Search NASA⌕ Search

SEARCH · Search NASA

Results for “Round Trip Time”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗

Asteroid resources

There are three types of possible asteroidal materials that appear to be attractive for exploitation: (1) volatiles, (2) free metals, and (3) bulk dirt. Because some of the near-Earth asteroids are energetically more accessible than the Moon (require a round-trip total change in velocity less than 9 km/sec, though the trip time would be measured in years not days), such an asteroid might be chosen as the source of any useful material, even if that material was also available on the Moon. Provided that the asteroid was minable, it might therefore be chosen as the source of bulk dirt needed for shielding in low Earth orbit (LEO) or elsewhere in near-Earth space. And the near-Earth asteroids may offer materials that are rare or absent on the surface of the Moon. The relationship between asteroids and meteorites is discussed. A brief overview of the entire range of meteorite compositions, with emphasis on the occurrence of interesting resources is presented. Focus is on materials useful in space, especially volatiles, metals, and raw dirt. Those few materials that may have sufficiently high market value to be worth returning to Earth will be mentioned.

Lewis, John S.↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

Local oscillator distribution using a geostationary satellite

A satellite communication system suitable for distribution of local oscillator reference signals for a widely spaced microwave array has been developed and tested experimentally. The system uses a round-trip correction method of the satellite This experiment was carried out using Telstar-5, a commercial Ku-band geostationary satellite. For this initial experiment, both earth stations were located at the same site to facilitate direct comparison of the received signals. The local oscillator reference frequency was chosen to be 300MHz and was sent as the difference between two Ku-band tones. The residual error after applying the round trip correction has been measured to be better than 3psec for integration times ranging from 1 to 2000 seconds. For integration times greater then 500 seconds, the system outperforms a pair of hydrogen masers with the limitation believed to be ground-based equipment phase stability. The idea of distributing local oscillators using a geostationary satellite is not new; several researchers experimented with this technique in the eighties, but the achieved accuracy was 3 to 100 times worse than the present results. Since substantially and the performance of various components has improved. An important factor is the leasing of small amounts of satellite communication bandwidth. We lease three 100kHz bands at approximately one hundredth the cost of a full 36 MHz transponder. Further tests of the system using terminal separated by large distances and comparison tests with two hydrogen masers and radio interferometry is needed.

hydrogen maser↗

Metrology Arrangement for Measuring the Positions of Mirrors of a Submillimeter Telescope

The position of the secondary mirror of a submillimeter telescope with respect to the primary mirror needs to be known .0.03 mm in three dimensions. At the time of this reporting, no convenient, reasonably priced arrangement that offers this capability exists. The solution proposed here relies on measurement devices developed and deployed for the GeoSAR mission, and later adapted for the ISAT (Innovative Space Based Radar Antenna Technology) demonstration. The measurement arrangement consists of four metrology heads, located on an optical bench, attached to the secondary mirror. Each metrology head has a dedicated target located at the edge of the primary mirror. One laser beam, launched from the head and returned by the target, is used to measure distance. Another beam, launched from a beacon on the target, is monitored by the metrology head and generates a measurement of the target position in the plane perpendicular to the laser beam. A 100-MHz modulation is carried by a collimated laser beam. The relevant wavelength is the RF one, 3 m, divided by two, because the light carries it to the target and back. The phase change due to travel to the target and back is measured by timing the zero-crossing of the RF modulation, using a 100-MHz clock. In order to obtain good resolution, the 100-MHz modulation signal is down-converted to 1 kHz. Then, the phase change corresponding to the round-trip to the target is carried by a 1-kHz signal. Since the 100-MHz clock beats 100,000 times during one period of the 1-kHz signal, the least-significant-bit (LSB) resolution is LSB = 0.015 mm.

Abramovici, Alex↗

Thermo-Hydrological Modeling of Thermal Energy Storage in a Depleted Oil Reservoir

Thermal energy storage in oil and gas reservoirs leverages the existing surface and subsurface infrastructure, which can pave the way for economic production of geothermal energy. Existing studies on geothermal energy storage are focused mostly on the use of aquifers with more homogeneous rock and fluid properties. Coupling of heat and fluid flow in a multiphase-multicomponent system, such as an oil reservoir, is imperative especially if existing oil field assets need to be repurposed as required for a sustainable energy transition. The objective is to model the subsurface thermo-hydrological processes associated with reservoir performance and operational sustainability. The model evaluates formation pressure and temperature within the reservoir and at the injection/production wells during multiple charge and discharge cycles. Hot water (approximately 200 degrees C) heated by Concentrating Solar Power (CSP) at high pressure is injected into the existing oil reservoir for storage and produced as thermal energy for power generation, which will be accompanied by enhanced oil recovery. To demonstrate the coupled fluid and heat flow during the injection/production cycle in the subsurface reservoir, TOUGH3 (developed by Berkeley Lab) is used to simulate the thermo-hydrological (TH) processes in a multiphase, multicomponent system. Two well geometries are considered within the reservoir grid: 1) a single-well huff-n-puff system (same well is used for injection and production), and 2) an isolated injection-production well doublet. Seasonal charge and discharge cycling are implemented based on the scheduling specified in the model input file. The model reports pressure, temperature, enthalpy, liquid fluxes, heat fluxes, pore velocities, and changes in porosity & permeability due to temperature and pressure variations during the cyclic Reservoir Thermal Energy Storage (RTES) operations. The results from the simulations can be used to optimize the operational parameters (such as well spacing and injection/production rates) and round-trip efficiency for surface power-plants coupled with thermal energy storage over time. They can also serve as important inputs for levelized cost of storage estimations. The research will help to design and integrate surface renewable energy sources, such as concentrating solar power (CSP), with RTES to help balance out power supply and demand on the grid.

CSP↗

Performance of advanced missions using fusion propulsion

A quantitive evaluation of the premise that nuclear fusion propulsion offers benefits as compared to other propulsion technologies for carrying out a program of advanced exploration of the solar system and beyond is presented. Using a simplified analytical model of trajectory performance, numerical results of mass requirements versus trip time are given for robotic missions beyond the solar system that include flyby and rendezvous with the Oort cloud of comets and with the star system Alpha Centauri. Round trip missions within the solar system, including robotic sample returns from the outer planet moons and multiple asteroid targets, and manned Mars exploration are also described.

Friedlander, Alan↗

Propulsion Selection for 85kft Remotely Piloted Atmospheric Science Aircraft

This paper describes how a 3 stage turbocharged gasoline engine was selected to power NASA's atmospheric science unmanned aircraft now under development. The airplane, whose purpose is to fly sampling instruments through targeted regions of the upper atmosphere at the exact location and time (season, time of day) where the most interesting chemistry is taking place, must have a round trip range exceeding 1000 km, carry a payload of about 500 lb to altitudes exceeding 80 kft over the site, and be able to remain above that altitude for at least 30 minutes before returning to base. This is a subsonic aircraft (the aerodynamic heating and shock associated with supersonic flight could easily destroy the chemical species that are being sampled) and it must be constructed so it will operate out of small airfields at primitive remote sites worldwide, under varying climate and weather conditions. Finally it must be low cost, since less than $50 M is available for its development. These requirements put severe constraints on the aircraft design (for example, wing loading in the vicinity of 10 psf) and have in turn limited the propulsion choices to already-existing hardware, or limited adaptations of existing hardware. The only candidate that could emerge under these circumstances was a propeller driven aircraft powered by spark ignited (SI) gasoline engines, whose intake pressurization is accomplished by multiple stages of turbo-charging and intercooling. Fortunately the turbocharged SI powerplant, owing to its rich automotive heritage and earlier intensive aero powerplant development during WWII, enjoys in addition to its potentially low development costs some subtle physical advantages (arising from its near-stochiometric combustion) that may make it smaller and lighter than either a turbine engine or a diesel for these altitudes. Just as fortunately, the NASA/industry team developing this aircraft includes the same people who built multi-stage turbocharged SI powerplants for unmanned military spyplanes in the early 1980's. Now adapting hardware developed for reconaissance at 65-70 kft to the interests of atmospheric science at 80-90 kft, their efforts should yield an aero powerplant that pushes the altitude limits of subsonic air breathing propulsion.

Bents, David J.↗

Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its associated centers across the US. KSC has found itself at the blunt end of change as the entire center has transitioned from an operations mindset to a development mentality. The author of this paper has had the fortunate privilege and opportunity to be part of a transforming NASA during the fall months of 2014. The following is a high level account of projects that he had the chance to work on including the Spaceport Command and Control System, the Advanced Ground System and Maintenance Program Project, Customer Avionics Development & Analysis (CAIDA) Lab and Swamp Works.

Advanced Ground System Maintenance↗

Manned Venus Orbiting Mission

Manned orbiting stopover round trips to Venus are studied for departure dates between 1975 and 1986 over a range of trip times and stay times. The use of highly elliptic parking orbits at Venus leads to low initial weights in Earth orbit compared with circular orbits. For the elliptic parking orbit, the effect of constraints on the low altitude observation time on the initial weight is shown. The mission can be accomplished with the Apollo level of chemical propulsion, but advanced chemical or nuclear propulsion can give large weight reductions. The Venus orbiting mission weights than the corresponding Mars mission.

LAUNCH DATE↗

Feasibility study of a single, elliptical heliocentric Earth-Mars trajectory

The initial intent of this design project was to evaluate the existence and feasibility of a single elliptical heliocentric Earth/Mars trajectory. This trajectory was constrained to encounter Mars twice in its orbit, within a time interval of 15 to 180 Earth days between encounters. The single ellipse restriction was soon found to be prohibitive for reasons shown later. Therefore, the approach taken in the design of the round-trip mission to Mars was to construct single-leg trajectories which connected two planets on two prescribed dates. Three methods of trajectory design were developed. Method 1 is an eclectic approach and employs Gaussian Orbit Determination (Method 1A) and Lambert-Euler Preliminary Orbit Determination (Method 1B) in conjunction with each other. Method 2 is an additional version of Lambert's Solution to orbit determination, and both a coplanar and a noncoplanar solution were developed within Method 2. In each of these methods, the fundamental variables are two position vectors and the time between the position vectors. In all methods, the motion was considered Keplerian motion and the reference frame origin was located at the sun. Perturbative effects were not considered in Method 1. The feasibility study of round-trip Earth/Mars trajectories maintains generality by considering only heliocentric trajectory parameters and planetary approach conditions. The coordinates and velocity components of the planets, for the standard epoch J2000, were computed from an approximate set of osculating elements by the procedure outlined in an ephemeris of coordinates.

Blake, M.↗

Analysis of Exposure during Transportation of Waste to the Nevada National Security Site (NNSS) - 20445

Safety is a priority for the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program. This commitment to safety is integrated into requirements and work procedures at DOE sites across the U.S. that generate low-level radioactive waste, mixed low-level radioactive waste, and classified waste that is transported to the Nevada National Security Site (NNSS) for permanent disposal. Generators of this waste are responsible for ensuring it is packaged and transported in a safe and compliant manner. These generators and their contracted commercial carriers must comply with U.S. Department of Transportation (DOT) regulations; the Nevada National Security Site Waste Acceptance Criteria (NNSSWAC); and other applicable federal, state, and local regulations and requirements. This includes packaging and shipping the waste to meet DOT regulatory radiation dose limits to ensure public safety during transportation. NNSS waste generators have a solid safety record for complying with these stringent regulations as demonstrated by the fact that no shipments exceeding DOT dose rate limits were received at the NNSS Area 5 Radioactive Waste Management Complex (RWMC) during FY 2014 through FY 2018. A 2005 study conducted by the Desert Research Institute validated shipments to the NNSS comply with DOT radiation dose limits. In response to recent Nevada stakeholder requests for an updated study, an analysis was conducted to verify and provide evidence that the public continues to be safe from exposure to radioactive waste shipment to the NNSS. Radiation exposure from radioactive waste shipments in transit to the NNSS was evaluated. Three studies were performed: 1. Confirm compliance of waste shipments to the DOT radiation limits using dose rate surveys taken at the generator site and at the disposal site. 2. Estimate the dose to the public from waste shipments using the dosimetry results for disposal site personnel by comparing time of exposure for various individuals/scenarios. 3. Estimate the truck driver dose using the receipt dose rate surveys and time of exposure, and from dosimetry results. Study 1 confirmed compliance with the DOT dose rate limits for a sample of waste shipments (123 of 1,038) received during fiscal year (FY) 2017. Study 2 showed that the average annual radiation equivalent dose for disposal site personnel during FY 2017 was approximately 6.7% [0.415 mSv (41.5 millirem)] of the annual average dose that a person living in the U.S. receives from all sources [6.2 mSv (620 mrem)]. Maximum dose to a member of the public, a person resting/sleeping in an adjacent truck at a rest area to a waste shipment, was 0.0166 mSv (1.66 mrem), which is less than the dose received from a person taking a round trip from the east coast to the west coast of the continental U.S. on an airplane [0.07 mSv (7 mrem) per round trip]. Study 3 showed that the truck driver who made the most shipments of radioactive waste to the NNSS, who drove the most hours (estimated time of exposure 2,520 hours), during FY 2017 had a total dose of 0.15 mSv (15 mrem), which was obtained from their personal dosimeter. The annual dose recorded for disposal site personnel, the dose estimates for the public, and the truck driver dose were all a small percentage of the average radiation dose a person receives from all sources (e.g., background and medical radiation). At these levels, risk should only be described qualitatively. Radiation exposure from radioactive waste shipments to the NNSS were shown to be compliant with the DOT dose rate limits, safe, and very low (i.e., within background levels). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Degradation of Commercial Lithium-Ion Cells as a Function of Chemistry and Cycling Conditions

Energy storage systems with Li-ion batteries are increasingly deployed to maintain a robust and resilient grid and facilitate the integration of renewable energy resources. However, appropriate selection of cells for different applications is difficult due to limited public data comparing the most commonly used off-the-shelf Li-ion chemistries under the same operating conditions. This article details a multi-year cycling study of commercial LiFePO 4 (LFP), LiNi x Co y Al 1–x–y O 2 (NCA), and LiNi x Mn y Co 1–x–y O 2 (NMC) cells, varying the discharge rate, depth of discharge (DOD), and environment temperature. The capacity and discharge energy retention, as well as the round-trip efficiency, were compared. Even when operated within manufacturer specifications, the range of cycling conditions had a profound effect on cell degradation, with time to reach 80% capacity varying by thousands of hours and cycle counts among cells of each chemistry. The degradation of cells in this study was compared to that of similar cells in previous studies to identify universal trends and to provide a standard deviation for performance. All cycling files have been made publicly available at batteryarchive.org, a recently developed repository for visualization and comparison of battery data, to facilitate future experimental and modeling efforts.

25 ENERGY STORAGE↗

Radar ranging to Ganymede and Callisto

Arecibo observations from 1992 February to March have yielded the first successful radar range measurements to the Galilean satellites. Round-up time delays were measured for Ganymede and Callisto with accuracies of 20 to 50 micrometer (3 to 7 km) and 90 micrometer (14 km), respectively. Both satellites showed round-trip delay residuals (relative to the E-3 ephemeris) of about a millisecond, most of which can be attributed to errors in the predicted along-track positions (orbital phases). Using a simple model that assumed that all of the ephemeris error was due to constant orbital phase and Jupiter range errors we estimate that Ganymede was leading its ephemeris by 122 +/- 4 km, Callisto was lagging its ephemeris by 307 +/- 14 km, and Jupiter was 11 +/- 4 km more distant than predicted by the PEP740 planetary ephemeris.

Harmon, J. K.↗

Simulated Space Radiation: Murine Skeletal Responses During Recovery and with Mechanical Stimulation

Simulated space radiation at doses similar to those of solar particle events or a round-trip sojourn to Mars (1-2Gy) may cause skeletal tissue degradation and deplete stem/progenitor cell pools throughout the body. We hypothesized that simulated space radiation (SSR) causes late, time-dependent deficits in bone structure and bone cell function reflected by changes in gene expression in response to anabolic stimuli. We used a unique sequential dual ion exposure (proton and iron) for SSR to investigate time-dependence of responses in gene expression, cell function, and microarchitecture with respect to radiation and an anabolic stimulus of axial loading (AL). Male 16-wk C57BL6/J mice (n=120 total) were exposed to 0Gy (Sham, n=10), 56Fe (2Gy, positive control dose, n=10), or sequential ions for SSR (1Gy 1H/56Fe/1H, n=10) by total body irradiation (IR), and the tissues were harvested 2 or 6 mo. later. Further, to assess the response to anabolic stimuli, we subjected additional Sham-AL (n=15) and SSR-AL (n=15) groups to rest-inserted tibial axial loading (AL) starting at 1 and 5 months post-IR (-9N, 60 cycles/day, 3 days/wk, 4 wks). Exposure to 56Fe caused a significant reduction in cancellous bone volume fraction (BV/TV) compared to Sham (-34%) and SSR (-20%) in the proximal tibia metaphysis at 2-months post-IR; however BV/TV for SSR group was not different than Sham. Both 56Fe and SSR caused significant reduction in trabecular number (Tb.N) compared to Sham (-33% and -16%, respectively). Further, Tb.N for 56Fe (2Gy) was significantly lower than SSR (-21%). Ex vivo culture of marrow cells to assess growth and differentiation of osteoblast lineage cells 6 months post-IR showed that both 56Fe and SSR exposures significantly impaired colony formation compared to Sham (-66% and -54%, respectively), as well as nodule mineralization (-90% and -51%, respectively). Two-way analysis of variance showed that both mechanical loading and radiation reduced BV/TV, mechanical loading reduced trabecular thickness (Tb.Th), and radiation reduced Tb.N, at both time points. To assess acute response to mechanical stimuli, samples were harvested from a subset of Sham-AL (n=5) and SSR-AL (n=5) to measure changes in gene expression levels. Preliminary results indicate that axial loading increased expression of the antioxidant response gene Nfe2l2 and the osteoprogenitor-associated marker Runx2 in the bone marrow cells, and there was an interaction effect between axial loading and radiation at 2-months post-IR. Additional analyses of gene expression levels in the mineralized tissue are in progress. Results indicate that SSR caused persistent impairment of osteoblast colony formation and nodule mineralization 6-mo post-IR. Contrary to our hypothesis, simulated space radiation did not impair the ability of cancellous bone to respond to a mechanical anabolic stimulus, consistent with our previous findings [1]. Hence, compressive loading may be a potential countermeasure against spaceflight-induced bone loss.

Bone Loss↗

Simulated Space Radiation: Murine Skeletal Responses During Recovery and with Mechanical Stimulation

Simulated space radiation at doses similar to those of solar particle events or a round-trip sojourn to Mars (1-2Gy) may cause skeletal tissue degradation and deplete stem/progenitor cell pools throughout the body. We hypothesized that simulated space radiation (SSR) causes late, time-dependent deficits in bone structure and bone cell function reflected by changes in gene expression in response to anabolic stimuli. We used a unique sequential dual ion exposure (proton and iron) for SSR to investigate time-dependence of responses in gene expression, cell function, and microarchitecture with respect to radiation and an anabolic stimulus of axial loading (AL). Male 16-wk C57BL6/J mice (n=120 total) were exposed to 0Gy (Sham, n=10), 56Fe (2Gy, positive control dose, n=10), or sequential ions for SSR (1Gy 1H/56Fe/1H, n=10) by total body irradiation (IR), and the tissues were harvested 2 or 6 mo. later. Further, to assess the response to anabolic stimuli, we subjected additional Sham-AL (n=15) and SSR-AL (n=15) groups to rest-inserted tibial axial loading (AL) starting at 1 and 5 months post-IR (-9N, 60 cycles/day, 3 days/wk, 4 wks). Exposure to 56Fe caused a significant reduction in cancellous bone volume fraction (BV/TV) compared to Sham (-34%) and SSR (-20%) in the proximal tibia metaphysis at 2-months post-IR; however BV/TV for SSR group was not different than Sham. Both 56Fe and SSR caused significant reduction in trabecular number (Tb.N) compared to Sham (-33% and -16%, respectively). Further, Tb.N for 56Fe (2Gy) was significantly lower than SSR (-21%). Ex vivo culture of marrow cells to assess growth and differentiation of osteoblast lineage cells 6 months post-IR showed that both 56Fe and SSR exposures significantly impaired colony formation compared to Sham (-66% and -54%, respectively), as well as nodule mineralization (-90% and -51%, respectively). Two-way analysis of variance showed that both mechanical loading and radiation reduced BV/TV, mechanical loading reduced trabecular thickness (Tb.Th), and radiation reduced Tb.N, at both time points. To assess acute response to mechanical stimuli, samples were harvested from a subset of Sham-AL (n=5) and SSR-AL (n=5) to measure changes in gene expression levels. Preliminary results indicate that axial loading increased expression of the antioxidant response gene Nfe2l2 and the osteoprogenitor-associated marker Runx2 in the bone marrow cells, and there was an interaction effect between axial loading and radiation at 2-months post-IR. Additional analyses of gene expression levels in the mineralized tissue are in progress. Results indicate that SSR caused persistent impairment of osteoblast colony formation and nodule mineralization 6-mo post-IR. Contrary to our hypothesis, simulated space radiation did not impair the ability of cancellous bone to respond to a mechanical anabolic stimulus, consistent with our previous findings. Hence, compressive loading may be a potential countermeasure against spaceflight-induced bone loss.

MURINE SKELETAL↗

Human Exploration of Near-Earth Objects Accessibility Study

Key questions addressed: How short can the trip times be reduced in order to reduce crew exposure to the deep-space radiation and microgravity environment? Are there options to conduct easy, early missions?. What is the affect of infusion of advanced propulsion technologies on target availability When do the departure opportunities open up, how frequent and how long are they? How many launches are required to conduct a round trip human mission to a NEA? And, based on the above, how many Near-Earth Asteroids are available

Abell, Paul↗