Search NASA⌕ Search

SEARCH · Search NASA

Results for “REGULATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Allosteric transcriptional regulation via changes in the overall topology of the core promoter

Many transcriptional activators act at a distance from core promoter elements and work by recruiting RNA polymerase through protein-protein interactions. We show here how the prokaryotic regulatory protein CueR both represses and activates transcription by differentially modulating local DNA structure within the promoter. Structural studies reveal that the repressor state slightly bends the promoter DNA, precluding optimal RNA polymerase-promoter recognition. Upon binding a metal ion in the allosteric site, CueR switches into an activator conformation. It maintains all protein-DNA contacts but introduces torsional stresses that kink and undertwist the promoter, stabilizing an A-DNA-like conformation. Finally, these factors switch on and off transcription by exerting dynamic control of DNA stereochemistry, reshaping the core promoter and making it a better or worse substrate for polymerase.

59 BASIC BIOLOGICAL SCIENCES↗

Models for Incorporating Equity in Transportation Electrification Considerations for Public Utility Regulators, An addendum to the NARUC report, Electric Vehicles: Key Trends, Issues, and Considerations for State Regulators

Momentum for the electric vehicle (EV) transition is well underway, and the utility sector plays an important role in supporting its success. For frontline communities, the transition offers a promising solution to improve environmental and public health outcomes, economic development, affordability, and transit equity. However, the transition will need to involve care and intention to ensure that the needs of underserved communities are prioritized throughout the planning, decision-making, and implementation processes. States have taken the lead in some cases, as profiled in Box 6. Whether driven by state commissions or utilities themselves, utilities have a range of options available to ensure equity is central in their transportation electrification plans and programs by drawing from a variety of existing and emerging experiences, as summarized in Table 1.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗