Process Optimization of Carbon Electrode Materials Manufacturing by Experimental Study and Machine Learning Techniques

Electrospun carbon fibers from coal have been investigated as electrodes for batteries and supercapacitors. Despite the excellent properties of coal-derived carbon fibers (CCNF) for energy storage devices, there still lacks systematic understanding on how various process parameters affect final electrode performances, which poses challenges to scale from pilot to high volume manufacturing. The goals of this project are twofold. First, we focuse on process optimization for converting a new precursor from powder river basin (PRB) coal, referred to as coal-based polyurethane (CPU) to CCNF using electrospinning. Second, different machine learning techniques will be examined using experimental data from this work and open literature. Specifically, for CPU the following process parameters need to be characterized and optimized in order to produce CCNFs with desirable mechanical integrity and physiochemical properties: precursor composition and viscosity, operating voltage and distance, oxidation and carbonization temperature and duration. Consequently, physiochemical properties of the fibers were characterized to correlate these process parameters with desirable electrochemical performance. Given the complex nature of the fiber production process, ML models are assessed for their ability to capture the nonlinear relationship between process parameters and the electrochemical properties in applications including supercapacitors. As such, we applied various machine learning techniques, to determine which technique produces a model that best predicts device function.

Cincotta, Robert E.F.↗

Empowering Rural Electrification in Honduras: An Integrated Assessment of PV/BESS and Productive Uses of Electricity in Gracias a Dios

Honduras faces significant challenges in its energy sector, particularly in rural areas where access to reliable and affordable electricity remains limited. The flagship rural electrification initiative for Honduras Secretary of Energy (SEN) is the Politica de Acceso Universal a la Electricidad (PAUEH - Universal Electricity Access Policy), a key solution for addressing this energy poverty is the deployment of more than 1700 distributed solar and hybrid mini-grid solutions. In late 2023 as a first step towards supporting SEN's electrification efforts, the National Renewable Energy Laboratory (NREL) developed a literature review of SEN electrification policy documents and conducted a series of technical capacity-building workshops with SEN and other energy sector stakeholders in Honduras focused on using NREL's open-source REopt tool to conduct techno-economic assessments and develop least-cost optimizations for potential solar + storage mini-grid systems. Building on some initial capacity building on mini-grid modeling, the National Renewable Energy Laboratory (NREL) worked with SEN to develop a detailed techno-economic assessment for electrifying two schools, a healthcare clinic, and a hospital in a hypothetical community within the department of Gracias a Dios. The analysis also evaluates the business case for cold storage productive use of energy (PUE) applications for the fisheries value chain and how the incorporation of these PUE loads potentially impacts both the viability of the PV+BESS solutions as well as local economic development. By assessing the potential for deployment of integrated PV/BESS systems to both support critical community services like education and healthcare, as well as potential for downstream enterprise and economic development, this analysis represents a first step that can help to inform specific strategies for development of pilot PV+BESS projects aligned with national priorities and sector level planning under PAUEH.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fortalecimiento de la Electrificación Rural en Honduras: Una Evaluación Integrada de PV+BESS y Usos Productivos de la Electricidad en Gracias a Dios, Honduras [Empowering Rural Electrification in Honduras: An Integrated Assessment of PV/BESS and Productive Uses of Electricity in Gracias a Dios] (Spanish Translation)

Honduras faces significant challenges in its energy sector, particularly in rural areas where access to reliable and affordable electricity remains limited. The flagship rural electrification initiative for Honduras Secretary of Energy (SEN) is the Politica de Acceso Universal a la Electricidad (PAUEH - Universal Electricity Access Policy), a key solution for addressing this energy poverty is the deployment of more than 1700 distributed solar and hybrid mini-grid solutions. In late 2023 as a first step towards supporting SEN's electrification efforts, the National Renewable Energy Laboratory (NREL) developed a literature review of SEN electrification policy documents and conducted a series of technical capacity-building workshops with SEN and other energy sector stakeholders in Honduras focused on using NREL's open-source REopt tool to conduct techno-economic assessments and develop least-cost optimizations for potential solar + storage mini-grid systems. Building on some initial capacity building on mini-grid modeling, the National Renewable Energy Laboratory (NREL) worked with SEN to develop a detailed techno-economic assessment for electrifying two schools, a healthcare clinic, and a hospital in a hypothetical community within the department of Gracias a Dios. The analysis also evaluates the business case for cold storage productive use of energy (PUE) applications for the fisheries value chain and how the incorporation of these PUE loads potentially impacts both the viability of the PV+BESS solutions as well as local economic development. By assessing the potential for deployment of integrated PV/BESS systems to both support critical community services like education and healthcare, as well as potential for downstream enterprise and economic development, this analysis represents a first step that can help to inform specific strategies for development of pilot PV+BESS projects aligned with national priorities and sector level planning under PAUEH. This is the Spanish translation of NREL/TP-7A40-90865.

14 SOLAR ENERGY↗

Characterizing falling particle curtain receivers at commercially relevant scales: Research Performance Progress Report (RPPR-1)

Sandia will construct a cold flow receiver test platform in order to characterize falling particle curtain receivers at commercially relevant scales. While Sandia has extensive experience in R&D of falling particle curtain receivers, most have been at pilot scale and smaller - on the order of 1 MWth with characteristic dimensions of nominally 1-2 m to adequately collect solar energy from the heliostat field at the National Solar Thermal Test Facility (NSTTF). However, scaling up receivers to commercially relevant scales (25 MWth and above) will require a thorough understanding of particle curtain dynamics at larger scales, especially longer drop heights, for design certainty. The goal of this project will be to construct a cold falling particle curtain test rig capable of simulating particle characteristics that are expected in a commercial scale CSP plant, namely the drop height, curtain thickness, and particle mass flow rate (normalized by length of curtain). This will enable data collection on curtain opacity and spread, both of which are correlated to receiver efficiency and reliable construction, for commercially relevant scales. It will also permit validation of numerical models that will enable detailed receiver characterization and design past currently validated scales.

14 SOLAR ENERGY↗

Characterizing falling particle curtain receivers at commercially relevant scales: Research Performance Progress Report (RPPR-1)

Sandia will construct a cold flow receiver test platform in order to characterize falling particle curtain receivers at commercially relevant scales. While Sandia has extensive experience in R&D of falling particle curtain receivers, most have been at pilot scale and smaller - on the order of 1 MW th with characteristic dimensions of nominally 1-2 m to adequately collect solar energy from the heliostat field at the National Solar Thermal Test Facility (NSTTF). However, scaling up receivers to commercially relevant scales (25 MW th and above) will require a thorough understanding of particle curtain dynamics at larger scales, especially longer drop heights, for design certainty. The goal of this project will be to construct a cold falling particle curtain test rig capable of simulating particle characteristics that are expected in a commercial scale CSP plant, namely the drop height, curtain thickness, and particle mass flow rate (normalized by length of curtain). This will enable data collection on curtain opacity and spread, both of which are correlated to receiver efficiency and reliable construction, for commercially relevant scales. It will also permit validation of numerical models that will enable detailed receiver characterization and design past currently validated scales.

14 SOLAR ENERGY↗

Fast physics-based launcher optimization for electron cyclotron current drive

With the increased urgency to design fusion pilot plants, fast optimization of electron cyclotron current drive (ECCD) launchers is paramount. Traditionally, this is done by coarsely sampling the 4D parameter space of possible launch conditions consisting of (1) the launch location (constrained to lie along the reactor vessel), (2) the launch frequency, (3) the toroidal launch angle, and (4) the poloidal launch angle. For each initial condition, a ray-tracing simulation is performed to evaluate the ECCD efficiency. Unfortunately, this approach often requires a large number of simulations (sometimes millions in extreme cases) to build up a dataset that adequately covers the plasma volume, which must then be repeated every time the design point changes. Here we adopt a different approach. Rather than launching rays from the plasma periphery and hoping for the best, we instead directly reconstruct the optimal ray for driving current at a given flux surface using a reduced physics model coupled with a commercial ray-tracing code. Repeating this throughout the plasma volume requires only hundreds of simulations, constituting a significant speedup. The new method is validated on two separate example tokamak profiles, and is shown to reliably drive localized current at the specified flux surface with the same optimal efficiency as obtained from the traditional approach.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Improbability of Post-Closure Criticality in Array of Transuranic Waste Containers after Compaction by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, post-closure nuclear criticality is improbable when room closure compacts containers disposing transuranic (TRU) waste emplaced at the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt in southeastern New Mexico. As described in the original WIPP certification, a qualitative estimate of the probability of post-closure criticality in TRU waste produced from atomic energy defense activities has been low either because remote-handled TRU waste canisters are neutronically isolated by the bedded salt or because the low fissile mass in an array of contact-handled TRU waste drums cannot be compacted sufficiently by room closure from salt creep. These situations are still valid for the majority of TRU waste that is disposed at WIPP without any disposal constraints, as updated herein. This report also qualitatively evaluates the probability of criticality after disposal of TRU waste in pipe overpack containers (POC) where every POC in a shipment may have the maximum 200 fissile gram equivalent of 239Pu content. The probability of criticality for a disposal room filled with POCs is estimated during four representative phases of repository evolution: (1) a large salt block falls onto POCs in the first 20 years, (2) salt creep closes a disposal room in the first 1000 years without brine seepage and subsequent gas generation, which permits maximum compaction, (3) some brine seepage occurs into the closed room, which initiates consumption of the fiberboard (cellulose) impact absorber in the POC in the second 1000 years, and (4) full brine inundation of a room and consumption of all fiberboard thereafter. Salt-block fall in the first phase does not greatly disrupt three tiers of POCs. The compacted spacing of POCs in the later three repository conditions is calculated through high-fidelity, geomechanical modeling. Criticality evaluation of compacted 200-g 239 Pu spheres at the compacted spacing shows that neither 12-inch nor 6-inch POCs are critical after the first 1000 years, the second 1000 years, or thereafter as the sea of reflector material changes to represent the three repository conditions. Specifically, fiberboard and iron isolates 239 Pu while dry, and brine reduces the reactivity when a room is partially and fully inundated. Because POC behavior bounds behavior of other standard TRU waste containers, post-closure criticality caused by room closure compacting containers is omitted in the performance assessments for the 2019 and 2026 WIPP compliance re-certification applications to the US Environmental Protection Agency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plasma confinement state classification in fusion power plants: Profile reflectometer and ensemble diagnostics

As Fusion Pilot Plants (FPPs) are increasingly viewed as within reach, many engineering challenges remain. Not many diagnostics are expected to be available in a reactor environment. Survivability, maintainability, and limited port space substantially restrict the number of FPP-relevant diagnostics. One remaining challenge is developing tools and devices to extract plasma state information necessary for controlling an FPP from a limited subset of diagnostics. This work is part of an overarching project to address this challenge. The specific diagnostic subset to be used in FPPs is still under debate. We take the approach of developing machine-learning-based tools for different significant plasma state parameters, using already known FPP-viable diagnostics. Previously we developed a plasma confinement mode classifier utilizing the Electron Cyclotron Emission (ECE) diagnostic. Here, we expand on this by developing a Profile Reflectometer (PR) based classifier with 97% test accuracy, and an ensemble model that combines the ECE and PR models into a single model, achieving 99% test accuracy.

Clark, Randall [Univ. of California, San Diego, CA↗

Brine Availability Test in Salt (BATS) FY24 Update

This report summarizes fiscal year 2024 (FY24) activities centered around a series of field tests in bedded salt at the Waste Isolation Pilot Plant (WIPP) funded by the Office of Spent Fuel and Waste Science and Technology in the Spent Fuel and Waste Disposition (SFWD) program of the US Department of Energy’s Office of Nuclear Energy (DOE-NE). High-level Purpose of Experiments: The Brine Availability Test in Salt (BATS) field tests are revealing both brine occurrence (i.e., where, and how much) and brine migration (i.e., how easily it moves) in the excavation damaged zone (EDZ). This understanding is foundational to develop a safety case for a future heat-generating waste repository in salt, and to starting up a generic repository program in salt to buy down risk. BATS seeks to predict how much brine can flow into both ambient and heated excavations (e.g., boreholes or rooms) in salt. This work is educating and empowering new repository scientists on two fronts: “design and execution of field tests” and “prediction and modeling of coupled processes.” DOE-NE capabilities in salt have grown and been tested through international modeling and benchmarking exercises (e.g., DECOVALEX, RANGERS, KOMPASS, and MEASURES; see Mills et al., 2024). The hands-on expertise we are building is a necessary step towards large-scale disposal demonstrations and eventual implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Plutonium Oxidation State Distribution under WIPP Relevant Conditions (Rev. 2)

The oxidation state of plutonium in the Waste Isolation Pilot Plant (WIPP) environment has been a topic of interest since the initial compliance certification application. Plutonium (Pu) was initially expected to be present primarily as Pu(IV), but since the presence of Pu(III) could not be ruled out, it was also included in performance assessment (PA) calculations. The redox of the other variant actinides, uranium (U) and neptunium (Np), are also coupled to the plutonium redox. This led to a position in performance assessment calculations that is commonly referred to as “50/50”. In which half of the PA realizations assume solubility is dominated by the low oxidation state [U(IV), Np(IV), Pu(III)] and the other half assume solubility is dominated by the higher oxidation state [U(VI), Np(V), Pu(IV)]. Recently, a joint group of WIPP project participants from Los Alamos National Laboratory (LANL), Sandia National Laboratories (SNL), and the Department of Energy’s Carlsbad Field Office (DOE-CBFO) agreed on a new path forward for the oxidation state model in PA which will decouple the redox active actinides and will instead consider their redox as a function of E h . This will take the current binary approach and turn it into a system with four possible redox states.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NSTX-U National Research Program: White Paper in Response to Call from FESAC Sub-Committee

Both scientific and technical innovation is needed for the realization of an attractive engineering solution for a timely and cost-effective Pilot Plant, the design and construction of which is the overarching recommendation of the FESAC Long Range Plan, and the 2021 NASEM Pilot Plant reports, which underpin the Bold Decadal Vision. The two most significant plasma physics gaps to close for a Compact Pilot Plant (CPP) are core confinement improvement and heat flux mitigation, neither of which have been closed in an integrated fashion for any planned fusion power production device. High core confinement and stability are essential for producing majority self-driven plasmas in CPPs with reduced size and auxiliary heating power requirements, with an improvement in confinement being the major driver for cost reduction of a CPP. The National Spherical Tokamak Experiment - Upgrade (NSTX-U) is a unique low aspect ratio research facility that will address the fundamental challenge of developing the science and technology basis for a CPP design that integrates high core and edge confinement with the ability to mitigate very high incident heat fluxes. NSTX-U capabilities will enable the high performance, already achieved on NSTX, to extend into physics regimes much closer to those anticipated in Spherical Tokamak (ST)-based CPPs. These confinement and stability properties will be assessed by a full complement of diagnostics and analysis tools, which will also aid in the development of the underlying theory and predictive models needed for further optimization. Both conventional and transformative heat flux mitigation methods, such as liquid lithium plasma-facing components, will be developed and tested in-situ in NSTX-U at incident heat fluxes of ~100 MW/m 2 , and will inform plans and reduce risk for a subsequent major upgrade to the device to fully heated, high-Z wall and full liquid lithium divertor capability, a technology that potentially could then be implemented on any magnetic confinement device at any aspect ratio. NSTX-U research is fully complementary to programs performed on other STs, nationally and internationally. Furthermore, NSTX-U research has a direct connection to the private sector by informing design choices for future power production facilities being developed by these companies. The NSTX-U program will operate as a national User Facility, with collaborating researchers, engineers, and graduate students from 19 outside institutions, and open to participation and experiments led by researchers from both public and private entities. The research program will advance workforce development through training of young scientists, engineers, and technicians, and it will also serve for further diagnostic innovation, especially for high heat flux and high-Z wall environments, and implementation of advanced artificial intelligence (AI) for plasma and heat flux control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fast ion confinement in quasi-axisymmetric stellarator equilibria

This report presents an initial analysis of the fast ion confinement and losses within quasi-axisymmetric stellarator equilibria in consideration by Thea Energy. The equilibria have not yet been explicitly optimized for fast particle confinement and require validation. Modeling with the ASCOT5 code is used to directly examine the fast ion transport. The particle tracking simulations are purely (neo)classical in nature and simply contain the supplied equilibrium and collisions (pitch-angle, energy slowing, and velocity diffusion) from supplied thermal profiles. Uniform marker deposition is used to probe the general confinement properties of the equilibria while a realistic beam-born population is provided from the BEAMS3D code and an alpha particle population is calculated from a fusion source integrator. A first wall is included and defines the loss boundary. Analysis for NBI ions within Thea Energy’s conceptual Eos neutron source are presented along with alpha particles in an enlarged DT-plasma. The fast ions are assessed in regards to their confinement time, pitch, energy, and spatial coordinates. For each population, the impact of collisions and orbit drifts are discussed. It is found that NBI born ions in Eos are strongly confined until slowing-down, owing largely to the tangential injection geometry, while 22% of DT-born alpha energy is lost in the scaled device, indicating that any fusion pilot plant design optimization should include metrics for fast ion confinement.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

University of Hawai‘i, Shallow Geothermal Resources: Energy Technology Innovation Partnership Project (Final Report)

Scientists at Lawrence Berkeley National Laboratory (Berkeley Lab) have teamed up with the University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology. UH requested this analysis to evaluate opportunities in building cooling, energy efficiency, and emissions reduction applications in Hawai‘i. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that, over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, so sites with large enough values of these properties must be selected. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Primarily, closed-loop systems have been investigated. Other options considered are open-loop systems and using cool seawater as the chilling source. Project work investigated the feasibility of GHE technology at two scales. At the island scale, GIS layers of various attributes relevant for GHE were combined to develop an overall favorability map for employing GHE in Hawai‘i. At the local scale, a hydrogeologic model for the subsurface component of a closed-loop system was developed for the Stan Sheriff Center at the UH Manoa campus. This site is considered promising because the rock below and immediately downgradient of the borefield is highly permeable, consisting of a subsurface karst system (limestone containing high-permeability open channels), which is underlain by a thick, high-permeability fractured basalt. Moreover, the site is near the base of the Ko‘olau Range, providing a large hydraulic head gradient. Thus, groundwater flow through the site is expected to be large, enabling efficient removal of heated groundwater. A full-GHE-system model of the site was also developed, with a simplified representation of the subsurface, in which groundwater flow is not considered and heat transfer is purely by conduction. Using the building cooling load data provided by UH, simulation results show that with groundwater flow present, a GHE can operate successfully for at least 10 years, but with no groundwater flow, the subsurface begins to heat up after only one year of operation, making the GHE unviable within 2-6 years. The team also developed a techno-economic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air-conditioning system. The GHE system is advantageous economically if favorable tax incentives and interest rates can be obtained.

15 GEOTHERMAL ENERGY↗

Data for An End-to-End Pipeline for Succinic Acid Production at an Industrially Relevant Scale Using Issatchenkia orientalis

Microbial production of succinic acid (SA) at an industrially relevant scale has been hindered by high downstream processing costs arising from neutral pH fermentation for over three decades. Here, we metabolically engineer the acid-tolerant yeast Issatchenkia orientalis for SA production, attaining the highest titers in sugar-based media at low pH (pH 3) in fed-batch fermentations, i.e. 109.5 g/L in minimal medium and 104.6 g/L in sugarcane juice medium. We further perform batch fermentation using sugarcane juice medium in a pilot-scale fermenter (300×) and achieve 63.1 g/L of SA, which can be directly crystallized with a yield of 64.0%. Finally, we simulate an end-to-end low-pH SA production pipeline, and techno-economic analysis and life cycle assessment indicate our process is financially viable and can reduce greenhouse gas emissions by 34–90% relative to fossil-based production processes. We expect I. orientalis can serve as a general industrial platform for production of organic acids.

Metabolomics↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Rooftop Solar in Lawrence, MA: Community Perspectives, Deceptive Practices, and Financing Options

This report was prepared as part of the U.S. Department of Energy's Communities Local Energy Action Program (Communities LEAP) pilot competitive technical assistance for the Lawrence Massachusetts Stakeholder Coalition (LSC) composed of The City of Lawrence, All In Energy, MassDevelopment, Mill City Community Investments, BlocPower and Groundwork Lawrence, and led by Browning the Green Space. The LSC identified rooftop solar photovoltaics as a top priority for this technical assistance opportunity. Lawrence faces high energy burden and electricity prices, thus rooftop solar can be a tool to help lower those costs. However, the coalition received feedback that some solar companies were using deceptive and unfair practices when marketing, selling, or financing solar energy, costing residents more money than utility rates and increasing the energy burden. This project sought to address rooftop solar community priorities through two pathways: 1. facilitating community engagement to understand community perspectives and experiences with rooftop solar development; and 2. conducting a financial cash-flow analysis highlighting the varying fiscal outcomes for rooftop solar adopters based off rooftop solar leasing, ownership, or buying electricity from the utility (National Grid).

14 SOLAR ENERGY↗

Efficient ECCD non-inductive plasma current start-up, ramp-up, and sustainment for an ST fusion reactor

The elimination of the need for an Ohmic heating solenoid may be the most impactful design driver for the realization of economical compact fusion tokamak reactor systems. However, this would require fully non-inductive start-up and current ramp-up from zero plasma current and low electron temperature of sub-keV to the full plasma current of ~10–15 MA at 20–30 keV electron temperature. To address this challenge, an efficient solenoid-free start-up and ramp-up scenario utilizing a low-field-side-launched extraordinary mode at the fundamental electron cyclotron harmonic frequency (X–I) is proposed, which has more than two orders of magnitude higher electron cyclotron current drive (ECCD) efficiency than the conventional ECCD for the sub-keV start-up regime. A time dependent model was developed to simulate the start-up scenarios. For the Spherical Tokamak Advanced Reactor (STAR) (Menard et al 2023 Next-Step Low-Aspect-Ratio Tokamak Design Studies (IAEA)), it was found that to fully non-inductively ramp-up to 15 MA, it would take about 25 MW of EC power at 170 GHz. Because of the relatively large plasma volume of STAR, radiation losses must be considered. It is important to make sure that high Z impurities are kept sufficiently low during the early current start-up phase where the temperature is sub-keV range. Since the initial current ramp up takes place at a factor of ten lower density compared to the sustained regimes, it is important to transition into a higher bootstrap fraction discharge at lower density to minimize the ECCD power requirement during the densification. For the sustainment phase an array of eight gyrotron launchers with a total of about 60 MW of fundamental O-mode was found to be sufficient to provide the required axis-peaked external current drive. High efficiencies between 19–57 kA MW –1 were found with optimal aiming, and these were resilient to small changes in aiming angles and density and temperature profiles.