Search NASA⌕ Search

SEARCH · Search NASA

Results for “TRADE OFF ANALYSIS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Spacecraft systems engineering: An introduction to the process at GSFC

The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

Fragomeni, Tony↗

Optical systems integrated modeling

An integrated modeling capability that provides the tools by which entire optical systems and instruments can be simulated and optimized is a key technology development, applicable to all mission classes, especially astrophysics. Many of the future missions require optical systems that are physically much larger than anything flown before and yet must retain the characteristic sub-micron diffraction limited wavefront accuracy of their smaller precursors. It is no longer feasible to follow the path of 'cut and test' development; the sheer scale of these systems precludes many of the older techniques that rely upon ground evaluation of full size engineering units. The ability to accurately model (by computer) and optimize the entire flight system's integrated structural, thermal, and dynamic characteristics is essential. Two distinct integrated modeling capabilities are required. These are an initial design capability and a detailed design and optimization system. The content of an initial design package is shown. It would be a modular, workstation based code which allows preliminary integrated system analysis and trade studies to be carried out quickly by a single engineer or a small design team. A simple concept for a detailed design and optimization system is shown. This is a linkage of interface architecture that allows efficient interchange of information between existing large specialized optical, control, thermal, and structural design codes. The computing environment would be a network of large mainframe machines and its users would be project level design teams. More advanced concepts for detailed design systems would support interaction between modules and automated optimization of the entire system. Technology assessment and development plans for integrated package for initial design, interface development for detailed optimization, validation, and modeling research are presented.

Shannon, Robert R.↗

Sample Acquisition and Instrument Deployment (SAID)

This report details the interim progress for contract NASW-4818, Sample Acquisition and Instrument Deployment (SAID), a robotic system for deploying science instruments and acquiring samples for analysis. The system is a conventional four degree of freedom manipulator 2 meters in length. A baseline design has been achieved through analysis and trade studies. The design considers environmental operating conditions on the surface of Mars, as well as volume constraints on proposed Mars landers. Control issues have also been studied, and simulations of joint and tip movements have been performed. A passively braked shape memory actuator with the ability to measure load has been developed. The wrist also contains a mechanism which locks the lid output to the bucket so that objects can be grasped and released for instrument deployment. The wrist actuator has been tested for operational power and mechanical functionality at Mars environmental conditions. The torque which the actuator can produce has been measured. Also, testing in Mars analogous soils has been performed.

Boyd, Robert C.↗

Advanced control design for hybrid turboelectric vehicle

The new environment standards are a challenge and opportunity for industry and government who manufacture and operate urban mass transient vehicles. A research investigation to provide control scheme for efficient power management of the vehicle is in progress. Different design requirements using functional analysis and trade studies of alternate power sources and controls have been performed. The design issues include portability, weight and emission/fuel efficiency of induction motor, permanent magnet and battery. A strategic design scheme to manage power requirements using advanced control systems is presented. It exploits fuzzy logic, technology and rule based decision support scheme. The benefits of our study will enhance the economic and technical feasibility of technological needs to provide low emission/fuel efficient urban mass transit bus. The design team includes undergraduate researchers in our department. Sample results using NASA HTEV simulation tool are presented.

Abban, Joseph↗

Sample acquisition and instrument deployment

Progress is reported in developing the Sample Acquisition and Instrument Deployment (SAID) system, a robotic system for deploying science instruments and acquiring samples for analysis. The system is a conventional four degree of freedom manipulator 2 meters in length. A baseline design has been achieved through analysis and trade studies. The design considers environmental operating conditions on the surface of Mars, as well as volume constraints on proposed Mars landers. Control issues have also been studied, and simulations of joint and tip movements have been performed. The systems have been fabricated and tested in environmental chambers, as well as soil testing and robotic control testing.

Boyd, Robert C.↗

International Space Station (ISS) Accommodation of a Single US Assured Crew Return Vehicle (ACRV)

The following report was generated to give the International Space Station (ISS) Program some additional insight into the operations and issues associated with accommodating a single U.S. developed Assured Crew Return Vehicle (ACRV). During the generation of this report, changes in both the ISS and ACRV programs were factored into the analysis with the realization that most of the work performed will eventually need to be repeated once the two programs become more integrated. No significant issues associated with the ISS accommodating the ACRV were uncovered. Kinematic analysis of ACRV installation showed that there are viable methods of using Shuttle and Station robotic manipulators. Separation analysis demonstrated that the ACRV departure path clears the Station structure for all likely contingency scenarios. The payload bay packaging analysis identified trades that can be made between payload bay location, Shuttle Remote Manipulator System (SRMS) reach and eventual designs of de-orbit stages and docking adapters.

Mazanek, Daniel D.↗

When is Testing Sufficient

The Software Assurance Technology Center (SATC) at NASA Goddard Space Flight Center has been investigating how projects can determine when sufficient testing has been completed. For most projects, schedules are underestimated, and the last phase of the software development, testing, must be decreased. Two questions are frequently asked: "To what extent is the software error-free? " and "How much time and effort is required to detect and remove the remaining errors? " Clearly, neither question can be answered with absolute certainty. Nonetheless, the ability to answer these questions with some acceptable level of confidence is highly desirable. First, knowing the extent to which a product is error-free, we can judge when it is time to terminate testing. Secondly, if errors are judged to be present, we can perform a cost/benefit trade-off analysis to estimate when the software will be ready for use and at what cost. This paper explains the efforts of the SATC to help projects determine what is sufficient testing and when is the most cost-effective time to stop testing.

Rosenberg, Linda H.↗

Materials Selection and Their Characteristics as Used in Rapid Prototyping

NASA's Marshall Space Flight Center (MSFC) conducted a program to evaluate six technologies used in Rapid Prototyping (RP) to produce investment casting patterns. In this paper, RP refers to the collective additive fabrication technologies known as Solid Free-Form Fabrication. Such technologies are being used with increasing frequency in manufacturing applications, due in part to their rapidly expanding capabilities to fabricate models from many types of materials. This study used ABS plastic, polycarbonate, TrueForm PM6, epoxy resin, paper, starch, and wax. The baseline model was a semi-complex prototype fuel pump housing, intended for use in the X-33 reusable launch vehicle. All models were shelled in a production- grade colloidal silica ceramic. Primary coats were zircon-base flour with zircon backup, while secondary coats were silica grains with a tabular alumina backup. Each model was shelled in an identical manner, using the same atmospheric conditions and drying times, as well as the same number of layers. Bake-outs and firing cycles were consistent with the leach ability of each material. Preheat and bath temperatures were also kept consistent. All molds were cast in vacuum using a hydrogen-resistant superalloy (NASA- 23) that was developed in-house. The final technical evaluation included detailed measurements of the model and the final casting, in order to determine any dimensional changes caused by different pattern materials, as well as documentation of all defects and any obvious refractory/model reactions. Prototype production costs were estimated for each method and taken into consideration during trade-off analysis.

Cooper, K.↗

Synthetic Scene Generation of the Stennis V and V Target Range for the Calibration of Remote Sensing Systems

The verification and validation (V&V) target range developed at Stennis Space Center is a useful test site for the calibration of remote sensing systems. In this paper, we present a simple algorithm for generating synthetic radiance scenes or digital models of this target range. The radiation propagation for the target in the solar reflective and thermal infrared spectral regions is modeled using the atmospheric radiative transfer code MODTRAN 4. The at-sensor, in-band radiance and spectral radiance for a given sensor at a given altitude is predicted. Software is developed to generate scenes with different spatial and spectral resolutions using the simulated at-sensor radiance values. The radiometric accuracy of the simulation is evaluated by comparing simulated with AVIRIS acquired radiance values. The results show that in general there is a good match between AVIRIS sensor measured and MODTRAN predicted radiance values for the target despite the fact that some anomalies exist. Synthetic scenes provide a cost-effective way for in-flight validation of the spatial and radiometric accuracy of the data. Other applications include mission planning, sensor simulation, and trade-off analysis in sensor design.

Cao, Chang-Yong↗

Formation Control of the MAXIM L2 Libration Orbit Mission

The Micro-Arcsecond Imaging Mission (MAXIM), a proposed concept for the Structure and Evolution of the Universe (SEU) Black Hole Imaging mission, is designed to make a ten million-fold improvement in X-ray image clarity of celestial objects by providing better than 0.1 microarcsecond imaging. To achieve mission requirements, MAXIM will have to improve on pointing by orders of magnitude. This pointing requirement impacts the control and design of the formation. Currently the architecture is comprised of 25 spacecraft, which will form the sparse apertures of a grazing incidence X-ray interferometer covering the 0.3-10 keV bandpass. This configuration will deploy 24 spacecraft as optics modules and one as the detector. The formation must allow for long duration continuous science observations and also for reconfiguration that permits re-pointing of the formation. In this paper, we provide analysis and trades of several control efforts that are dependent upon the pointing requirements and the configuration and dimensions of the MAXIM formation. We emphasize the utilization of natural motions in the Lagrangian regions that minimize the control efforts and we address both continuous and discrete control via LQR and feedback linearization. Results provide control cost, configuration options, and capabilities as guidelines for the development of this complex mission.

Folta, David↗

Synthetic Scene Generation of Stennis Target Range for the Calibration of Remote Sensing Systems

The validation and verification (V&V) target range developed at Stennis Space Center is a useful tool for the calibration of remote sensing systems. In this paper, we present an algorithm for generating synthetic scenes or digital models of this target range. The atmospheric radiative transfer code Modtran 4 is used in simulating at-sensor radiance for a given sensor. Software is developed to generate the scene with different spatial and spectral resolutions using the at-sensor radiance values. Synthetic scenes provide a cost-effective way for in-flight validation for the spatial and radiometric accuracy of the data. Other applications include mission planning, sensor simulation, and trade-off analysis in sensor design. The radiometric and spatial accuracy of the simulation is evaluated by comparing simulated scenes with AVIRIS acquired values.

Cao, Chang-Yong↗

Calipso's Mission Design: Sun-Glint Avoidance Strategies

CALIPSO will fly in formation with the Aqua spacecraft to obtain a coincident image of a portion of the Aqua/MODIS swath. Since MODIS pixels suffering sun-glint degradation are not processed, it is essential that CALIPSO only co- image the glint h e portion of the MODIS instrument swath. This paper presents sun-glint avoidance strategies for the CALIPSO mission. First, we introduce the Aqua sun-glint geometry and its relation to the CALIPSO-Aqua formation flying parameters. Then, we detail our implementation of the computation and perform a cross-track trade-space analysis. Finally, we analyze the impact of the sun-glint avoidance strategy on the spacecraft power and delta-V budget over the mission lifetime.

Mailhe, Laurie M.↗

Promising Results from Three NASA SBIR Solar Array Technology Development Programs

Results from three NASA SBIR solar array technology programs are presented. The programs discussed are: 1) Thin Film Photovoltaic UltraFlex Solar Array; 2) Low Cost/Mass Electrostatically Clean Solar Array (ESCA); and 3) Stretched Lens Array SquareRigger (SLASR). The purpose of the Thin Film UltraFlex (TFUF) Program is to mature and validate the use of advanced flexible thin film photovoltaics blankets as the electrical subsystem element within an UltraFlex solar array structural system. In this program operational prototype flexible array segments, using United Solar amorphous silicon cells, are being manufactured and tested for the flight qualified UltraFlex structure. In addition, large size (e.g. 10 kW GEO) TFUF wing systems are being designed and analyzed. Thermal cycle and electrical test and analysis results from the TFUF program are presented. The purpose of the second program entitled, Low Cost/Mass Electrostatically Clean Solar Array (ESCA) System, is to develop an Electrostatically Clean Solar Array meeting NASA s design requirements and ready this technology for commercialization and use on the NASA MMS and GED missions. The ESCA designs developed use flight proven materials and processes to create a ESCA system that yields low cost, low mass, high reliability, high power density, and is adaptable to any cell type and coverglass thickness. All program objectives, which included developing specifications, creating ESCA concepts, concept analysis and trade studies, producing detailed designs of the most promising ESCA treatments, manufacturing ESCA demonstration panels, and LEO (2,000 cycles) and GEO (1,350 cycles) thermal cycling testing of the down-selected designs were successfully achieved. The purpose of the third program entitled, "High Power Platform for the Stretched Lens Array," is to develop an extremely lightweight, high efficiency, high power, high voltage, and low stowed volume solar array suitable for very high power (multi-kW to MW) applications. These objectives are achieved by combining two cutting edge technologies, the SquareRigger solar array structure and the Stretched Lens Array (SLA). The SLA SquareRigger solar array is termed SLASR. All program objectives, which included developing specifications, creating preliminary designs for a near-term SLASR, detailed structural, mass, power, and sizing analyses, fabrication and power testing of a functional flight-like SLASR solar blanket, were successfully achieved.

Eskenazi, Mike↗

On Space Exploration and Human Error: A Paper on Reliability and Safety

NASA space exploration should largely address a problem class in reliability and risk management stemming primarily from human error, system risk and multi-objective trade-off analysis, by conducting research into system complexity, risk characterization and modeling, and system reasoning. In general, in every mission we can distinguish risk in three possible ways: a) known-known, b) known-unknown, and c) unknown-unknown. It is probably almost certain that space exploration will partially experience similar known or unknown risks embedded in the Apollo missions, Shuttle or Station unless something alters how NASA will perceive and manage safety and reliability

Bell, David G.↗

Guidance and Navigation for a Martian Sample Return Ascent Vehicle

Overview: Mission Design and Concept of Operations; Vehicle Concept and System Requirements; Guidance and Navigation Architecture; Simulation Architecture; Guidance Algorithm Development; Navigation System Design; Integrated Vehicle Performance; Continuing Analysis and Trades; Conclusions.

Anzalone, Evan↗

Using Systems Engineering to Develop an Integrated Crew Health and Performance System to Mitigate Risk for Human Exploration Missions

New space exploration missions are currently being designed to take humanity beyond low Earth orbit (LEO) to cis-lunar space, the lunar surface, and eventually to Mars. These missions carry increased risks due to a number of factors, including distance from Earth, exposure to deep space hazards, reduced capacity and ability to resupply and evacuate, and increased communication delays. As distance from Earth grows and mission length increases, a growing proportion of mission risk can be attributed to the “human system.” Almost twenty years ago, the Institute of Medicine in the United States recommended the early and complete integration of the human system into the spacecraft and mission design process to mitigate this increased risk inherent in exploration missions. Exploration missions will require increasing levels of crew self-sufficiency that will challenge the current operational paradigms established in LEO. Enabling progressive Earth independence requires management of the increasingly complex interactions among spacecraft systems and integration of all the data and functions that affect human health and performance into one coordinated system –the Crew Health and Performance (CHP) system. This system is a critical spacecraft system that is analogous to other systems such as propulsion, guidance and navigation, or avionics. Design and integration of the CHP system requires the evidence-based merger of typically disparate disciplines such as medicine, human factors, and life support system design, using systems engineering (SE) practices. SE provides traceability of spacecraft requirements and enables reliable and repeatable trade space analysis of the many competing options for hardware and software to be included in the mission architecture. The approach described here enables spacecraft and mission designers to align the scope of a CHP system with mission specific requirements, decrease risk to the crew, and increase the probability of mission success.

Kerry McGuire↗

Mars Planetary Network for Human Exploration Era – Potential Challenges and Solutions

During 2016-2017, a study was conducted under the sponsorship of the NASA’s Space Communications and Navigation (SCaN) Program to investigate the deep space communications capacity taking into account the needs of all the present and envisioned future missions toward 2030s. It was soon recognized that planning for human exploration to Mars would impose certain unprecedent challenges, both fiscal and technical, to the current space communications paradigm. Targeting the assumed missions concepts, i.e., Crewed Mission to Phobos (CMTP) and Mars Short Stay Mission (MSSM), a Mars Planetary Network for the human exploration era has been formulated. The activity modeling and network traffic simulation/modeling we performed gave some insight into the technical challenges in space communications for the envisioned human Mars exploration era. Chief among the potential challenges are: (1) the high demand on the deep space network (DSN) assets for achieving the high-rate links, both return and forward, from Mars farthest/farther distance (up to 2.67 AU); (2) the need for resilient, persistent communication coverage for crewed vehicles, on surface and in orbits; (3) the significant period of outage for the Mars-Earth link due to superior solar conjunction; (4) the need for on-demand, simultaneous access to the proximity link by multiple vehicles and astronauts in the exploration zone; (5) the capability of determining precise, real-time, positions of surface vehicles and astronauts by the deep space habitat and/or other tele-operations entities. Solution space to each of the above challenges has been explored and analyzed in the context of the individual problem domain and, more importantly, in conjunction with that for the other challenges. This has led to an end-to-end definition of a Mars Planetary Network that would feature: (1) the fusion of deep space Ka-band and optical communications for achieving Mars-Earth high-rate links taking advantage of the optical/RF hybrid 8m/34m antennas in DSN; (2) the integrated application of the Multiple Spacecraft Per Antenna (MSPA) technique, for return link data acquisition, and the Multiple Uplink Per Antenna (MUPA) technique, for forward link data trasnmission, to reduce the number of 34m beam-wave guide (BWG) antennas needed for the era; (3) the integration of three, arrayed, 34m beam-wave guide (BWG) antennas, to provide a high G/T aperture, with the MSPA/MUPA techniques, and a dual “trunk link”approach to cut down the needed G/T -- hence, reducing the number of 34m antennas, relative to that in the single trunk approach by 50%; (4) the deployment of two areostationary/areosynchronous Mars relay orbiters; one of them could also function as (or be served by) a notional Deep Space Habitat (DSH); (5) the opportunistic deployment of a science orbiter in a Pioneer-6 type orbit, equidistant Mars/Earth, that could also serve as an intermediary relay during the Mars superior solar conjunction perod; (6) the existence of the multi-function Mars proximity link that provides the demand-assigned, multiple access (DAMA) capability; and (7) the provision of tracking observables, by leveraging on the planned Mars orbiting and surface infrastructure, to enable the in-situ navigation for surface and orbiting vehicles. This paper provides the description of the proposed Mars Planetary Network in the human exploration era, the trade-off analysis for the various alternative architectures, and the optimal solutions to the key challenges in defining this end-to-end network.

Cheung, Kar-Ming↗

Cryogenic Insulation Solutions for the Surface of Mars with Its Unique Environments

The surface of Mars provides unique challenges for cryogenic insulation systems and for cryogenic spacecraft traveling there. In order to store cryogenic fluids for propulsion, life support, and other applications on the surface of Mars one must protect the insulation from the array of unique environmental factors that are present. Travel to Mars is a very energy intensive endeavor and landing on the surface requires launching over 200 kg of propellant and spacecraft per kilogram landed. As such, high performance, lightweight insulations are needed for cryogenic systems to be used on the surface. Traditional spacecraft use multilayer insulation that works well in a vacuum, but Mars has an atmospheric of pressure approximately 7 torr, consisting of approximately 95 % carbon dioxide. Based on analysis and trade studies NASA has shown that the mass savings from the higher performance of multilayer insulation with a vacuum jacket saved several hundred kilograms of mass for a typical human Mars ascent stage. Thus NASA, along with several contractors, have been developing a lightweight vacuum jacketed system for the 7 torr environment. This lightweight vacuum jacketed system must survive launch from earth, travel to Mars, and on the surface for several years. On the surface, it must be able to survive landing, natural environmental occurrences such as dust storms, and temperature cycling with minimal if any human maintenance. The insulation systems under development have been exposed to an array of tests to demonstrate their capability to survive these environments while still providing the high performance required to meet mission needs.

Cryogenic Fluid Management↗