Search NASA⌕ Search

SEARCH · Search NASA

Results for “STEWARDSHIP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Strategy for Long-Term Stewardship and Monitoring of Amchitka Island - 12190

The Long-Term Surveillance and Maintenance Plan (LTSMP) for Amchitka details how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at and around the sites on Amchitka Island. The LTSMP calls for monitoring to be performed every 5 years, at least in the initial phase of the project. The purpose of the monitoring is to develop a baseline of activity concentrations for selected radionuclides in biota, water, and soil, both on Amchitka and at the reference location on Adak Island, approximately 322 km (200 miles) northeast of Amchitka. Data compiled by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP, 2006) are being included as part of the baseline data set. The specific biological, water, and sediment samples collected during the 2011 sampling event were developed through close coordination with the primary stakeholders, including the Alaska Department of Environmental Conservation, the Aleutian Pribilof Island Association, and the U.S. Fish and Wildlife Service (USFWS). Amchitka is managed by the USFWS as part of the Alaska Maritime National Wildlife Refuge. Two plans were developed to address specific needs of the biological- and the terrestrial-monitoring programs. Results from these monitoring programs will help determine whether the environment is being impacted by radionuclide migration and uptake, and if subsistence and commercial-catch seafood is safe for human consumption. The RESRAD-BIOTA code is being used to evaluate ecological health relative to the radionuclide levels determined from this sampling event. The samples were sent to three laboratories for analysis. With the exception of the seawater samples, most of the samples were sent to the Center for Accelerator Mass Spectrometry at the Lawrence Livermore National Laboratory. A smaller subset of rock-weed samples, Star reindeer lichen samples, and soil samples collected from beneath the lichen were sent to UAF for cesium-137 analysis. Marine sediment samples were also collected and sent to UAF for testing. The seawater samples were sent to the University of Miami Tritium Laboratory for enriched tritium analysis. Results from the seawater samples for tritium were received in September 2011. Results from the 2011 sampling are expected to be available on the LM web site in 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Sustainability and Stewardship

The Y-12 National Security Complex recently won a White House award for its leadership among Government installations for pollution prevention. This video tells the story of the many actions taken by this NNSA National Security Enterprise site towards being a responsible environmental citizen while protecting the national interest.

Y12, sustainability, NNSA, Nuclear security, pollu↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

US DOE Perspectives on Advisory Board Effectiveness - 13539

Federal missions on the Oak Ridge Reservation began with the Manhattan Project, and continues today with major facilities supporting the Nation's Science and National Security missions. While most of the land area on the Oak Ridge Reservation is free of environmental impacts from these activities, significant legacy contamination is associated with specific facilities and past waste management areas. In 1989, the Oak Ridge Reservation (ORR) was placed on National Priorities List, and DOE established its Office of Environmental Management that same year. Three years later, in 1992, the Federal Facility Agreement for the reservation was signed. Three years afterward, the Oak Ridge Site Specific Advisory Board was established to augment ongoing public involvement activities related to Oak Ridge Reservation cleanup activities. One of the early and most impactful decisions the board made was to organize the End Use Working Group. This broad-based group of board members, DOE representatives, and members of the public was formed in 1997 to study future uses for contaminated areas of the reservation. The group was instrumental in building consensus in the Oak Ridge community regarding the long-term end state of reservation lands. The group's recommendations were a fundamental input into Record's of Decision subsequently developed to establish cleanup requirements across the ORR, and they continue to influence decisions being made today. In developing its recommendations on end states, the End Use Working Group came to the realization that long-term stewardship of contaminated areas of the reservation would be necessary, in some cases in perpetuity. It was from this concept that the Oak Ridge SSAB's 15-year involvement in stewardship would begin. A stewardship committee formed by the End Use Working Group wrote Volume 1 of the Stakeholder Report on Stewardship. This document-and its companion Volume 2, which was written a year later-form a crucial foundation for stewardship planning in Oak Ridge and have been referenced around the DOE complex as other sites consider stewardship planning. From these two broad-based initiatives, the board's focus has evolved to increasingly hone in on more specific, project-based recommendations and initiatives. The Oak Ridge Reservation Site Specific Advisory Board has been a highly effective forum for soliciting community input on Oak Ridge Reservation cleanup. Experience in Oak Ridge indicates that the utility of Board recommendations is far higher when the Board is asked to focus on broad programmatic issues, and less useful when the Board attempts to provide advice and recommendations on matters related to technical or project management issues. In Oak Ridge the Board has helped shape the program on many levels including definition of end-state cleanup objectives, budget development, program sequencing, waste management, and decisions concerning preservation of history related to missions implemented on the Oak Ridge Reservation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Changes in Cleanup Strategies and Long-Term Monitoring Costs for DOE FUSRAP Sites - 17241

The Department of Energy (DOE) Office of Legacy Management (LM) is responsible for the post-closure management of remediated DOE sites. LM's objective for Formerly Utilized Sites Remedial Action Program (FUSRAP) includes the long-term surveillance and maintenance (LTSM) of sites that have been remediated by the US Army Corps of Engineers (USACE). FUSRAP was initiated in 1974 by the US Atomic Energy Commission, a predecessor agency of DOE. FUSRAP was managed by DOE from 1981 to 1997. Through a congressional act, the scope to remediate FUSRAP sites was transferred to USACE in 1997. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program, and had begun cleanups at 13 additional sites. USACE assumed responsibility for the cleanup of the 21 remaining FUSRAP sites, and 8 additional sites that have been recommended for cleanup. Presently, LM provides long-term stewardship for 30 completed FUSRAP sites while USACE is actively remediating 23 sites. FUSRAP sites are typically privately-owned factories or research facilities. However, there are four DOE owned FUSRAP sites. These sites are Maywood and Middlesex in New Jersey, and Colonie and Niagara Falls in New York. In support of LM's Beneficial Reuse strategic mission, the site in Wayne, New Jersey has been transferred to a municipality and the site in New Brunswick, New Jersey has been sold. Historically, most sites in FUSRAP were remediated to 'unlimited exposure and unrestricted use' cleanup levels consistent with residential use. Some sites were remediated using supplemental limits due to inaccessible areas while remaining sites have been remediated to other-than residential standards based on site-specific long-term land use assumptions. Of the 31 completed FUSRAP sites under LM stewardship, one site requires land-use controls and no site requires groundwater monitoring. Over the next 10 years USACE plans to transfer 11 sites to LM. Several of these sites will have additional long-term monitoring requirements as per their Records of Decisions (RODs). These transitioning sites include the Colonie, New York site, the Maywood and Deepwater, New Jersey, sites and the St. Louis, Missouri site. The additional stewardship requirements will include groundwater monitoring, enforcement of institutional and engineered controls, and five-year reviews. In addition to these sites, more than 100 vicinity properties will also be transferred to LM for stewardship. Given the increase in long-term stewardship activities for these sites and their associated vicinity properties, initiatives are under way to incorporate the additional LTSM requirements into the program's out-year planning. LM will be evaluating several methods to customize LTSM cost and liability estimates for all of the completed FUSRAP sites, planning to address the sites not yet transferred and those that are in LM's custody. Where necessary, LM will use remedial process optimization techniques and evaluate monitored natural attenuation protocols to reduced long-term monitoring costs. Methods for identifying costs include the cost estimates provided in RODs, cost estimates refined during remediation, operation and maintenance costs provided by USACE prior to transition, and presumptive remedies using USACE and Environmental Management / LM historic costs at similar sites. On the basis of this evaluation, a strategy for estimating site-specific LTSM costs will be selected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Right Size Determining the Staff Necessary to Sustain Simulation and Computing Capabilities for Nuclear Security

The Advanced Simulation and Computing Campaign, herein referred to as the ASC Program, is a core element of the science-based Stockpile Stewardship Program (SSP), which enables assessment, certification, and maintenance of the safety, security, and reliability of the U.S. nuclear stockpile without the need to resume nuclear testing. The use of advanced parallel computing has transitioned from proof-of-principle to become a critical element for assessing and certifying the stockpile. As the initiative phase of the ASC Program came to an end in the mid-2000s, the National Nuclear Security Administration redirected resources to other urgent priorities, and resulting staff reductions in ASC occurred without the benefit of analysis of the impact on modern stockpile stewardship that is dependent on these new simulation capabilities. Consequently, in mid-2008 the ASC Program management commissioned a study to estimate the essential size and balance needed to sustain advanced simulation as a core component of stockpile stewardship. The ASC Program requires a minimum base staff size of 930 (which includes the number of staff necessary to maintain critical technical disciplines as well as to execute required programmatic tasks) to sustain its essential ongoing role in stockpile stewardship.

97 MATHEMATICS AND COMPUTING↗

NIF Operations Management Plan, August 2011

Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.

42 ENGINEERING↗

Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on the NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Simulation and Computing: ASC FY24 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. The ASC program is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification process, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This work requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions. The ASC program focuses on increasing the predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The Program continues to improve its unique tools for understanding and solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further from the original test base. While the focus remains on the U.S. nuclear weapons program, where possible, the Program also enables the use of high-performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and nuclear counterterrorism. The 2022 Nuclear Posture Review (NPR) calls for NNSA to “deliver a modern, adaptive nuclear security enterprise based on an integrated strategy for risk management, production-based resilience, science and technology innovation, and workforce initiatives.” Furthermore, “NNSA will establish a Science and Technology Innovation Initiative to accelerate the integration of science and technology (S&T) throughout its activities.” Executing this strategy necessitates the continued emphasis on developing and sustaining high-quality scientific and engineering staff, as well as supporting computational and experimental capabilities. These components constitute the foundation of the nuclear weapons program. The continued success of the SSP and LEPs is predicated upon the ability to credibly certify the stockpile, without a return to underground nuclear tests (UGTs). Shortly after the nuclear test moratorium entered into force in 1992, the Accelerated Strategic Computing Initiative (ASCI) was established to provide an extensive simulation capability to underpin stockpile certification. While computing and simulation have always been essential to the success of the nuclear weapons program, the program goal of ASCI was to execute NNSA’s vision of using these tools in support of the stockpile stewardship mission. The ASCI program was essential to the successful demonstration of the SSP, providing critical nuclear weapons simulation and modeling capabilities. ASCI officially evolved into the ASC program in fiscal year (FY) 2005, but the mission remains essentially the same: provide the simulation and computational capabilities that underpin the ability to maintain a safe, secure, effective nuclear weapon stockpile, without returning to underground nuclear testing. The capabilities that the ASC program provides at the national laboratories play a vital role in the nuclear security enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Stockpile Management and Production Modernization programs (formerly Directed Stockpile Work) also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these life extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT.

97 MATHEMATICS AND COMPUTING↗