Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pilot reactor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

178 records · Page 10

Computational Fluid Dynamics Simulation of Compressible Non-Newtonian Biomass in a Compression-Screw Feeder

Compression-screw feeders play a critical role in biorefineries to transport lignocellulosic biomass feedstocks from the feeding hoppers to biomass-conversion reactors in order to pretreat and convert biomass to hydrocarbon liquid biofuels and other power and energy resources. One of the main challenges in the operation of screw feeder is plugging and jamming of compressed biomass with high concentration of insoluble solids. The focus of this paper is to numerically investigate the screw feeder at these challenging operating conditions and help with the optimization of the screw feeder design to avoid operation failure. In this work a customized CFD model based on open-source OpenFOAM package [1] was developed to simulate the concentrated biomass as a highly viscous non-Newtonian fluid in the screw feeder. The biomass is modeled as a single-phase compressible Bingham fluid with a plastic viscosity as well as a density-dependent yield stress. The compressibility formulation (pressure-dependent density) and the density-dependent yield stress formulation in the governing equations follow the suggestions from a recent study by Duncan et al. [2]. A pilot-scale hopper/screw feeding system at NREL [3] is used to compare the experimental observations with our simulation results. The auger is 280 mm long and tapered with outer diameter changing from 80 mm to 35 mm. The auger rotates from 10 to 60 rpm in a conical throat which contains anti-rotational bars. The simulations predicted the required torque for the screw feeder and the pressure increase at the exit for biomass feedstocks with various fluid viscosity properties and auger rotating speeds. The analysis of the stress forces helped to identify the critical conditions were the screw feeder excessive wear or jamming could occur.

biofuels↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Overview of results from the 2023 DIII-D negative triangularity campaign

Negative triangularity (NT) is a potentially transformative configuration for tokamak-based fusion energy with its high-performance core, edge localized mode (ELM)-free edge, and low-field-side divertors that could readily scale to an integrated reactor solution. Previous NT work on the TCV and DIII-D tokamaks motivated the installation of graphite-tile armor on the low-field-side lower outer wall of DIII-D. A dedicated multiple-week experimental campaign was conducted to qualify the NT scenario for future reactors. During the DIII-D NT campaign, high confinement ($H_\mathrm{98y,2}\gtrsim$ 1), high current ($q_\mathrm{95} \lt$ 3), and high normalized pressure plasmas ($\beta_\mathrm{N} \gt$ 2.5) were simultaneously attained in strongly NT-shaped discharges with average triangularity $\delta_\mathrm{avg}$ = −0.5 that were stably controlled. Experiments covered a wide range of DIII-D operational space (plasma current, toroidal field, electron density and pressure) and did not trigger an ELM in a single discharge as long as sufficiently strong NT was maintained; in contrast, to other high-performance ELM-suppression scenarios that have narrower operating windows. These strong NT plasmas had a lower outer divertor X-point shape and maintained a non-ELMing edge with an electron temperature pedestal, exceeding that of typical L-mode plasmas. Also, the following was achieved during the campaign: high normalized density ($n_\mathrm{e}$/$n_\mathrm{GW}$ of at least 1.7), particle confinement comparable to energy confinement with $Z_\mathrm{eff}\sim2$ , a detached divertor without impurity seeding, and a mantle radiation scenario using extrinsic impurities. These results are promising for a NT fusion pilot plant but further questions on confinement extrapolation and core-edge integration remain, which motivate future NT studies on DIII-D and beyond.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

U.S. Indirect and Direct Potable Water Reuse Systems (2020)

Collection of proposed, operating, demonstration, and pilot study potable reuse systems across the U.S. as of 2020. Information includes project name, location, augmentation type, capacity, year operational, treatment train, and source water type. References are included in this submission. As potable reuse facilities undergo expansions or upgrades, treatment trains and capacities are subject to change. Operational status may also change. Treatment trains listed are reported to the detail that the source provides. Type and doses of chemical post-treatment or chlorination is often not specified. Please see README section in spreadsheet for definitions of acronyms used.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancing Continuous Manufacturing of Metal Organic Frameworks [Abstract]

InnaVenture has succeeded in developing a pilot-scale facility implementing a radically new concept for synthesis of metal-organic framework (MOF) materials based upon a patent-pending evaporative aerosolization-condensation process developed at PNNL. The successful synthesis of kilogram quantities of Ni-MOF-74 in InnaVenture’s facility represents a major step in the advancement of MOFs from being novelty materials to industrial adsorbents. Using this approach, fifteen kilograms of Ni-MOF-74 were synthesized for use in a demonstration adsorption chiller developed for the U.S. Navy. However, the evaporative condensation method for MOF synthesis has so far only been demonstrated for synthesizing MOFs under conditions where the reactants are part of a single homogeneous liquid phase solvent system. For InnaVenture to expand opportunities to support broader commercial applications of MOFs and related nanoporous materials (e.g., metal-aromatic frameworks (MAFs), covalent organic frameworks (COFs)), extension of the method to heterogeneous mixed phase conditions is essential. Examples of commercially promising MOFs that require such synthesis conditions include but are not limited to MIL-101, MIL-88B, MIL-100, MOF-801, MIL-160, MOF-841, and many others. InnaVenture has also informed PNNL that they need to address problems with the low density of MOF particles being generated in their fluidized reactor system. The purpose of this effort is to address both of these challenges.

36 MATERIALS SCIENCE↗

Development of Energy Storage: Cost models

Energy storage technologies offer a promising solution to electric grid stability issues associated with the integration of variable renewable generators. The capability to match the electrical power output to instantaneous fluctuations in grid demand is crucial to ensure continuity of service. Including energy storage capability in an integrated energy system (IES) can provide the flexibility needed to meet variable electric demand and reduce the load following demands place on the reactor. In this report, economic data collected for energy storage (ES) technologies are described to support the objective of assessing the profitability of ES integration within the IES framework. In particular, there is a growing interest in thermal energy storage (TES) given its unique capability for long-duration storage for improving electricity reliability at a low levelized cost. It is common practice to evaluate the total lifetime cost and profitability before commercializing new technologies. In this report we identify and examine the models needed to better understand the economics of thermal energy storage. We extend the TES cost model in RAVEN in the context of a balance of plant (BOP) that incorporates thermal storage. To focus the discussion, following a general overview of the most promising TES technologies, we consider a use case that involves a sensible heat, two-tank, molten-salt system. Structural and operational details are reported to identify the source of construction capital expenditure and operation and maintenance cost. A detailed description of the different cost items is provided as well as the cost scaling with different storage capacity and power ratings for capacity optimization purpose. In addition, the capital expenditure and the recurring cost of representative two-tank, molten salt coupled with concentrated solar plants are provided for readers’ reference. The ES use case is noteworthy as it is in the pilot stage of commercialization. We identify those areas that would benefit from an increased economic focus to obtain a more complete compilation of cost data. We also describe the thermal coupling issues that arise from integration of the two-tank molten salt thermal energy storage system with a BOP, which is the subject of our current research. Some components of costs will need to be evaluated through dedicated technoeconomic analysis in future modeling activities using modeling procedures proposed in this report. With the data presented and the procedures described in this report, sufficiently accurate models can be implemented for the solution of both the power dispatch and the capacity expansion problems within the RAVEN-based HYBRID framework.

25 ENERGY STORAGE↗

Assessment of a Detailed Biomass Pyrolysis Kinetic Scheme in Multiscale Simulations of a Single-Particle Pyrolyzer and a Pilot-Scale Entrained Flow Pyrolyzer

A detailed biomass pyrolysis kinetic scheme was assessed in the multiscale simulations of a single-particle pyrolyzer with slow pyrolysis and a pilot-scale entrained flow pyrolyzer with fast pyrolysis. The detailed kinetic scheme of biomass pyrolysis developed by the CRECK group consists of 32 reactions and 58 species. A multiscale simulation model was developed, where the CRECK kinetics was employed to simulate biomass pyrolysis reactions, a one-dimensional particle model was utilized to simulate the intraparticle transport phenomena, and the particle-in-cell (PIC) model was employed to simulate the hydrodynamics. The multiscale model was first applied to simulate a single-particle pyrolysis experiment. The simulation with nonisothermal particles matched the experimental data better than the simulation with isothermal particles. Then the multiscale model was applied to simulate the pilot-scale entrained flow pyrolyzer. In this case, the simulation with isothermal particles matched the experimental data better than the simulation with nonisothermal particles. The reason for this difference might be that the kinetics itself already partially included the intraparticle transport effect as it was fitted using both TGA data (slow pyrolysis of small size biomass) and fluidized bed data (fast pyrolysis of relatively large size biomass). This study provides some insights into biomass pyrolysis kinetics development and pyrolyzer multiscale simulation for a future study.

09 BIOMASS FUELS↗

Developing a Carbon Negative Biorefinery for Organic Waste Valorization

Production of bio-based chemicals have become increasingly attractive as efforts to meet carbon neutrality goals expand. Diverse organic waste feedstocks can be valorized via arrested anaerobic digestion and chain elongation to produce important key intermediates, such as medium chain carboxylic acids. Our work aims to develop a carbon negative biorefinery that funnels multiple organic waste feedstocks into a chemically consistent stream of carboxylic acids that are then upgraded to exemplary carbon negative products. The pairing of a hydrolysis reactor with a chain elongation reactor will allow each biological step to be optimized to improve the ability to valorize a variety of organic waste streams. Specifically, this work has so far been aimed at screening for potential chain elongating organisms to produce VFAs and MCCAs of interest. Four chain elongating organisms were tested for their chain elongation potential with diverse single and mixed substrates. So far, Megasphaera elsdenii and Actinobacillus succinogenes have been tested to determine potential differences in titer as well as product speciation due to variations in pH. To do this, each organism was tested under 3 different substrate combinations with pH maintained at either 5.5, 6, or 7. With better understanding of their metabolic needs and optimal operating conditions, these chain elongating organisms could provide a valuable option to facilitate the chain elongation necessary to produce precursor molecules. In addition to optimizing the bioconversion steps, downstream processing of carboxylic acids is also a key component for the overall feasibility of the process. Our group previously developed a downstream in-situ product recovery (ISPR) process for continuously recovering bio-based carboxylic acids from fermentation broth. The ISPR includes: (i) a solid-liquid separation as a cell retention device, (ii) a liquid-liquid extraction (LLE) to selectively extract the desired bio-based acids, and (iii) a distillation to obtain the neat product. The integrated process was demonstrated at bench-scale and is now scaled up for pilot-scale operations. A more cost-efficient membrane-based emulsion separation is introduced for LLE in downstream separation process with greatly promoted mass transfer, leading to -2800 times smaller needed membrane area than membrane contactors to achieve the same butyric acid extraction rate.

BIOMASS FUELS↗

FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment (Final Report)

This report documents the FY25 Theory and Simulation Performance Target (TSPT) of developing an integrated modeling framework for fusion reactor design and assessment (FREDA). Over Q1-Q4, new capabilities were developed across both plasma and engineering domains and demonstrated on an example representation of a Compact Advanced Tokamak with a Dual Cooled Lead Lithium blanket. This represents a first-of-a-kind demonstration of coupled core-to-wall-to-engineering for a reactor. Self-consistent CESOL workflows were applied to provide core, pedestal, and SOL prediction; new modules were developed for energetic particle stability (FAR3D) and transport (TGLF-EP) analysis; and boundary plasma modeling (SOLPS-ITER, BOUT++/Hermes-3) was expanded to evaluate wall and divertor heat fluxes and interface with engineering thermal analysis. A parameterized CAD tool, TRACER, was expanded to generate medium-fidelity divertor, blanket, and coil geometries; OpenFOAM and Diablo workflows were applied for first-wall and divertor thermal analyses with helium cooling; and reduced-order models were created for high-mass-flux divertor cooling. Magnet multiphysics capabilities were verified between Elmer, Diablo, and a new MFEM-based solver, and workflows enable stress, thermal, and neutron-fluence analysis of TF coils with neutronics-driven heating. Nuclear and blanket analysis workflows were demonstrated, including tritium breeding, transport, and CFD-informed thermo-mechanical assessment. Preliminary multi-fidelity uncertainty quantification workflows were applied to boundary modeling codes and shown to achieve variance reductions with fewer high-fidelity boundary simulations. Key findings highlight the challenges of resolving the ITEP gap to find suitable balance between wall and divertor loads, neutron heating, and practical limits of PFC cooling. Next step priorities are to develop automated workflows to check boundary code convergence and detachment, implement tighter physics-engineering CAD provenance tracking, and inclusion of plasma-material interface models for SLAG and tungsten cracking behavior. Collectively, these developments establish sophisticated capabilities for predictive, multi-fidelity, whole-device modeling that integrates plasma physics, materials, magnets, and nuclear engineering to guide pathways to viable Fusion Pilot Plant design points.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Risk-Informed MultiPphysics BestEestimate Plus Uncertainties (BEPU) Application Development of RELAP5-3D Perturbation Model

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes RELAP5-3D development activities for best estimated and uncertainty (BEPU) capability to support ongoing RISA Pathway pilot projects for risk informed uncertainty quantification applications. Work scope includes (1) development of initial perturbation model for selected closure laws and (2) testing of suitable probability distribution functions (PDF) for the selected correlations. Developed BEPU modules are tested with selected separate effect cases and compared with conventional thermal-hydraulics model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plasma Wall Interaction with 3-D Plasma Boundaries

The interaction of the edge plasma and the material surfaces is one of the most critical challenges on the path to harness fusion power as new, fundamental energy source. This challenge typically combines the thrust to reach high density, low temperature (detached) plasmas in front of the divertor target plates as well as understanding the plasma material interaction (PMI) in particular in this regime. The combination of both research thrusts represents an extraordinarily challenging subject encompassing spatial scales spanning nanometers to meters in all states of matter and across a broad energy range. Modeling capabilities, which help to interpret data from nowadays experiments and enable extrapolation to future devices are urgently required. This is in particular true for toroidal magnetic confinement devices with three-dimensional (3D) plasma boundaries. Such plasma boundary geometries occur in tokamaks, when small amplitude magnetic perturbations are used to stabilize the unruly edge plasma or in stellarators, that are inherently 3D plasma confinement devices. In this project, the impact of 3D plasma boundaries on the plasma material interaction (PMI) was assessed. This work focused on plasma boundary conditions, in which high-density conditions at the material surfaces yield mitigation of the otherwise immense heat and particle loads that these materials would see. These so-called high recycling and eventually detached plasma regimes are of great interest for future reactor operation. In the project, key features that are unique to 3D boundaries were explored in comparison to canonically assumed axisymmetric plasma edge situations in tokamaks. In particular, the relevance of the 3D boundary situation in the extrapolation to the plasma boundary solution at ITER, the next step fusion energy experiment under construction as a multi-national, world-wide large-science experiment in southern France, has been explored. The EMC3-EIRENE plasma edge fluid and kinetic neutral transport code has been advanced to cope with the challenging and unprecedented conditions in the ITER boundary plasma including 3D fields that are planned to be used to suppress harmful edge instabilities, the so-called edge localized modes. This is a vital integration challenge for ITER and the results from this grant have provide a leading capability for this assessment. It was shown that the detachment process in a 3D edge solution for ITER follows the recycling regimes that are known from axisymmetric solutions, but that multiple plasma exhaust channels connected to the material surfaces are established which feature individual recycling characteristics. Because these channels touch the material surfaces in the divertor in a 3D geometry, the compatibility with the plasma material interaction (PMI), including erosion and impurity generation has been found to be an important part of the integration challenge. To address this, the fully 3D plasma material interaction code ERO2 has been adapted to these ITER specific geometries and a homogeneous mixing model was implemented, that allows to consider the mixing of Be and Was used at ITER in the PMI modeling. This model enhancement has been used to study non-local migration of Be in the JET ITER like wall configuration and it has been shown that with this model such complex migration processes in ITER relevant plasma shapes and with ITER relevant plasma boundary conditions can be addressed. The combined modeling approach using EMC3-EIRENE as a plasma boundary transport code and the ERO2 specialized PMI model will be an asset for the continued preparations of ITER operation as well as for Fusion Pilot Plant efforts that have emerged in the U.S. during the evolution of this grant. The predictive capability of this numerical tool has been validated at the DIII-D US national fusion facility. Here, dedicated plasma edge diagnostics were implemented to measure the impurity household around a 3D edge plasma during ELM suppression by 3D fields. Dedicated experiments with local material probes using these diagnostics and the state-of-the-art suite of boundary measurements at DIII-D have shown that the 3D perturbation of the plasma edge that is excreted by such 3D control fields yield a perturbation of the plasma boundary flux structure and hence also of the resulting PMI. The 3D boundary plasma is composed out of helical magnetic flux channels that intersect the divertor targets at an angle relative to the main guiding field, i.e., the toroidal magnetic field component of the tokamak. A similar effect has been measured as well on limiter surfaces during the startup campaign at the new stellarator experiment Wendelstein 7-X. These experiments ad initial analysis with the ERO plasma material interaction model, suggested that the place of erosion for a given particle from the surface and its re-deposition can be different in such 3D field geometries yielding potentially a significant level of net-erosion. This is not the case for axisymmetric solutions, where it was shown in the past that the eroded particles are effectively re-deposited into gaps produced by erosion at the same position and hence the net-erosion levels are small. For ITER, the quest to suppress the ELMs and at the same time maintain the integrity of the divertor is an issue, which these fundamental findings will help to resolve. The coupling of this work to the extrapolation in the ITER program has been addressed by both the PI and the lead numerical scientist being ITER Science Fellows in the duration of the contract and forward. A second focus in the exploration of 3D boundary effects on tokamaks and stellarators has been set on the measurement of helium exhaust features with such 3D fields. This is important because He represents the ash of the fusion process and needs to be exhausted. It was shown that 3D field application compatible with suppression of ELMs yields an increase of the helium exhaust performance. The ratio of the effective helium confinement time over the energy confinement time was reduced by almost 50% which demonstrated that the impact of helium accumulation in the plasma core with respect to the confinement of energy to sustain the fusion reaction is significantly improved with such 3D control fields. It was shown that this is the case for tokamaks as well as stellarators. At the Large helical Device in Japan, a similar enhancement of the helium exhaust features when small amplitude additional 3D fields were applied was measured. This is an important additional function of 3D field application and its impact on ITER is presently being studied in combination with investigations of helium exhaust in 3D field geometries of stellarator devices.

3D plasma edge transport↗

Efficient ECCD non-inductive plasma current start-up, ramp-up, and sustainment for an ST fusion reactor

The elimination of the need for an Ohmic heating solenoid may be the most impactful design driver for the realization of economical compact fusion tokamak reactor systems. However, this would require fully non-inductive start-up and current ramp-up from zero plasma current and low electron temperature of sub-keV to the full plasma current of ~10–15 MA at 20–30 keV electron temperature. To address this challenge, an efficient solenoid-free start-up and ramp-up scenario utilizing a low-field-side-launched extraordinary mode at the fundamental electron cyclotron harmonic frequency (X–I) is proposed, which has more than two orders of magnitude higher electron cyclotron current drive (ECCD) efficiency than the conventional ECCD for the sub-keV start-up regime. A time dependent model was developed to simulate the start-up scenarios. For the Spherical Tokamak Advanced Reactor (STAR) (Menard et al 2023 Next-Step Low-Aspect-Ratio Tokamak Design Studies (IAEA)), it was found that to fully non-inductively ramp-up to 15 MA, it would take about 25 MW of EC power at 170 GHz. Because of the relatively large plasma volume of STAR, radiation losses must be considered. It is important to make sure that high Z impurities are kept sufficiently low during the early current start-up phase where the temperature is sub-keV range. Since the initial current ramp up takes place at a factor of ten lower density compared to the sustained regimes, it is important to transition into a higher bootstrap fraction discharge at lower density to minimize the ECCD power requirement during the densification. For the sustainment phase an array of eight gyrotron launchers with a total of about 60 MW of fundamental O-mode was found to be sufficient to provide the required axis-peaked external current drive. High efficiencies between 19–57 kA MW –1 were found with optimal aiming, and these were resilient to small changes in aiming angles and density and temperature profiles.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗