At least 181 records · Page 10

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

First Spacelab flight - A status report of the joint ESA/NASA mission

A general overview of the first Spacelab flight is presented and a table is given listing the payload composition. An accommodation study is presented with emphasis on the configuration, mass status, timeline, and experiment interface specifications. Also considered are flight and ground operations, safety factors, and payload specialists training for the first flight.

Craft, H. G., Jr.↗

A status report on the Energy Efficient Engine Project

The Energy Efficient Engine (E3) Project is directed at providing, by 1984, the advanced technologies which could be used for a new generation of fuel conservative turbofan engines. This paper summarizes the scope of the entire project and the current status of these efforts. Included is a description of the preliminary designs of the fully developed engines, the potential benefits of these advanced engines, and highlights of some of the component technology efforts conducted to date.

Macioce, L. E.↗

High Temperature Gas-Cooled Test Reactor Options Status Report

Preliminary scoping calculations are being performed for a 100 MWt gas-cooled test reactor. The initial design uses standard prismatic blocks and 15.5% enriched UCO fuel. Reactor physics and thermal-hydraulics simulations have been performed to identify some reactor design features to investigate further. Current status of the effort is described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

2020 Status Report - Research Reactor Infrastructure Program

This presentation will discuss the purpose and scope of the Department of Energy - Research Reactor Infrastructure (RRI) Program. Personnel involved in the program will be introduced and contact information will be provided for team member. Information will be provided to conference attendees as to the status of the core activities of the program. These activities include fresh fuel element fabrication and spent nuclear fuel shipment returns to the DOE. Current and future issues pertinent to the RRI program will also be presented. The RRI program maintains fuels support contracts and provides nuclear reactor fuel at no or low cost to 24 U.S. universities operating a total of 25 reactor facilities. These facilities include: - Twelve TRIGA facilities - Eight plate fueled facilities - Three AGN facilities - One Pulstar fueled facility - One Critical facility The title for the fuel remains with the United States government and when the universities are finished with the fuel, the fuel is returned to the United States government for long-term storage. Mission of the Research Reactor Infrastructure Program: The Research Reactor Infrastructure Program is funded by the U.S. Department of Energy, Office of Nuclear Energy and is managed by the Idaho National Laboratory (INL) in Idaho Falls, Idaho. The program goals are: - Keep all U.S. operating university reactor programs supplied with nuclear fuel. - Provide assistance for movement of irradiated nuclear fuel from U.S. universities, after the DOE receipt facility authorizes the fuel receipt.

99 GENERAL AND MISCELLANEOUS↗

Chiral magnetic and vortical effects in high-energy nuclear collisions—A status report

Here, the interplay of quantum anomalies with magnetic field and vorticity results in a variety of novel non-dissipative transport phenomena in systems with chiral fermions, including the quark–gluon plasma. Among them is the Chiral Magnetic Effect (CME)—the generation of electric current along an external magnetic field induced by chirality imbalance. Because the chirality imbalance is related to the global topology of gauge fields, the CME current is topologically protected and hence non-dissipative even in the presence of strong interactions. As a result, the CME and related quantum phenomena affect the hydrodynamical and transport behavior of strongly coupled quark–gluon plasma, and can be studied in relativistic heavy ion collisions where strong magnetic fields are created by the colliding ions. Evidence for the CME and related phenomena has been reported by the STAR Collaboration at Relativistic Heavy Ion Collider at BNL, and by the ALICE Collaboration at the Large Hadron Collider at CERN. The goal of the present review is to provide an elementary introduction into the physics of anomalous chiral effects, to describe the current status of experimental studies in heavy ion physics, and to outline the future work, both in experiment and theory, needed to eliminate the existing uncertainties in the interpretation of the data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status Report on Power System Transformation: A 21st Century Power Partnership Report

This report has three primary goals: (1) to articulate the concept of power system transformation; (2) to explore the current global landscape of ‘innovations’ that constitute power system transformation and provide evidence of how these innovations are emerging; and (3) to suggest an analytical framework for assessing the status of power system transformation on an on-going basis.

14 SOLAR ENERGY↗

FY19 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Preliminary Testing of a Selected Process Model

Sandia National Laboratories continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project. This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY19 task included continued operation of the cluster; maintenance of the TSPA-LA models (with Gold Sim 9.60.300); preliminary assessment of the status of the Infiltration Model (a process model that feeds the TSPA-LA). In addition, precautionary actions were needed to extend the life of the cluster hardware. To do that, three new nodes were added to the cluster. In the event any of the original nodes fail they will be replaced with the new nodes, thereby maintaining the core capability. The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

FY2021 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Testing of Selected Process Models

Sandia National Laboratories continued evaluation of the total system performance assessment (TSPA) for License Application (LA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. The FY21 task included continued operation of the cluster; maintenance of the TSPA-LA models (with GoldSim 9.60.300); continued assessment of the status of the Infiltration Model; (a process model that feeds the TSP -LA) and preliminary assessments of the Unsaturated Zone Flow Model and the Saturated Zone Flow and Transport Model Abstraction (process models that feed the TSPA-LA). The 2014 cluster and supporting software systems are currently fully operational to support TSPA-LA type analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inventory and Waste Characterization Status Report

This report provides an update to Sassani et al. (2016) and includes: (1) an updated set of inputs (Sections 2.3) on various additional waste forms (WF) covering both DOE-managed spent nuclear fuel (SNF) and DOE-managed (as) high-level waste (HLW) for use in the inventory represented in the geologic disposal safety analyses (GDSA); (2) summaries of evaluations initiated to refine specific characteristics of particular WF for future use (Section 2.4); (3) updated development status of the Online Waste Library (OWL) database (Section 3.1.2) and an updated user guide to OWL (Section 3.1.3); and (4) status updates (Section 3.2) for the OWL inventory content, data entry checking process, and external OWL BETA testing initiated in fiscal year 2017.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Magnetically suspended Stirling cryogenic space refrigerator Status report

At the 1979 Cryogenic Engineering Conference, attention was given to conceptual designs of spaceborne cryogenic refrigeration systems which can provide long-term, unattended operation. Since that time, efforts have continued to translate one of those concepts into an engineering model. The present investigation is concerned with a refrigerator which was designed to generate 5 W of cooling power at a temperature of 65 K. The compression heat of the refrigerator is dissipated at a temperature of 300 K, and the output of the system is to be maintained reliably for a period of five years or longer. The refrigerator design is based on the Stirling cycle, which has an ideal efficiency equal to that of the Carnot cycle. Attention is given to some background information concerning a cryogenic refrigerator, the design of the refrigerator components, and the development status. The magnetic bearings and the linear motors have been tested at the component level.

Daniels, A.↗

International Space Station Acoustics - A Status Report

It is important to control acoustic noise aboard the International Space Station (ISS) to provide a satisfactory environment for voice communications, crew productivity, and restful sleep, and to minimize the risk for temporary and permanent hearing loss. Acoustic monitoring is an important part of the noise control process on ISS, providing critical data for trend analysis, noise exposure analysis, validation of acoustic analysis and predictions, and to provide strong evidence for ensuring crew health and safety, thus allowing Flight Certification. To this purpose, sound level meter (SLM) measurements and acoustic noise dosimetry are routinely performed. And since the primary noise sources on ISS include the environmental control and life support system (fans and airflow) and active thermal control system (pumps and water flow), acoustic monitoring will indicate changes in hardware noise emissions that may indicate system degradation or performance issues. This paper provides the current acoustic levels in the ISS modules and sleep stations, and is an update to the status presented in 20031. Many new modules, and sleep stations have been added to the ISS since that time. In addition, noise mitigation efforts have reduced noise levels in some areas. As a result, the acoustic levels on the ISS have improved.

Allen, Christopher S.↗

FY 18 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Inventory of Software used for Process Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016), and Hadgu et al. (2017). The TSPA computing hardware (2014 server cluster -CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of Gold Sim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The FY18 task included developing an inventory of software used for the Yucca Mountain Project process models and preliminary assessment of status of the software; enhancing security of the cluster and setting a backup system. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HSR Propulsion System Studies: A Status Report on the Down-Select Process

When the HSR program began there was widespread belief that a simple and familiar turbojet-like engine coupled to an advanced technology mixer-ejector nozzle was the propulsion system of choice for achieving FAR 36-Stage 3 noise requirements. Our ability to quickly demonstrate a practical 20(+) dB suppression nozzle was confidently presumed by many. Our rate of progress towards that objective, however, has been somewhat humbling. At the moment we are reasonably confident of achieving about 15 dB suppression with a mixer-ejector nozzle designed for a high specific thrust turbojet-like cycle. Therefore, if we make no further suppression progress and conservatively assume no new operational procedures such as programmed lapse rate (PLR), then meeting the Stage 3 goal requires a large amount of engine and/or wing oversizing which is economically prohibitive. The scenario is further aggravated by the possibility of eventually needing to comply with even more stringent regulations (Stage 4). While this status may be somewhat disappointing to some, it must be remembered that the HSR program plan involves two generations of mixer-ejector nozzles beyond the current generation I nozzle designs. It is premature to conclude that we cannot design a practical 20(+) dB mixer-ejector nozzle. On the other hand, it is prudent to consider alternative solutions to the noise problem. Thus, we are investigating four other propulsion system concepts.

Strack, W. C.↗

Status report of advanced cladding modeling work to assess cladding performance under accident conditions

Scoping simulations performed using a severe accident code can be applied to investigate the influence of advanced materials on beyond design basis accident progression and to identify any existing code limitations. In 2012 an effort was initiated to develop a numerical capability for understanding the potential safety advantages that might be realized during severe accident conditions by replacing Zircaloy components in light water reactors (LWRs) with silicon carbide (SiC) components. To this end, a version of the MELCOR code, under development at the Sandia National Laboratories in New Mexico (SNL/NM), was modified by replacing Zircaloy for SiC in the MELCOR reactor core oxidation and material properties routines. The modified version of MELCOR was benchmarked against available experimental data to ensure that present SiC oxidation theory in air and steam were correctly implemented in the code. Additional modifications have been implemented in the code in 2013 to improve the specificity in defining components fabricated from non-standard materials. An overview of these modifications and the status of their implementation are summarized below.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The first pilot project of the consortium for top-down proteomics: A status report

Pilot Project #1—the identification and characterization of human histone H4 proteoforms by top-down MS—is the first project launched by the Consortium for Top-Down Proteomics (CTDP) to refine and validate top-down MS. Within the initial results from seven participating laboratories, all reported the probability-based identification of human histone H4 (UniProt accession P62805) with expectation values ranging from 10-13 to 10-105. Regarding characterization, a total of 74 proteoforms were reported, with 21 done so unambiguously; one new PTM, K79ac, was identified. Inter-laboratory comparison reveals aspects of the results that are consistent, such as the localization of individual PTMs and binary combinations, while other aspects are more variable, such as the accurate characterization of low-abundance proteoforms harboring >2 PTMs. An open-access tool and discussion of proteoform scoring are included, along with a description of general challenges that lie ahead including improved proteoform separations prior to mass spectrometric analysis, better instrumentation performance, and software development.

59 BASIC BIOLOGICAL SCIENCES↗