Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FEMP's Workforce Development Offerings

Fact sheet describes the Federal Energy Management Program's (FEMP) workforce development training offerings for federal agencies.

Federal Energy Management Program↗

Holistic Energy Management Yields Cost Savings and Resilience Benefits for the U.S. Coast Guard Academy

As the U.S. Coast Guard's third largest energy consumer, the 86-year-old Coast Guard Academy in New London, Connecticut, was ripe for an energy management overhaul. That overdue overhaul was made possible by the largest utility energy service contract (UESC) in U.S. Department of Homeland Security history. Awarded in September 2017, the $72.6 million contract provided for $39 million in capital improvements and is expected to cut total energy costs by 80% - more than $2 million - each year. On-site generation of 82% of the site's electricity needs will dramatically improve site-wide resilience, and savings generated from implementation of the project will pay for all project costs. The UESC project team developed and executed an energy management project to meet several priority objectives, including implementing essential infrastructure improvements, increasing reliability, and enhancing resilience - and engaged the Federal Energy Management Program (FEMP) Utility Partnerships Program for project assistance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Crosscut report: Exascale Requirements Reviews, March 9–10, 2017 – Tysons Corner, Virginia. An Office of Science review sponsored by: Advanced Scientific Computing Research, Basic Energy Sciences, Biological and Environmental Research, Fusion Energy Sciences, High Energy Physics, Nuclear Physics

The mission of the U.S. Department of Energy Office of Science (DOE SC) is the delivery of scientific discoveries and major scientific tools to transform our understanding of nature and to advance the energy, economic, and national security missions of the United States. To achieve these goals in today’s world requires investments in not only the traditional scientific endeavors of theory and experiment, but also in computational science and the facilities that support large-scale simulation and data analysis. The Advanced Scientific Computing Research (ASCR) program addresses these challenges in the Office of Science. ASCR’s mission is to discover, develop, and deploy computational and networking capabilities to analyze, model, simulate, and predict complex phenomena important to DOE. ASCR supports research in computational science, three high-performance computing (HPC) facilities — the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory and Leadership Computing Facilities at Argonne (ALCF) and Oak Ridge (OLCF) National Laboratories — and the Energy Sciences Network (ESnet) at Berkeley Lab. ASCR is guided by science needs as it develops research programs, computers, and networks at the leading edge of technologies. As we approach the era of exascale computing, technology changes are creating challenges for science programs in SC for those who need to use high performance computing and data systems effectively. Numerous significant modifications to today’s tools and techniques will be needed to realize the full potential of emerging computing systems and other novel computing architectures. To assess these needs and challenges, ASCR held a series of Exascale Requirements Reviews in 2015–2017, one with each of the six SC program offices,1 and a subsequent Crosscut Review that sought to integrate the findings from each. Participants at the reviews were drawn from the communities of leading domain scientists, experts in computer science and applied mathematics, ASCR facility staff, and DOE program managers in ASCR and the respective program offices. The purpose of these reviews was to identify mission-critical scientific problems within the DOE Office of Science (including experimental facilities) and determine the requirements for the exascale ecosystem that would be needed to address those challenges. The exascale ecosystem includes exascale computing systems, high-end data capabilities, efficient software at scale, libraries, tools, and other capabilities. This effort will contribute to the development of a strategic roadmap for ASCR compute and data facility investments and will help the ASCR Facility Division establish partnerships with Office of Science stakeholders. It will also inform the Office of Science research needs and agenda. The results of the six reviews have been published in reports available on the web at http://exascaleage.org/. This report presents a summary of the individual reports and of common and crosscutting findings, and it identifies opportunities for productive collaborations among the DOE SC program offices.

97 MATHEMATICS AND COMPUTING↗

ORNL Report of Analysis for the Verification of NRMP CRM U030A

In support of the Certified Reference Material (CRM) program managed by the Nuclear Reference Material Program (NRMP), the Material Signatures and Isotopic Standards (MSIS) group of Oak Ridge National Laboratory (ORNL) was asked to prepare a set of CRM U030A units for use as standards for isotopic analysis using multicollector thermal ionization mass spectrometry (TIMS) and inductively coupled plasma mass spectrometry (ICP-MS) instruments. This report documents the results of the verification measurements performed on three randomly selected units by the MSIS group’s ISO/IEC 17025:2017 accredited operating procedure CSD-AM-CIMS-IN20, Determination of Uranium and Plutonium Isotopic Composition using Thermal Ionization Mass Spectrometry [1], and in accordance with the quality assurance plan as described in QAP-X-96-CSD/RML-001, Nuclear Analytical Chemistry Laboratory Section Quality Assurance Plan [2].

Mathew, Kattathu [Oak Ridge National Laboratory (O↗

The overview in safety review of human factors engineering and control room design in chinese AP1000 nuclear power plant - 174

The first AP1000 nuclear power plant is constructed in Sanmen county in Zhejiang Province in China, which has creative and distinctive design characteristics. Human factors engineering disciplines are applied to the design of the AP1000. In addition to the elements of the program review model(including human factors engineering program management, operating experience review, functional requirements analysis and allocation, task analysis, staffing, integration of human reliability analysis with human factors engineering, human system interface design, procedure development, training program development, human system interface verification and validation, design implementation, human performance monitoring),the minimum inventory of controls, displays, and alarms present in the main control room and at the remote shutdown workstation. These contents mentioned above are reviewed according to standards, rules and regulations. This article introduces review process, and several important issues during the reviewing are described in detail. These issues include many elements, such as operating experience review, task analysis, human system interface design, verification and validation,and so on. This paper emphasizes on the main control room design(including environment and layout). Background noise in the actual main control room may exceed too much to design value. Another important issue is about main control room habitability systems(VES) changes to satisfy post-actuation performance requirements in AP1000 design change proposal. All the wall panel displays will be closed in this design change proposal. Review process and proposal are described in the paper. Since the AP1000 unit in China is the first constructed all over the world, verification and validation are especially important and necessary. The plan of verification and validation, the results summary report of verification and validation, the report of human engineering discrepancies are focus attention. Verification and validation in human factors engineering include HSI task support verification, HFE design verification and integrated system validation. This paper introduces the review process of verification and validation, the issues found in verification and validation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Data Center Energy Efficiency

Fact sheet describes how the Federal Energy Management Program helps federal agencies implement data center energy efficiency projects.

Kam, Kendall [US Department of Energy (USDOE) Fede↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FCIC Task X - Project Management and Consortium Overview

The objective of the FCIC Program Management Task is to provide scientific direction and leadership to the nine participating labs, and to provide robust project management to ensure robust operational planning and execution. The FCIC directly supports the BETO portfolio by focusing on feedstock variability across the bioenergy value chain, and the Project Management Task ensures the smooth operation of the FCIC, making sure that the 9 independent projects with different objectives have a common focus - understanding and mitigating the impacts of feedstock variability across the value chain.

bioenergy↗

Applying State-of-the-Art Tools for Safety-Optimized D and D - 17410

Decommissioning, Demolition and Disposal of 'hot' facilities (D3) is a relatively new science to the extent it has been part our public consciousness for ∼50-years. Due to the high hazard of uncontrolled exposure and the possibility of environmental release, the technologies applied to D3 have not embraced many of the recently developed engineering tools, especially those that leverage the digital and optical advances of the past 10-years. This summary paper provides an overview of how we are layering readily available technologies with sophisticated techniques to D3, ranging from agile program management to advanced modular construction to augmented reality. Using this approach, we are significantly improving safety and ALARA aspects while saving costs, optimizing schedules, maintaining quality and engaging the customer and the regulator in the D3 environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Facilitating Sound, Cost-Effective Federal Energy Management

Fact sheet offers an overview of the Federal Energy Management Program (FEMP), which provides agencies and organizations with the information, tools, and assistance they need to achieve their energy-related requirements and goals through specialized initiatives.

energy efficiency↗

Determination of Duty Cycle for Energy Storage Systems in a PV Smoothing Application

This report supplements the document, "Protocol for Uniformly Measuring and Expressing the Performance of Energy Storage Systems," issued in a revised version in April 2016 (see [4]), which will include the photovoltaic (PV) smoothing application for an energy storage system (ESS). This report provides the background and documentation associated with the determination of a duty cycle for an ESS operated in a PV smoothing application for the purpose of measuring and expressing ESS performance in accordance with the ESS performance protocol. ACKNOWLEDGEMENTS The authors gratefully acknowledge the support of Dr. Imre Gyuk, program manager for the DOE Energy Storage Systems Program. The authors would also like to express their appreciation to all the stakeholders who participated as members of the PV Smoothing Subgroup. Without their thoughtful input and recommendations, the definitions, metrics, and duty cycle provided in this report would not have been possible. A complete listing of members of the PV Smoothing Subgroup appears in the first chapter of this report. Special recognition should go to the staffs at Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) in collaborating on this effort. In particular, Mr. David Conover and Dr. Vish Viswanathan of PNNL and Dr. Summer Ferreira of SNL were especially helpful in their suggestions for the determination of a duty cycle for the PV Smoothing application.

25 ENERGY STORAGE↗

FEMP's Workforce Development Offerings

The Federal Energy Management Program (FEMP) offers training to develop and sustain a high-performance federal workforce that constructs, operates, and maintains energy-efficient and cost-effective federal facilities and fleets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaic Systems in Hurricanes and Other Severe Weather

Field examinations of hurricane-damaged photovoltaic systems have revealed important design, construction, and operational factors that greatly influence a system's survivability from a severe weather event. The U.S. Department of Energy Federal Energy Management Program (FEMP) is expanding its recommended design specifications to include factors and best practices for system survivability identified from 2017 hurricanes. This fact sheet provides an overview of the upcoming additions to these design specifications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia's Liquid-Cooled Data Center Boosts Efficiency and Resiliency

The Federal Energy Management Program (FEMP) encourages federal agencies and organizations to improve data center energy efficiency, which can offer tremendous opportunities for energy and cost savings. In this success story, a novel liquid cooling system provides reliable, resilient, and energy-efficient cooling for high-performance computing (HPC) systems at Sandia National Laboratories.

data center↗

Inspection Technologies for Waste Containers at Canadian Nuclear Laboratories - 19429

To provide data for aging management programs, containers for different forms of nuclear waste, ranging from low-level waste to irradiated nuclear fuel, should be inspected. At Canadian Nuclear Laboratories, visual, ultrasonic, electromagnetic, and hybrid forms of non-destructive evaluation (NDE) are used for in situ inspection of carbon steel containers having various configurations, access issues, and material thickness. NDE applications tailored to the requirements of the task provide data for condition monitoring and operational assessments. The examples of fuel baskets stacked in concrete canisters and sheet metal containers arrayed in warehouses are illustrated here. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗