Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. For short missions, radiation risk is dominated by the possibility of a large Solar Particle Event (SPE). Longer duration missions have both SPE and Galactic Cosmic Ray (GCR) risks. SPE exposure can contribute significantly toward cancer induction in combination with GCR. As mission duration increases, mitigation strategies must address the combined risks from SPE and GCR exposure. In this paper, full mission exposure assessments were performed for the proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, previously developed radiation shielding models for a proposed lunar habitat and rover were utilized. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during Extra-Vehicular Activities (EVA). Subsequently, total mission exposures were evaluated for the proposed timelines. Mission exposure results, assessed in terms of effective dose, are presented for the proposed timelines and recommendations are made for improved astronaut shielding and safer operational practices.

Adamczyk, Anne↗

Gas Chromatograph Method Optimization Trade Study for RESOLVE: 20-meter Column v. 8-meter Column

RESOLVE is the payload on a Class D mission, Resource Prospector, which will prospect for water and other volatile resources at a lunar pole. The RESOLVE payload's primary scientific purpose includes determining the presence of water on the moon in the lunar regolith. In order to detect the water, a gas chromatograph (GC) will be used in conjunction with a mass spectrometer (MS). The goal of the experiment was to compare two GC column lengths and recommend which would be best for RESOLVE's purposes. Throughout the experiment, an Inficon Fusion GC and an Inficon Micro GC 3000 were used. The Fusion had a 20m long column with 0.25mm internal diameter (Id). The Micro GC 3000 had an 8m long column with a 0.32mm Id. By varying the column temperature and column pressure while holding all other parameters constant, the ideal conditions for testing with each column length in their individual instrument configurations were determined. The criteria used for determining the optimal method parameters included (in no particular order) (1) quickest run time, (2) peak sharpness, and (3) peak separation. After testing numerous combinations of temperature and pressure, the parameters for each column length that resulted in the most optimal data given my three criteria were selected. The ideal temperature and pressure for the 20m column were 95 C and 50psig. At this temperature and pressure, the peaks were separated and the retention times were shorter compared to other combinations. The Inficon Micro GC 3000 operated better at lower temperature mainly due to the shorter 8m column. The optimal column temperature and pressure were 70 C and 30psig. The Inficon Micro GC 3000 8m column had worse separation than the Inficon Fusion 20m column, but was able to separate water within a shorter run time. Therefore, the most significant tradeoff between the two column lengths was peak separation of the sample versus run time. After performing several tests, it was concluded that better detection via good peak separation with a longer run time is a better asset than moderate peak separation with a shorter run time. Even given that RESOLVE is highly interested in water and that mission timeline is of significant importance given the short seven-to-ten-day mission timeline, worse detection with an 8m column may lead to overlooking other substances existing on the moon that could advance planetary science. Thus, I recommend the 20m column. However, if mission timeline and water separation are deemed the highest priority, the 8m column should be selected due to its ability to separate water within a shorter run time than the 20m column.

Column↗

Integrated Medical Model (IMM) 4.0 Enhanced Functionalities

The Integrated Medical Model is a probabilistic simulation model that uses input data on 100 medical conditions to simulate expected medical events, the resources required to treat, and the resulting impact to the mission for specific crew and mission characteristics. The newest development version of IMM, IMM v4.0, adds capabilities that remove some of the conservative assumptions that underlie the current operational version, IMM v3. While IMM v3 provides the framework to simulate whether a medical event occurred, IMMv4 also simulates when the event occurred during a mission timeline. This allows for more accurate estimation of mission time lost and resource utilization. In addition to the mission timeline, IMMv4.0 features two enhancements that address IMM v3 assumptions regarding medical event treatment. Medical events in IMMv3 are assigned the untreated outcome if any resource required to treat the event was unavailable. IMMv4 allows for partially treated outcomes that are proportional to the amount of required resources available, thus removing the dichotomous treatment assumption. An additional capability IMMv4 is to use an alternative medical resource when the primary resource assigned to the condition is depleted, more accurately reflecting the real-world system. The additional capabilities defining IMM v4.0the mission timeline, partial treatment, and alternate drug result in more realistic predicted mission outcomes. The primary model outcomes of IMM v4.0 for the ISS6 mission, including mission time lost, probability of evacuation, and probability of loss of crew life, are be compared to those produced by the current operational version of IMM to showcase enhanced prediction capabilities.

Spae Adaptation Syndrome↗

Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated with the MSC via voice and text messaging. They also provided scientific instrument data, still imagery, video streams from chest-mounted cameras, GPS location tracking information. The MSC monitored and reviewed incoming data from the field across delay and provided recommendations for pre-sampling and sampling tasks based on their collective expertise. The scientists used dynamic priority ranking lists, referred to as dynamic leaderboards, to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards throughout the EVA were relayed regularly to the IV crewmembers. The use of these leaderboards enabled the crew to track the dynamic nature of the MSC recommendations and helped minimize crew idle time (defined as time spent waiting for input from Earth during which no other productive tasks are being performed). EVA timelines were strategically designed to enable continuous (delayed) feedback from an Earth-based Science Team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA timeline data, ground assimilation times (defined as the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.↗

LMI Automated Air Cargo Operations Market Research and Forecast

Air cargo companies and aircraft manufacturers are making significant investments to enable the movement of cargo via various levels of automated aircraft, such as aircraft with simplified operations requiring a pilot, remotely monitored or piloted aircraft, and fully autonomous aircraft. These investments will enable greater utilization of aircraft while unlocking new air markets traditionally served by ground transportation only. Many cargo companies and aerospace experts envision an operating environment where a single pilot can remotely pilot numerous aircraft for significant increases in aircraft utilization. The future operating environment is also expected to include air cargo companies flying smaller aircraft from airports and distribution centers outside of major U.S. cities directly to city centers, avoiding congested roads and increasing the velocity of cargo shipments, particularly those that are high-value, time-sensitive, and security sensitive (e.g., pharmaceuticals). These are just a few benefits and use cases cargo companies and aerospace experts see with the advancement of automated aircraft. To better understand industry’s direction, NASA asked the LMI team to research the forecasted market, timeline, risks, and opportunities for integrating unmanned air cargo vehicles into the National Airspace System (NAS) for the development and prioritization of the NASA Air Traffic Management Exploration’s research portfolio. To begin the market assessment, we gathered data via numerous interviews with key stakeholders and subject matter experts and literature reviews. We then incorporated the data into a custom-developed systems dynamics model and visualization dashboard. The systems dynamics model classifies the size of the market (e.g., overall fleet size of automated aircraft) for four distinct use cases over the next 20 years. The model projects the year in which various types of automated aircraft will enter the commercial cargo market based on our team’s collective research on when the aircraft will become viable due to manufacturing and certification timelines and the lifespan of current, traditional aircraft in service, to name a few factors. While this report defines our team’s estimated timeline of entry and growth, the model is dynamic—it enables NASA users to change variables based on future-year events. If the necessary technology does not mature in accordance with our assumptions, then NASA can change the entry of service point to a future year to evaluate the changes in market size in the out years. This flexibility will be key to deciding when and how NASA should invest in various areas.

air traffic management↗

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture↗

Operational Implications from Field Test Results: Sensorimotor Guidelines for Exploration Missions

Two key sensorimotor objectives of the joint NASA-Russian Field Test (FT) study were (1) to quantify functional performance on long duration crewmembers as close to landing as possible, and (2) to develop a recovery timeline back to preflight baseline. The purpose of this presentation is to provide an overview of the FT results and discuss the operational implications for future exploration missions. The NASA and Russian teams conducted a total of 48 Field Tests, including 18 using a reduced Pilot FT (PFT) protocol. The combined PFT/FT cohort included 14 first-time fliers, 4F, and nine cosmonauts who repeated FT during a second mission. The mission durations were 185 ± 42 days, mean ± std. Nominally, the initial postflight session was performed in the medical test at the Soyuz landing site or at the nearby airport (R+2.2 ± 1.3 hrs, mean ± std), and then repeated multiple times throughout the postflight recovery. The common tasks performed across PFT and full FT protocols included sit-to-stand, recovery from fall (prone to stand) and tandem walk, performed in that order of increasing difficulty. The full FT protocol also included seated tasks (eccentric gaze, dysmetria finger to nose, eye-hand coordination on a tablet, grip force discrimination), a standing posture test with an upper body perturbation, a timed up and go mobility test with obstacles, and a dynamic visual acuity task during vertical oscillations. While there was considerable variability in the postflight outcome measures across crewmembers, the level of vestibular/cerebellar and sensorimotor impairment was greater than previously observed during shorter spaceflight missions. Most striking was the higher incidence of motion sickness even without constraining the standard medical interventions. Motion sensitivity prevented some crewmembers from attempting and/or completing the early testing. The recovery timeline varied with task complexity, generally taking longer when either the basis of support was limited (e.g., tandem walk) or visual cues were deprived (eyes closed). Based on this evidence, mission planners need to expect a range of response across individuals and tasks following G-transitions. Individual health assessments are recommended along with development of pre-worked, prioritized content and timelines, with the ability to change roles depending on crew readiness. Handholds and balance aids are recommended to help stabilize the crewmembers to perform specific tasks (e.g., touch screen selection) or to allow the crewmember the ability to rest with onset of symptoms. Based on anecdotal reports and performance on computerized dynamic posturography, multiple testing on landing day appeared to be beneficial for some participants, while others may have pushed beyond their motion tolerance limit in an effort to complete more FT objectives. Instead of delaying planetary surface operations to allow for recovery, our results suggest that early mobility may be important. Early active self-administered retraining, individualized based on the level of initial impairment and motion sensitivity, will enable a more efficient motor learning and enhance crew performance.

S J Wood↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

PersEIDS: A Biomedical Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars↗

EVA Planning: Using Neutral Buoyancy Laboratory (NBL) Training to Predict in-Flight Energy Expenditure

Metabolic rate (“met rate”) is the amount of energy expended over a period of time and is influenced by many factors including body composition, level of physical activity, resting metabolic rate, sex, age, and food intake. Met rate is measured during Extravehicular Activity (EVA) training at the Neutral Buoyancy Laboratory (NBL) and during in-flight EVAs through indirect calorimetry, calculating energy expenditure from respiratory measurements of O 2 consumption and/or CO 2 production. During Extravehicular Activity (EVA) planning, metabolic cost is important to consider and is used to inform EVA duration based on spacesuit consumables associated with life support systems. Currently, NBL and previous ISS EVA met rate data for specified crewmembers are utilized to predict in-flight EVA metabolic costs based on a proposed EVA timeline. Timeline data collected during training is used to relate met rates to specific EVA activities, which are in turn assigned to more generalized EVA task categories, categorizing by both task type and restraint type. EVA task categories include EVA Setup/Cleanup, Worksite Setup/Cleanup, Cable Routing, Bolts, Fluid Connectors, Electrical Connectors, R&R Work, Miscellaneous Work, Incapacitated Crew Rescue (being rescued or performing), Assisted Crew Rescue (being assisted or performing), and Translation. Restraint types consist of Free-Float, Body Restraint Tether (BRT), Articulating Portable Foot Restraint (APFR), and Space Station Remote Manipulator System (SSRMS). From a crewmember’s historical data, individualized 10th, 50th and 90th percentile met rate estimates are generated for each task category and used to estimate the proposed EVA timeline metabolic cost. In-flight metabolic data (“As-Executed”) from recent ISS US EVAs 85-88 (totaling eight EVA crewmember met rates) was compared with their predicted metabolic cost (“As-Planned”) to evaluate the accuracy of the current met rate estimation method. Across the four EVAs, As-Executed Cumulative EVA Total Metabolic Cost (M = 5893.78 BTU, SD = 816.60) was not significantly different compared to As-Planned Cumulative EVA Total Metabolic Cost (M = 6106.60 BTU, SD = 826.62; t(7) = 0.751 , p = .477). Though not a significant difference, generally, As-Planned total estimates were slightly higher than As-Executed total metabolic cost. Relative Error for Cumulative EVA Total Metabolic Cost ranged from -33% to 14.7%, depending on the crewmember and EVA. When comparing As-Planned to A-Executed EVA task categories for Bolts, Electrical Connectors, EVA Cleanup, EVA Setup, Miscellaneous Work, Translation, Worksite Cleanup, and Worksite Setup during these EVAs, no significant differences were observed, however, there was a significant difference in As-Planned (M = 783.71 BTU, SD = 408.88) compared to As-Executed (M = 608.87 BTU, SD = 425.29) metabolic cost for the task category of Repair-and-Replace (R&R) Work (t(17) = 3.21 , p = .005). Looking closer within the R&R Work task category, As-Executed R&R Work with Free-Float restraint type (M = 706.17 BTU, SD = 352.18) was significantly less than As-Planned R&R Work with Free-Float restraint type (M= 887.96 BTU, SD = 381.42; t(12) = 2.59, p < .024). As-Executed R&R Work with SSRMS Restraint type (M = 355.89 BTU, SD = 534.65) was not significantly different from As-Planned values (M = 512.69 BTU, SD = 383.34; t(4) = 1.88, p = 0.132). These findings suggest that the energy expended performing R&R Work (Free-Float) is lower in flight than predicted. Accurate predictions of the metabolic cost of EVA are essential for planning and executing successful ISS EVAs. Overall, the current met rate prediction method is similar to actual in-flight values, slightly erring on the side of overestimation. Future work includes analysis of more historical in-flight EVA data to increase the power of the analysis, evaluating the NBL-ISS met rate conversion factor between NBL and ISS tasks, as well as exploring methods of substitution when crewmembers are missing prior task category data.

Lauren Cox↗

Methodology and Application of Physical Security Effectiveness Based on Dynamic Force-on-Force Modeling

This report describes the research and development being performed at INL towards a dynamic modeling and simulation framework to enable physical security optimization at commercial nuclear power plants. The framework is based on the dynamic modeling tool EMRALD and is demonstrated for applications that can result in physical security optimization. Two main applications are presented: 1. Integrating FLEX portable equipment performance with FOF models of a plant’s physical security posture, and 2. Location optimization of bullet resistant enclosure. The generic framework for modeling FLEX portable equipment is described in detail, followed by a case study modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical PWR. Two distinct FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial FOF tool, AVERT, are integrated with the FLEX deployment model in EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. Thermal-hydraulic analysis of FLEX performance is performed in RELAP5 and integrated with the EMRALD simulations to provide more realistic timelines in the models. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework of integrating FLEX equipment with FOF models enables the NPPs to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security. The objective of location optimization of BRE is to determine the best location in the plant for a new BRE being planned by the plant to enhance their physical security effectiveness. The plant physical security FOF model is integrated with EMRALD that performs Monte Carlo simulation to run different attack scenarios and a discrete set of potential BRE locations. Sensitivity analysis is used to determine the most effective location for the BRE. The optimization approach can be extended to wide applications such as location optimization of remotely operated weapons and other strategic fixed assets.

97 MATHEMATICS AND COMPUTING↗

Savannah River National Laboratory Collaborative Innovation Pilot Team - 17560

The Collaborative Innovation (COIN) program was established by the Savannah River National Laboratory (SRNL) in March 2016. The goal of the SRNL COIN program is to identify innovative options to significantly reduce program and project risks (improve safety, reduce schedule and cost) of high priority Department of Energy Environmental Management, National Nuclear Security Administration, and Nuclear Energy missions. The COIN Advisory Board selected as the target outcome of the first COIN effort a 50% improvement to the Savannah River Site (SRS) H-Canyon spent nuclear fuel (SNF) processing 'baseline,' or current plan, as defined in the SRS Nuclear Materials Planning Roadmap. A small team of SRNL and Savannah River Nuclear Solutions personnel with pertinent experience and expertise was co-located and largely sequestered for eight weeks to identify improvements to H-Canyon processing of SNF. Following the process defined in the SRNL COIN Charter, the COIN Pilot Team analyzed the baseline for processing SNF through H Canyon; generated alternative ideas; tested seemingly viable ideas by reaching out to other subject-matter experts; and identified options for consideration for implementation by the COIN Advisory Board. The COIN Pilot produced a number of important outcomes, including important lessons learned for subsequent COIN efforts. The two principal outcomes are these: 1. The COIN Pilot Team conducted a comprehensive examination of the individual unit operations, the integrated system, and external interfaces to produce a timeline of H-Canyon processing and sampling times that had not previously existed. The general timeline served as the baseline from which the Pilot Team identified processing improvements. In addition, the timeline has already been employed in other planning efforts. 2. The COIN Pilot Team determined that innovations to the H-Canyon Dissolving unit operation alone could increase the number of SNF bundles processed through H Canyon by the target of 50%, but with little margin for error. To ensure that the gains in throughput in the Dissolving unit operation would be maintained throughout the facility, the Pilot Team identified four additional improvements to create greater efficiency and flexibility in downstream H-Canyon unit operations. The COIN Pilot Team's innovations reduce the processing time of a single batch of SNF through H Canyon from about 70 days to about 50 days. This talk will review the COIN process and the results of the pilot of the process. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Imaging System to Measure Kinetics of Material Cluster Ejection During Exit-Surface Damage Initiation and Growth in Fused Silica

Laser-induced damage on the surface of optical components typically is manifested by the formation of microscopic craters that can ultimately degrade the optics performance characteristics. It is believed that the damage process is the result of the material exposure to high temperatures and pressures within a volume on the order of several cubic microns located just below the surface. The response of the material following initial localized energy deposition by the laser pulse, including the timeline of events and the individual processes involved during this timeline, is still largely unknown. In this work we introduce a time-resolved microscope system designed to enable a detailed investigation of the sequence of dynamic events involved during surface damage. To best capture individual aspects of the damage timeline, this system is employed in multiple imaging configurations (such as multi-view image acquisition at a single time point and multi-image acquisition at different time points of the same event) and offers sensitivity to phenomena at very early delay times. The capabilities of this system are demonstrated with preliminary results from the study of exit-surface damage in fused silica. The time-resolved images provide information on the material response immediately following laser energy deposition, the processes later involved during crater formation or growth, the material ejecta kinetics, and overall material motion and transformation. Such results offer insight into the mechanisms governing damage initiation and growth in the optical components of ICF class laser systems.

42 ENGINEERING↗

A Chronological History of Federal Fleet Actions and Mandates

This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

Alternative Fuels↗

The missing correlation between the potential rate impacts of rooftop solar and the timing of state net metering policy revisions

Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states—California and Hawaii—retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

A pilot oral history of plant synthetic biology

The whole field of synthetic biology (SynBio) is only about 20 years old, and plant SynBio is younger still. Nevertheless, within that short time, SynBio in general has drawn more scientific, philosophical, government, and private-sector interest than anything in biology since the recombinant DNA revolution. Plant SynBio, in particular, is now drawing more and more interest in relation to plants’ potential to help solve planetary problems such as carbon capture and storage and replacing fossil fuels and feedstocks. As plant SynBio is so young and so fast-developing, we felt it was too soon to try to analyze its history. Instead, we set out to capture the essence of plant SynBio's origins and early development through interviews with 8 of the field's founders, representing 5 countries and 3 continents. We then distilled these founders’ personal recollections and reflections into this review, centering the narrative on timelines for pivotal events, articles, funding programs, and quoting from interviews. We have archived the interview recordings and documented timeline entries. This work provides a resource for future historical scholarship.

59 BASIC BIOLOGICAL SCIENCES↗

MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication between all parties involved in the TP process increasing patient safety.

60 APPLIED LIFE SCIENCES↗