Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

2016 Fermilab Laboratory Directed Research & Development Program Plan

Fermilab is executing Laboratory Directed Research and Development (LDRD) as outlined by order DOE O 413.2B in order to enhance and realize the mission of the laboratory in a manner that also supports the laboratory’s strategic objectives and the mission of the Department of Energy. LDRD funds enable scientific creativity, allow for exploration of “high risk, high payoff” research, and allow for the demonstration of new ideas, technical concepts, and devices. LDRD also has an objective of maintaining and enhancing the scientific and technical vitality of Fermilab. LDRD is able to fund employee-initiated proposals that address the current strategic objectives and better position Fermilab for future mission needs. The request for such funds is made in consideration of the investment needs, affordability, and directives from DOE and Congress. Review procedures of the proposals will insure that those proposals which most address the strategic goals of the DOE and the Laboratory or which best position Fermilab for the future will be recommended to the Laboratory Director who has responsibility for approval. The execution of each approved project will be the responsibility of the Principal Investigator, PI, who will follow existing Laboratory guidelines to ensure compliance with safety, environmental, and quality assurance practices. A Laboratory Director-appointed LDRD Coordinator will work with Committees, Laboratory Management, other Fermilab Staff, and the PI’s to oversee the implementation of policies and procedures of LDRD and provide the management and execution of this Annual Program Plan. FY16 represents third fiscal year in which LDRD has existed at Fermilab. The number of preliminary proposals (117) submitted in response to the LDRD Call for Proposals indicates very strong interest of the program within the Fermilab community. The first two Calls have resulted in thirteen active LDRD projects – and it is expected that between five and seven new projects will be approved in response to the FY16 Call for Proposals. The implementation of the program compared with FY15 is mostly unchanged except that the program is on the expected normal fiscal year calendar cycle with new projects starting at the beginning of the fiscal year. Because of this, there is some expanded discussion that the Laboratory Director may decide to initiate mid-year Late Start or Strategic- Hire LDRD projects.

99 GENERAL AND MISCELLANEOUS↗

Performance Year 1 Technical Report - OPEN COG Grid: Extendable Coherent Models-Datasets for Cognitive Power Grids

The OPEN COG Grid project is a collaborative effort between LLNL, NREL, and Texas A&M University (TAMU) to develop synthetic power system datasets that (i) contain all technical information that would be available in a real system, allowing to conduct studies ranging from dynamic simulation to long term planning studies; ii) are accessible to researchers from the broader data sciences community, as oppossed to power system experts only; and (iii) This report summarizes the work conducted during the first 15 months of execution of the project. These activities encompassed: 1. Conduct a survey of existing open data sets and open source power systems simulators, their supported use cases, and accessibility (Chapter 1). 2. Define a new extensible specification for power system data, covering all parameters necessary for most computational use cases (Chapter 2). 3. Collecting real technical system data to complete missing parameters in existing open source datasets (Chapter 3). 4. Develop models that capture the behavior of emergent actors in power grids, neglected by existing datasets; aggregated residential demand response (Chapter 4) and demand response of cryptocurrency miners (Chapter 5). 5. Collect detailed spatial information on distributed energy resources, particular, solar photovoltaic facilities (Chapter 6). The following chapters provide detailed descriptions of these tasks, the assumptions taken, and their findings. In conducting these tasks, the project team produced: two (accepted) conference papers; one journal paper under submission; one draft journal paper pending submission; released one repository with the developed power system data specification, with documentation and examples; and one extended dataset for the Texas power grid under review for release. The team hopes these contributions will enhance access to power system data and remove barriers to the development of new computational techniques for power systems, particularly, those inspired by cognitive sciences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2017 Grid Modernization Peer Review Report; Foundational Projects and Technical Area Portfolio Review

In April 2017, the U.S. Department of Energy’s (DOE’s) Grid Modernization Initiative (GMI) conducted its first external peer review of the projects awarded to the Grid Modernization Laboratory Consortium (GMLC) to execute a diverse portfolio of technologies to modernize the nation’s grid. The six technology areas reviewed during the 2017 Project Peer Review were: Design and Planning Tools; Devices and Integrated Systems; Institutional Support, Security and Resilience; Sensing and Measurement; and System Operations, Power Flow, and Control. Results of the 2017 Peer Review have been, and will be, used to help inform programmatic decision making, modify or discontinue existing projects, guide future funding opportunities, and support other budget and strategic planning objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2017 Year End Nuclear Science User Facilities (NSUF) Post-Irradiation Examination Summary Report

The Nuclear Science User Facilities (NSUF) are part of a growing number of Department of Energy (DOE) user facilities in the U.S., and is the only national designated nuclear energy user facility. Through a peer-reviewed proposal process, NSUF provides external research teams cost-free access to reactor, post-irradiation examination (PIE) and beamline capabilities at INL and a diverse mix of affiliated partner institutions at universities, national laboratories and industry facilities located across the country. In Fiscal Year 2017 (FY17), the NSUF sponsored planning, management and execution of PIE activities at Idaho National Laboratory (INL), the Center for Advanced Energy Studies (CAES), and other NSUF partner facilities. The individual projects associated with these PIE activities are a result from DOE awards under the following mechanisms: Consolidated Innovative Nuclear Research (CINR) awards that include full sample irradiation and PIE, PIE only (using samples from the NSUF Fuel and Materials Library) awards, or Rapid Turn-Around Experiments (RTE). An accounting of FY17 activities for each project is provided in this report.

36 MATERIALS SCIENCE↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STS/Spacelab payload utilization planning study: Executive summary

The planning process recommended to meet the orbital flight requirements for the Space Transportation System and payload development, procurement, operations, and support leading to authorization and funding of STS and payload project activities is described. The rationale and rp primary products of STS utilization planning are summarized along with the implementation of the system. Major recommendations of the study are included.

Source record↗

Mission Data System Java Edition Version 7

The Mission Data System framework defines closed-loop control system abstractions from State Analysis including interfaces for state variables, goals, estimators, and controllers that can be adapted to implement a goal-oriented control system. The framework further provides an execution environment that includes a goal scheduler, execution engine, and fault monitor that support the expression of goal network activity plans. Using these frameworks, adapters can build a goal-oriented control system where activity coordination is verified before execution begins (plan time), and continually during execution. Plan failures including violations of safety constraints expressed in the plan can be handled through automatic re-planning. This version optimizes a number of key interfaces and features to minimize dependencies, performance overhead, and improve reliability. Fault diagnosis and real-time projection capabilities are incorporated. This version enhances earlier versions primarily through optimizations and quality improvements that raise the technology readiness level. Goals explicitly constrain system states over explicit time intervals to eliminate ambiguity about intent, as compared to command-oriented control that only implies persistent intent until another command is sent. A goal network scheduling and verification process ensures that all goals in the plan are achievable before starting execution. Goal failures at runtime can be detected (including predicted failures) and handled by adapted response logic. Responses can include plan repairs (try an alternate tactic to achieve the same goal), goal shedding, ignoring the fault, cancelling the plan, or safing the system.

Reinholtz, William K.↗

Advanced Manufacturing of Cathode Materials for Lithium-ion Batteries

Original objectives (per the Statement of Project Objectives) centered on developing and translating a continuous pilot process for cathode materials production while targeting (i) a 29% manufacturing cost reduction, (ii) an 82% energy consumption reduction for cathode production, and (iii) a doubling of manufacturing productivity. Planned validation included characterization at appropriate analytical facilities and electrochemical performance evaluation progressing from half-cells to pouch-cell formats, with a pathway to kilogram-scale production of finished cathode materials for representative testing. Scope evolution: During execution, the project team identified that the surfactant-enabled chemistry offered high selectivity for lithium precipitation from brine sources. A formal scope revision shifted the final project year from cathode manufacturing development to direct lithium extraction/lithium recovery, while maintaining the overarching intent of cost reduction and process simplification relevant to the battery supply chain.

25 ENERGY STORAGE↗

The entropy reduction engine: Integrating planning, scheduling, and control

The Entropy Reduction Engine, an architecture for the integration of planning, scheduling, and control, is described. The architecture is motivated, presented, and analyzed in terms of its different components; namely, problem reduction, temporal projection, and situated control rule execution. Experience with this architecture has motivated the recent integration of learning. The learning methods are described along with their impact on architecture performance.

Drummond, Mark↗

A Sundial-Atlas Precursor to the TIMED Mission: A Quick-Response Global Investigation into Coupled Lower Thermospheric, Ionospheric, and Mesospheric Physics

The SUNDIAL-ATLAS effort was a global-scale investigation which responded to the science priorities of the ITM Panel, the Integrated SPD Strategy Implementation Plan as a whole, and the need for potential cost-saving design criteria for the TIMED mission. The investigation focused on coupling processes in the ionospheric-thermospheric system, taking advantage of the timelines of the ATLAS-1 mission (March 1992), and the global-scale ground-based measurement and modeling activities of the SUNDIAL program. The collaborative SUNDIAL-ATLAS activity was the first opportunity for global measurements of the chemistry, kinetics, and electrodynamics which couple the E-, Fl-, and F2-regions into a single interactive system. As such, the program represented an important first step in studying global issues; and accordingly, was an important proof of concept experiment relevant to the strategic mission plans for the ITM community and the upcoming intermediate class satellite program called TIMED. To meet its projected goals, TIMED must perform a number of critical measurements and execute a number of correlations that were to be tried and tested for the first time in the SUNDIAL-ATLAS investigation. This was designed to include global correlations of thermospheric and ionospheric composition during quiet and disturbed conditions and the co-registration of global-scale ground-based measurements with along-track satellite diagnostics. The SUNDIAL component of the current investigation addressed this need by acquiring, reducing, and analyzing a multi-sensor database that complemented and extended that which was generated in the ATLAS mission (Atmospheric Laboratory for Applications and Science). The SUNDIAL data defined the state and condition of the global-scale ionosphere in the altitude range from 100 km to the F2-peak. These data specified the peak heights and densities of the E-, Fl-, and F2-regions, along with the global distributions of intermediate, descending, and sequential layers which play a critical role in the dynamo region of the lower ionospheric-thermospheric domain. The data were collected by the SUNDIAL network of more than 50 ground-based stations utilizing ionosondes, radars, photometers, Fabry-Perot interferometers, and total electron content measurements. The data were acquired during a three-week period centered on the eight-day ATLAS-1 mission, which provided image and photometric sensing of the altitude distributions of the major and minor ions and neutrals in the ITM system. This report focuses on the scientific contributions of the SUNDIAL component of the overall investigation. Specific findings are described in seven papers (attached) published in the Journal of Geophysical Research.

Szuszczewicz, E. P.↗

Project Plan: Salt in Situ Heater Test.

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update on Investigations of Viability of Cold Spray and FSW as a Spent Nuclear Fuel Dry Storage Canister Mitigation Tool

The purpose of this work is to investigate the use of cold spray and friction stir welding or processing (FSW/P) for repair and mitigation of chloride-induced stress corrosion cracking (CISCC) in dry cask storage system (DCSS) canisters to ensure integrity far beyond their original license period. This report provides a viability analysis of cold spray and friction stir welding for repair and fabrication of DCSS canisters. This report presents experimental work and a research strategy to optimize and evaluate cold spray and FSW/P for CISCC resistance. The literature reports that the following three conditions must exist for CISCC to occur: tensile stress, corrosive environment, and susceptible material. These conditions must be understood and accounted for while evaluating CISCC susceptibility. Furthermore, non-obvious factors, such as surface conditions and geometric confinement, can dramatically increase the intensity of one or more of the three listed conditions for CISCC. Arc welding should be considered for either temporary or permanent repair when combined with a mitigation technology. It is known that alloys used in the existing inventory of spent nuclear fuel storage canisters become sensitized in areas around fusion welds. Technologies, such as cold spray or FSW, can mitigate the sensitization caused by fusion welds. FSW/P and cold spray, potential alternatives for fabrication and repair, are solid-phase processes. No melting occurs and the energy input can be controlled such that no harm is done to the base metal during these processes. FSW/P should be considered for use in new fabrication of canisters and repair of existing canisters. Low heat input and grain refinement result in material with improved mechanical properties and comparable generalized corrosion performance relative to base metal. FSW/P offers the potential of through-thickness CISCC resistance. Cold spray should be considered for production, mitigation, and repair of canisters. Cold spray has demonstrated the ability to deposit stainless steel, Inconel alloys, and other alloys on stainless steel 304L such that galvanic potential is matched and resistance to pitting is improved. The technical basis for cold spray mitigation and repair within the overpack using remote robotic equipment is established. A non-obvious application to the research community is the sealing of crevices. All reported instances of CISCC in the fielded nuclear applications were associated with crevice corrosion. This can be avoided by cold spraying to seal crevices. The bulk of the work planned for FY 2020 will be generating coupons for CISCC testing by collaborative projects at Pacific Northwest National Laboratory and Sandia National Laboratories. First an exploratory study will be executed that will include screening studies and process optimization. This task will identify the effect of process parameters on microstructure and CISCC resistance. Optimized parameters will be used to produce a smaller number of coupons for full testing and evaluation. Test methods for evaluating CISCC resistance must meet the following criteria: (1) normalized surface geometry and exposed process microstructure, (2) account for residual stresses, (3) be in a controlled and appropriate test environment, and (4) be numerically quantifiable and repeatable. Failure to meet these criteria could lead to results that cannot be used for comparative analysis of processes and materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Maintaining Situation Awareness with Autonomous Airborne Observation Platforms

Unmanned Aerial Vehicles (UAVs) offer tremendous potential as intelligence, surveillance and reconnaissance (ISR) platforms for early detection of security threats and for acquisition and maintenance of situation awareness in crisis conditions. However, using their capabilities effectively requires addressing a range of practical and theoretical problems. The paper will describe progress by the "Autonomous Rotorcraft Project," a collaborative effort between NASA and the U.S. Army to develop a practical, flexible capability for UAV-based ISR. Important facets of the project include optimization methods for allocating scarce aircraft resources to observe numerous, distinct sites of interest; intelligent flight automation software than integrates high-level plan generation capabilities with executive control, failure response and flight control functions; a system architecture supporting reconfiguration of onboard sensors to address different kinds of threats; and an advanced prototype vehicle designed to allow large-scale production at low cost. The paper will also address human interaction issues including an empirical method for determining how to allocate roles and responsibilities between flight automation and human operations.

Freed, Michael↗

Morpheus 1.5A Lander Failure Investigation Results

On August 9th, 2012, the Morpheus 1.5 Vertical Testbed (VTB) crashed during Free Flight 2 (FF2) at KSC SLF, resulting in the loss of 1.5 VTB hardware. JSC/KSC Morpheus team immediately executed the pre‐rehearsed Emergency Action Plan to protect personnel and property, so damage was limited to 1.5 VTB hardware. JSC/KSC Morpheus team secured data and mapped & recovered debris. Project had pre‐declared loss of VTB to be a test failure, not a mishap.

Munday, Steve↗

The NASA Continuous Risk Management Process

As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics are established and monitored as tools for risk tracking. Also a trigger or threshold should be set on the metric data that indicates when an action is needed. Results of this tracking are usually evaluated and reported in a relevant format at weekly or monthly meetings. Choosing controls is the subsequent step, which involves the effects of the tracking. The three basic controls are: close, continue tracking, and re- plan. Finally communicate & document is the last step, but occurs throughout the process. It is vital that main risks, plans, changes, and progress are known by everyone in the project. A good way to keep everyone updated and inform other projects of common issues is by thoroughly documenting project risks. NASA sees value in risk management and believes that projects have greater probability or success by using the NASA Continuous Risk Management Process.

Pokorny, Frank M.↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

Upgrade of the NASA 4STAR (Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research) to its Full Science Capability of Sun-Sky-Cloud-Trace Gas Spectrometry in Airborne Science Deployments

The objectives of this task in the AITT (Airborne Instrument Technology Transition) Program are to (1) upgrade the NASA 4STAR (Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research) instrument to its full science capability of measuring (a) direct-beam sun transmission to derive aerosol optical depth spectra, (b) sky radiance vs scattering angle to retrieve aerosol absorption and type (via complex refractive index spectra, shape, and mode-resolved size distribution), (c) zenith radiance for cloud properties, and (d) hyperspectral signals for trace gas retrievals, and (2) demonstrate its suitability for deployment in challenging NASA airborne multiinstrument campaigns. 4STAR combines airborne sun tracking, sky scanning, and zenith pointing with diffraction spectroscopy to improve knowledge of atmospheric constituents and their links to air pollution, radiant energy budgets (hence climate), and remote measurements of Earth's surfaces. Direct beam hyperspectral measurement of optical depth improves retrievals of gas constituents and determination of aerosol properties. Sky scanning enhances retrievals of aerosol type and size distribution. 4STAR measurements are intended to tighten the closure between satellite and ground-based measurements. 4STAR incorporates a modular sun-tracking/sky-scanning optical head with fiber optic signal transmission to rack mounted spectrometers, permitting miniaturization of the external optical head, and future detector evolution. 4STAR test flights, as well as science flights in the 2012-13 TCAP (Two-Column Aerosol Project) and 2013 SEAC4RS (Studies of Emissions and Atmospheric Composition, Clouds and Climate Coupling by Regional Surveys) have demonstrated that the following are essential for 4STAR to achieve its full science potential: (1) Calibration stability for both direct-beam irradiance and sky radiance, (2) Improved light collection and usage, and (3) Improved flight operability and reliability. A particular challenge for the AITT-4STAR project has been conducting it simultaneously with preparations for, and execution of, ARISE (Arctic Radiation - IceBridge Sea&Ice Experiment), a NASA airborne science deployment (unplanned when AITT-4STAR was selected for funding) in which 4STAR will deploy to Thule, Greenland, and Fairbanks, Alaska, on the NASA C- 130. This presentation describes progress to date in accomplishing AITT-4STAR goals, and plans for project completion.

Sun-Sky-Cloud-Trace↗

Advances in Discrete-Event Simulation for MSL Command Validation

In the last five years, the discrete event simulator, SEQuence GENerator (SEQGEN), developed at the Jet Propulsion Laboratory to plan deep-space missions, has greatly increased uplink operations capacity to deal with increasingly complicated missions. In this paper, we describe how the Mars Science Laboratory (MSL) project makes full use of an interpreted environment to simulate change in more than fifty thousand flight software parameters and conditional command sequences to predict the result of executing a conditional branch in a command sequence, and enable the ability to warn users whenever one or more simulated spacecraft states change in an unexpected manner. Using these new SEQGEN features, operators plan more activities in one sol than ever before.

discrete event simulation↗