Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.

99 GENERAL AND MISCELLANEOUS↗

Data-Driven Linear Parameter-Varying Modeling and Control of Flexible Loads for Grid Services

Flexible loads have great potential to improve the electric grid's flexibility and stability. To effectively control large ensembles of heterogeneous loads, reliable models thereof are required. This paper presents a data-driven modeling and control approach to manage flexible loads for providing grid services. We leverage a linear parameter-varying autoregressive moving average (LPV-ARMA) model to describe the aggregate load response, where the parameters in the model are used to capture external environmental impacts (e.g., weather). A gain-scheduling feedback controller is then developed to adapt to environmental variations. This data-driven approach can be easily applied to different types of loads in various environmental conditions. In addition to the ensemble controller, distributed load controllers are designed to deliver grid services, while maintaining the quality of service of inherent load tasks. We demonstrate the work on the IEEE 37-node distribution system for real-time power regulation services through control of thermostatically controlled loads.

61 RADIATION PROTECTION AND DOSIMETRY↗

Data-Driven Linear Parameter-Varying Modeling and Control of Flexible Loads for Grid Services: Preprint

Flexible loads have great potential to improve the power grid's flexibility and stability. To effectively control large ensembles of heterogeneous loads, reliable models thereof are required. The paper presents a data-driven modeling and control approach to manage flexible loads for providing grid services. We leverage a linear parameter-varying autoregressive moving average (LPV-ARMA) model to describe the aggregate load response, where the parameters in the model are used to capture external environment impacts (e.g., weather). A gain-scheduling feedback controller is then developed to adapt to environmental variations. This data-driven approach can be easily applied to different types of loads in various environmental conditions. In addition to the ensemble controller, distributed load controllers are designed to deliver grid services, while maintaining the quality of service of inherent load tasks. We demonstrate the work on the IEEE 37-node distribution system for real-time power regulation services through control of thermostatically controlled loads.

control↗

The Empirical Effect of Fleet Optimization on Synchronization and Rebound Effects in Heat Pump Water Heaters

Demand response is a growing concept in light of the internet of things and an increasing need for grid flexibility. Water heaters are one of the preferred devices for providing demand response for grid services and peak management due to their capability to store energy. The efficient use of water heaters for demand response requires consideration of the associated load effects such as synchronization of device schedules and rebound effect. These effects present a significant challenge. Despite the importance of the mentioned effects for water heater queuing and scheduling, there has been no effort to quantify and empirically validate their impact. This study attempts to address this gap by offering two methods - Ward clustering and Euclidean K-means - to evaluate the extent of synchronization in a fleet of 42 water heaters in Atlanta, GA. Using the aforementioned methods on the measured data, we find evidence of convergence of water heater loads as a result of optimization compared to an idle period and analyzed their impact.

demand response↗

Toward a Synthetic Model for Distribution System Restoration and Crew Dispatch

Distribution service restoration (DSR) is critical for improving the resilience and reliability of modern distribution systems by strategically and sequentially energizing the system components and customer loads. Restoring electricity service to affected customers also requires multiple crews with different skill sets to perform multiple tasks that are procedurally interdependent with safety guaranteed. However, in existing DSR practices, switch operations and crew dispatch are scheduled separately, and their interdependence is not fully considered. As advanced technologies are enabling remote communication, control, and dispatch, utilities now desire an integrated DSR framework to achieve seamless coordination among multiple DSR tasks such as switch operation, crew dispatch, and component repair. In this paper, we introduce a synthetic model that integrates the service restoration model and the crew dispatch model based on a universal routing model. The proposed model can provide the estimated time of restoration for each load, the switching sequence for safely operating remotely/manually operated switches, and dispatch solutions for crews with different skill sets. The proposed synthetic model is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the IEEE 123 bus test feeder and several large-scale test feeders (EPRI Ckt5, Ckt7, Ckt24, and IEEE 8500 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virtual infrastructure management in private and hybrid clouds.

One of the many definitions of 'cloud' is that of an infrastructure-as-a-service (IaaS) system, in which IT infrastructure is deployed in a provider's data center as virtual machines. With IaaS clouds growing popularity, tools and technologies are emerging that can transform an organization's existing infrastructure into a private or hybrid cloud. OpenNebula is an open source, virtual infrastructure manager that deploys virtualized services on both a local pool of resources and external IaaS clouds. Haizea, a resource lease manager, can act as a scheduling back end for OpenNebula, providing features not found in other cloud software or virtualization-based data center management software.

99 GENERAL AND MISCELLANEOUS↗

Curb Allocation and Pick-Up Drop-Off Aggregation for a Shared Autonomous Vehicle Fleet

Advances in information technologies and vehicle automation have birthed new transportation services, including shared autonomous vehicles (SAVs). Shared autonomous vehicles are on-demand self-driving taxis, with flexible routes and schedules, able to replace personal vehicles for many trips in the near future. The siting and density of pick-up and drop-off (PUDO) points for SAVs, much like bus stops, can be key in planning SAV fleet operations, since PUDOs impact SAV demand, route choices, passenger wait times, and network congestion. Unlike traditional human-driven taxis and ride-hailing vehicles like Lyft and Uber, SAVs are unlikely to engage in quasi-legal procedures, like double parking or fire hydrant pick-ups. In congested settings, like central business districts (CBD) or airport curbs, SAVs and others will not be allowed to pick up and drop off passengers wherever they like. This paper uses an agent-based simulation to model the impact of different PUDO locations and densities in the Austin, Texas CBD, where land values are highest and curb spaces are coveted. In this paper 18 scenarios were tested, varying PUDO density, fleet size and fare price. The results show that for a given fare price and fleet size, PUDO spacing (e.g., one block vs. three blocks) has significant impact on ridership, vehicle-miles travelled, vehicle occupancy, and revenue. A good fleet size to serve the region’s 80 core square miles is 4000 SAVs, charging a $1 fare per mile of travel distance, and with PUDOs spaced three blocks of distance apart from each other in the CBD.

Hunter, Christian B.↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

Multi-Timescale Optimal Operation Framework for Integrated Economic and Reliability Analysis of Hybrid Power Plants

This paper introduces a hierarchical modeling framework for hybrid power plants (HPP) to facilitate the operation of HPP in power systems similar to conventional generators (Congens) in the integrated multi-timescale optimal operation framework. To consider the uncertainties of HPP renewable power in the day-ahead scheduling, distributionally robust optimization (DRO) is used. To ensure that the state-of-charge (SOC) of energy storage systems in HPPs aligns closely with the planned value for long-term reliability, real-time SOC management is incorporated. In addition, an adjustable real-time control is designed for the robust delivery of HPP real-time services. Case studies performed on a revised IEEE 39-bus system demonstrate the effectiveness of the proposed framework for HPP operation. Simulation results highlight that the proposed framework not only can help operators schedule HPP similar to Congens in varying weather conditions but can also maintain the frequency reliability of the system.

frequency stability↗

Adaptive job and resource management for the growing quantum cloud

As the popularity of quantum computing continues to grow, efficient quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis and optimization of job / resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing.This paper proposes optimized adaptive job scheduling to the quantum cloud taking note of primary characteristics such as queuing times and fidelity trends across machines, as well as other characteristics such as quality of service guarantees and machine calibration constraints. Key components of the proposal include a) a prediction model which predicts fidelity trends across machine based on compiled circuit features such as circuit depth and different forms of errors, as well as b) queuing time prediction for each machine based on execution time estimations. Altogether, this proposal is evaluated on simulated IBM machines across a diverse set of quantum applications and system loading scenarios, and is able to reduce wait times by over 3x and improve fidelity by over 40% on specific usecases, when compared to traditional job schedulers.

97 MATHEMATICS AND COMPUTING↗

Development, deployment and operations of ATLAS databases.

In preparation for ATLAS data taking, a coordinated shift from development towards operations has occurred in ATLAS database activities. In addition to development and commissioning activities in databases, ATLAS is active in the development and deployment (in collaboration with the WLCG 3D project) of the tools that allow the worldwide distribution and installation of databases and related datasets, as well as the actual operation of this system on ATLAS multi-grid infrastructure. We describe development and commissioning of major ATLAS database applications for online and offline. We present the first scalability test results and ramp-up schedule over the initial LHC years of operations towards the nominal year of ATLAS running, when the database storage volumes are expected to reach 6.1 TB for the Tag DB and 1.0 TB for the Conditions DB. ATLAS database applications require robust operational infrastructure for data replication between online and offline at Tier-0, and for the distribution of the offline data to Tier-1 and Tier-2 computing centers. We describe ATLAS experience with Oracle Streams and other technologies for coordinated replication of databases in the framework of the WLCG 3D services.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Predicting runtime and resource utilization of jobs on integrated cloud and HPC systems

Recent advances in virtualization technologies used in cloud computing offer performance that closely approaches bare-metal levels. Combined with specialized instance types and high-speed networking services for cluster computing, cloud platforms have become a compelling option for high-performance computing (HPC). However, most current batch job schedulers in HPC systems are designed for homogeneous clusters and make decisions based on limited information about jobs and system status. Scientists typically submit computational jobs to these schedulers with a requested runtime that is often over- or under-estimated. More accurate runtime predictions can help schedulers make better decisions and reduce job turnaround times. Here, they can also support decisions about migrating jobs to the cloud to avoid long queue wait times in HPC systems.

97 MATHEMATICS AND COMPUTING↗

Sustainable Energy Solutions Task 2.0: Wind Turbine Reliability and Maintainability Enhancement through System-wide Structure Health Monitoring and Modifications to Rotating Components

An evaluation of nondestructive structural health monitoring methods was completed with over 132 documents, 37 specifically about wind turbines, summarized into a technology matrix. This matrix lists the technology, what can be monitored with this technology, and gives a short summary of the key aspects of the technology and its application. Passive and active acoustic emission equipment from Physical Acoustics Corp. and Acellent Technologies have been evaluated and selected for use in experimental state loading and fatigue tests of composite wind turbine blade materials. Acoustic Emission (AE) and Active Ultrasonic Testing (AUT), were applied to composite coupons with both simulated and actual damage. The results found that, while composites are more complicated in nature, compared to metallic structures, an artificial neural network analysis could still be used to determine damage. For the AE system, the failure mode could be determined (i.e. fiber breakage, delamination, etc.). The Acellent system has been evaluated to work well with composite materials. A test-rig for reliability testing of the rotating components was constructed. The research on the types of bearings used in the wind turbines indicated that in most of the designs, the main bearings utilized to support the shaft are cylindrical roller bearings. The accelerated degradation testing of a population of bearings was performed. Vibration and acoustic emission data was collected and analyzed in order to identify a representative degradation signal for each bearing to identify the initiation of the degradation process in the bearings. Afterwards, the RMS of the vibration signal from degradation initiation up to the end of the useful life of the bearing was selected to predict the remaining useful life of the bearing. This step included fitting Autoregressive Moving Average (ARMA) models to the degradation signals and approximating the probability distribution function (PDF) of remaining useful life based on the results of Monte-Carlo simulation of the ARMA models. This step was performed for different percentages of the degradation signal of each bearing. The accuracy of the proposed approach then was assessed by comparing the actual life of the bearing and the estimated life of the bearing from the developed models. The results were impressive and indicated that the accuracy of the models improved as more data was utilized in developing the ARMA models (we get closer to the end of the life of the bearing).

17 WIND ENERGY↗

Battery capacity and recharging needs for electric buses in city transit service

Our paper evaluates the energy consumption and battery performance of city transit electric buses operating on real day-to-day routes and standardized bus drive cycles, based on a developed framework tool that links bus electrification feasibility with real-world vehicle performance, city transit bus service reliability, battery sizing and charging infrastructure. The impacts of battery capacity combined with regular and ultrafast charging over different routes have been analyzed in terms of the ability to maintain city transit bus service reliability like conventional buses. These results show that ultrafast charging via frequent short-time boost charging events, for example at a designated bus stop after completing each circuit of an assigned route, can play a significant role in reducing the battery size and can eliminate the need for longer duration charging events that would cause schedule delays. Furthermore, the analysis presented shows that significant benefits can be realized by employing multiple battery configurations and flexible battery swapping practices in electric buses. These flexible design and use options will allow electric buses to service routes of varying city driving patterns and can therefore enable meaningful reductions to the cost of the vehicle and battery while ensuring service that is as reliable as conventional buses.

33 ADVANCED PROPULSION SYSTEMS↗

Stabilizing the Grid and Reducing Utility Bills Through Price-Responsive Controls for Heat Pump Water Heaters

The electricity grid is facing increasing challenges in cost-effectively balancing supply and demand. These challenges are exacerbated by increased penetration of photovoltaics, which causes mid-day overproduction, and electrification of gas appliances, which increases peak-period electricity demand. Decarbonization requires shifting building loads from fossil-intensive high-cost times to renewable-intensive low-cost times while maintaining quality of service to occupants. Utilities and ISO’s are investigating new ways of incentivizing this load shifting. One promising method is the use of Highly Dynamic Prices (HDPs). HDPs feature continuously changing prices that reflect real-time grid generation and distribution costs and capacity constraints, and thus incentivize consumers to shift their loads. California’s CPUC CalFUSE proposal and Hawaii’s recent changes demonstrate that electricity tariffs are moving towards this model. For this to work however, loads must have the capability to respond to these prices. Heat pump water heaters (HPWHs) are an ideal device for this purpose because their storage tanks decouple delivery of domestic hot water from electricity consumption. The storage enables control strategies that consume midday solar power to increase the energy stored in the tank, then provide evening peak domestic hot water services using the stored energy. Berkeley Lab's CalFlexHub project is pioneering price-driven load flexibility by developing and deploying cost-minimizing controls for many flexible loads - including HPWHs - in response to HDP. Control development is based on simulations using the Flexible Heat Pump Water Heater Performance Predictor which captures the control decisions of the on-board controller in a residential, integrated HPWH . The price-responsive controls a) shift load in ways that consume additional midday solar power to help stabilize the grid and reduce overall emissions, b) ensure that occupants receive equal or better hot water delivery service, and c) minimize the operating cost for each home in the fleet. On the grid level, the resulting shift will reduce utility operating costs and emissions, and can avoid expensive system capacity expansions. The control approach is customized to each home based on typical hot water consumption patterns. HPWH controllers, whether on the device or remotely, will receive a schedule of CTA-2045-B signals or set temperature adjustments customized to the current HDP price schedule and home. Simulation results for a fleet of 148 HPWHs on a summer day in Berkeley, California show cost savings of 29% and high price electricity consumption reductions of 80%, while maintaining full quality of service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations

With increasing wind power penetration in the electricity grid, system operators are recognizing the need for additional flexibility, and some are implementing new ramping products as a type of ancillary service. However, wind is generally thought of as causing the need for ramping services, not as being a potential source for the service. In this paper, a multi-timescale unit commitment and economic dispatch model is developed to consider the wind power ramping product (WPRP). An optimized swinging door algorithm with dynamic programming is applied to identify and forecast wind power ramps (WPRs). Designed as positive characteristics of WPRs, the WPRP is then integrated into the multi-timescale dispatch model that considers new objective functions, ramping capacity limits, active power limits, and flexible ramping requirements. Numerical simulations on the modified IEEE 118-bus system show the potential effectiveness of WPRP in increasing the economic efficiency of power system operations with high levels of wind power penetration. It is found that WPRP not only reduces the production cost by using less ramping reserves scheduled by conventional generators, but also possibly enhances the reliability of power system operations. Moreover, wind power forecasts play an important role in providing high-quality WPRP service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methodology for Automated Detection of Degradation and Faults in Packaged Air Conditioners and Heat Pumps Using Only Two Sensors

The software was created in the process of developing a system known as the Smart Monitoring and Diagnostic System (SMDS) for packaged air conditioners and heat pumps used on commercial buildings (known as RTUs). The SMDS provides automated remote monitoring and detection of performance degradation and faults in these RTUs and could increase the awareness by building owners and maintenance providers of the condition of the equipment, the cost of operating it in degraded condition, and the quality of maintenance and repair service when it is performed. The SMDS provides these capabilities and would enable conditioned-based maintenance rather than the reactive and schedule-based preventive maintenance commonly used today, when maintenance of RTUs is done at all. Improved maintenance would help ensure persistent peak operating efficiencies, reducing energy consumption by an estimated 10% to 30%.

Source record↗