Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Integrated Advanced Microwave Sounding Unit-A (AMSU-A. Engineering Report: Electromagnetic Interface (EMI)/Electromagnetic Radiation (EMR) and Electromagnetic Compatibility (EMC), for the METSAT/METOP AMSU-A1

This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Electromagnetic Interference (EMI), Electromagnetic Susceptibility, and Electromagnetic Compatibility (EMC) qualification test for the Meteorological Satellite (METSAT) and the Meteorological Operation Platform (METOP) projects. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/5D. This document describes the EMI/EMC test performed by Aerojet and it is presented in the following manner: Section-1 contains introductory material and a brief summary of the test results. Section 2 contains more detailed descriptions of the test plan, test procedure, and test results for each type of EMI/EMC test conducted. Section 3 contains supplementary information that includes test data sheets, plots, and calculations collected during the qualification testing.

Valdez, A.↗

X-33 Leading the Way to VentureStar(Trademark) in this Decade

The X-33, reusable space plane technology demonstrator is on course to begin the flights of the X-33 by the end of 2002 that will serve as a basis for industry and government decisions that could lead to VentureStar(Trademark). Lockheed Martin has placed the VentureStar(Trademark) LLC in it's Space Company and is now competing in an industry wide effort that will permit NASA to select a Second Generation RLV source by 2005. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2002 and possibly with upgraded technologies a year or so later. Since the IAF 50th Congress in Amsterdam, most of the major hardware elements of X-33 have been through their assembly and test. The flight liquid oxygen tank was the first major element to complete final assembly. Aerospike Engine qualification testing has progressed successfully through its test objectives and the two flight engines are in preparation to be delivered to the Assembly Facility in Palmdale. All Thermal Protection System (TPS) metallic panels have completed qualification testing and have been delivered to Palmdale and all remaining TPS elements have been assembled and are ready for delivery. Flight Software and Avionics have been delivered and are in integration testing. In November 1999, the first graphite composite liquid hydrogen tank experienced a debond between the tank inner skin and the honeycomb core in testing. This tank had completed its third successful cryogenic and loads testing at MSFC. Replacement liquid hydrogen tanks have completed design and are in fabrication. The resulting delay from this change of design for the liquid hydrogen tank will be approximately two years.

Austin, Robert E.↗

Concentrator hot-spot testing, phase 1

Results of a study to determine the hot-spot susceptibility of concentrator cells, to provide a hot-spot qualification test for concentrator modules, and to provide guidelines for reducing hot-spot susceptibility are presented. Hot-spot heating occurs in a photovoltaic module when the short-circuit current of a cell is lower than the string operating current forcing the cell into reverse bias with a concurrent power dissipation. Although the basis for the concentrator module hot-spot qualification test is the test developed for flat-plate modules, issues, such as providing cell illumination, introduce additional complexities into the testing procedure. The same general guidelines apply for protecting concentrator modules from hot-spot stressing as apply to flat-plate modules. Therefore, recommendations are made on the number of bypass diodes required per given number of series cells per module or source circuit. In addition, a new method for determining the cell temperature in the laboratory or in the field is discussed.

Gonzalez, C. C.↗

Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2

In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B- 2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cryoshroud, achieved the required thermal conditions for the qualification tests. This report focuses on the design and analysis of the planar arrays based on first principles. Computational spreadsheets are included in the report.

Ziemke, Robert A.↗

Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2

In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B-2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cold wall, achieved the required thermal conditions for the qualification tests. The following slides accompanied the presentation of the report entitled Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2, at the 27th Aerospace Testing Seminar, October 2012. The presentation described the test article, the test facility capability, the solar simulation requirements, the highlights of the engineering approach, and the results achieved. The presentation was intended to generate interest in the report and in the B-2 test facility.

Ziemke, Robert A.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Engineering Test Report: AMSU-A1 EOS Instrument, (S/N 202) Qualification Level Vibration Tests of August/September 1998, (S/O 565632, OC-417) Plus Addendum A

The purpose of this report is to present a qualification level vibration testing performed on the S/N 202, EOS AMSU-A1 Instrument was vibration tested to qualification levels per the Ref. 1 shop order. The instrument withstood the 8 g sine sweep test, the 7.5 Grms random vibration test, and the 18.75 g sine burst test in each of the three orthogonal axes. Some loss of transmissibility, however, is seen in the lower reflector after Z-axis random vibration. The test sequence was not without incidence. Failure of Channel 7 in the Limited Performance Test (LPT) performed after completion of the 1 st (X-axis) axis vibration sequence, required replacement of the DRO and subsequent re-testing of the instrument. The post-vibration comprehensive performance test (CPT) was successfully run after completion of the three axes of vibration with the replacement component installed in the instrument. Passing the CPT signified the successful completion of the S/N 202 A1 qualification vibration testing.

Heffer, R.↗

Electrical Evaluation of RCA MWS5001D Random Access Memory, Volume 1

Electrical characterization and qualification tests were performed on the RCA MWS5001D, 1024 by 1-bit, CMOS, random access memory. Characterization tests were performed on five devices. The tests included functional tests, AC parametric worst case pattern selection test, determination of worst-case transition for setup and hold times and a series of schmoo plots. The qualification tests were performed on 32 devices and included a 2000 hour burn in with electrical tests performed at 0 hours and after 168, 1000, and 2000 hours of burn in. The tests performed included functional tests and AC and DC parametric tests. All of the tests in the characterization phase, with the exception of the worst-case transition test, were performed at ambient temperatures of 25, -55 and 125 C. The worst-case transition test was performed at 25 C. The preburn in electrical tests were performed at 25, -55, and 125 C. All burn in endpoint tests were performed at 25, -40, -55, 85, and 125 C.

Klute, A.↗

Environmental requirements for flat plate photovoltaic modules for terrestrial applications

The environmental test requirements that have been developed for flat plate modules purchased through Department of Energy funding are described. Concurrent with the selection of the initial qualification tests from space program experience - temperature cycling and humidity - surveys of existing photovoltaic systems in the field revealed that arrays were experiencing the following failure modes: interconnect breakage, delamination, and electrical termination corrosion. These coupled with application-dependent considerations led to the development of additional qualification tests, such as cyclic pressure loading, warped mounting surface, and hail. Rationale for the selection of tests, their levels and durations is described. Comparisons between field-observed degradation and test-induced degradation show a positive correlation with some of the observed field effects. Also, the tests are proving useful for detecting design, process, and workmanship deficiencies. The status of study efforts for the development of environmental requirements for field-related problems is reviewed.

Hoffman, A. R.↗

On the Use of 3dB Qualification Margin for Structural Parts on Expendable Launch Vehicles

The standard random vibration qualification test used for Expendable Launch Vehicle components is Maximum Predicted Environment (MPE) + 6dB for a duration of 4 times the service life of the part. This can be a severe qualification test for these fatigue-sensitive structures. This paper uses flight data from several launch vehicles to establish that reducing the qualification approach to MPE+3dB for the duration of the peak environment (1x life) is valid for fatigue-sensitive structural components. Items that can be classified as fatigue-sensitive are probes, ducts, tubing, bellows, hoses, and any non-functional structure. Non-functional structure may be flight critical or carry fluid, but it cannot include any moving parts or electronics. This reduced qualification approach does not include primary or secondary structure which would be exclusively designed by peak loads, either transient or quasi-static, that are so large and of so few cycles as to make fatigue a moot point.

Yunis, Isam↗

Development of electrical test procedures for qualification of spacecraft against EID. Volume 1: The CAN test and other relevant data

A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. The data on the response of a simple satellite model, called CAN, to electron-induced discharges is presented. The experimental results were compared to predicted behavior and to the response of the CAN to electrical injection techniques simulating blowoff and arc discharges. Also included is a review of significant results from other ground tests and the P78-2 program to form a data base from which is specified those test procedures which optimally simulate the response of spacecraft to EID. The electrical and electron spraying test data were evaluated to provide a first-cut determination of the best methods for performance of electrical excitation qualification tests from the point of view of simulation fidelity.

Wilkenfeld, J. M.↗

Ion thruster system (8-cm) cyclic endurance test

This report describes the qualification test of an Engineering-Model 5-mN-thrust 8-cm-diameter mercury ion thruster which is representative of the Ion Auxiliary Propulsion System (IAPS) thrusters. Two of these thrusters are scheduled for future flight test. The cyclic endurance test described herein was a ground-based test performed in a vacuum facility with a liquid-nitrogen-cooled cryo-surface and a frozen mercury target. The Power Electronics Unit, Beam Shield, Gimal, and Propellant Tank that were used with the thruster in the endurance test are also similar to those of the IAPS. The IAPS thruster that will undergo the longest beam-on-time during the actual space test will be subjected to 7,055 hours of beam-on-time and 2,557 cycles during the flight test. The endurance test was successfully concluded when the mercury in the IAPS Propellant Tank was consumed. At that time, 8,471 hours of beam-on-time and 599 cycles had been accumulated. Subsequent post-test-evaluation operations were performed (without breaking vacuum) which extended the test values to 652 cycles and 9,489 hours of beam-on-time. The Power Electronic Unit (PEU) and thruster were in the same vacuum chamber throughout the test. The PEU accumulated 10,268 hr of test time with high voltage applied to the operating thruster or dummy load.

Dulgeroff, C. R.↗

Recent Enhancements to the NASA Langley Structural Acoustics Loads and Transmission (SALT) Facility

The Structural Acoustics Loads and Transmission (SALT) facility at the NASA Langley Research Center is comprised of an anechoic room and a reverberant room, and may act as a transmission loss suite when test articles are mounted in a window connecting the two rooms. In the latter configuration, the reverberant room acts as the noise source side and the anechoic room as the receiver side. The noise generation system used for qualification testing in the reverberant room was previously shown to achieve a maximum overall sound pressure level of 141 dB. This is considered to be marginally adequate for generating sound pressure levels typically required for launch vehicle payload qualification testing. Recent enhancements to the noise generation system increased the maximum overall sound pressure level to 154 dB, through the use of two airstream modulators coupled to 35 Hz and 160 Hz horns. This paper documents the acoustic performance of the enhanced noise generation system for a variety of relevant test spectra. Additionally, it demonstrates the capability of the SALT facility to conduct transmission loss and absorption testing in accordance with ASTM and ISO standards, respectively. A few examples of test capabilities are shown and include transmission loss testing of simple unstiffened and built up structures and measurement of the diffuse field absorption coefficient of a fibrous acoustic blanket.

Rizzi, Stephen A.↗

Generic system components of the Thiokol ultrasonic RSRM case-to-insulation bondline inspection system

Qualification testing of the Ultrasonic Redesigned Solid Rocket Motor Bondline Inspection Systems (URBIS) was conducted at the Thiokol Nondestructive Evaluation Test Facility M337A and at the Rotation Process Storage Facility at Kennedy Space Center. The test was performed on portions of the URBIS that are generic to redesigned solid rocket motor case-to-insulation bondline inspections. Testing began on Feb. 13, 1989 and was completed on May 26, 1989. The main purpose of the test was to verify that each URBIS performed to the manufacturer's specifications in the same manner and to make any procedural changes necessary for specific redesigned solid rocket motor inspections. All five URBISs passed every stage of the qualification test. Each URBIS is now qualified for use on redesigned solid rocket motors. Verifying the fact that each URBIS obtains and analyzes data in a similar fashion has eliminated concerns about variations in data between the five systems. The following recommendations were made as a result of this test: (1) each URBIS should be located within a stable environment; (2) an electronic preventative maintenance program should be established for each URBIS; (3) when the URBIS is being utilized to perform transducer analysis, the URBIS equipment setting should match the equipment setting noted on the manufacturer-supplied transducer certification sheet; and (4) optimum scan velocities for each inspection technique (clevis, capture feature, pinhole and membrane) should be determined through further testing.

Cook, M.↗

Component design, construction and evaluation for satellites

Components for a high-reliability system such as the Telstar project are obtained by: (a) design of the component for the required environment, (b) careful control of manufacturing processes, (c) elimination of potential early failures by screening tests, and (d) selection of the most stable components. For passive components, these methods could be applied by using design parameters, suppliers and screening techniques established in the earlier submarine cable program, with consideration being given to the additional effects of the satellite launch and orbit environments. Semiconductor component designs were selected by qualification tests using accelerated electrical and environmental stress conditions. Screening tests were applied to eliminate early failures, and resulting components were aged from two to six months before selection for the satellite. The recognition of the effect of ionizing radiation on transistors caused the addition of a radiation qualification test, or a screening to assure selection of the least sensitive devices. Tests have shown this screening to be effective for the radiation intensity expected. Experience with the passive components, and evaluation of the accelerated test results and aging data of the semiconductor devices, indicate that the reliability objective was obtained.

TELSTAR SATELLITE↗

High Energy Density Electrolytic Capacitor

A new type of electrolytic capacitor which combines an electrolytic capacitor anode with an electrochemical capacitor cathode was developed. The resulting capacitor has a four time higher energy density than standard electrolytic capacitors, with comparable electric performance. The prototype, a 480 microFarad, 200 V device, has an energy density exceeding 4 J/cc. Now a 680 microFarad 50 V, MIL-style all tantalum device has been constructed and is undergoing qualification testing. Pending a favorable outcome, work will begin on other ratings. The potential for commercially significant development exists in applying this technology to aluminum-based electrolytic capacitors. It is possible to at least double the energy density of aluminum electrolytics, while using existing manufacturing methods, and without adding material expense. Data presented include electrical characteristics and performance measurements of the 200 V and 50 V hybrid capacitors and results from ongoing qualification testing of the MIL-style tantalum capacitors.

Evans, David A.↗

Space Shuttle Orbiter leading edge structural subsystem thermal performance

An extensive qualification test program and the STS-1 flight of the Space Shuttle Orbiter have provided the data necessary to verify the performance of the Orbiter thermal protection system. The reinforced carbon-carbon leading edge structural subsystem is used on areas of the orbiter where temperatures exceed 2300 F. The subsystem consists of the ROC nose cap and wing leading edge panels, metallic attachments, internal insulation, and interface tiles. Thermal response data from the qualification tests and the STS-1 flight, postflight inspection, and analytical predictions support the conclusion that the thermal performance of the subsystem verified the design.

Curry, D. M.↗

Flexural Fatigue Testing and Qualification of Hybrid PAN-pitch Composite Materials with High Through-Thickness Thermal Conductivity

Carbon-fiber-reinforced polymers (CFRPs) considered for motor components within future electric vertical takeoff and landing (eVTOL) vehicles require not only a high strength-to-weight ratio but also a high through-thickness thermal conductivity (TC) to dissipate heat. Previously, CFRPs incorporating pitch CF interleaves demonstrated an increased through-thickness TC relative to the baseline composite, but the effect on flexural fatigue life was not evaluated. For this work, T700S/TC275–1 braided carbon fiber/epoxy prepreg baseline (no interleave), YSH–60A pitch interleave, and YS–80A pitch interleave configurations were tested for fatigue life. A combination of ASTM International Standards D7264 and D3479 were used to develop a reliable testing method. An Instron® (Illinois Tool Works Inc.) 8501 servohydraulic system with a fatigue test fixture was set up with a 16:1 span:thickness ratio, load ratio R set to 0.1, and frequency of 4 Hz. High-cycle fatigue testing was completed, and it was found that YSH–60A interleave performed slightly better than YS–80A below 100,000 cycles but showed no differences above 100,000 cycles. In all cases, the baseline CFRP had superior fatigue life performance both in terms of stress handled and total cycles to failure. These fatigue testing data will inform future use of hybrid CFRP materials by highlighting the tradeoff between increased through-thickness TC and fatigue life. Testing guidelines, equipment, and parameters for static and fatigue tests were successfully outlined for CFRPs.

composites↗