Search NASA⌕ Search

SEARCH · Search NASA

Results for “REPORTING REQUIREMENTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Experience Report: Using Formal Methods for Requirements Analysis of Critical Spacecraft Software

Formal specification and analysis of requirements continues to gain support as a method for producing more reliable software. However, the introduction of formal methods to a large software project is difficult, due in part to the unfamiliarity of the specification languages and the lack of graphics. This paper reports results of an investigation into the effectiveness of formal methods as an aid to the requirements analysis of critical, system-level fault-protection software on a spacecraft currently under development. Our experience indicates that formal specification and analysis can enhance the accuracy of the requirements and add assurance prior to design development in this domain.

Formal↗

Mission Study and Optics Development Support for Constellation X

This document is the Final Report for NASA Cooperative Agreement NCC5-268 between NASA Goddard Space Flight Center (GSFC) and the Smithsonian Astrophysical Observatory (SAO). The Agreement is entitled "Constellation X-ray Mission Study and Optics Development." The report is required by the terms of the Agreement. There were four modifications to the Agreement. The period of performance was from February 1, 1998 through March 31, 1999. The report summarizes the main areas of SAO activity. Other than the design and analysis related to the SXT Mirror (see Section 4.0), most of the work was carried out jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). Consequently, we do not mean to imply that such activities were carried out exclusively by SAO. Rather, we have tried to describe the SAO participation in these efforts.The report summarizes the main areas of SAO activity. Other than the design and analysis related to the SXT Mirror (see Section 4.0), most of the work was carried out jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). Consequently, we do not mean to imply that such activities were carried out exclusively by SAO. Rather, we have tried to describe the SAO participation in these efforts. As is appropriate to a Cooperative Agreement, SAO worked with GSFC in an integrated team mode. SAO was involved in the mission management, technology development, and mission definition. The organization is shown in Figure 1. While overall management responsibility resided with GSFC, scientific lead and subordinate responsibilities were shared between GSFC and SAO.

Tananbaum, H.↗

Regulation of insulin-like growth factor I transcription by cyclic adenosine 3',5'-monophosphate (cAMP) in fetal rat bone cells through an element within exon 1: protein kinase A-dependent control without a consensus AMP response element

Insulin-like growth factor I (IGF-I) is a locally synthesized anabolic growth factor for bone. IGF-I synthesis by primary fetal rat osteoblasts (Ob) is stimulated by agents that increase the intracellular cAMP concentration, including prostaglandin E2 (PGE2). Previous studies with Ob cultures demonstrated that PGE2 enhanced IGF-I transcription through selective use of IGF-I promoter 1, with little effect on IGF-I messenger RNA half-life. Transient transfection of Ob cultures with an array of promoter 1-luciferase reporter fusion constructs has now allowed localization of a potential cis-acting promoter element(s) responsible for cAMP-stimulated gene expression to the 5'-untranslated region (5'-UTR) of IGF-I exon 1, within a segment lacking a consensus cAMP response element. Our evidence derives from three principal observations: 1) a transfection construct containing only 122 nucleotides (nt) of promoter 1 and 328 nt of the 5'-UTR retained full PGE2-stimulated reporter expression; 2) maximal PGE2-driven reporter expression required the presence of nt 196 to 328 of exon 1 when tested within the context of IGF-I promoter 1; 3) cotransfection of IGF-I promoter-luciferase-reporter constructs with a plasmid encoding the alpha-isoform of the catalytic subunit of murine cAMP-dependent protein kinase (PKA) produced results comparable to those seen with PGE2 treatment, whereas cotransfection with a plasmid encoding a mutant regulatory subunit of PKA that cannot bind cAMP blocked PGE2-induced reporter expression. Deoxyribonuclease I footprinting of the 5'-UTR of exon 1 demonstrated protected sequences at HS3A, HS3B, and HS3D, three of six DNA-protein binding sites previously characterized with rat liver nuclear extracts. Of these three regions, only the HS3D binding site is located within the functionally identified hormonally responsive segment of IGF-I exon 1. These results directly implicate PKA in the control of IGF-I gene transcription by PGE2 and identify a segment of IGF-I exon 1 as being essential for this hormonal regulation.

Non-NASA Center↗

Environmental Projects: Biological Assessment, Opinion, and New 34-Meter Beam-Waveguide Antenna (DSS 24) at Apollo Site - Volume 17

This report deals with the Biological Assessment, Biological Opinion and Final Report on the construction of a high- efficiency 34-meter, multifrequency beam-waveguide antenna at the Apollo Site of the Goldstone Deep Space Communications Complex, operated by JPL. According to the Endangered Species Act of 1973, a Biological Assessment must be conducted and a Biological Opinion, with terms and conditions, rendered (the Opinion by the U.S. Department of the Interior) before construction of any federal project that may affect endangered or threatened flora or fauna. After construction, a final report is filed with the Department. The desert tortoise, designated "threatened" by the U.S. Fish and Wildlife Service, and the Mojave ground squirrel and the Lane Mountain milk vetch, both designated "candidate threatened," required the reporting specified by the Act. The Assessment found no significant danger to the animal species if workers are educated about them. No stands of the plant species were observed in the surveyed construction area. The Department issued a Biological Opinion to safeguard the two animal species. The Service and the California Department of Fish and Game both issued a Biological Concurrence that JPL had satisfied all environmental criteria for preserving threatened species.

Bengelsdorf, Irving↗

Preliminary Assessment of Turbomachinery Codes

This report assesses different CFD codes developed and currently being used at Glenn Research Center to predict turbomachinery fluid flow and heat transfer behavior. This report will consider the following codes: APNASA, TURBO, GlennHT, H3D, and SWIFT. Each code will be described separately in the following section with their current modeling capabilities, level of validation, pre/post processing, and future development and validation requirements. This report addresses only previously published and validations of the codes. However, the codes have been further developed to extend the capabilities of the codes.

Mazumder, Quamrul H.↗

Geostationary Operational Environmental Satellite (GOES-N report). Volume 1: Technical

The GOES-N study consisted of five distinct tasks including: determining replication costs of GOES I-M and GOES-7 in the GOES-N time frame; defining and evaluating modifications to GOES I-M to improve efficiency or reduce costs; and defining evolutionary changes to the GOES I-M design to satisfy National Weather Service (NWS) 1983 and NOAA 1989 requirements. The categorization and disposition of NOAA requirements is reported in volume 1 section 4. Results of the GOES I-M efficiency/cost improvement modifications study are described in Section 7.1. The system concept options 1, 2, and 3 that generally represent the results of the Task 2, 3A, and 3B studies are summarized in Section 7.2. Another result of the GOES-N study, the determination of which NWS 1983 and NOAA 1989 requirements can be met with the three options, is contained in volume 1 section 7. Conclusions and recommendations are covered in volume 1 section 8. Imager, sounder, control system, space environment monitor, search and rescue, weather facsimile, data collection system, and products/process/communications recommendations were extracted from sections 9, 10, and 11. Section 8 also contains conclusions pertaining to programmatic operational satellite issues (prerequisite development strategies, the direct procurement of instruments by the government, protoflight mission, etc.). Sections 9, 10, and 11 address instrument, control system, image/navigation/registration, and other system design considerations and surveys. These sections are supported by the appendices in volume 2.

Source record↗

Advanced information processing system: Local system services

The Advanced Information Processing System (AIPS) is a multi-computer architecture composed of hardware and software building blocks that can be configured to meet a broad range of application requirements. The hardware building blocks are fault-tolerant, general-purpose computers, fault-and damage-tolerant networks (both computer and input/output), and interfaces between the networks and the computers. The software building blocks are the major software functions: local system services, input/output, system services, inter-computer system services, and the system manager. The foundation of the local system services is an operating system with the functions required for a traditional real-time multi-tasking computer, such as task scheduling, inter-task communication, memory management, interrupt handling, and time maintenance. Resting on this foundation are the redundancy management functions necessary in a redundant computer and the status reporting functions required for an operator interface. The functional requirements, functional design and detailed specifications for all the local system services are documented.

Burkhardt, Laura↗

Enabling exploration with small radioisotope power systems

The purpose of this report is to provide an initial reference document to support further definition of science community needs for small-RPS flight systems. It describes the most recent results of the ongoing NASA/DOE studies, and provides information for review by potential users that might take advantage of these types of power systems. This is extremely important since any future decision to proceed with the development of such units will require a strong identified need from the space science community and a well-defined set of power and operational requirements. NASA and DOE intend to use this document as a basis for soliciting information on additional small-RPS-enabled mission concepts, along with their respective power and operational requirements. This report is a first step in fleshing out a roadmap for potential future development and acquisition.

Shirley, James H.↗

Group Capability Model

The Group Capability Model (GCM) is a software tool that allows an organization, from first line management to senior executive, to monitor and track the health (capability) of various groups in performing their contractual obligations. GCM calculates a Group Capability Index (GCI) by comparing actual head counts, certifications, and/or skills within a group. The model can also be used to simulate the effects of employee usage, training, and attrition on the GCI. A universal tool and common method was required due to the high risk of losing skills necessary to complete the Space Shuttle Program and meet the needs of the Constellation Program. During this transition from one space vehicle to another, the uncertainty among the critical skilled workforce is high and attrition has the potential to be unmanageable. GCM allows managers to establish requirements for their group in the form of head counts, certification requirements, or skills requirements. GCM then calculates a Group Capability Index (GCI), where a score of 1 indicates that the group is at the appropriate level; anything less than 1 indicates a potential for improvement. This shows the health of a group, both currently and over time. GCM accepts as input head count, certification needs, critical needs, competency needs, and competency critical needs. In addition, team members are categorized by years of experience, percentage of contribution, ex-members and their skills, availability, function, and in-work requirements. Outputs are several reports, including actual vs. required head count, actual vs. required certificates, CGI change over time (by month), and more. The program stores historical data for summary and historical reporting, which is done via an Excel spreadsheet that is color-coded to show health statistics at a glance. GCM has provided the Shuttle Ground Processing team with a quantifiable, repeatable approach to assessing and managing the skills in their organization. They now have a common frame of reference across NASA/contractor lines to communicate and mitigate any critical skills concerns.

Olejarski, Michael↗