Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The 2005 HST Calibration Workshop Hubble After the Transition to Two-Gyro Mode

The 2005 HST Calibration Workshop was held at the Space Telescope Science Institute during October 26, 2005 to bring together members of the observing community, the instrument development teams, and the STScI instrument support teams to share information and techniques. Presentations included the two-gyro performance of HST and FGS, advances in the calibration of a number of instruments, the results of other instruments after their return from space, and the status of still others which are scheduled for installation during the next servicing mission. Cross-calibration between HST and JWST was discussed, as well as the new Guide Star Catalog and advances in data analysis software. This book contains the published record of the workshop, while all the talks and posters are available electronically on the workshop Web site.

Koekemoer, Anton M.↗

Deep Space Optical Communications (DSOC)

NASA’s future deep space science and exploration missions will require enhanced communications and navigation services. Laser communications offers expanded bandwidth and the potential for satisfying this need, with comparable mass and power as state of the art telecommunication systems. Consequently, NASA is planning a Deep Space Optical Communications (DSOC) technology demonstration, to retire the risk for future enhanced optical communication services. NASA’s upcoming Psyche Mission scheduled to launch in August of 2022 plans to host a DSOC flight laser transceiver (FLT) for demonstrating optical links from deep-space to earth. Existing ground assets retrofitted with laser transmitters and photon-counting receivers will be used for the technology demonstration. Advancing optical technology from near-Earth ranges to deep space (> 0.01 astronomical units or AU) involves orders of magnitude increased link difficulty (defined as data-rate squared distance). The plan to bridge the difficulty gap implements new technologies developed over the past two decades. These technologies emphasize high photon efficiency (HPE) with the use of high-peak-to-average power laser transmitters in space, and single photon counting sensitivity detectors, that together support signaling schemes for achieving approximately 23 information bits per detected photon. Implementing HPE schemes relies on accurate and stable pointing of narrow laser beams from space platforms using active control. Key developments needed for future technology infusion, following a successful DSOC technology demonstration, include, cost-effective ground infrastructure, long term reliability of space lasers and detection systems, and solutions for high precision laser ranging. The current status of the DSOC Project and plans for future development will be discussed in this paper.

Biswas, Abhijit↗

An Integrated Gate Turnaround Management Concept Leveraging Big Data Analytics for NAS Performance Improvements

"Gate Turnaround" plays a key role in the National Air Space (NAS) gate-to-gate performance by receiving aircraft when they reach their destination airport, and delivering aircraft into the NAS upon departing from the gate and subsequent takeoff. The time spent at the gate in meeting the planned departure time is influenced by many factors and often with considerable uncertainties. Uncertainties such as weather, early or late arrivals, disembarking and boarding passengers, unloading/reloading cargo, aircraft logistics/maintenance services and ground handling, traffic in ramp and movement areas for taxi-in and taxi-out, and departure queue management for takeoff are likely encountered on the daily basis. The Integrated Gate Turnaround Management (IGTM) concept is leveraging relevant historical data to support optimization of the gate operations, which include arrival, at the gate, departure based on constraints (e.g., available gates at the arrival, ground crew and equipment for the gate turnaround, and over capacity demand upon departure), and collaborative decision-making. The IGTM concept provides effective information services and decision tools to the stakeholders, such as airline dispatchers, gate agents, airport operators, ramp controllers, and air traffic control (ATC) traffic managers and ground controllers to mitigate uncertainties arising from both nominal and off-nominal airport gate operations. IGTM will provide NAS stakeholders customized decision making tools through a User Interface (UI) by leveraging historical data (Big Data), net-enabled Air Traffic Management (ATM) live data, and analytics according to dependencies among NAS parameters for the stakeholders to manage and optimize the NAS performance in the gate turnaround domain. The application will give stakeholders predictable results based on the past and current NAS performance according to selected decision trees through the UI. The predictable results are generated based on analysis of the unique airport attributes (e.g., runway, taxiway, terminal, and gate configurations and tenants), and combined statistics from past data and live data based on a specific set of ATM concept-of-operations (ConOps) and operational parameters via systems analysis using an analytic network learning model. The IGTM tool will then bound the uncertainties that arise from nominal and off-nominal operational conditions with direct assessment of the gate turnaround status and the impact of a certain operational decision on the NAS performance, and provide a set of recommended actions to optimize the NAS performance by allowing stakeholders to take mitigation actions to reduce uncertainty and time deviation of planned operational events. An IGTM prototype was developed at NASA Ames Simulation Laboratories (SimLabs) to demonstrate the benefits and applicability of the concept. A data network, using the System Wide Information Management (SWIM)-like messaging application using the ActiveMQ message service, was connected to the simulated data warehouse, scheduled flight plans, a fast-time airport simulator, and a graphic UI. A fast-time simulation was integrated with the data warehouse or Big Data/Analytics (BAI), scheduled flight plans from Aeronautical Operational Control AOC, IGTM Controller, and a UI via a SWIM-like data messaging network using the ActiveMQ message service, illustrated in Figure 1, to demonstrate selected use-cases showing the benefits of the IGTM concept on the NAS performance.

Efficent ATM systems↗

TDRSS Onboard Navigation System (TONS) flight qualification experiment

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

Gramling, C. J.↗

Satellite services - An added benefit of the space transportation system

It is argued that the greatest economic benefit can be achieved by the Space Shuttle Orbiter's use as a satellite servicing platform if the following conditions are fulfilled: (1) the international user community must build serviceability features into its satellite and orbital platform designs, based on a common set of guidelines; (2) the various tools required for satellite servicing must be developed in a timely manner; and (3) servicing costs must be kept as low as possible, in order to appeal to the greatest number and variety of satellite operators. A three-part program development schedule is proposed, beginning with near-Orbiter servicing in low earth orbit, continuing with servicing at orbital heights between the low and geosynchronous at greater distances from the Orbiter, and culminating in the early 1990's with the use of the Space Operations Center (SOC) platform for servicing at all orbital heights.

Herardian, M. M.↗

Performance Analysis of Cloud Computing Architectures Using Discrete Event Simulation

Cloud computing offers the economic benefit of on-demand resource allocation to meet changing enterprise computing needs. However, the flexibility of cloud computing is disadvantaged when compared to traditional hosting in providing predictable application and service performance. Cloud computing relies on resource scheduling in a virtualized network-centric server environment, which makes static performance analysis infeasible. We developed a discrete event simulation model to evaluate the overall effectiveness of organizations in executing their workflow in traditional and cloud computing architectures. The two part model framework characterizes both the demand using a probability distribution for each type of service request as well as enterprise computing resource constraints. Our simulations provide quantitative analysis to design and provision computing architectures that maximize overall mission effectiveness. We share our analysis of key resource constraints in cloud computing architectures and findings on the appropriateness of cloud computing in various applications.

Stocker, John C.↗

Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go" decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

Zelenka, Richard↗

Development and Preliminary Results of CTAS on Airline Operational Control Center Operations

Continued growth and expansion of air traffic and increased air carrier economic pressures have mandated greater flexibility and collaboration in air traffic management. The ability of airspace users to select their own routes, so called "free-flight", and to more actively manage their fleet operations for maximum economic advantage are receiving great attention. A first step toward greater airspace user and service provider collaboration is information sharing. In this work, arrival scheduling and airspace management data generated by the NASA/FAA Center/TRACON Automation System (CTAS) and used by the FAA service provider is shared with an airline with extensive operations within the CTAS operational domain. The design and development of a specialized airline CTAS "repeater" system is described, as well as some preliminary results of the impact and benefits of this information on the air carrier's operations. FAA controller per aircraft scheduling information, such as that provided by CTAS, has never before been shared in real-time with an airline. Expected airline benefits include improved fleet planning and arrival gate management, more informed "hold-go decisions, and avoidance of costly aircraft diversions to alternate airports when faced with uncertain airborne arrival delays.

Zelenka, Richard↗

Life Cycle Cost Modeling of High-speed Commercial Aircraft - Final Report

SpaceWorks has concluded a 9-month research and development project aimed at addressing key questions in NASA’s effort to anticipate, understand, and ultimately support the emerging high-speed commercial flight market. The current project is a continuation of the Life Cycle Cost Modeling of High-Speed Commercial Aircraft1 , which is a follow-on to a 2021 study led by Deloitte and SpaceWorks entitled Commercial Hypersonic Transportation Market Study2 . Based in part on the recommendations of these prior studies, the objectives of this current effort were to expand the trade space to include Mach 1.5 aircraft and conduct additional trade studies. These included utilizing tech stops to extend serviceable range between city pairs, mixed aircraft fleets based on market size, flight scheduling to maximize value of the travel opportunity, and scenarios with multiple service operators. Additionally, SpaceWorks conducted new market surveys and research to update air passengers’ willingness-to-pay for highspeed flights given the changes in macroeconomic conditions since the start of the Commercial Hypersonic Transportation Market Study with Deloitte. Ultimately, the new data and capability to evaluate all the trade studies were implemented in a new simulation environment called MIDAS (Multi-market Integrated Dynamic Aerospace Simulation). This sophisticated tool, implemented using AnyLogic software, utilizes agent-based and discrete event simulation (DES) techniques to provide highly detailed analysis and assessment of the high-speed aircraft market problem.

high-speed↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Scheduling algorithms for multiprogramming in a hard-real-time environment.

The problem of multiprogram scheduling on a single processor is studied from the viewpoint of the characteristics peculiar to the program functions that need guaranteed service. It is shown that an optimum fixed priority scheduler possesses an upper bound to processor utilization which may be as low as 70 percent for large task sets. It is also shown that full processor utilization can be achieved by dynamically assigning priorities on the basis of their current deadlines. A combination of these two scheduling techniques is also discussed.

Liu, C. L.↗

Scaling Optimal Allocation of Cloud Resources Using Lagrange Relaxation

The rapid growth of Cloud Computing (CC) has increased the variety of computing resources, storage, and communication services that pose significant new challenges for the efficient use of cloud resources. The cost-efficient allocation of cloud resources has become a decisive premise for the adoption of CC services. The cost-efficient selection and scheduling of these resources to meet the demands of a scientific workflow is a challenging problem that is exacerbated by the inclusion of multiple CC providers. In this paper, we present a novel strategy for the cost-efficient selection of CC resources using Lagrange relaxation. Our approach is based on preselection of resources and demand decomposition to create a series of smaller sub-problems, which allow the estimation of the best cost-structures and selection of CC service providers for a subset of the time period of the planning horizon. Decomposition of the demand is achieved through the boundary analysis of a continuous relaxation of the problem. Using the metrics defined in terms of the cost and time of completion, we demonstrate excellent performance in relation to optimal solutions. Our method reduced the computational time from hours to seconds for a representative 36-month problem and provided high-quality solutions (< 0.05% relative error). Given the importance of selecting resources and scheduling complex scientific workflows, we believe that this novel strategy will be beneficial for many researchers and users of cloud computing resources.

De La Torre, Luis↗

Conflict-Aware Scheduling Algorithm

conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

Wang, Yeou-Fang↗

BigData Express: Toward Predictable, Schedulable, and High-Performance Data Transfer [PowerPoint]

Topics include: • BigData Express: a schedulable, predictable, and high-performance data transfer service – A peer-to-peer, scalable, and extensible data transfer model – A visually appealing, easy-to-use web portal – A high-performance data transfer engine – A time-constraint-based scheduler – On-demand provisioning of end-to-end network paths with guaranteed QoS – Robust and flexible error handling – CILogon-based security

97 MATHEMATICS AND COMPUTING↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Autonomous Navigation with Ground-to-Space Doppler Measurements Referenced to a Temperature-Compensated Crystal Oscillator

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational Onboard Navigation Systems (ONS's) to provide real-time autonomous, high-accuracy navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite System (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, flight-demonstrated the ONS for high-accuracy navigation using TDRSS forward- link communications services, In late 1994, the ground station ONS (GONS) experiment, using the same EP/EUVE flight hardware, flight-demonstrated the feasibility of high-accuracy autonomous navigation using ground station forward-link communication services, with an ultrastable oscillator (USO) as the frequency reference (1 part in 10(exp 10) over 24 hours). This paper provides a follow-on analysis of GONS performance to assess the navigation accuracy achievable if GONS uses the significantly less stable (5 parts in 10(exp 8) over 24 hours, compared with a specification of 1 part in 10(exp 6)) Temperature-Compensated Crystal Oscillator (TCXO), which is integral to the transponder, as a frequency reference rather than an external USO. The GONS TCXO experiment results from a 20-day period are used to project the expected performance of an operational system. The GONS processes Doppler data derived from nominally scheduled ground station forward-link communication services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. To evaluate the navigation accuracies achievable if a TCXO were used, actual experiment data (which used the USO as the frequency reference) were corrupted with errors from real TDRSS one-way return tracking measurements taken from EP/EUVE's TCXO. Analysis of the GONS TCXO experiment performance indicates that real-time onboard position accuracies of better than 300 meters (1 sigma) are achievable with as few as two tracking contacts per day for the EP/EUVE 525-kilometer altitude, 28.5-degree inclination orbit, provided the TCXO is as stable as that in EP/EUVE's TDRSS transponder. GONS using a TCXO frequency reference provides a viable option for many upcoming spacecraft missions with moderate position accuracy requirements and an interest in reducing their operational costs with autonomous navigation.

Radomski, M. S.↗

An Augmented Ground Station Architecture for Spacecraft-Initiated Communication Service Requests

Spacecraft performing science and exploration missions have increasingly complex and event-driven objectives, making communication needs difficult to predict in advance. Additional flexibility is required in space communication provider networks to effectively meet time-varying demand. We envision a framework for automated resource allocation in which requests for communications service are initiated by spacecraft based on current mission needs. We propose an augmented ground station configuration featuring a wide field-of-view antenna to receive transmissions from spacecraft requesting high-rate communications. A software suite to automate the service fulfillment process, including interfacing with external scheduling systems such as NASA’s Near Space Network, is described. Experimental results characterizing the physical-layer link between the wide field-of-view antenna and a software-defined radio testbed on the International Space Station are presented. We also discuss long-duration software testing on a ground-based testbed. Taken together, these proof-of-concept results demonstrate the feasibility of the concept to improve the responsiveness of space communications.

user-initiated service↗

End-to-end planning and scheduling systems technology for space operations

Consideration is given to planning and scheduling operations concepts from an end-to-end perspective, through both mission operations and institutional support functions. An operations concept is proposed which is based on a flexible request language used to state resource requirements and mission constraints to a scheduling system. The language has the potential to evolve into an international standard for exchanging service request information on international space networks. The key benefit of the flexible scheduling request concept is the shift of a significant conflict resolution effort from humans to computers, reducing the time for generating a week's worth of schedules to hours instead of days.

Moe, Karen L.↗