Search NASA⌕ Search

SEARCH · Search NASA

Results for “Remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Initial Field Deployment Results of Green PCB Removal from Sediment Systems (GPRSS)

The goal of this task order was to complete optimization and development of the Green PCB Remediation from Sediment Systems(GPRSSs) technology, culminating in the production of functioning demonstration test units which would be deployed at a suitable demonstration location. This location would be selected in conjunction with Toxicological & Ecological Associates who have entered into a SAA with NASA to partner with and further develop this technology. The GPRSSs technology was initially developed under ESC Task Order 83 with the purpose of providing a green remediation technology capable of in-situ removal and remediation of polychlorinated biphenyls (PCBs) from contaminated sediments. The core concept of the technology, a polymeric blanket capable of absorbing PCBs when in contact with contaminated sediments was then transitioned to Task Order 165 where the primary objective was to fully design and optimize a functioning test unit capable of testing the theoretical and laboratory scale concepts in a real world situation. Results from both task orders are included in this report for completeness, although Task Order 165 focused on the blanket design and the small scale field demonstration in which is currently still ongoing in Altavista, VA.

Deployment↗

Preliminary Analysis of Two Years of the Massive Collision Monitoring Activity

It is hypothesized that the interactions between many of the most massive derelicts in low Earth orbit are more frequent than modeled by the traditional combination of kinetic theory of gases and Poisson probability distribution function. This is suggested by the fact that there are clusters of derelicts where members' inclinations are nearly identical and their apogees/perigees overlap significantly resulting in periodic synchronization of the objects' orbits. In order to address this proposition, an experiment was designed and conducted over the last two years. Results from this monitoring and characterization experiment are presented with implications for proposed debris remediation strategies. Four separate clusters of massive derelicts were examined that are centered around 775km, 850km, 975km, and 1500km, respectively. In aggregate, the constituents of these clusters contain around 500 objects and about 800,000kg of mass; this equates to a third of all derelict mass in LEO. Preliminary analysis indicates that encounter rates over this time period for these objects are greater than is estimated by traditional techniques. Hypothesized dependencies between latitude of encounter, relative velocity, frequency of encounters, inclination, and differential semi-major axis were established and verified. This experiment also identified specific repeatable cluster dynamics that may reduce the cost/risk and enhance the effectiveness of debris remediation activities and also enable new operational debris remediation options.

McKnight, Darren↗

Know Your Enemy - Implementation of Bioremediation within a Suspected DNAPL Source Zone Following High-Resolution Site Characterization at Contractors Road Heavy Equipment Area, Kennedy Space Center, Florida

The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), has adopted high-resolution site characterization (HRSC) sampling techniques during baseline sampling prior to implementation of remedies to confirm and refine the conceptual site model (CSM). HRSC sampling was performed at Contractors Road Heavy Equipment Area (CRHE) prior to bioremediation implementation to verify the extent of the trichloroethene (TCE) dense non-aqueous phase liquid (DNAPL) source area (defined as the area with TCE concentrations above 1% solubility) and its daughter product dissolved plume that had been identified during previous HRSC events. The results of HRSC pre-bioremediation implementation sampling suggested that the TCE source area was larger than originally identified during initial site characterization activities, leading to a design refinement to improve electron donor distribution and increase the likelihood of achieving remedial objectives. Approach/Activities: HRSC was conducted from 2009 through 2014 to delineate the vertical and horizontal extent of chlorinated volatile organic compounds (CVOCs) in the groundwater. Approximately 2,340 samples were collected from 363 locations using direct push technology (DPT) groundwater sampling techniques. Samples were collected from up to 14 depth intervals at each location using a 4-foot sampling screen. This HRSC approach identified a narrow (approx. 5 to 30 feet wide), approximately 3,000 square foot TCE DNAPL source area (maximum detected TCE concentration of 160,000 micrograms per liter [micro-g/L] at DPT sampling location DPT0225). Prior to implementation of a bioremediation interim measure, HRSC baseline sampling was conducted using DPT groundwater sampling techniques. Concentrations of TCE were an order of magnitude lower than previous reported (12,000 micro-g/L maximum at DPT sampling location DPT0225) at locations sampled adjacent to previous sampling locations. To further evaluate the variability in concentrations observed additional sampling was conducted in 2016. The results identified higher concentrations than originally detected within the previously defined source area and the presence of source zone concentrations upgradient of the previously defined source area (maximum concentration observed 570,000 micro-g/L). The HRSC baseline sampling data allowed for a revision of the bioremediation design prior to implementation. Bioremediation was implemented within the eastern portion of the source area in November and December 2016 and quarterly performance monitoring was completed in March and June 2017. Reductions in CVOC concentrations from baseline were observed at all performance monitoring wells in the treatment area, and by June 2017, an approximate 95% CVOC mass reduction was observed based on monitoring well sampling results. Results/Lessons Learned: The results of this project suggest that, due to the complexity of DNAPL source zones, HRSC during pre-implementation baseline sampling in the TCE source zone was an essential strategy for verifying the treatment area and depth prior to remedy implementation. If the upgradient source zone mass was not identified prior to bioremediation implementation, the mass would have served as a long-term source for the dissolved plume.

Chrest, Anne↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

IAC Abstract for Orbital Debris Phase II Report

Orbital debris poses a growing risk for spacecraft operations. This risk has most often been measured by proxies, like the number of debris or expected collisions, but few have attempted quantify the consequences of orbital debris or the costs and benefits of different methods to address the problem. This has made it difficult to assess the trade-offs and relative value among proposed actions for the mitigation, tracking, and remediation of debris. In March of 2023, the NASA Office of Technology, Policy, and Strategy (OTPS) took a step toward quantifying these relative values when we released Cost and Benefit Analysis of Orbital Debris Remediation. Since that time, OTPS has continued to build on this work. We have increased the fidelity of our risk model. For example, we added an ensemble of risk models that use varying assumptions of debris populations and lethality, included debris as small as 1mm, and incorporated atmospheric drag to naturally deorbit debris. We have also expanded our cost-benefit calculations to include action that mitigate and track debris, both large and small. The analysis has several important findings regarding the conditions under which debris remediation is more cost-effective than mitigation and tracking, the value of increased shielding of spacecraft and faster timelines for post-mission disposal, and how changes in the portfolio have interdependent effects. This presentation summarizes the body of work, with a particular focus on the risks and benefits to the global spacecraft population.

orbital debris↗

Exploring the Use of a Ground-Based Laser System to Deorbit Small Orbital Debris

In March 2023, NASA Office of Technology, Policy, and Strategy (OTPS) released its Cost and Benefit Analysis of Orbital Debris Remediation report. This analysis found that the two most efficient methods for remediating orbital debris were the removal of small (1-10 cm) debris and nudging large debris away from predicted collisions; both methods could be performed by high-energy laser systems. To further explore the concept, OTPS has been assessing a reference mission using ground-based, pulsed lasers to detect, engage, and rapidly deorbit 1- to 10-cm debris that would otherwise threaten the safety of the International Space Station and future crewed platforms in low Earth orbit. In March of 2024, OTPS convened a technical interchange meeting (TIM) of experts in detection and tracking of debris, high-energy glass and excimer lasers, laser-matter interactions, atmospheric propagation, and adaptive optics. The TIM spanned two days, covering the unclassified state of the art, uncertainties, and technical challenges for the entire concept of operations of the reference mission. In this presentation, we will summarize the reference mission analyzed, key findings from the TIM, and solicit the feedback from this community to further define “what is good enough” for debris remediation.

orbital debris↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Introduction

Remediation of Legacy Hazardous and Nuclear Industrial Sites provides an overview of the key elements involved in remediating complex waste sites using the Hanford nuclear site as a case study. Hanford is one of the most complex waste sites in the world and has examples of most, if not all, characteristics of the complex waste sites that exist globally. This book is aimed at a non-technical audience and describes the stages of remediation based on general RCRA/CERCLA processes, from establishing a strategy that includes all stakeholders to site assessment, waste treatment and disposal, and long-term monitoring.

Arm, Stuart T. [BATTELLE (PACIFIC NW LAB)]↗

Automation of Vulnerability and Patch Management: Information Extraction, Association, and Optimization

Vulnerability and patch management is an integral part of a robust cybersecurity program, yet it grows increasingly complex due to the sheer amount of data that must be analyzed. Particularly in Operational Technology (OT) environments, analysis must be done manually because of the lack of automated solutions. Additionally, there are many steps in this process, from the initial discovery of the vulnerability to the implementation of its remediation, and each step in the process requires different data in order to be performed effectively. In this work, we provide approaches and strategies to assist operators in industrial or OT environments throughout the vulnerability management cycle. Security advisories provide key information about mitigation strategies, or actions that can be taken when a patch is unavailable or cannot be installed. Details of these strategies are not shared in public vulnerability databases and must be found manually. We approach this problem by designing a solution to automatically identify that information within vendor security advisories and retrieve it for operator use. We start with an approach that requires domain-specific knowledge of certain frequently-seen reference websites. Next, an approach that can work on an arbitrary website but relies on certain keywords. Finally, an approach that uses Natural Language Processing (NLP) methods and does not require specific knowledge or keywords. Each of these approaches is more general than its predecessor; we demonstrate high accuracy for all approaches Advisories also often contain details of affected products in non-standard or natural language formats. While this information can be easily understood when read by an operator, the non-standard format acts as a barrier to effective automation. We provide an approach for the first step in this process: identifying vendors in security advisories and mapping them to a standard framework for representing digital assets and software products. We evaluate five established string similarity algorithms, plus one of our own design that combines string similarity and information theory, on the task of mapping vendors to their corresponding entries in the Common Platform Enumeration (CPE) repository. Our results show that our proposed metric outperforms all others. Due to the constraints on time, finances, and personnel for organizations, Large Language Models (LLMs) may seem like attractive opportunities for security operators to speed up information gathering; however, it is still not clear whether LLMs can handle vulnerability management tasks well. To answer this question, we perform an empirical study of LLMs’ ability to provide consistent, accurate information about vulnerabilities in order to guide organizations in their adoption of LLMs. We observe poor performance for all models tested, suggesting that these models are not well-suited to the consistent retrieval of accurate vulnerability information. Finally, once vulnerabilities have been identified and any additional information has been obtained, operators must decide which remediation actions to implement based on their available resources. This already-complex problem becomes even more so when we consider that a vulnerability may have multiple avenues for remediation. We formulate this scenario as two knapsack problems and provide solutions, which we then compare against several existing strategies for vulnerability prioritization seen in real operational environments.

McClanahan, Kylie↗

Utilization of Unmanned Aircraft Systems for Environmental Purposes at the Savannah River Site – 26578

Born in the 1950s, the Savannah River Plant was constructed as a plutonium and tritium production plant. As the Cold War era came and went, a change of direction was signaled when the name of the facility changed from Savannah River Plant to Savannah River Site (1989) – the main mission at Savannah River shifted from “production” to “cleanup.” The Department of Energy is responsible for managing the 310 square miles of land that is the Savannah River Site and the cleanup/remediation activities that occur. The Savannah River National Laboratory utilizes unmanned aircraft systems to assist with some of those environmental monitoring and remediation activities. One function of unmanned aircraft systems at the Savannah River National Laboratory is conducting aerial photography and videography. Various infrastructure evaluations have been performed with unmanned aircraft – facility rooftop inspections, water tower lock verifications, earthen dam surveys, etc. An unmanned aircraft system has been used for progress footage of remediation projects – Dunbarton Bay remediation, Saltstone Disposal Unit construction, etc. Thermal cameras on an unmanned aircraft system are used to help identify cracks/leaks in structures from vantage points not readily accessible by personnel. Virtual tours of different waste units are conducted with unmanned aircraft systems for Site groups and federal/state regulators to save costs and travel time. Additionally, advanced remote sensing technologies are used on unmanned aircraft systems at the Savannah River Site. Light Detection and Ranging uses laser pulses to measure distances to the Earth's surface or other targets to create highly detailed topographic maps that accurately portray terrain (e.g., elevation changes, slopes, and contours). Data collection with a Light Detection and Ranging unit mounted on an unmanned aircraft system is quick and efficient – large-area surveys are conducted in shorter time frames. Because Light Detection and Ranging can penetrate through foliage and vegetation to ground level, it is being used in conjunction with a watershed model to study the General Separations Area of the Site to determine stormwater flow volume and direction, monitor stream stability, and forecast river flow behavior. A hyperspectral camera captures a wide spectrum of electromagnetic wavelengths across numerous narrow bands, beyond what the human eye can see. It provides detailed spectral information about the objects or surfaces in an image, which can be used to identify and analyze materials based on their spectral signatures. A hyperspectral camera mounted on an unmanned aircraft system has been used at the Savannah River Site for non-destructive evaluation of concrete and concrete structures. Unmanned aircraft systems at the Savannah River Site are also used for the application of herbicide on identified rooftops. P-Reactor and R-Reactor are entombed nuclear reactors at the Savannah River Site. Unwanted vegetation is often present on these rooftops – over time roots can penetrate seams, cracks, and joints of the general roof and concrete caps, leading to water ingress and deterioration of the structural components. For time and cost efficiencies as well as in the interest of personnel safety, an unmanned aircraft is used to dispense herbicide on rooftop areas where vegetation is noticed to help alleviate the issues/hazards.

Lorier, Troy [Savannah River National Laboratory (↗

Integrating Analytical Solutions and U-Net Model for Predicting Groundwater Contaminant Plumes in Pump-and-Treat Systems

Pump-and-treat (P&T) is a common technique for groundwater remediation involving the extraction and treatment of contaminated water above ground. Optimizing the design and operation of the P&T well network is essential for maximizing the system’s effectiveness and efficiency. However, this optimization often necessitates many model evaluations, leading to computationally demanding tasks. This study introduces a novel approach that integrates analytical solutions for groundwater dynamics with the U-Net (Ronneberger et al., 2015) deep learning framework to predict groundwater contaminant plume migration under dynamic pumping conditions. By incorporating the Thiem equation (Thiem, 1906) into the input preprocessing, the U-Net model transforms sparse well data into a continuous spatial field that captures the hydraulic impacts of pumping activities. This integration enables the model to leverage both deep learning capabilities and classical physics-based groundwater theories, enhancing prediction accuracy and computational efficiency. These advancements can facilitate rapid, large-scale evaluations of P&T optimization simulations, allowing for timely and effective decision-making in well placement and system management. We demonstrate the model's robust performance across both simplified transient 2D models and a more complex 3D heterogeneous site model at the 200 West P&T facility at the Hanford Site. The U-Net-based model offers substantial computational advantages, reducing simulation times significantly compared to full physics-based models and providing a powerful tool for rapid site evaluation and P&T system optimization, such as evaluating alternative P&T well network designs. Our findings highlight the potential of advanced machine learning models to significantly enhance the efficiency and sustainability of groundwater remediation efforts, offering a novel application of U-Net architecture in environmental science.

Pump-and-treat↗

The efficacy and ecological impact of mercury sorbents on the physiology and reproductive fitness of Daphnia magna

Environmental mercury (Hg) contamination threatens ecosystems due to its bioaccumulation and toxicity. Effective and sustainable remediation strategies are essential, with carbon-based sorbents like biochar (BC) and activated carbon (AC) gaining attention for their high adsorption capacity and cost-effectiveness. However, their ecological impacts remain poorly understood. This study evaluates the Hg removal efficacy and ecological effects of three sorbents—BC, granular AC (GAC), and AC fiber (ACF)—in a flow-through column system with and without Hg additions. We tested Hg removal at two concentrations (1 and 4 µg/L Hg) and assessed chronic exposure effects on a sentinel and sensitive freshwater organism, Daphnia magna, over 30 days of exposure to the columns’ effluent. GAC removed 100 % of Hg, while BC and ACF achieved 99 % removal. The ACF + 4 µg/L Hg effluent induced 70 % lethality in D. magna after nearly three weeks of exposure, while the GAC effluent significantly reduced fecundity, even in the absence of Hg exposure. In contrast, the BC effluent enhanced reproductive output, likely due to inputs of carbon and nitrogen in the effluent. These findings highlight the need to balance Hg removal efficacy with ecological safety, emphasizing the importance of considering both remediation effectiveness and potential environmental impacts.

Activated carbon↗

Bacterial nitrite production oxidizes Fe(II) bioremediating acidic abandoned coal mine drainage

Passive remediation systems (PRSs) treating either acidic or neutral abandoned coal mine drainage (AMD) are colonized by bacteria that can bioremediate iron (Fe) through chemical cycling. Due to the low pH in acidic AMD, iron oxidation from soluble Fe(II) to precipitated Fe(III) is mainly directed by microbial oxidation. Less well described are biotic reactions that lead to iron remediation through abiotic secondary reactions. We describe here iron oxidation in acidic AMD that is mediated by the bacterial reduction of nitrate to nitrite followed by the geochemical oxidation of Fe(II). Within an acidic PRS, 4,560 bacteria cultured from the microbial community were screened for their ability to oxidize iron and to perform nitrate-dependent iron oxidation (NDFO). Iron oxidation in the culturable community was observed in every pond of the system, ranging from 2.1% to 11.4%, and NDFO was observed in every pond, ranging from 1.4% to 6.0% of the culturable bacteria. Five NDFO isolates were purified and identified as Paraburkholderia spp. One of our isolates, Paraburkholderia sp. AV18 was shown to drive NDFO through the bacterial production of nitrite that in turn chemically oxidizes Fe(II) (nitrate reduction-iron oxidation; NRIO). AV18 expressed nitrate reductase, napA, concurrent to nitrite production. Burkholderiales are found by 16S rRNA gene sequencing in every pond of the PRS. The frequency of NDFO metabolism in the culturable microbial community and abundance of Burkholderiales in the PRS suggest nitrite producers contribute to the bioremediation of iron in acidic AMD and may be an unharnessed opportunity to increase iron bioremediation in acidic conditions.

(NDFO)↗

Exploring the Nature of f-Element Soft Donor Interactions Using Electronically Tunable Azolate Ionic Liquids

This project was undertaken to advance the understanding of how f-elements interact with moderately soft donors, a heavily investigated yet open question which is of prime importance in spent nuclear fuel processing and fundamental inorganic chemistry. During the course of the project, based on exciting results, a stretch goal was developed to study the hydrolysis products of transuranic actinide metals, a somewhat understudied field even with its significance in nuclear fuel cycle and impacts in environmental chemistry. The stretch goal was to take our serendipitous discovery of an easy route to isolation of crystalline multinuclear ƒ-element hydrolysis products, and apply it to gaining a mechanistic understanding of Pu(III/IV) colloid formation. The simplicity of our techniques should lend themselves to the remote handling required for study of many transuranic elements. We developed several methodologies using azolium azolate chemistry to overcome ƒ-element hydrolysis problems that prohibit the isolation of ƒ-element soft donor complexes and to build a crystallographic library of ƒ-element N-donor complexes as a means to understand the fundamental differences between actinide and lanthanide interactions with moderately soft donor ligands. Our next major endeavor will be to transfer this chemistry from 4ƒ elements to transuranic elements, particularly in the study of hydrolysis of Pu(III/IV). While our work is fundamental in nature, applications of the knowledge we are generating should be felt in such diverse fields as catalysis, separations in general, nuclear waste remediation specifically, and many other applications in f-element magnetic and luminescent properties. The potential ramifications of the consistent and robust formation of hydrolysis controlled hexanuclear lanthanide structures are enormous, with future uses being catalyst formation, higher-nuclearity structure synthesis using our hexanuclear motif as a fundamental building block, Pu waste remediation, separations, and many other potential applications resulting from characteristic magnetic and luminescent properties of lanthanide polynuclear structures. Three synthetic methodologies (direct mixing with variable stoichiometries, use of volatile solvent, metathesis) were developed starting with 7 acidic and 6 basic azoles to obtain ionic liquids suitable for f-element coordination. Proton transfer by acidic/basic azole combination led to suitable low melting salts and two cocrystals. Acid/base reaction of azoles with soft-donor permanent cations of ([X 4444 ][OH] (where [X 4444 ] + = tetrabutylammonium [N 4444 ] + or tetrabutylphosphonium [P 4444 ] + ) with weakly acidic azoles including imidazole, 1,2,3-triazole, 1,2,4-triazole, 5-aminotetrazole, 4,5-dicyanoimidazole, and 2-amino-4,5-dicyanoimidazole) revealed several suitable low-melting salts. Metathesis reactions of Na(azolate) were conducted by first using weakly acidic azoles including 4,5-dicyanoimidazole, 2-amino-4,5-dicyanoimidazole, 5-aminotetrazole, and 1,2,4-triazole to form sodium or lithium salts using group(I) hydroxides in methanolic solutions. The best results were obtained by reacting the basic and acidic azoles directly in 1:1 or 3:1 ratios at elevated temperatures. Twenty-two azole mixtures were identified which are either low melting solids or room temperature liquids. Each of the low melting solids was confirmed to be a new solid phase, each of which is being further characterized. The liquids and solids are anticipated to be ILs, eutectics, or partially ionized systems, all of which will be suitable for the dissolution of f-element salts. Five new synthetic methodologies were developed to finding suitable crystallization conditions for f-element complexation with the goal of finding simple one pot reaction syntheses and crystallization strategies that could be used under the demanding conditions of transuranic chemistries. These synthetic methods yield many new crystalline phases which were studied by single crystal X-ray diffraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interim Measure Report Revision 0: Un-Numbered Operational Areas PRL 229

This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.

PAHs↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

I Can't Patch My OT Systems! A Look at CISA's KEVC Workarounds & Mitigations for OT

We examine the state of publicly available information about known exploitable vulnerabilities applicable to operational technology (OT) environments. Specifically, we analyze the Known Exploitable Vulnerabilities Catalog (KEVC) maintained by the US Department of Homeland Security Cybersecurity and Infrastructure Security Agency (CISA) to assess whether currently available data is sufficient for effective and reliable remediation in OT settings. Our team analyzed all KEVC entries through July 2025 to determine the extent to which OT environments can rely on existing remediation recommendations. We found that although most entries in the KEVC could affect OT environments, only 13% include vendor workarounds or mitigations as alternatives to patching. This paper also examines the feasibility of developing such alternatives based on vulnerability and exploit characteristics, and we present early evidence of success with this approach.

97 MATHEMATICS AND COMPUTING↗