Search NASA⌕ Search

SEARCH · Search NASA

Results for “Structurally Insulated Panels”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

164 records · Page 10

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

VALENTInE: A Concept for a New Frontiers Class Long Duration In-Situ Balloon Mission to Venus

Venus and Earth are similar in bulk composition, size, density, and approximate distance from the Sun, yet Venus’s modern-day climate and surface geology is distinctly different [1]. Previous missions to Venus revealed unusual volcanic features, possible continental crust, widespread volcanic plains, a weak magnetic field [2], and insights into the Venusian atmosphere [3,4]. Unfortunately, data from these missions were limited in spatial and temporal resolution and global extent. A future mission to Venus is critical to address fundamental questions surrounding the chemical composition and dynamics of the Venusian atmosphere [5], its geologic history [6,7], its internal structure [8,9], and its habitability throughout time [10,11]. We present the Venus Air and Land Expedition: a Novel Trailblazer for In situ Exploration (VALENTInE) mission to meet this need. VALENTInE is a variable altitude balloon that will passively float in Venus’s atmosphere between 45 and 55 km altitude. VALENTInE will acquire atmospheric data at varying latitudes and longitudes in addition to mapping the surface geomorphology and mineralogy across multiple terrains. Mission Objectives: The VALENTInE mission concept is driven by four main science objectives: 1. Determine whether the driving force of the superrotation of Venus’s atmosphere is caused by horizontal or vertical momentum transport. 2. Determine whether the atmospheric composition and noble gas inventory of the Venusian atmosphere is a product of outgassing from the initial protoplanetary source or if there are significant contributions from exogenic sources. 3. Determine whether the tesserae regions (particularly Aphrodite Terra) are felsic and relatively older than surrounding regions. 4. Determine if there is any evidence of a recent dynamo preserved in the rock record of Venus. Mission Overview: A balloon architecture provides a robust system that can survive long-term in the Venusian environment while taking accurate measurements of the lower cloud deck and surface. Two prior balloon missions to Venus, VEGA 1 and VEGA 2 in 1984, have demonstrated the potential for such planetary exploration; however, these missions were short-lived (46 hr), with limited range (54 km). Our spacecraft concept consists of a battery powered balloon with a gondola and flyby carrier stage (Fig. 1). Our novel design allows for at least 15 days of atmospheric exploration, including multiple ascents and descents in the Venus atmosphere. VALENTInE is baselined to launch in 2032, cruise on solar power for 128 days, enter, descend, and inflate (EDI) into Venus’s atmosphere above Aphrodite Terra, and float in Venus’s atmosphere for a total nominal mission duration of 15 days. The balloon, able to control its altitude by changing its buoyancy, will make one full circumnavigation every 4–8 days and move poleward ~1 o latitude per day; it will be passively directed by the horizontal air currents on Venus. The balloon can only be controlled in the z direction, and the expected latitude range is ±10° from EDI. The balloon itself will be a tracer for atmospheric structures such as zonal winds [5, 12]. During the 15-day operational period, there will be five dips to 45 km for a compositional study of the lower atmosphere and geological and magnetic mapping of the surface. Dips are used to take images and measurements closer to the surface and to obtain in situ vertical atmospheric profiles between 45 and 55 km. Instruments: The VALENTInE instrument payload will allow for extensive study of the geology, atmosphere, and interior of Venus. The instrument suite consists of six instruments. The mission profile for each instrument is shown in Fig. 2. Lower Atmosphere Meteorology Analyzer (LAMA) is an atmospheric structure instrument consisting of a thermometer, barometer, and accelerometer to continuously measure temperature and pressure as a function of altitude, longitude, and latitude. TracE and Noble Gas Investigator (TENGI) is aneutral mass spectrometer used to sample the dense atmosphere. TENGI will operate continuously at 45 km and 55 km and will measure D/H ratios, as well as Ne, Ar, and O isotopic ratios. Kilometer Scale Spectral Imager (KSSI) is amultispectral imager (850-1150 nm) used to resolve surface features on the order of km. Near InfraRed Multispectral Photometer (NIRMP) is an Infrared (IR) photometer used to image the surface through the clouds to characterize mineral assemblages at five different areas of the surface. NIRMP will be operated during dwell. ELevation REConnaissance (ELREC) is a light detection and ranging (LIDAR) instrument used for measuring topography at five different areas of the surface. The ELREC data will be combined with those of NIRMP to determine mineral assemblages and how they correlate to topography. Magnetic Exploration and Interior Detective (MEID) is a magnetometer used to detect any near-surface magnetic anomalies. The magnetometer will continuously operate at all altitudes. Mission Design: The spacecraft’s propulsion system will have a wet mass of 930 kg and will be launched on an Atlas V rocket. The spacecraft will jettison the payload upon arrival in Venus’s atmosphere before decelerating to orbital velocity. Figure 2. Notional power-dip profile while the balloon is on the dayside. Risks and Challenges: Raising and lowering the spacecraft to dip beneath the haze layer require a large amount of energy. This issue was partly compensated by limiting the number of dips over the 15 day prime mission. Power needs for pumping helium are reduced by slowing the descent speed, which consequently increases spatial resolution of in situ measurements between 45 and 55 km. The main limitation for the duration of the mission is the need to carry 15 days’ worth of batteries. The bus experiences external Venusian temperatures ranging from ~27°C at 55 km altitude to ~110°C at 45 km altitude. These high atmospheric temperatures require thermal protection for the bus (instruments, electronics, and flight systems) during its descent, dwell at 45 km, and ascent. The bus is maintained at a mechanically safe temperature range of -10°C to 50°C using white external paint, multi-layer insulation (MLI), mechanical/thermal isolation (e.g. Ti, composites), and ~57 kg of Phase Change Materials (PCM). Images and spectra taken below the haze dominate the available data transmission regardless of the time spent at 45 km. Therefore, less time at the lower altitude mainly reduces the coverage of in situ measurements there. Further, we assumed an unrealistically low-density material for the helium storage tanks on the gondola. However, this issue is partially resolved if we were to jettison 75% of the spent helium storage tanks. After the entry process, the balloon volume remains mostly inflated and storage tanks are required only for reducing balloon volume in dipping to 45 km. This mission was planned against an expected New Frontiers 5 (NF5) cost cap of $1B, as the NF5 call had not yet been released. The mission we describe fits within the predicted cost cap if the flyby carrier stage, responsible for powering the spacecraft during cruise and for relaying in situ measurements back to Earth, can be contributed by another space agency. Acknowledgments: We thank the JPL Planetary Science Summer School, especially A. Nash, J. Scully, K. Mitchell, L. Lowes, and J. Armijo, and our mentors from JPL Team X. Thank you to our review panel for their insightful review. References: [1] Kane, S. et al. (2019) JGR:Ps, 124 , 2015–2028. [2] Phillips, J. L., & Russell, C. T. (1987). JGR: Space Physics , 92 (A3), 2253-2263. [3] Nakamura, M. et al. (2018) Earth Planets Space, 70 (1), 144. [4] Svedhem, H. et al. (2009) JGR:P 114 (E5). [5] Limaye et al. (2009) Decadal Survey White Paper . [6] Ivanov, M. and Head, J. (2011) PSS, 59 (13) , 1559-1600. [7] Smrekar, S. et al. (2018) Space Sci Rev, 214 (5), 88. [8] O’Rourke, J. et al. (2018) EPSL, 502 , 46-56. [9] O’Rourke J. et al. (2019) GRL , (46), 5768–5777 [10] Way, M. et al. (2016) GRL, 43 (16), 8376-8383. [11] Way, M. et al. (2020) JGR:P, 125 (5), e2019JE006276. [12] Preston, R. A. et al. (1986) Science, 231 (4744), 1414-1416.

Mission Concept↗