Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACECRAFT LAUNCH VEHICLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Flight Dynamics Risk Assessment of Artemis I

With launch vehicles and spacecraft, it is necessary to dynamically test the structure to validate structural models. These validated models are then used to determine a launch vehicle's control stability margin and the loads on the structure. While often a dedicated structural test article is used to correlate the integrated structure in preparation for the final analysis cycles, the Artemis I flight is using an approach where the components of the launch vehicle are dynamically tested and the component models validated. The fully integrated vehicle is not tested until a few months before launch, which limits the ability to fully correlate a model prior to launch. This paper introduces the Flight Dynamics Risk Assessment of the vehicle, which is the process being used to determine the adequacy of the vehicle structural model after the Integrated Modal Test. This work outlines the process of quickly tuning a model post-test then determining any control margin violations and increases in loads due to the tuning of the model.

Eric C Stewart↗

Flat H Frangible Joint Evolution

Space vehicle staging and separation events require pyrotechnic devices. They are single-use mechanisms that cannot be tested, nor can failure-tolerant performance be demonstrated in actual flight articles prior to flight use. This necessitates the implementation of a robust design and test approach coupled with a fully redundant, failure-tolerant explosive mechanism to ensure that the system functions even in the event of a single failure. Historically, NASA has followed the single failure-tolerant (SFT) design philosophy for all human-rated spacecraft, including the Space Shuttle Program. Following the end of this program, aerospace companies proposed building the next generation human-rated vehicles with off-the-shelf, non-redundant, zero-failure-tolerant (ZFT) separation systems. Currently, spacecraft and launch vehicle providers for both the Orion and Commercial Crew Programs (CCPs) plan to deviate from the heritage safety approach and NASA's SFT human rating requirements. Both programs' partners have base-lined ZFT frangible joints for vehicle staging and fairing separation. These joints are commercially available from pyrotechnic vendors. Non-human-rated missions have flown them numerous times. The joints are relatively easy to integrate structurally within the spacecraft. In addition, the separation event is debris free, and the resultant pyro shock is lower than that of other design solutions. It is, however, a serious deficiency to lack failure tolerance. When used for critical applications on human-rated vehicles, a single failure could potentially lead to loss of crew (LOC) or loss of mission (LOM)). The Engineering and Safety & Mission Assurance directorates within the NASA Johnson Space Center took action to address this safety issue by initiating a project to develop a fully redundant, SFT frangible joint design, known as the Flat H. Critical to the ability to retrofit on launch vehicles being developed, the SFT mechanisms must fit within the same three-dimensional envelope as current designs as well as meet structural loads requirements. There is increased mass associated with the redundant design, and the goal is to minimize the weight impact as much as possible. These requirements presented significant challenges, both technically and financially; these challenges will be explored in this paper. Perhaps greater than the technical issues confronted during this design process, were the financial considerations. These were a significant part of the story of this design and development plan. Insufficient financial and labor resources were formidable barriers to completing this project. Nevertheless, JSC personnel successfully conducted several test series at JSC with very useful results. The many lessons learned drove design improvements, performance efficiency, and increased functional reliability. This paper examines the significant technical and financial challenges that these requirements posed to the project team. It discusses the evolution of the SFT frangible joint design, including optimization, testing, and successful partnering of the Johnson Space Center (JSC) engineering and JSC safety organizations, to enhance the flight safety margin for America's next generation of human-rated space vehicles.

Diegelman, Thomas E.↗

A compilation of spacecraft loads data from four Titan Centaur Launch Vehicle flights. Volume 1: Acoustics data

The payloads carried by the first four Titan Centaur launch vehicle flights were, a Viking spacecraft dynamic simulator, the Helios A spacecraft, and the two Viking spacecraft. Dynamic loads data were accumulated from these four flights for application to the Viking spacecraft. The accoustics data include time histories and spectral analysis plots of accoustic pressure measurements made in the Centaur and payload compartment during launch flight. Summary plots are presented to show composite spectra for liftoff and Mach 1/Max Q periods of flight.

Kachadourian, G.↗

An overview of United States manned space flight from Mercury to the Shuttle

Technical considerations in the design, development and operation of United States manned spacecraft from Project Mercury to the Space Shuttle are reviewed. The design and mission philosophies, launch vehicle and spacecraft characteristics, mode of operation, flight results and influence on later programs are discussed for Project Mercury, and Gemini Apollo and Skylab programs, the Apollo-Soyuz Test Project and the Space Shuttle program. The Space Shuttle is shown to represent a major departure from the trend established in previous programs, requiring major advancements in the fields of flight control, thermal protection, and liquid-propellant rocket technology.

Faget, M. A.↗

Spacecraft loads methodology - Transient vs. shock spectra method

The methodology for the establishment of spacecraft loads is strongly influenced by project constraints which include the cost, schedule and allowable weight. The most rigorous approach is the transient loads analysis which requires a composite mathematical model of the spacecraft and launch vehicle. The structural member loads for the entire composite structure are computed by applying the forcing functions, which represent various dynamic environments during the mission, to the composite model. Although this method ideally leads to a lightweight design, it is costly and time consuming due to complex interfaces involving many organizations. To reduce complexity and cost a shock spectra method has been used to design spacecraft structures. This method utilizes envelopes of shock spectra of launch vehicle accelerations obtained from analysis and/or flight measurements. Since only limited information on the launch vehicle model is involved in this process the design loads iteration cycle can be rapidly performed within the payload organization. In the present paper, these two methods will be evaluated by comparing the loads for several spacecraft. Flight measured loads will also be used in the evaluation.

Chen, J. C.↗

Capabilities of Single Launch NTP and Chemical Spacecrafts for Cis-Lunar Tug Missions

Renewed interest in the region between the Earth and the moon suggests that a tug operating between these two destinations will be most likely required in the near future. This report details a parametric spacecraft model which sizes a nuclear thermal propulsion or chemical propulsion spacecraft and compares their payload transport capabilities for missions to the moon. A spacecraft sized to fit in a single launch vehicle is assumed, and six launch vehicles are investigated. Maximum spacecraft payload mass and minimum mission transit time are compared between nuclear and chemical propulsion spacecrafts. For vehicles sized to the maximum capability of a launch vehicle, payloads of at least five metric tons are possible with either propulsion option; with nuclear thermal propulsion able to provide additional mass or reduced transit time when the spacecraft is sized to the maximum capability of the heaviest-lift launch vehicles. Transit times to the moon with a five-ton payload could be reduced by at least 0.2 days with a nuclear propulsion system.

Cis-lunar tug↗

Capabilities of Single Launch NTP and Chemical Spacecrafts for Cis-Lunar Tug Missions

Renewed interest in the region between the Earth and the moon suggests that a tug operating between these two destinations will be most likely required in the near future. This report details a parametric spacecraft model which sizes a nuclear thermal propulsion or chemical propulsion spacecraft and compares their payload transport capabilities for missions to the moon. A spacecraft sized to fit in a single launch vehicle is assumed, and six launch vehicles are investigated. Maximum spacecraft payload mass and minimum mission transit time are compared between nuclear and chemical propulsion spacecrafts. For vehicles sized to the maximum capability of a launch vehicle, payloads of at least five metric tons are possible with either propulsion option; with nuclear thermal propulsion able to provide additional mass or reduced transit time when the spacecraft is sized to the maximum capability of the heaviest-lift launch vehicles. Transit times to the moon with a five-ton payload could be reduced by at least 0.2 days with a nuclear propulsion system.

Cis-lunar tug↗

General Purpose Data-Driven Monitoring for Space Operations

As modern space propulsion and exploration systems improve in capability and efficiency, their designs are becoming increasingly sophisticated and complex. Determining the health state of these systems, using traditional parameter limit checking, model-based, or rule-based methods, is becoming more difficult as the number of sensors and component interactions grow. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. System health can be monitored by comparing real-time operating data with these nominal characterizations, providing detection of anomalous data signatures indicative of system faults or failures. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. The scope of IMS based data-driven monitoring applications continues to expand with current development activities. Successful IMS deployment in the International Space Station (ISS) flight control room to monitor ISS attitude control systems has led to applications in other ISS flight control disciplines, such as thermal control. It has also generated interest in data-driven monitoring capability for Constellation, NASA's program to replace the Space Shuttle with new launch vehicles and spacecraft capable of returning astronauts to the moon, and then on to Mars. Several projects are currently underway to evaluate and mature the IMS technology and complementary tools for use in the Constellation program. These include an experiment on board the Air Force TacSat-3 satellite, and ground systems monitoring for NASA's Ares I-X and Ares I launch vehicles. The TacSat-3 Vehicle System Management (TVSM) project is a software experiment to integrate fault and anomaly detection algorithms and diagnosis tools with executive and adaptive planning functions contained in the flight software on-board the Air Force Research Laboratory TacSat-3 satellite. The TVSM software package will be uploaded after launch to monitor spacecraft subsystems such as power and guidance, navigation, and control (GN&C). It will analyze data in real-time to demonstrate detection of faults and unusual conditions, diagnose problems, and react to threats to spacecraft health and mission goals. The experiment will demonstrate the feasibility and effectiveness of integrated system health management (ISHM) technologies with both ground and on-board experiments.

Iverson, David L.↗

The New NASA Orbital Debris Mitigation Procedural Requirements and Standards

NASA has issued major updates to its principal orbital debris mitigation policy directive and standards. The new NASA Procedural Requirements for Limiting Orbital Debris (NPR 8715.6), with its supporting NASA Standard 8719.14, both refine earlier orbital debris mitigation documents and in some areas expand their applicability. Organizational and individual responsibilities along with general directives are set forth in NPR 8715.6. New requirements include routine conjunction assessments for all maneuverable NASA spacecraft in LEO and GEO, prompt notifications of intended or unintended debris generation, preparation and maintenance of formal end-of-mission plans, and disposal of vehicles in operation around the Moon and Mars and at the Earth-Sun Lagrangian points. NASA Standard 8719.14 replaces the 1995 NASA Safety Standard 1740.14 with no major new requirements but with several refinements and additions, some of which had already been adopted. Compliance with human casualty risk limitations from reentering debris will be calculated explicitly and not be expressed in terms of average debris casualty area. Moreover, the minimum kinetic energy threshold for potentially injurious reentering debris is set at 15 Joules. The overarching requirement for the disposal of GEO spacecraft and launch vehicle orbital stages is to ensure that the vehicles do not come within GEO + 200 km for at least 100 km after end of mission, rather than setting specific requirements for the disposal orbit. Spacecraft operating in or routinely transiting LEO must remain in the region for no more than 25 years after end of mission or 30 years after launch, whichever occurs sooner. A comprehensive new NASA handbook on orbital debris has also been prepared to provide background on the orbital debris environment and the related NASA mitigation requirements and standards.

Johnson, Nicholas L.↗

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.↗

ADDRESS BY

United states space program - launch vehicles, satellites and spacecraft

SPACE PROGRAM↗

Earth Observatory Satellite system definition study. Report 5: System design and specifications. Volume 1: Baseline system description

A system baseline design oriented to the requirements of the next generation of Earth Observatory Satellite missions is presented. The first mission (EOS-A) is envisioned as a two-fold mission which (1) provides a continuum of data of the type being supplied by ERTS for the emerging operational applications and also (2) expands the research and development activities for future instrumentation and analysis techniques. The baseline system specifically satisfies the requirements of this first mission. However, EOS-A is expected to be the first of a series of earth observation missions. Thus the baseline design has been developed so as to accommodate these latter missions effectively as the transition is made from conventional, expendable launch vehicles and spacecraft to the Shuttle Space Transportation System era. Further, a subset of alternative missions requirements including Seasat, SEOS, SMM and MSS-5 have been analyzed to verify that the spacecraft design to serve a multi-mission role is economically sound. A key feature of the baseline system design is the concept of a modular observatory system whose elements are compatible with varying levels of launch vehicle capability. The design configuration can be used with either the Delta or Titan launch vehicles and will adapt readily to the space shuttle when that system becomes available in the early 1980's.

Source record↗