamics and Development in Chemical Emergency Response

This presentation is focused on Team Dynamics and Development in Chemical Emergency Response. While regulatory requirements focus on defining the performance requirements associated with this category of response team, there is very little information and guidance provided to team leaders on the criticality of team dynamics of development in performance. These elements are essential to achieving successfully integrated team operations. NREL has worked to expand chemical response team participation to include operational personnel from research, support operations, and various technical areas. Since this team expansion has encompassed integration from numerous levels and areas within the organization, a systematic approach was adopted to better understand how organization culture, dynamics, and diversity can be used to be more effective. Benchmarking other organizations and reviewing relevant literature assisted in laying the foundation to develop a strategy that incorporates team development principles, dynamics, and leadership practices to increase the effectiveness of emergency response operations. This presentation focuses on the valuable lessons learned and the team-based approaches that can be used to develop a successful response team.

emergency response↗

Design considerations for the Shuttle/Orbiter closed-circuit television subsystem

The Shuttle/Orbiter Program requirements relative to operational and performance parameters of the CCTV (closed circuit television) subsystem and their influence upon design considerations are presented. The anticipated use of the CCTV for rendezvous, docking, manipulator arm operation, satellite inspection and general orbiter operations is outlined to establish the performance requirements of each subsystem element. Typical physical characteristics, interface parameters, and remote-control design philosophy are briefly described.

Perry, W. E.↗

The 30-centimeter ion thrust subsystem design manual

The principal characteristics of the 30-centimeter ion propulsion thrust subsystem technology that was developed to satisfy the propulsion needs of future planetary and early orbital missions are described. Functional requirements and descriptions, interface and performance requirements, and physical characteristics of the hardware are described at the thrust subsystem, BIMOD engine system, and component level.

Source record↗

Flexible stator control on the Galileo spacecraft

Galileo is a dual-spin spacecraft designed to deliver a probe to Jupiter and then orbit the planet. The stator, or despun section, contains four flexible modes below 10 Hz and the despun actuator is separated from the inertial sensors by this flexibility. Control loop separation by bandwidth proved unacceptable due to performance requirements. To obtain the desired performance, a control scheme was devised which consists of three parts. First, flexibility damping and control notch filtering are accomplished by phase locked loop techniques. Second, slewing maneuvers are produced by torque profiles which are nonexcitatory to the structure. Finally, a low bandwidth perturbation controller is supplied to remove spacecraft disturbances.

Kopf, E. H.↗

National Wind Tunnel Complex (NWTC)

The National Wind Tunnel Complex (NWTC) Final Report summarizes the work carried out by a unique Government/Industry partnership during the period of June 1994 through May 1996. The objective of this partnership was to plan, design, build and activate 'world class' wind tunnel facilities for the development of future-generation commercial and military aircraft. The basis of this effort was a set of performance goals defined by the National Facilities Study (NFS) Task Group on Aeronautical Research and Development Facilities which established two critical measures of improved wind tunnel performance; namely, higher Reynolds number capability and greater productivity. Initial activities focused upon two high-performance tunnels (low-speed and transonic). This effort was later descoped to a single multipurpose tunnel. Beginning in June 1994, the NWTC Project Office defined specific performance requirements, planned site evaluation activities, performed a series of technical/cost trade studies, and completed preliminary engineering to support a proposed conceptual design. Due to budget uncertainties within the Federal government, the NWTC project office was directed to conduct an orderly closure following the Systems Design Review in March 1996. This report provides a top-level status of the project at that time. Additional details of all work performed have been archived and are available for future reference.

Source record↗

Materials Needs for Future In-Space Propulsion Systems

NASA's In-Space Propulsion Technology Project is developing the next generation of in-space propulsion systems in support of robotic exploration missions throughout the solar system. The propulsion technologies being developed are non-traditional and have stressing materials performance requirements. Earth-storable bipropellant performance is constrained by temperature limitations of the columbium used in the chamber. Iridium/rhenium (Ir/Re) is now available and has been implemented in initial versions of Earth- Storable rockets with specific impulses about 10 seconds higher than columbium rocket chambers. New chamber fabrication methods that improve process and performance of Ir/Re and other promising material systems are needed. The solar sail is a propellantless propulsion system that gains momentum by reflecting sunlight. The sails need to be very large in area (from 10000 sq m up to 62500 sq m) yet be very lightweight in order to achieve adequate accelerations for realistic mission times. Lightweight materials that can be manufactured in thicknesses of less than 1 micron and that are not harmed by the space environment are desired. Blunt Body Aerocapture uses aerodynamic drag to slow an approaching spacecraft and insert it into a science orbit around any planet or moon with an atmosphere. The spacecraft is enclosed by a rigid aeroshell that protects it from the entry heating and aerodynamic environment. Lightweight, high-temperature structural systems, adhesives, insulators, and ablatives are key components for improving aeroshell efficiencies at heating rates of 1000-2000 W/sq cm and beyond. Inflatable decelerators in the forms of ballutes and inflatable aeroshells will use flexible polymeric thin film materials, high temperature fabrics, and structural adhesives. The inflatable systems will be tightly packaged during cruise and will be inflated prior to entry interface at the destination. Materials must maintain strength and flexibility while packaged at cold temperatures (-100 C) for up to 10 years and then withstand the high temperatures (500 C) encountered during aerocapture.

Johnson, Les↗

An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

Martzaklis, Konstantinos S.↗

Partially Turboelectric Aircraft Drive Key Performance Parameters

The purpose of this paper is to propose electric drive specific power, electric drive efficiency, and electrical propulsion fraction as the key performance parameters for a partially turboelectric aircraft power system and to investigate their impact on the overall aircraft performance. Breguet range equations for a base conventional turbofan aircraft and a partially turboelectric aircraft are found. The benefits and costs that may result from the partially turboelectric system are enumerated. A break even analysis is conducted to find the minimum allowable electric drive specific power and efficiency, for a given electrical propulsion fraction, that can preserve the range, fuel weight, operating empty weight, and payload weight of the conventional aircraft. Current and future power system performance is compared to the required performance to determine the potential benefit.