Search NASA⌕ Search

SEARCH · Search NASA

Results for “Shuttle Payloads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The first Shuttle scientific payload /OSTA-1/

On Nov. 12, 1981, the Space Shuttle was launched for its second flight (STS-2). It carried with it the first scientific payload designed to perform remote sensing observations of the earth. During the 54 hour flight, scientific instruments from the OSTA-1 (Office of Space and Terrestrial Applications) payload gathered data over the earth's oceans and land masses, and global atmospheric data on concentrations of carbon monoxide in the atmosphere. The flight demonstrated the capability of the Shuttle to serve as an orbiting platform for scientific research. Instruments were successfully developed for spaceflight for a fraction of the costs associated with instruments flown on unmanned satellite missions. Perhaps most importantly, the instruments have been successfully returned to the investigators for the first time in the history of remote sensing from space.

Taranik, J. V.↗

Efficient payload processing - The opposite side of frequent Space Shuttle launches

An overview is presented of the processing cycles of horizontally integrated and vertically integrated Shuttle payloads at the Kennedy Space Center. Attention is given to the integration of these payloads into Shuttle-ready cargos and the installation of the cargo into the Orbiter. Diagrams are presented of: (1) Shuttle processing flow at KSC, (2) payload processing flow, (3) typical items of multimission support equipment, (4) primary items of checkout equipment, (5) payload ready for transfer into the canister for vertical processing, and (6) the rotating service structure retracted to receive the payload canister.

Scherer, L. R.↗

A Feasibility Study on a Parallel Mechanism for Examining the Space Shuttle Orbiter Payload Bay Radiators

The goal of the project was to develop the necessary analysis tools for a feasibility study of a cable suspended robot system for examining the space shuttle orbiter payload bay radiators These tools were developed to address design issues such as workspace size, tension requirements on the cable, the necessary accuracy and resolution requirements and the stiffness and movement requirements of the system. This report describes the mathematical models for studying the inverse kinematics, statics, and stiffness of the robot. Each model is described by a matrix. The manipulator Jacobian was also related to the stiffness matrix, which characterized the stiffness of the system. Analysis tools were then developed based on the singular value decomposition (SVD) of the corresponding matrices. It was demonstrated how the SVD can be used to quantify the robot's performance and to provide insight into different design issues.

Roberts, Rodney G.↗

Payload transportation system study

A standard size set of shuttle payload transportation equipment was defined that will substantially reduce the cost of payload transportation and accommodate a wide range of payloads with minimum impact on payload design. The system was designed to accommodate payload shipments between the level 4 payload integration sites and the launch site during the calendar years 1979-1982. In addition to defining transportation multi-use mission support equipment (T-MMSE) the mode of travel, prime movers, and ancillary equipment required in the transportation process were also considered. Consistent with the STS goals of low cost and the use of standardized interfaces, the transportation system was designed to commercial grade standards and uses the payload flight mounting interfaces for transportation. The technical, cost, and programmatic data required to permit selection of a baseline system of MMSE for intersite movement of shuttle payloads were developed.

Source record↗

Choosing reliability level for Shuttle-carried payloads

The paramount importance of high payload reliability is questioned in the light of payload recoverability in Spacelab and Space Shuttle experiments, and cost effectiveness through less stringent reliability requirements backed up by recovery and reflight of the experiment if necessary is considered. Ground rules and parameters for assessing reliability and recoverability in relation to mission cost effectiveness are advanced. Mission success probability (for one or several flights), experiment hardware cost, design reliability, cost of orbiting the experiment, support system reliability, and other relevant parameters are identified and discussed, and graphs of experimental total cost envelope are plotted. It is proposed that reliability and quality assurance standards be weighed against failure costs and penalties in the case of recoverable space systems.

Campbell, J. W.↗

Data relay system for Space Shuttle and payload pre-launch checkout

Engineering requirements and design characteristics of the coherent throughput relay system which supports the East Coast prelaunch checkout of NASA's Space Shuttle and its payloads are presented. Link requirements and design constraints are reviewed, and gain/loss analysis is given. Group delay distortion is considered and isolation and antenna siting are discussed. The systems controlling various aspects of the relays are examined.

O'Donnell, Hugh B.↗

Kennedy Space Center processing of Shuttle small payloads

There are many steps involved in preparing a payload for a mission into space on the Space Shuttle. Operations at the John F. Kennedy Space Center (KSC) are the last of those steps for the hardware before the payload is launched. To assure a successful and efficient KSC processing flow, a great deal of planning between the Robert H. Goddard Space Flight Center (GSFC) and KSC personnel is required before the payload arrives at KSC. After arrival, pre-flight operations occur between payload personnel, GSFC personnel, and KSC personnel for integration of the payload into its carrier (if required), in preparation for installation into a Orbiter. Once installed into an Orbiter, final test(s), checkout, and close-out of the payload is performed by GSFC and KSC personnel before launch. Mission support varies depending on the payload flying, but once the mission is complete and the Orbiter has returned to KSC, post-flight operations begin. This usually involves a reverse flow of the pre-flight operations. KSC operations conclude when the payload, its ground support equipment (GSE), and personnel depart KSC. A list of lessons learned is generated at the end of each payload flow, to avoid repeating the same mistakes (if any) for the next payload or for multiple repeat flights of the same payload. Always monitored are planned changes that may affect the payloads, GSE, KSC facilities, payload personnel, GSFC personnel, and/or KSC personnel.

Haddad, Michael E.↗

Payload safety requirements

Space Shuttle payload safety requirements are summarized. Consideration is given to NASA objectives on STS payloads, payload safety documents, STS payload safety management, safety implementation possibilities, the hazard control procedure, and significant technical requirements.

Scheller, J.↗

Shuttle Ku-band bent-pipe implementation considerations

This paper describes an approach for relay of data-modulated subcarriers from Shuttle payloads through the Shuttle Ku-band communications subsystem (and subsequently through a tracking and data relay satellite system to a ground terminal). The novelty is that a channel originally provided for baseband digital data is shown to be suitable for this purpose; the resulting transmission scheme is referred to as a narrowband bent-pipe scheme. Test results demonstrating the validity of the narrowband bent-pipe mode are presented, and limitations on system performance are described.

Batson, B. H.↗

Development of a relatchable cover mechanism for a cryogenic IR-sensor

A cover mechanism for use on the Infrared Background Signature Survey (IBSS) cryostat was developed. The IBSS IR-instrument is scheduled for STS launch in early 1991 as a payload of the Shuttle Payload Satellite (SPS) 2. The cover is hinged, with a motorized rope drive. During ground processing, launch, entry, and landing, the cryostat, which houses the IR-instrument, is required to be a sealed vacuum tight container for cooling purposes and contamination prevention. When on orbit, the cover is opened to provide an unobstructed field of view for the IR-instrument. A positive seal is accomplished through the use of latch mechanism. The cover and the latch are driven by a common redundant actuator consisting of dc motors, spur gears, and a differential gear. Hall probe limit switches and position sensors (rotary variable transformer) are used to determine the position of the cover and the latch. The cover mechanism was successfully qualified for thermal vacuum (-25 to 35 C), acoustic noise, vibration (6 Gs sine, 9.7 G RMS) and life cycles. Constricting requirements, mechanical and electronic control design, specific design details, test results of functional performance, and environmental and life tests are described.

Birner, R.↗

Research, planning, design and development of selected components, subsystems and systems for the Students for the Exploration and Development of Space Satellite (SEDSAT)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the SEDSAT satellite to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The SEASIS instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was cancelled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis↗

Research and Development of Satellites, Small Expendable Deployer System (SEDS)

The work proposed in this task order was successfully accomplished. This is reflected in the approval by three NASA centers of the Students for the Exploration and Development of Space Satellite (SEDSAT) to fly as a payload on the shuttle. All documentation necessary for evaluation of the satellite as a Shuttle payload was submitted and approved by the appropriate safety boards. The Small Expendable Deployer System - SEDS - Earth Atmosphere and Space Imaging System (SEASIS) instrument was demonstrated to work and its inclusion as a SEDSAT payload was accomplished in the task period. Finally, the SEDSAT interface to the NASA GSFC PES was approved by MSFC and GSFC with no substantive issues outstanding. As of the end of the contract date all milestones were met. However the NASA MSFC SEDS program was canceled by the center. Since that time SEDSAT has gone on to be manifested on a Delta vehicle.

Wingo, Dennis Ray↗

Jet Propulsion Laboratory/Kennedy Space Center telerobotic inspection and manipulation demonstration

The goal of this effort is to demonstrate telerobotic inspection and mainpulation of space shuttle payloads in the presence of substantial communications time delays between the operator station and the robotic work space. The processing of space shuttle payloads provides a variety of tasks which are typical of both space shuttle ground operations and Space Station in-flight operations, and communications time delays are inevitable in space operations where the operator station will be light-seconds away from the telerobot. With this demonstration we hope to show the efficacy and safety of robotic technology for ground and space operations. Our approach is to develop an experimental telerobotic system with the remote sensing, actuation and reflex portions located at KSC in Florida, while the operator control station will be located at Jet Propulsion Laboratory (JPL) in California. The JPL portion of the system includes a high-level operator interface, intelligent spatial planning and machine vision, while the KSC portion includes the robot arm, end effectors, cameras and proximity sensors, and the necessary control and communications computers and software. The communications between JPL and KSC are over a limited-bandwidth network channel (19200 baud) with unpredictable and unrepeatable time delays. In FY89 we integrated a basic version of the robotic, communications, and computer hardware, and we developed the software to perform an operator-supervised inspection of a PAM-D satellite upper stage rocket motor and its shuttle support cradle. The demonstration, though severely limited by the bulk of the available computer arm, showed the potential of telerobotics for inspection tasks. In the future, we plan to develop additional capabilities which will allow manipulation tasks to be performed, including removal of dust covers and lens caps, insertion of connectors and batteries, and installation of payload objects.

Wilcox, Brian↗

Thermal study of interface between the Orbiter cold plate and typical Shuttle spacecraft payload flight electronics

Spacelab provides a set of Freon line plumbing and cold plates for experiment equipments which are located in the Shuttle pallet and which need active thermal control. The reported study deals with the thermal problem of attaching a Command and Data Handling module with various electronic boxes whose combined footprints on the baseplate are much larger than the cold plate. A description of two modules and the cold plate assembly in the pallet is presented and a thermal model description is provided. The method employed in modeling heat pipes-honey-comb matrix is based upon an effective conductance between the heat pipe vapor and the walls of the heat pipe. The considered thermal models and a computer program are used to perform steady-state thermal analyses. The temperature gradients in the large module baseplate attached to the small cold plate are predicted as a function of the interface plate thickness.

Hwangbo, H.↗

Space science payloads for Shuttle

This paper presents a sampling of space science missions currently planned or under study at the Jet Propulsion Laboratory. Early use of the Shuttle for launching planetary exploration missions will not differ very much in principle from expendable launch vehicles. Future concepts which make use of the unique characteristics of the Shuttle in conjunction with other new technology open some truly fascinating prospects. Shuttle has other roles in space science as well, both for deep space and earth-directed observations. A variety of payload concepts, ranging from highly conventional to 'far-out', are under study. Increasing experience with Shuttle operations will broaden the spectrum of possibilities.

French, J. R.↗

Operational support considerations in Space Shuttle prelaunch processing

This paper presents an overview of operational support for Space Shuttle payload processing at the John F. Kennedy Space Center. The paper begins with a discussion of the Shuttle payload processing operation itself. It discusses the major organizational roles and describes the two major classes of payload operations: Spacelab mission payload and vertically-installed payload operations. The paper continues by describing the Launch Site Support Team and the Payload Processing Test Team. Specific areas of operational support are then identified including security and access, training, transport and handling, documentation and scheduling. Specific references for further investigatgion are included.

Schuiling, Roelof L.↗