Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Integrity Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Laboratory testing methods to evaluate the reliability of occupancy sensors for commercial building applications

The energy performance of commercial buildings is greatly influenced by occupants which are highly variable and among the most unpredictable components of a building's operation. While most building control systems use fixed, predetermined occupancy schedules, these fixed occupancy levels can be quite different from actual occupancy. This can cause unnecessary energy consumption, particularly from heating, ventilation, and air conditioning (HVAC) and lighting systems which are responsible for approximately 60% of commercial buildings' energy use. The use of occupancy counting sensor systems integrated with building management system controls is one method that can be used to improve the energy-consuming performance of buildings. However, there is no standardized universal methodology and metrics to evaluate their reliability. The aim of this research is to develop a uniform evaluation methodology to assess the reliability of occupancy counting sensor systems in a controlled laboratory environment. The developed testing methodology includes both “typical” scenarios representing the occupancy scenarios of a typical commercial building, and “failure” testing scenarios which represent a range of potential scenarios that may impact a sensor system's reliability. These methods were then implemented in a case study to evaluate the performance of two novel occupancy counting sensor systems (i.e., door-centric, and camera-based). Results suggest that typical testing results can be used to compare the overall performance of the occupancy counting sensor systems; however, failure testing is also important to understand the weaknesses of the sensor system in order to select the suitable one for the intended use of the commercial building. In addition, the proposed methodology includes a modified confusion matrix which enables the ability to identify if failures are caused by over or under counting occupants and to what extent this occurs over the testing period.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smart Grid and Smart Cities

We hope the proceedings will offer the readers a good opportunity to explore the state-of-the art developments and future directions of researches on smart grid and smart cities. These conferences covered the recent trends and progresses made in the field of smart grid and smart cities. For the past few years, smart grids have been one of the main topics in research and development at academic, industry, business and government level. The smart grid is envisaged to be the next generation electric grid for Smart Cities. It enables the smart integration of conventional power generation, renewable generation, distributed generation, energy storage, transmission, distribution and demand management. The benefits of smart grid include the enhanced reliability and resilience, higher intelligence and optimized control, decentralized operation, higher operational efficiency, more efficient demand management, and better power quality. However, all these prospected transformations also bring with them numerous challenges and opportunities. The conference program covers keynotes, invited, oral and poster presentations. The keynotes and invited talks are focused on the potential application of smart grid and smart cities in various fields of application. Among 105 full length articles submitted to the conference, 59 manuscripts were accepted after a thorough peer reviews and were recommended for presentations and publication in this proceedings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The NASA IVHM Technology Experiment for X-37

The NASA IVHM (Integrated Vehicle Health Management) technology experiment for X-37 is presented. The goals and objectives of this program are: to reduce cost and increase reliability of space transportation; to demonstrate benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle; to advance this IVHM technology to Technology Readiness Level approx. 7 within a flight environment; and to operate IVHM software on the Vehicle Management Computer. The following sections are included: Background (X-37 & Livingstone), Livingstone model example from DS-1, Experiment overview, X-37 IVHM scope, Stanley interface to livingstone model, Right ruddervator actuator, Motor state diagram, inferred nominal state, and X-37 informed maintenance experiment.

Source record↗

Emerging technologies for V&V of ISHM software for space exploration

Systems1,2 required to exhibit high operational reliability often rely on some form of fault protection to recognize and respond to faults, preventing faults' escalation to catastrophic failures. Integrated System Health Management (ISHM) extends the functionality of fault protection to both scale to more complex systems (and systems of systems), and to maintain capability rather than just avert catastrophe. Forms of ISHM have been utilized to good effect in the maintenance phase of systems' total lifecycles (often referred to as 'condition-based mainte-nance'), but less so in a 'fault protection' role during actual operations. One of the impediments to such use lies in the challenges of verification, validation and certification of ISHM systems themselves. This paper makes the case that state-of-the-practice V&V and certification techniques will not suffice for emerging forms of ISHM systems; however, a number of maturing software engineering assurance technologies show particular promise for addressing these ISHM V&V challenges.

fault detection, isolation, and recovery↗

Army Energy and Water Reporting System Assessment

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Smart Sensor Demonstration Payload

Sensors are a critical element to any monitoring, control, and evaluation processes such as those needed to support ground based testing for rocket engine test. Sensor applications involve tens to thousands of sensors; their reliable performance is critical to achieving overall system goals. Many figures of merit are used to describe and evaluate sensor characteristics; for example, sensitivity and linearity. In addition, sensor selection must satisfy many trade-offs among system engineering (SE) requirements to best integrate sensors into complex systems [1]. These SE trades include the familiar constraints of power, signal conditioning, cabling, reliability, and mass, and now include considerations such as spectrum allocation and interference for wireless sensors. Our group at NASA s John C. Stennis Space Center (SSC) works in the broad area of integrated systems health management (ISHM). Core ISHM technologies include smart and intelligent sensors, anomaly detection, root cause analysis, prognosis, and interfaces to operators and other system elements [2]. Sensor technologies are the base fabric that feed data and health information to higher layers. Cost-effective operation of the complement of test stands benefits from technologies and methodologies that contribute to reductions in labor costs, improvements in efficiency, reductions in turn-around times, improved reliability, and other measures. ISHM is an active area of development at SSC because it offers the potential to achieve many of those operational goals [3-5].

Schmalzel, John↗

Simulation and Non-Simulation Based Human Reliability Analysis Approaches

Part of the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Program, the Risk-Informed Safety Margin Characterization (RISMC) Pathway develops approaches to estimating and managing safety margins. RISMC simulations pair deterministic plant physics models with probabilistic risk models. As human interactions are an essential element of plant risk, it is necessary to integrate human actions into the RISMC risk model. In this report, we review simulation-based and non-simulation-based human reliability assessment (HRA) methods. Chapter 2 surveys non-simulation-based HRA methods. Conventional HRA methods target static Probabilistic Risk Assessments for Level 1 events. These methods would require significant modification for use in dynamic simulation of Level 2 and Level 3 events. Chapter 3 is a review of human performance models. A variety of methods and models simulate dynamic human performance; however, most of these human performance models were developed outside the risk domain and have not been used for HRA. The exception is the ADS-IDAC model, which can be thought of as a virtual operator program. This model is resource-intensive but provides a detailed model of every operator action in a given scenario, along with models of numerous factors that can influence operator performance. Finally, Chapter 4 reviews the treatment of timing of operator actions in HRA methods. This chapter is an example of one of the critical gaps between existing HRA methods and the needs of dynamic HRA. This report summarizes the foundational information needed to develop a feasible approach to modeling human interactions in the RISMC simulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Potential Reductions in Variability with Alternative Approaches to Balancing Area Cooperation with High Penetrations of Variable Generation

The work described in this report was performed by the National Renewable Energy Laboratory (NREL) and funded by the Office of the Energy Efficiency and Renewable Energy, U.S. Department of Energy (EERE DOE). This project is a joint project with the Pacific Northwest National Laboratory. This report evaluates the physical characteristics that improve the ability of the power system to absorbvariable generation. It then uses evidence from electricity markets in the Eastern Interconnection of the United States to show how large, fast energy markets can help with integration. The concept of Virtual Balancing Area is introduced, a concept that covers a broad range of cooperative measures that can be undertaken by balancing areas to help manage variability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Human Performance Modeling for Dynamic Human Reliability Analysis

Part of the U.S. Department of Energy’s (DOE’s) Light Water Reac- tor Sustainability (LWRS) Program, the Risk-Informed Safety Margin Charac- terization (RISMC) Pathway develops approaches to estimating and managing safety margins. RISMC simulations pair deterministic plant physics models with probabilistic risk models. As human interactions are an essential element of plant risk, it is necessary to integrate human actions into the RISMC risk framework. In this paper, we review simulation based and non simulation based human reliability analysis (HRA) methods. This paper summarizes the founda- tional information needed to develop a feasible approach to modeling human in- teractions in RISMC simulations.

human reliability analysis↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PR100: Puerto Rico Grid Resilience and Transition to 100% Renewable Energy

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) comprehensively analyzes possible pathways for Puerto Rico to achieve its renewable energy goals while incorporating stakeholder perspectives and advancing energy resilience for all Puerto Ricans. PR100 is a wide-ranging and in-depth examination of Puerto Rico's energy system investment options. The findings are the culmination of two years of stakeholder engagement, scenario modeling, and impact analysis. The PR100 report and Implementation Roadmap contain a range of results and actions that reflect Puerto Rico's priorities around energy justice, resilience, and reliability. Led by the U.S. Department of Energy's Grid Deployment Office with funding from the Federal Emergency Management Agency, the PR100 study leveraged and integrated dozens of best-in-class models and in-depth analyses from researchers across six national laboratories: National Renewable Energy Laboratory (which led the study), along with Argonne National Laboratory, Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, and Sandia National Laboratories (which conducted the study). For more information, please see the "PR100 Project Website" resource below.

Array↗

From Here to Autonomicity: Self-Managing Agents and the Biological Metaphors that Inspire Them

We seek inspiration for self-managing systems from (obviously, pre-existing) biological mechanisms. Autonomic Computing (AC), a self-managing systems initiative based on the biological metaphor of the autonomic nervous system, is increasingly gaining momentum as the way forward for integrating and designing reliable systems, while agent technologies have been identified as a key enabler for engineering autonomicity in systems. This paper looks at other biological metaphors such as reflex and healing, heart- beat monitors, pulse monitors and apoptosis for assisting in the realization of autonomicity.

Sterritt, Roy↗

A rose by any other name: Certification seen as process rather than content

Green (1990) believes that the two main factors safeguarding flying from human error are both related to certification and regulation. First is the increasingly proceduralized nature of flying whereby as much as possible is reduced to a rule-based activity. Second is the emphasis placed upon training and competency checking of aircrew in simulators and in the air, both generally and for all particular types of aircraft flown. This leaves, believes Green, other human factors that are relatively unaddressed as yet and which can give rise to human reliability problems. These include: hardware factors and especially pilot/co-pilot relationships; and system factors including fatigue and cost/safety trade-offs. He also, importantly, identifies problems with the integration of the 'electronic crew member' following increased automation. Human reliability failures with artificial intelligence and automation, due to over-reliance on the system fail-safe mechanisms, or to operator under- confidence in the integrity or self-regulating capacity of the system, or to out-of-loop effects, are widely accepted as being due to deficiencies in plant design, planning, management and maintenance more than to 'operator error' - Reason's (1990) latent error or organization pathogens argument. Reliability failures in complex systems are well enough documented to give cause for concern and at least promote a debate on the merits of a full certification program. The purpose of this short paper is to seek out and explore what is valuable in certification, at the least to show that the benefits outweigh the disadvantages and at best to identify positive outcomes perhaps not obtainable in other ways. On both sides of the debate on certification there is general agreement on the need for a better human factors perspective and effort in complex aviation systems design. What is at issue is how this is to be promoted. It is incumbent upon opponents of certification to say how else such promotion be enabled. This is an exploratory and philosophical review, not a focused and specific one, and it will draw upon much that is not firmly in the domain of complex aviation systems.

Wilson, John R.↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

Modeling in the State Flow Environment to Support Launch Vehicle Verification Testing for Mission and Fault Management Algorithms in the NASA Space Launch System

Analysis methods and testing processes are essential activities in the engineering development and verification of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS). Central to mission success is reliable verification of the Mission and Fault Management (M&FM) algorithms for the SLS launch vehicle (LV) flight software. This is particularly difficult because M&FM algorithms integrate and operate LV subsystems, which consist of diverse forms of hardware and software themselves, with equally diverse integration from the engineering disciplines of LV subsystems. M&FM operation of SLS requires a changing mix of LV automation. During pre-launch the LV is primarily operated by the Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) organization with some LV automation of time-critical functions, and much more autonomous LV operations during ascent that have crucial interactions with the Orion crew capsule, its astronauts, and with mission controllers at the Johnson Space Center. M&FM algorithms must perform all nominal mission commanding via the flight computer to control LV states from pre-launch through disposal and also address failure conditions by initiating autonomous or commanded aborts (crew capsule escape from the failing LV), redundancy management of failing subsystems and components, and safing actions to reduce or prevent threats to ground systems and crew. To address the criticality of the verification testing of these algorithms, the NASA M&FM team has utilized the State Flow environment6 (SFE) with its existing Vehicle Management End-to-End Testbed (VMET) platform which also hosts vendor-supplied physics-based LV subsystem models. The human-derived M&FM algorithms are designed and vetted in Integrated Development Teams composed of design and development disciplines such as Systems Engineering, Flight Software (FSW), Safety and Mission Assurance (S&MA) and major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GN&C), Thrust Vector Control (TVC), liquid engines, and the astronaut crew office. Since the algorithms are realized using model-based engineering (MBE) methods from a hybrid of the Unified Modeling Language (UML) and Systems Modeling Language (SysML), SFE methods are a natural fit to provide an in depth analysis of the interactive behavior of these algorithms with the SLS LV subsystem models. For this, the M&FM algorithms and the SLS LV subsystem models are modeled using constructs provided by Matlab which also enables modeling of the accompanying interfaces providing greater flexibility for integrated testing and analysis, which helps forecast expected behavior in forward VMET integrated testing activities. In VMET, the M&FM algorithms are prototyped and implemented using the same C++ programming language and similar state machine architectural concepts used by the FSW group. Due to the interactive complexity of the algorithms, VMET testing thus far has verified all the individual M&FM subsystem algorithms with select subsystem vendor models but is steadily progressing to assessing the interactive behavior of these algorithms with LV subsystems, as represented by subsystem models. The novel SFE applications has proven to be useful for quick look analysis into early integrated system behavior and assessment of the M&FM algorithms with the modeled LV subsystems. This early MBE analysis generates vital insight into the integrated system behaviors, algorithm sensitivities, design issues, and has aided in the debugging of the M&FM algorithms well before full testing can begin in more expensive, higher fidelity but more arduous environments such as VMET, FSW testing, and the Systems Integration Lab7 (SIL). SFE has exhibited both expected and unexpected behaviors in nominal and off nominal test cases prior to full VMET testing. In many findings, these behavioral characteristics were used to correct the M&FM algorithms, enable better test coverage, and develop more effective test cases for each of the LV subsystems. This has improved the fidelity of testing and planning for the next generation of M&FM algorithms as the SLS program evolves from non-crewed to crewed flight, impacting subsystem configurations and the M&FM algorithms that control them. SFE analysis has improved robustness and reliability of the M&FM algorithms by revealing implementation errors and documentation inconsistencies. It is also improving planning efficiency for future VMET testing of the M&FM algorithms hosted in the LV flight computers, further reducing risk for the SLS launch infrastructure, the SLS LV, and most importantly the crew.

Trevino, Luis↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of integrated radioactive waste packaging and conditioning solutions in the UK

In order to offer a more cost effective, safer and efficient Intermediate Level Waste (ILW) management service, EnergySolutions EU Ltd. and Gesellschaft fur Nuklear-Service mbH (GNS) have been engaged in the development of integrated radioactive waste retrieval, packaging and conditioning solutions in the UK. Recognising the challenges surrounding regulatory endorsement and on-site implementation in particular, this has resulted in an alternative approach to meeting customer, safety regulator and disposability requirements. By working closely with waste producers and the organisation(s) responsible for endorsing radioactive waste management operations in the UK, our proposed solutions are now being implemented. By combining GNS' off-the-shelf, proven Ductile Cast Iron Containers (DCICs) and water removal technologies, with EnergySolutions EU Ltd.'s experience and expertise in waste retrieval, safety case development and disposability submissions, a fully integrated service offering has been developed. This has involved significant effort to overcome technical challenges such as onsite equipment deployment, active commissioning, conditioning success criteria and disposability acceptance. Our experience in developing such integrated solutions has highlighted the importance of working in collaboration with all parties to achieve a successful and viable outcome. Ultimately, the goal is to ensure reliable, safe and effective delivery of waste management solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗