Search NASA⌕ Search

SEARCH · Search NASA

Results for “Technology readiness level”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Lab Demonstration of the Hybrid Doppler Wind Lidar (HDWL) Transceiver

The recommended design approach for the 3D Tropospheric Winds mission is a hybrid Doppler lidar which combines the best elements of both a coherent aerosol Doppler lidar operating at 2 micron and a direct detection molecular Doppler lidar operating at 0.355 micron. In support of the mission, we built a novel, compact, light-weighted multi-field of view transceiver where multiple telescopes are used to cover the required four fields of view. A small mechanism sequentially selects both the "transmit" and "receive" fields of view. The four fields are combined to stimulate both the 0.355 micron receiver and the 2 micron receiver. This version is scaled (0.2 micron diameter aperture) from the space-based version but still demonstrates the feasibility of the hybrid approach. The primary mirrors were conventionally light-weighted and coated with dielectric, high reflectivity coatings with high laser damage thresholds at both 2 micron and 0.355 micron. The mechanical structure and mounts were fabricated from composites to achieve dimensional stability while significantly reducing the mass. In the laboratory, we demonstrated the system level functionality at 0.355 micron and at 2 micron raising the Technology Readiness Level (TRL) from 2 to 4.

Marx, Catherine T.↗

Lab Demonstration of the Hybrid Doppler Wind Lidar (HDWL) Transceiver

The recommended design approach for the 3D Tropospheric Winds mission is a hybrid Doppler lidar which combines the best elements of both a coherent aerosol Doppler lidar operating at 2 microns and a direct detection molecular Doppler lidar operating at 0.355 microns. In support of the mission, we built a novel, compact, light-weighted multi-field of view transceiver where multiple telescopes are used to cover the required four fields of view. A small mechanism sequentially selects both the "transmit" and "receive" fields of view. The four fields are combined to stimulate both the 0.355 micron receiver and the 2 micron receiver. This version is scaled (0.2 m diameter aperture) from the space-based version but still demonstrates the feasibility of the hybrid approach. The primary mirrors were conventionally light-weighted and coated with dielectric, high reflectivity coatings with high laser damage thresholds at both 2 microns and 0.355 microns. The mechanical structure and mounts were fabricated from composites to achieve dimensional stability while significantly reducing the mass. In the laboratory, we demonstrated the system level functionality at 0.355 microns and at 2 microns, raising the Technology Readiness Level (TRL) from 2 to 4.

Marx, Catherine T.↗

Enabling Communication and Navigation Technologies for Future Near Earth Science Missions

In 2015, the Earth Regimes Network Evolution Study (ERNESt) Team proposed a fundamentally new architectural concept, with enabling technologies, that defines an evolutionary pathway out to the 2040 timeframe in which an increasing user community comprised of more diverse space science and exploration missions can be supported. The architectural concept evolves the current instantiations of the Near Earth Network and Space Network through implementation of select technologies resulting in a global communication and navigation network that provides communication and navigation services to a wide range of space users in the Near Earth regime, defined as an Earth-centered sphere with radius of 2M Km. The enabling technologies include: High Rate Optical Communications, Optical Multiple Access (OMA), Delay Tolerant Networking (DTN), User Initiated Services (UIS), and advanced Position, Navigation, and Timing technology (PNT). This paper describes this new architecture, the key technologies that enable it and their current technology readiness levels. Examples of science missions that could be enabled by the technologies and the projected operational benefits of the architecture concept to missions are also described.

Networking↗

Enabling Communication and Navigation Technologies for Future Near Earth Science Missions

In 2015, the Earth Regimes Network Evolution Study (ERNESt) proposed an architectural concept and technologies that evolve to enable space science and exploration missions out to the 2040 timeframe. The architectural concept evolves the current instantiations of the Near Earth Network and Space Network with new technologies to provide a global communication and navigation network that provides communication and navigation services to a wide range of space users in the near Earth domain. The technologies included High Rate Optical Communications, Optical Multiple Access (OMA), Delay Tolerant Networking (DTN), User Initiated Services (UIS), and advanced Position, Navigation, and Timing technology. This paper describes the key technologies and their current technology readiness levels. Examples of science missions that could be enabled by the technologies and the projected operational benefits of the architecture concept to missions are also described.

Laser↗

The Wind Turbine Rotors of the Future: A Research Agenda from the Big Adaptive Rotor Project

This white paper outlines a roadmap to inform future research efforts around the wind turbine rotors of the future. The document is authored by researchers that have been working on the Big Adaptive Rotor (BAR) and related initiatives at the National Renewable Energy Laboratory and Sandia National Laboratories. The Wind Energy Technologies Office of the U.S. Department of Energy has been funding BAR since 2018. The learnings from BAR have been documented in dozens of publications. This new paper identifies unresolved critical challenges in wind turbine rotor technology and structures them in four large topic areas: 1. Predictive and validated numerical tools. 2. Design methods and standards. 3. Improvements in manufacturing. 4. Technological innovations. Although wind turbines have not changed in their core architecture, with the market almost entirely dominated by three-bladed upwind rotors, a vast amount of research has allowed to introduce technological innovations resulting in a reduction in levelized cost of energy that made wind competitive with all traditional sources of electricity. Focusing on the rotor, blades will keep following the trend of mass and stiffness reduction, will adopt segmentation, and will keep growing in length, both land-based and offshore. To support this continuous innovation, this white paper argues that research efforts in rotor technology at the national labs are best directed to the first three topic areas and to low technology-readiness-levels (1-3) innovations, leaving the task of implementing higher-TRL (4-9) technological innovations to industry stakeholders. This research roadmap is also well aligned with the upcoming roadmap defined during the International Energy Agency 109th Topical Expert Meeting on the Grand Challenges of Wind Energy.

17 WIND ENERGY↗

Decision Gate Process for Assessment of a Technology Development Portfolio

The NASA Dust Management Project (DMP) was established to provide technologies (to TRL 6 development level) required to address adverse effects of lunar dust to humans and to exploration systems and equipment, which will reduce life cycle cost and risk, and will increase the probability of sustainable and successful lunar missions. The technology portfolio of DMP consisted of different categories of technologies whose final product is either a technology solution in itself, or one that contributes toward a dust mitigation strategy for a particular application. A Decision Gate Process (DGP) was developed to assess and validate the achievement and priority of the dust mitigation technologies as the technologies progress through the development cycle. The DGP was part of continuous technology assessment and was a critical element of DMP risk management. At the core of the process were technology-specific criteria developed to measure the success of each DMP technology in attaining the technology readiness levels assigned to each decision gate. The DGP accounts for both categories of technologies and qualifies the technology progression from technology development tasks to application areas. The process provided opportunities to validate performance, as well as to identify non-performance in time to adjust resources and direction. This paper describes the overall philosophy of the DGP and the methodology for implementation for DMP, and describes the method for defining the technology evaluation criteria. The process is illustrated by example of an application to a specific DMP technology.

Kohli, Rajiv↗

LWS/SET Technology Experiment Carrier

This paper examines the approach taken to building a low-cost, modular spacecraft bus that can be used to support a variety of technology experiments in different space environments. It describes the techniques used and design drivers considered to ensure experiment independence from as yet selected host spacecraft. It describes the technology experiment carriers that will support NASA's Living With a Star Space Environment Testbed space missions. NASA has initiated the Living With a Star (LWS) Program to develop a better scientific understanding to address the aspects of the connected Sun-Earth system that affect life and society. A principal goal of the program is to bridge the gap between science, engineering, and user application communities. The Space Environment Testbed (SET) Project is one element of LWS. The Project will enable future science, operational, and commercial objectives in space and atmospheric environments by improving engineering approaches to the accommodation and/or mitigation of the effects of solar variability on technological systems. The SET Project is highly budget constrained and must seek to take advantage of as yet undetermined partnering opportunities for access to space. SET will conduct technology validation experiments hosted on available flight opportunities. The SET Testbeds will be developed in a manner that minimizes the requirements for accommodation, and will be flown as flight opportunities become available. To access the widest range of flight opportunities, two key development requirements are to maintain flexibility with respect to accommodation constraints and to have the capability to respond quickly to flight opportunities. Experiments, already developed to the technology readiness level of needing flight validation in the variable Sun-Earth environment, will be selected on the basis of the need for the subject technology, readiness for flight, need for flight resources and particular orbit. Experiments will be accumulated by the Project and manifested for specific flight opportunities as they become available. The SET Carrier is designed to present a standard set of interfaces to SET technology experiments and to be modular and flexible enough to interface to a variety of possible host spacecraft. The Carrier will have core components and mission unique components. Once the core carrier elements have been developed, only the mission unique components need to be defined and developed for any particular mission. This approach will minimize the mission specific cost and development schedule for a given flight opportunity. The standard set of interfaces provided by SET to experiments allows them to be developed independent of the particulars of a host spacecraft. The Carrier will provide the power, communication, and the necessary monitoring features to operate experiments. The Carrier will also provide all of the mechanical assemblies and harnesses required to adapt experiments to a particular host. Experiments may be hosted locally with the Carrier or remotely on the host spacecraft. The Carrier design will allow a single Carrier to support a variable number of experiments and will include features that support the ability to incrementally add experiments without disturbing the core architecture.

Sherman, Barry↗

Deployable Aeroshell Flexible Thermal Protection System Testing

Deployable aeroshells offer the promise of achieving larger aeroshell surface areas for entry vehicles than otherwise attainable without deployment. With the larger surface area comes the ability to decelerate high-mass entry vehicles at relatively low ballistic coefficients. However, for an aeroshell to perform even at the low ballistic coefficients attainable with deployable aeroshells, a flexible thermal protection system (TPS) is required that is capable of surviving reasonably high heat flux and durable enough to survive the rigors of construction handling, high density packing, deployment, aerodynamic loading and aerothermal heating. The Program for the Advancement of Inflatable Decelerators for Atmospheric Entry (PAIDAE) is tasked with developing the technologies required to increase the technology readiness level (TRL) of inflatable deployable aeroshells, and one of several of the technologies PAIDAE is developing for use on inflatable aeroshells is flexible TPS. Several flexible TPS layups were designed, based on commercially available materials, and tested in NASA Langley Research Center's 8 Foot High Temperature Tunnel (8ft HTT). The TPS layups were designed for, and tested at three different conditions that are representative of conditions seen in entry simulation analyses of inflatable aeroshell concepts. Two conditions were produced in a single run with a sting-mounted dual wedge test fixture. The dual wedge test fixture had one row of sample mounting locations (forward) at about half the running length of the top surface of the wedge. At about two thirds of the running length of the wedge, a second test surface drafted up at five degrees relative to the first test surface established the remaining running length of the wedge test fixture. A second row of sample mounting locations (aft) was positioned in the middle of the running length of the second test surface. Once the desired flow conditions were established in the test section the dual wedge test fixture, oriented at 5 degrees angle of attack down, was injected into the flow. In this configuration the aft sample mounting location was subjected to roughly twice the heat flux and surface pressure of the forward mounting location. The tunnel was run at two different conditions for the test series: 1) 'Low Pressure', and 2) 'High Pressure'. At 'Low Pressure' conditions the TPS layups were tested at 6W/cm2 and 11W/cm2 while at 'High Pressure' conditions the TPS layups were tested at 11W/cm2 and 20W/cm2. This paper details the test configuration of the TPS samples in the 8Ft HTT, the sample holder assembly, TPS sample layup construction, sample instrumentation, results from this testing, as well as lessons learned.

Hughes, Stephen J.↗

NASA's Launch Propulsion Systems Technology Roadmap

Safe, reliable, and affordable access to low-Earth (LEO) orbit is necessary for all of the United States (US) space endeavors. In 2010, NASA s Office of the Chief Technologist commissioned 14 teams to develop technology roadmaps that could be used to guide the Agency s and US technology investment decisions for the next few decades. The Launch Propulsion Systems Technology Area (LPSTA) team was tasked to address the propulsion technology challenges for access to LEO. The developed LPSTA roadmap addresses technologies that enhance existing solid or liquid propulsion technologies and their related ancillary systems or significantly advance the technology readiness level (TRL) of less mature systems like airbreathing, unconventional, and other launch technologies. In developing this roadmap, the LPSTA team consulted previous NASA, military, and industry studies as well as subject matter experts to develop their assessment of this field, which has fundamental technological and strategic impacts for US space capabilities.

McConnaughey, Paul K.↗

Considerations for Architecture Level Trade Studies for Environmental Sensors

Comparisons of key characteristics of environmental sensors such as technology readiness levels, mass, power, volume, and detection capabilities are essential for initial trade studies to determine likely candidates for further development and evaluation. However, these trade studies only provide part of the information necessary to make selection decisions. Ultimately, the sensors must be judged based on the overall system architectures and operational scenarios for which they are intended. This means that additional characteristics, such as architectural needs for redundancy, operational lifetime, ability to maintain calibration, and repair and replacement strategies, among others, must also be considered. Given that these characteristics can be extremely time-consuming and costly to obtain, careful planning is essential to minimize the effort involved. In this paper, an approach is explored for determining an effective yet comprehensive set of architecture level trades which is minimally impacted by the inevitable changes in operational (mission) scenarios. The approach will also identify and integrate the various facilities and opportunities required to obtain the desired architecture level trade information.

Peterson, Craig↗

Propulsion Technology Assessment: Science & Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s2 and 0.664 mm/s2, were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/s2, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 sq km/s2 for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

As part of a larger effort led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA’s George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system’s heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025 to 2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/s(exp 2) and 0.664 mm/s(exp 2), were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s(exp 2) and 2 mm/s(exp 2), were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA’s Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km(exp 2)/s(exp 2) for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

Propulsion Technology Assessment: Science and Enabling Technologies to Explore the Interstellar Medium

Led by the Keck Institute for Space Studies at the California Institute of Technology, the Advanced Concepts Office at NASA's George C. Marshall Space Flight Center conducted a study to assess what low-thrust advanced propulsion system candidates, existing and near term, could deliver a small, Voyager-like satellite to our solar system's heliopause, approximately 100 AU from the center of the sun, within 10 years and within a 2025-2035 launch window. The advanced propulsion system trade study consisted of three candidates, including a Magnetically Shielded Miniature (MaSMi) Hall thruster, a solar sail and an electric sail. Two aerial densities, and thus characteristic accelerations, 0.426 mm/sq s and 0.664 mm/sq s were analyzed for the solar sail option in order understand the impact of near and long term development of this technology. Similarly, two characteristic accelerations, 1 mm/s2 and 2 mm/sq s, were also analyzed for the electric sail option in addition to tether quantities of 10 and 20, respectively, and individual tether length of 20 km. A second analysis was conducted to determine what existing solid rocket motor kick stage(s) would be required to provide additional thrust at various points in the trajectory, assuming an earth departure characteristic energy capability provided by a Space Launch System (SLS) Block 1B vehicle architecture carrying an 8.4 meter payload fairing. Two trajectory profiles were considered, including an escape trajectory using a Jupiter gravity assist (E-Ju), and an escape trajectory first performing a Jupiter gravity assist followed by an Oberth maneuver around the sun and an optional Saturn gravity assist (E-Ju-Su-Sa). The Oberth maneuver would need to be performed very close to the sun, wherein this study assumed a perihelion distance of approximately 11 solar radii, or 0.05 AU, away from the surface. The heat shield technology required to perform this type of ambitious maneuver was assumed to be similar to that of NASA's Solar Probe Plus mission, which is slated to launch in July 2018. With respect to a SLS Block 1B earth departure characteristic energy capability of 100 km2/sq s for the E-Ju trajectory option, results indicated that compared to having no advanced propulsion system onboard, both the MaSMi Hall thruster and solar sail options subtract approximately 8 to 10 years from the total trip time while the electric sail outperforms all options by subtracting up to 20 years. With respect to an average kick stage velocity capability of 2.5 to 3.5 km/s at perihelion, the most sensitive segment of the E-Ju-Su-Sa trajectory option, results indicated that both the MaSMi Hall thrust and solar sail options only subtract 1 to 3 years from the total trip time whereas the electric sail again outperforms all other options by subtracting up to 5 years. In other words, if the Technology Readiness Level of an electric sail could be increased in time, this propulsion technology could not only enable a satellite to reach 100 AU in 10 years but it could potentially do so even faster. Completing such an ambitious mission in that short of a timespan would be very attractive to many as it would be well within the average career span of any of those involved.

Hopkins, Randall C.↗

A Hybrid Mars Ascent Vehicle Concept for Low Temperature Storage and Operation

A hybrid propulsion system presents many advantages for a potential Mars Ascent Vehicle including high specific impulse, restartability and predicted excellent low temperature survivability. This additional benefit of low temperature storage and operation could substantially reduce the power required to maintain the system while on Mars and therefore decrease the total landed system mass required for the system. A new wax-based hybrid fuel has been formulated to realize these low temperature benefits, while still preserving high performance (Isp). The freezing point of the oxidizer can be selected to match the capabilities of the fuel, in this case Mixed Oxides of Nitrogen has been selected. The main disadvantages of this system are associated with the relatively low technology readiness level of the selected hybrid propulsion system for operation on Mars. However, technology development efforts are currently underway to advance the hybrid propulsion system to a level where it could potentially compete with heritage propulsion systems. An internal study completed at JPL in 2015 identified the single stage to orbit hybrid MAV as the lowest gross liftoff mass case from a large range of potential propulsion systems. Updates to this design are presented here.

Karp, Ashley Chandler↗

NASA Kennedy Space Center Swamp Works 10th Anniversary: Innovative Research & Technology Development Summary

Kennedy Space Center’s (KSC) Swamp Works, provides government and commercial space ventures with the technologies required for working and living on the surfaces of the Moon or other planets and bodies in our solar system. The Swamp Works team establishes rapid, innovative and cost-effective exploration mission solutions through leveraging of partnerships across NASA, industry and academia. Concepts start small and build up fast, with lean development processes and a hands-on approach. Testing is performed in early stages to drive design improvements and progressively increase Technology Readiness Levels (TRL). Swamp Works provides concepts, architecture studies and trades, designs, data, technology development, technology demonstration hardware, flight hardware, testing, flight support and knowledge in support of the development of surface systems. It consists of several teams with associated laboratories and test capabilities. The Granular Mechanics and Regolith Operations (GMRO) Laboratory and the Electrostatics and Surface Physics Laboratory (ESPL) are co-located in the Engineering Development Lab (EDL) facility high bay. The Applied Chemistry Lab (ACL) is in an adjacent facility and other KSC labs are being influenced by the innovation methods pioneered at the Swamp Works. The Swamp Works was founded in January 2013 by a group of scientists and engineers at KSC with the over-arching vision of expanding humanity and civilization into the solar system by the use of space resources via advanced technology. Ultimately, this will create a solar system economy that will improve the human condition due to the abundance of energy and resources. This paper will summarize the projects and technology development that have been performed by the Swamp Works to celebrate its 10th Anniversary of innovation success.

Robotic Mining↗

NASA Kennedy Space Center Swamp Works: Innovation Methods for Advanced Research & Technology Development

Kennedy Space Center’s (KSC) Swamp Works, provides government and commercial space ventures with the technologies required for working and living on the surfaces of the Moon or other planets and bodies in our solar system. The Swamp Works team establishes agile, innovative and cost effective exploration mission solutions through leveraging of partnerships across NASA, industry and academia. Concepts start small and build up efficiently, with lean development processes and a hands on approach. Testing is performed in early stages to drive design improvements and progressively increase Technology Readiness Levels (TRL). Swamp Works provides concepts, architecture studies and trades, designs, data, technology development, technology demonstration hardware, flight hardware, testing, flight support and knowledge in support of the development of surface systems. This paper will summarize the state of the art in innovation methods, and it will compare the various other methods to how innovation is accomplished at the NASA KSC Swamp Works. Since 2013, Swamp Works has developed a wide variety of technologies, and has demonstrated viable methods for innovation while also collaborating with other government agencies, industry and academia to support space exploration. These methods focus on agile design, test, build iterations where each cycle of prototyping results in improved knowledge and designs. Failures are tole rated in the early stages of these iterations, since the overall development cycle is shorter more efficient and cost effective by retiring risk early in the cycle. Momentum is maintained and the development teams remain highly motivated by the high level of team work, technical excellence, engagement and creative freedom.

Robotic Mining↗

Swamp Works Technology Development 10th Anniversary: 2013-2023

Kennedy Space Center’s (KSC) Swamp Works, provides government and commercial space ventures with the technologies required for working and living on the surfaces of the Moon or other planets and bodies in our solar system. The Swamp Works team establishes efficient, innovative and cost-effective exploration mission solutions through leveraging of partnerships across NASA, industry and academia. Concepts start small and build up momentum, with lean development processes and a hands-on approach. Testing is performed in early stages to drive design improvements and progressively increase Technology Readiness Levels (TRL). Swamp Works provides concepts, architecture studies and trades, designs, data, technology development, technology demonstration hardware, flight hardware, testing, flight support and knowledge in support of the development of surface systems. It consists of several teams with associated laboratories and test capabilities. The Granular Mechanics and Regolith Operations (GMRO) Laboratory and the Electrostatics and Surface Physics Laboratory (ESPL) are co-located in the Engineering Development Lab (EDL) facility high bay. The Applied Chemistry Lab (ACL) is in an adjacent facility and other KSC labs are being influenced by the innovation methods pioneered at the Swamp Works. The Swamp Works was founded in January 2013 by a group of scientists and engineers at KSC with the over-arching vision of expanding humanity and civilization into the solar system by the use of space resources via advanced technology. Ultimately, this will create a solar system economy that will improve the human condition due to the abundance of energy and resources. This presentation will summarize the projects and technology development that have been performed by the Swamp Works to celebrate its 10th Anniversary of innovation success.

Swamp Works↗

Swamp Works Technology Development 10th Anniversary: 2013-2023 - Innovative Research & Technology Development Summary

Kennedy Space Center’s (KSC) Swamp Works, provides government and commercial space ventures with the technologies required for working and living on the surfaces of the Moon or other planets and bodies in our solar system. The Swamp Works team establishes rapid, innovative and cost-effective exploration mission solutions through leveraging of partnerships across NASA, industry and academia. Concepts start small and build up efficiently, with lean development processes and a hands-on approach. Testing is performed in early stages to drive design improvements and progressively increase Technology Readiness Levels (TRL). Swamp Works provides concepts, architecture studies and trades, designs, data, technology development, technology demonstration hardware, flight hardware, testing, flight support and knowledge in support of the development of surface systems. It consists of several teams with associated laboratories and test capabilities. The Granular Mechanics and Regolith Operations (GMRO) Laboratory and the Electrostatics and Surface Physics Laboratory (ESPL) are co-located in the Engineering Development Lab (EDL) facility high bay. The Applied Chemistry Lab (ACL) is in an adjacent facility and other KSC labs are being influenced by the innovation methods pioneered at the Swamp Works. The Swamp Works was founded in January 2013 by a group of scientists and engineers at KSC with the over-arching vision of expanding humanity and civilization into the solar system by the use of space resources via advanced technology. Ultimately, this will create a solar system economy that will improve the human condition due to the abundance of energy and resources. This presentation will summarize the projects and technology development that have been performed by the Swamp Works to celebrate its 10th Anniversary of innovation success.

Swamp Works↗