Reliability and systems engineering.
Complex systems improvement by integration of reliability and systems engineering techniques
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Complex systems improvement by integration of reliability and systems engineering techniques
This paper describes the results of a one-year feasibility study for an Electric Propulsion Orbital Platform (EPOP), whose primary objective is to provide an instrumented platform for testing electric propulsion devices in space. The first flight, EPOP-1, is planned aboard the Shuttle-deployed Wake Shield Facility in March 1995, and will be designed around a commercial 1.8 kW, 0.5 hydrazine arcjet system. Specific subsystems are described, namely the arcjet and the power conditioning unit, the propellant and power systems, and Wake Shield Facility. Also, system engineering and integration issues are discussed. In an accompanying paper, the diagnostics and data acquisition and control systems are described in more detail.
This presentation provides an overview of the Model-Based Systems Analysis and Engineering work to be completed by the Advanced Air Transportation Technology Project, Systems Analysis and Integration team. The work aims to develop an integrated systems analysis and engineering capability that will be used to digitally integrate and evaluate subsonic aircraft technologies being developed by projects comprising the Sustainable Flight National Partnership.
Product Lifecycle Management (PLM) is an outcome of lean thinking to eliminate waste and increase productivity. PLM is inextricably tied to the systems engineering business philosophy, coupled with a methodology by which personnel, processes and practices, and information technology combine to form an architecture platform for product design, development, manufacturing, operations, and decommissioning. In this model, which is being implemented by the Engineering Directorate at the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center, total lifecycle costs are important variables for critical decisionmaking. With the ultimate goal to deliver quality products that meet or exceed requirements on time and within budget, PLM is a powerful tool to shape everything from engineering trade studies and testing goals, to integrated vehicle operations and retirement scenarios. This paper will demonstrate how the Engineering Directorate is implementing PLM as part of an overall strategy to deliver safe, reliable, and affordable space exploration solutions. It has been 30 years since the United States fielded the Space Shuttle. The next generation space transportation system requires a paradigm shift such that digital tools and knowledge management, which are central elements of PLM, are used consistently to maximum effect. The outcome is a better use of scarce resources, along with more focus on stakeholder and customer requirements, as a new portfolio of enabling tools becomes second nature to the workforce. This paper will use the design and manufacturing processes, which have transitioned to digital-based activities, to show how PLM supports the comprehensive systems engineering and integration function. It also will go through a launch countdown scenario where an anomaly is detected to show how the virtual vehicle created from paperless processes will help solve technical challenges and improve the likelihood of launching on schedule, with less hands-on labor needed for processing and troubleshooting. Sustainable space exploration solutions demand that all lifecycle phases be optimized. Adopting PLM, which has been used by the automotive industry for many years, for aerospace applications provides a foundation for strong, disciplined systems engineering and accountable return on investment by making lifecycle considerations variables in an iterative decision-making process. This paper combines the perspectives of the founding father of PLM, along with the experience of Engineering leaders who are implementing these processes and practices real-time. As the nation moves from an industrial-based society to one where information is a valued commodity, future NASA programs and projects will benefit from the experience being gained today for the exploration missions of tomorrow.
The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.
An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.
A methodology is described for system engineering security into large information technology systems under development. The methodology is an integration of a risk management process and a generic system development life cycle process. The methodology is to be used by Security System Engineers to effectively engineer and integrate information technology security into a target system as it progresses through the development life cycle. The methodology can also be used to re-engineer security into a legacy system.
The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.
Final Document is attached. The presentation describes an avionics and software architecture that has been developed through NASAs Advanced Exploration Systems (AES) division. The architecture is open-source, highly reliable with fault tolerance, and utilizes standard capabilities and interfaces, which are scalable and customizable to support future exploration missions. Specific focus areas of discussion will include command and data handling, software, human interfaces, communication and wireless systems, and systems engineering and integration. Final Paper, not the Abstract, is attached.
An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.
The EVA/Space Suit Development Office (ESSD) Systems Engineering and Integration (SE&I) team has utilized MBSE in multiple programs. After developing operational and architectural models, the MBSE framework was expanded to link the requirements space to the system models through functional analysis and interfaces definitions. By documenting all the connections within the technical baseline, ESSD experienced significant efficiency improvements in analysis and identification of change impacts. One of the biggest challenges presented to the MBSE structure was a program transition and restructuring effort, which was completed successfully in 4 months culminating in the approval of a new EVA Technical Baseline. During this time three requirements sets spanning multiple DRMs were streamlined into one NASA-owned Systems Requirement Document (SRD) that successfully identified requirements relevant to the current hardware development effort while remaining extensible to support future hardware developments. A capability-based hierarchy was established to provide a more flexible framework for future space suit development that can support multiple programs with minimal rework of basic EVA/Space Suit requirements. This MBSE approach was most recently applied for generation of an EMU Demonstrator technical baseline being developed for an ISS DTO. The relatively quick turnaround of operational concepts, architecture definition, and requirements for this new suit development has allowed us to test and evolve the MBSE process and framework in an extremely different setting while still offering extensibility and traceability throughout ESSD projects. The ESSD MBSE framework continues to be evolved in order to support integration of all products associated with the SE&I engine.
The Integrated Airframe/Propulsion Control System Architecture program (IAPSA) is a two-phase program which was initiated by NASA in the early 80s. The first phase, IAPSA 1, studied different architectural approaches to the problem of integrating engine control systems with airframe control systems in an advanced tactical fighter. One of the conclusions of IAPSA 1 was that the technology to construct a suitable system was available, yet the ability to create these complex computer architectures has outpaced the ability to analyze the resulting system's performance. With this in mind, the second phase of IAPSA approached the same problem with the added constraint that the system be designed for validation. The intent of the design for validation requirement is that validation requirements should be shown to be achievable early in the design process. IAPSA 2 has demonstrated that despite diligent efforts, integrated systems can retain characteristics which are difficult to model and, therefore, difficult to validate.
The NASA Office of Exploration has completed a Systems Engineering and Integration effort to define a point design for an evolving lunar base that supports substantial science, exploration, and resource production objectives. This study addressed systems level design; element requirements and conceptual designs; assessments of precursor and technology needs, and operations concepts. The central base is assumed to be located equatorially on the lunar nearside north of the crater Moltke in Mare Tranquillitatis. The study considers an aggressive case with three main phases. The initial Man-Tended Phase establishes basic enabling facilities that include a modular habitat that periodically houses a crew of four. During the Experimental Phase the base becomes permanently manned with the construction of a larger habitat that provides augmented workshop and laboratory volumes and housing for crew. The Operational Phase expands base capabilities to a substantially mature level while reducing reliance on earth.
This final report has been prepared by Honeywell Aerospace, Phoenix, Arizona, a unit of Honeywell International, Inc., documenting work performed during the period December 2004 through August 2007 for the NASA Glenn Research Center, Cleveland, Ohio, under the Revolutionary Aero-Space Engine Research (RASER) Program, Contract No. NAS3-01136, Task Order 8, Engine Validation of Noise and Emission Reduction Technology Phase I. The NASA Task Manager was Dr. Joe Grady of the NASA Glenn Research Center. The NASA Contract Officer was Mr. Albert Spence of the NASA Glenn Research Center. This report is for a test program in which NASA funded engine validations of integrated technologies that reduce aircraft engine noise. These technologies address the reduction of engine fan and jet noise, and noise associated with propulsion/airframe integration. The results of these tests will be used by NASA to identify the engineering tradeoffs associated with the technologies that are needed to enable advanced engine systems to meet stringent goals for the reduction of noise. The objectives of this program are to (1) conduct system engineering and integration efforts to define the engine test-bed configuration; (2) develop selected noise reduction technologies to a technical maturity sufficient to enable engine testing and validation of those technologies in the FY06-07 time frame; (3) conduct engine tests designed to gain insight into the sources, mechanisms and characteristics of noise in the engines; and (4) establish baseline engine noise measurements for subsequent use in the evaluation of noise reduction.
The Planet Surface Systems Office at the NASA Johnson Space Center has participated in an analysis of the Space Exploration Initiative architectures described in the Synthesis Group report. This effort involves a Systems Engineering and Integration effort to define point designs for evolving lunar and Mars bases that support substantial science, exploration, and resource production objectives. The analysis addresses systems-level designs; element requirements and conceptual designs; assessments of precursor and technology needs; and overall programmatics and schedules. This paper focuses on the results of the study of the Space Resource Utilization Architecture. This architecture develops the capability to extract useful materials from the indigenous resources of the Moon and Mars. On the Moon, a substantial infrastructure is emplaced which can support a crew of up to twelve. Two major process lines are developed: one produces oxygen, ceramics, and metals; the other produces hydrogen, helium, and other volatiles. The Moon is also used for a simulation of a Mars mission. Significant science capabilities are established in conjunction with resource development. Exploration includes remote global surveys and piloted sorties of local and regional areas. Science accommodations include planetary science, astronomy, and biomedical research. Greenhouses are established to provide a substantial amount of food needs.
A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.
A key element of achieving a sustained surface presence, such as defined in NASA’s Artemis plan, is In-Situ Resource Utilization (ISRU). ISRU is the practice of using local resources to provide mission consumables that reduce system launch mass requirements, and regenerate resources (chiefly, water and oxygen) for propulsion and life support supporting both Lunar and Martian missions. ISRU systems require multiple complex processes, such as excavation, chemical reactors, and electrolysis subsystems that must operate in harmony to optimize the overall system process from beginning to end. The Mission Analysis and Integration Tool (MAIT) was previously developed with MATLAB in FY22 to connect individual subsystem models into a customized, flexible framework for the purpose of technology downselect, optimization, and end-to-end process planning. Beginning in FY24, MAIT was updated and became the capital program in the Systems Engineering and Integration (SE&I) ISRU Modeling and Analysis (SIMA) project. Prior work was leveraged and evolved using MATLAB/Simulink due to its ability to communicate with a vast number of other programming languages and makes up the backbone of data flow between inputs and outputs to the subsystem models. MAIT initially evaluated a suite of ISRU-related technologies, including the water processing Lunar Auger Dryer for ISRU (LADI) system with integrated upstream excavation and downstream electrolysis subsystems. With individual models consolidated, the MAIT tool generated over 5,000 cases during its first round of parametric sweeps on the water processing architecture at multiple production targets; the system analysis produced valuable insight into the optimal LADI geometry that minimized energy demands, estimated effects to cold trap size and radiator requirements, and calculated the power dynamics of the electrolysis unit and liquid oxygen storage volume. Additional efforts are being made to demonstrate the ability to scale ISRU technologies supporting the Space Technology Mission Directorate’s (STMD) commercialization strategy and increase the MAIT software capability. Work is ongoing to handle a wide array of ISRU system models beyond the Lunar environment, e.g. production of propellant for a Martian lander.
The High Stability Engine Control (HISTEC) Program, managed and funded by the NASA Lewis Research Center, is a cooperative effort between NASA and Pratt & Whitney (P&W). The program objective is to develop and flight demonstrate an advanced high stability integrated engine control system that uses real-time, measurement-based estimation of inlet pressure distortion to enhance engine stability. Flight testing was performed using the NASA Advanced Controls Technologies for Integrated Vehicles (ACTIVE) F-15 aircraft at the NASA Dryden Flight Research Center. The flight test configuration, details of the research objectives, and the flight test matrix to achieve those objectives are presented. Flight test results are discussed that show the design approach can accurately estimate distortion and perform real-time control actions for engine accommodation.