Search NASA⌕ Search

SEARCH · Search NASA

Results for “Telemetry”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

The Progressive Insurance Automotive X PRIZE Education Program

The Progressive Insurance Automotive X PRIZE Education Program conducted education and outreach activities and used the competition's technical goals and vehicle demonstrations as a means of attracting students and the public to learn more about advanced vehicle technologies, energy efficiency, climate change, alternative fuels, and the science and math behind efficient vehicle development. The Progressive Insurance Automotive X PRIZE Education Program comprised three integrated components that were designed to educate the general public and create a multi-tiered initiative to engage students and showcase the 21st century skills students will need to compete in our global economy: teamwork, creativity, strong literacy, math and science skills, and innovative thinking. The elements included an Online Experience, a National Student Contest, and in person education events and activites. The project leveraged online connections, strategic partnerships, in-classroom, and beyond-the-classroom initiatives, as well as mainstream media. This education program supported by the U.S. Department of Energy (DOE) also funded the specification of vehicle telemetry and the full development and operation of an interactive online experience that allowed internet users to follow the Progressive Insurance Automotive X PRIZE vehicles as they performed in real-time during the Progressive Insurance Automotive X PRIZE competition events.

33 ADVANCED PROPULSION SYSTEMS↗

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid the recovery of Snake River steelhead populations.

13 HYDRO ENERGY↗

Biotelemetry system for Epilepsy Seizure Control

The Biotelemetry System for Epilepsy Seizure Control Project developed and tested an automated telemetry system for use in an epileptic seizure prevention device that precisely controls localized brain temperature. This project was a result of a Department of Energy (DOE) Global Initiatives for Proliferation Prevention (GIPP) grant to the Kansas City Plant (KCP), Argonne National Laboratory (ANL), and Pacific Northwest National Laboratory (PNNL) to partner with Flint Hills Scientific, LLC, Lawrence, KS and Biophysical Laboratory Ltd (BIOFIL), Sarov, Russia to develop a method to help control epileptic seizures.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Determining Lamprey Species Composition, Larval Distribution and Adult Abundance in the Deschutes River Subbasin, Oregon ; 2007 Annual Report.

We will report results of an ongoing project in the Deschutes River Subbasin to describe Pacific lamprey (Lampetra tridentata) life history. Project objectives were to determine adult lamprey escapement from Sherars Falls located at Rkm 70.4 and determine lamprey focal spawning areas, spawn timing and habitat through radio telemetry. A mark-recapture study and tribal creel was conducted to determine adult escapement. Lamprey were radio tagged and are currently being mobile, aerial and fixed site tracked to describe spawning. Adult lamprey were collected at Sherars Falls using a long-handled dip net from June-September 2007. The fate of lamprey collected at Sherars Falls was determined based on girth measurements. Fish measuring less than 10.5 cm received two markings for the mark-recapture estimation while those measuring 10.5 cm or greater were implanted with radio transmitters. Two-hundred and nine lamprey were marked during first event sampling, 2,501 lamprey inspected for marks and 64 recaptured during second event sampling. We estimate lamprey abundance to be 8,083 (6,352-10,279) with a relative precision of 19.8. Tribal harvest was 2,303 +/- 88. Escapement was estimated at 5,780 adult lamprey. Thirty-six lamprey received radio transmitters. Lamprey were transported upstream 6.3 Rkm for surgery, held to recover from anesthesia and released. Mobile tracking efforts started mid-July 2007 and are on-going. To date 35 of the 36 lamprey have been detected. Upon release, extensive ground-based tracking was conducted until fish became dormant in mid-October. Since, fixed site downloading and tracking have occurred weekly on the mainstem Deschutes River. Majority of lamprey (88%) are holding in the mainstem Deschutes River. Three lamprey moved upstream more than 70 Rkms into westside tributaries from August-December. Three moved approximately 18 Rkms downstream of the release site. Tracking will continue through the spawning season when redd characteristics will be measured and reported in the 2008-2009 annual report.

13 HYDRO ENERGY↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam : Annual Report October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations - a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezometers. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet. During our overall monitoring period (October 2007 through June 2008), mean temperature in chum spawning areas was nearly 2 C warmer within the riverbed than in the overlying river. During chum salmon spawning (mid-November 2007 through December2007), mean riverbed temperature in the Ives Island area was 14.5 C, more than 5 C higher than in the river, where mean temperature was 9.4 C. During the incubation period (January 2008 through mid-May 2008), riverbed temperature was approximately 3 C greater than in the overlying river (10.5 C and 7.2 C, respectively). Chum salmon preferentially select spawning locations where riverbed temperatures are elevated; consequently the incubation time of alevin is shortened before they emerge in the spring.

13 HYDRO ENERGY↗

Snake River Fall Chinook Salmon Life History Investigations, Annual Report 2007.

In 2007, we used radio and acoustic telemetry to evaluate the migratory behavior, survival, mortality, and delay of subyearling fall Chinook salmon in the Clearwater River and Lower Granite Reservoir. Monthly releases of radio-tagged fish ({approx}95/month) were made from May through October and releases of 122-149/month acoustic-tagged fish per month were made from August through October. We compared the size at release of our tagged fish to that which could have been obtained at the same time from in-river, beach seine collections made by the Nez Perce Tribe. Had we relied on in-river collections to obtain our fish, we would have obtained very few in June from the free-flowing river but by late July and August over 90% of collected fish in the transition zone were large enough for tagging. Detection probabilities of radio-tagged subyearlings were generally high ranging from 0.60 (SE=0.22) to 1.0 (SE=0) in the different study reaches and months. Lower detection probabilities were observed in the confluence and upper reservoir reaches where fewer fish were detected. Detection probabilities of acoustic-tagged subyearlings were also high and ranged from 0.86 (SE=0.09) to 1.0 (SE=0) in the confluence and upper reservoir reaches during August through October. Estimates of the joint probability of migration and survival generally declined in a downstream direction for fish released from June through August. Estimates were lowest in the transition zone (the lower 7 km of the Clearwater River) for the June release and lowest in the confluence area for July and August releases. The joint probability of migration and survival in these reaches was higher for the September and October releases, and were similar to those of fish released in May. Both fish weight and length at tagging were significantly correlated with the joint probability of migrating and surviving for both radio-tagged and acoustic-tagged fish. For both tag types, fish that were heavier at tagging had a higher probability of successfully passing through the confluence (P=0.0050 for radio-tagged fish; P=0.0038 for acoustic-tagged fish). Radio-tagged fish with greater weight at tagging also had a higher probability of migrating and surviving through both the lower free-flowing reach (P=0.0497) and the transition zone (P=0.0007). Downstream movement rates of radio-tagged subyearlings were highest in free-flowing reaches in every month and decreased considerably with impoundment. Movement rates were slowest in the transition zone for the June and August release groups, and in the confluence reach for the July release group. For acoustic-tagged subyearlings, the slowest movement rates through the confluence and upper reservoir reaches were observed for the September release group. Radio-tagged fish released in August showed the greatest delay in the transition zone, while acoustic-tagged fish released in September showed the greatest delay in the transition zone and confluence reaches. Across the monthly release groups from July through September, the probability of delaying in the transition zone and surviving there declined throughout the study. All monthly release groups of radio-tagged subyearlings showed evidence of mortality within the transition zone, with final estimates (across the full 45-d detection period) ranging from 0.12 (SE not available) for the May release group to 0.58 (SE = 0.06) for the June release group. The May and September release groups tended to have lower mortality in the transition zone than the June, July, and August release groups. Live fish were primarily detected away from shore in the channel, whereas all dead fish were located along shorelines with most being located in the vicinity of the Memorial Bridge and immediately upstream. During the May detection period, before the implementation of summer flow augmentation, temperatures in the Clearwater River and Snake River arms of Lower Granite Reservoir and the downstream boundary of the confluence ranged from 8 to 17 C. During the June-August detection periods, however, temperatures in the Clearwater River arm ranged from 10-16 C down to 7 m and the Snake River arm was above 20 C down to a depth of 9 m. Incomplete mixing between the two water sources resulted in significant vertical temperature variation at the downstream boundary of the confluence during a large portion of the June-August detection periods. This variation diminished during the September and October detection periods when temperatures once again fell to 17 C and lower and eventually became uniformly distributed throughout the water column in the confluence.

13 HYDRO ENERGY↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam -- Annual Report -- October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations----a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezo¬meters. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines and neutrally-buoyant particles) the lower numbered turbine units.

58 GEOSCIENCES↗

Wireless Infrastructure for Performing Monitoring, Diagnostics, and Control HVAC and Other Energy-Using Systems in Small Commercial Buildings

This project focused on developing a low-cost wireless infrastructure for monitoring, diagnosing, and controlling building systems and equipment. End users receive information via the Internet and need only a web browser and Internet connection. The system used wireless communications for: (1) collecting data centrally on site from many wireless sensors installed on building equipment, (2) transmitting control signals to actuators and (3) transmitting data to an offsite network operations center where it is processed and made available to clients on the Web (see Figure 1). Although this wireless infrastructure can be applied to any building system, it was tested on two representative applications: (1) monitoring and diagnostics for packaged rooftop HVAC units used widely on small commercial buildings and (2) continuous diagnosis and control of scheduling errors such as lights and equipment left on during unoccupied hours. This project developed a generic infrastructure for performance monitoring, diagnostics, and control, applicable to a broad range of building systems and equipment, but targeted specifically to small to medium commercial buildings (an underserved market segment). The proposed solution is based on two wireless technologies. The first, wireless telemetry, is used for cell phones and paging and is reliable and widely available. This risk proved to be easily managed during the project. The second technology is on-site wireless communication for acquiring data from sensors and transmitting control signals. The technology must enable communication with many nodes, overcome physical obstructions, operate in environments with other electrical equipment, support operation with on-board power (instead of line power) for some applications, operate at low transmission power in license-free radio bands, and be low cost. We proposed wireless mesh networking to meet these needs. This technology is relatively new and has been applied only in research and tests. This proved to be a major challenge for the project and was ultimately abandoned in favor of a directly wired solution for collecting sensor data at the building. The primary reason for this was the relatively short ranges at which we were able to effectively place the sensor nodes from the central receiving unit. Several different mesh technologies were attempted with similar results. Two hardware devices were created during the original performance period of the project. The first device, the WEB-MC, is a master control unit that has two radios, a CPU, memory, and serves as the central communications device for the WEB-MC System (Currently called the 'BEST Wireless HVAC Maintenance System' as a tentative commercial product name). The WEB-MC communicates with the local mesh network system via one of its antennas. Communication with the mesh network enables the WEB-MC to configure the network, send/receive data from individual motes, and serves as the primary mechanism for collecting sensor data at remote locations. The second antenna enables the WEB-MC to connect to a cellular network ('Long-Haul Communications') to transfer data to and from the NorthWrite Network Operations Center (NOC). A third 'all-in-one' hardware solution was created after the project was extended (Phase 2) and additional resources were provided. The project team leveraged a project funded by the State of Washington to develop a hardware solution that integrated the functionality of the original two devices. The primary reason for this approach was to eliminate the mesh network technical difficulties that severely limited the functionality of the original hardware approach. There were five separate software developments required to deliver the functionality needed for this project. These include the Data Server (or Network Operations Center), Web Application, Diagnostic Software, WEB-MC Embedded Software, Mote Embedded Software. Each of these developments was necessarily dependent on the others. This resulted in a challenging management task - requiring high bandwidth communications among all the team members. Fortunately, the project team performed exceptionally well together and was able to work through the various challenges that this presented - for example, when one software tool required a detailed description of the output of a second tool, before that tool had been fully designed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot

The 2009 Participating Load Pilot Customer Impact Evaluation provides evidence that short duration demand response events which cycle off air conditioners for less than thirty minutes in a hot, dry environment do not lead to a significant degradation in the comfort level of residents participating in the program. This was investigated using: (1) Analysis of interval temperature data collected from inside residences of select program participants; and (2) Direct and indirect customer feedback from surveys designed and implemented by Southern California Edison at the conclusion of the program season. There were 100 indoor temperature monitors that were acquired by LBNL for this study that transmitted temperature readings at least once per hour with corresponding timestamps during the program season, June-October, 2009. Recorded temperatures were transferred from the onsite telemetry devices to a mesh network, stored, and then delivered to KEMA for analysis. Following an extensive data quality review, temperature increases during each of the thirty demand response test events were calculated for each device. The results are as follows: (1) Even for tests taking place during outside temperatures in excess of 100 degrees Fahrenheit, over 85 percent of the devices measured less than a 0.5 degree Fahrenheit temperature increase indoors during the duration of the event. (2) For the increases that were observed, none was more than 5 degrees and it was extremely rare for increases to be more than 2 degrees. At the end of the testing season SCE and KEMA designed and conducted a survey of the a facilities and public works managers and approximately 100 customers feedback survey to assess the extent the PLP events were noticed or disrupted the comfort level of participants. While only a small sampling of 3 managers and 16 customer surveys were completed, their responses indicate: (1) No customer reported even a moderate level of discomfort from the cycling-off of their air conditioners during test events; and (2) Very few customers noticed any of the thirty events at all. The results of this study suggest that the impacts on comfort from short-duration interruptions of air-conditioners, even in very hot climates, are for the most part very modest, if they are even noticed at all. Still, we should expect that these impacts will increase with longer interruptions of air-conditioning. By the same token, we should also expect that they will be less significant in cooler climates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010

The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design Parameters of a Miniaturized Piezoelectric Underwater Acoustic Transmitter

The Juvenile Salmon Acoustic Telemetry System (JSATS) project supported by the U.S. Army Corps of Engineers, Portland District, has yielded the smallest acoustic fish tag transmitter commercially available to date. In order to study even smaller fish populations and make the transmitter injectable by needles, the JSATS acoustic micro transmitter needs to be further downsized. As part of the transmitter downsizing effort some of the design parameters of the lead zirconate titanate (PZT) ceramic tube transducer in the transmitter were studied, including the type of PZT, the backing material, the necessary drive voltage, the transmitting bandwidth and the length of the transducer. It was found that, to satisfy the 156-dB source level requirement of JSATS, a square wave with a 10-volt amplitude is required to drive 'soft' PZT transducers. PZT-5H demonstrated the best source level performance. For Navy types I and II, 16 volts or 18 volts were needed. Ethylene-propylene-diene monomer (EPDM) closed-cell foam was found to be the backing material providing the highest source level. The effect of tube length on the source level is also demonstrated in this paper, providing quantitative information for downsizing of small piezoelectric transmitters.

47 OTHER INSTRUMENTATION↗

How Low Can You Go? Determining a Size Threshold for Implantation of a New Acoustic Transmitter in Age-0 White Sturgeon

Telemetry studies are often used to investigate sturgeon habitat use and movement patterns; however, existing acoustic transmitters are generally too large to implant into age-0 sturgeon without harming the fish. Recent development of a miniaturized acoustic transmitter (cylindrical, 0.7 g in air, 24.2 mm long, 5.0 mm diameter) with up to 365 d battery life has the potential to advance our understanding of age-0 sturgeon ecology in rivers and lakes. Prior to use in field studies, it is essential to conduct experiments evaluating potential adverse transmitter effects on fish. We tested transmitter retention, fish survival, and growth of a broad size range of age-0 white sturgeon (Acipenser transmontanus; 158–277 mm fork length; 26–126 g; 0.6–2.6% transmitter burden) in an 84 d laboratory study, with an ultimate goal of determining a minimum size threshold of sturgeon that can be implanted with this acoustic transmitter. At 84 d post-implantation, transmitter retention and fish survival were 100%. Specific growth rates were reduced at 7 and 14 d post-implantation, resulting in minimum fork length thresholds of 250 and 171 mm, respectively. Juveniles implanted with transmitters regained their growth potential by 28 d post-implantation and no size differences were detected in comparisons with unmarked control fish. This study demonstrates the ability to implant small age-0 sturgeon with high transmitter retention and fish survival, and only minor growth effects. Use of new miniaturized acoustic transmitters may give researchers a means to address questions about young-of-the-year fish recruitment, ecological patterns, and potentially advance conservation management of sturgeon populations.

behavior↗

Fish Passage: A New Tool to Investigate Fish Movement: JSATS

A new system is being used to determine fish mortality issues related to hydroelectric facilities in the Pacific Northwest. Called the juvenile salmon acoustic telemetry system (JSATS), this tool allows researchers to better understand fish movement, behavior, and survival around dams and powerhouses.

13 HYDRO ENERGY↗

Open Automated Demand Response Communications in Demand Response for Wholesale Ancillary Services

The Pacific Gas and Electric Company (PG&E) is conducting a pilot program to investigate the technical feasibility of bidding certain demand response (DR) resources into the California Independent System Operator's (CAISO) day-ahead market for ancillary services nonspinning reserve. Three facilities, a retail store, a local government office building, and a bakery, are recruited into the pilot program. For each facility, hourly demand, and load curtailment potential are forecasted two days ahead and submitted to the CAISO the day before the operation as an available resource. These DR resources are optimized against all other generation resources in the CAISO ancillary service. Each facility is equipped with four-second real time telemetry equipment to ensure resource accountability and visibility to CAISO operators. When CAISO requests DR resources, PG&E's OpenADR (Open Automated DR) communications infrastructure is utilized to deliver DR signals to the facilities energy management and control systems (EMCS). The pre-programmed DR strategies are triggered without a human in the loop. This paper describes the automated system architecture and the flow of information to trigger and monitor the performance of the DR events. We outline the DR strategies at each of the participating facilities. At one site a real time electric measurement feedback loop is implemented to assure the delivery of CAISO dispatched demand reductions. Finally, we present results from each of the facilities and discuss findings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Next-Generation Intensity-Duration-Frequency Curves for Hydrologic Design in Snow-Dominated Environments

We report that there is a renewed focus on the design of infrastructure resilient to extreme hydrometeorological events. While precipitation-based intensity-duration-frequency (IDF) curves are commonly used as part of infrastructure design, a large percentage of peak runoff events in snow-dominated regions are caused by snowmelt, particularly during rain-on-snow (ROS) events. In these regions, precipitation-based IDF curves may lead to substantial over-/under-estimation of design basis events and subsequent over-/under-design of infrastructure. To overcome this deficiency, we proposed next-generation IDF (NG-IDF) curves, which characterize the actual water reaching the land surface. We compared NG-IDF curves to standard precipitation-based IDF curves for estimates of extreme events at 376 Snowpack Telemetry (SNOTEL) stations across the western United States that each had at least 30 years of high-quality records. We found standard precipitation-based IDF curves at 45% of the stations were subject to under-design, many with significant under-estimation of 100-year extreme events, for which the precipitation-based IDF curves can underestimate water potentially available for runoff by as much as 125% due to snowmelt and ROS events. The regions with the greatest potential for under-design were in the Pacific Northwest, the Sierra Nevada Mountains, and the Middle and Southern Rockies. We also found the potential for over-design at 20% of the stations, primarily in the Middle Rockies and Arizona mountains. Finally, these results demonstrate the need to consider snow processes in the development of IDF curves, and they suggest use of the more robust NG-IDF curves for hydrologic design in snow-dominated environments.

54 ENVIRONMENTAL SCIENCES↗

Spatially explicit network analysis reveals multi‐species annual cycle movement patterns of sea ducks

Abstract Conservation of long‐distance migratory species poses unique challenges. Migratory connectivity, that is, the extent to which groupings of individuals at breeding sites are maintained in wintering areas, is frequently used to evaluate population structure and assess use of key habitat areas. However, for species with complex or variable annual cycle movements, this traditional bimodal framework of migratory connectivity may be overly simplistic. Like many other waterfowl, sea ducks often travel to specific pre‐ and post‐breeding sites outside their nesting and wintering areas to prepare for migration by feeding extensively and, in some cases, molting their flight feathers. These additional migrations may play a key role in population structure, but are not included in traditional models of migratory connectivity. Network analysis, which applies graph theory to assess linkages between discrete locations or entities, offers a powerful tool for quantitatively assessing the contributions of different sites used throughout the annual cycle to complex spatial networks. We collected satellite telemetry data on annual cycle movements of 672 individual sea ducks of five species from throughout eastern North America and the Great Lakes. From these data, we constructed a multi‐species network model of migratory patterns and site use over the course of breeding, molting, wintering, and migratory staging. Our results highlight inter‐ and intra‐specific differences in the patterns and complexity of annual cycle movement patterns, including the central importance of staging and molting sites in James Bay, the St. Lawrence River, and southern New England to multi‐species annual cycle habitat linkages, and highlight the value of Long‐tailed Ducks ( Calengula haemalis ) as an umbrella species to represent the movement patterns of multiple sea duck species. We also discuss potential applications of network migration models to conservation prioritization, identification of population units, and integrating different data streams.

54 ENVIRONMENTAL SCIENCES↗

Intrinsic and environmental drivers of pairwise cohesion in wild Canis social groups

Animals within social groups respond to costs and benefits of sociality by adjusting the proportion of time they spend in close proximity to other individuals in the group (cohesion). Variation in cohesion between individuals, in turn, shapes important group-level processes such as subgroup formation and fission–fusion dynamics. Although critical to animal sociality, a comprehensive understanding of the factors influencing cohesion remains a gap in our knowledge of cooperative behavior in animals. We tracked 574 individuals from six species within the genus Canis in 15 countries on four continents with GPS telemetry to estimate the time that pairs of individuals within social groups spent in close proximity and test hypotheses regarding drivers of cohesion. Pairs of social canids (Canis spp.) varied widely in the proportion of time they spent together (5%–100%) during seasonal monitoring periods relative to both intrinsic characteristics and environmental conditions. The majority of our data came from three species of wolves (gray wolves, eastern wolves, and red wolves) and coyotes. For these species, cohesion within social groups was greatest between breeding pairs and varied seasonally as the nature of cooperative activities changed relative to annual life history patterns. Across species, wolves were more cohesive than coyotes. For wolves, pairs were less cohesive in larger groups, and when suitable, small prey was present reflecting the constraints of food resources and intragroup competition on social associations. Pair cohesion in wolves declined with increased anthropogenic modification of the landscape and greater climatic variability, underscoring challenges for conserving social top predators in a changing world. We show that pairwise cohesion in social groups varies strongly both within and across Canis species, as individuals respond to changing ecological context defined by resources, competition, and anthropogenic disturbance. Our work highlights that cohesion is a highly plastic component of animal sociality that holds significant promise for elucidating ecological and evolutionary mechanisms underlying cooperative behavior.

59 BASIC BIOLOGICAL SCIENCES↗