Search NASA⌕ Search

SEARCH · Search NASA

Results for “Visual data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

DXT Explorer v2.0

DTX Explorer is a tool to generate interactive data visualizations of Darshan I/O traces collected from HPC applications. Its goal is to provide an easy and interactive way for researchers and developers to explore their application's I/O behavior and detect possible I/O bottlenecks that are impacting performance.

Bez, JeanLuca↗

MaltQt

The code allows users to visualize data collected by the open source malt memory profiler. It is written in python and contains no physics whatsoever.

Balakireva, Lyudmila↗

SHIVER - Spectroscopy HIstogram Visualizer for Event Reduction

Visualizing data from neutron scattering experiments is the first step in understanding the physics. The program is intended to generate and plot cuts and slices, through the four dimensional single crystal inelastic datasets, measured on direct geometry neutron spectrometers at the Spallation Neutron Source (ARCS, CNCS, HYSPEC, SEQUOIA).

Savici, AndreiT [Oak Ridge National Laboratory (OR↗

Efficient exascale discretizations: High-order finite element methods

Efficient exploitation of exascale architectures requires rethinking of the numerical algorithms used in many large-scale applications. These architectures favor algorithms that expose ultra fine-grain parallelism and maximize the ratio of floating point operations to energy intensive data movement. One of the few viable approaches to achieve high efficiency in the area of PDE discretizations on unstructured grids is to use matrix-free/partially assembled high-order finite element methods, since these methods can increase the accuracy and/or lower the computational time due to reduced data motion. In this paper we provide an overview of the research and development activities in the Center for Efficient Exascale Discretizations (CEED), a co-design center in the Exascale Computing Project that is focused on the development of next-generation discretization software and algorithms to enable a wide range of finite element applications to run efficiently on future hardware. CEED is a research partnership involving more than 30 computational scientists from two US national labs and five universities, including members of the Nek5000, MFEM, MAGMA and PETSc projects. We discuss the CEED co-design activities based on targeted benchmarks, miniapps and discretization libraries and our work on performance optimizations for large-scale GPU architectures. We also provide a broad overview of research and development activities in areas such as unstructured adaptive mesh refinement algorithms, matrix-free linear solvers, high-order data visualization, and list examples of collaborations with several ECP and external applications.

97 MATHEMATICS AND COMPUTING↗

Unsaturated and Saturated Hydraulic Parameters of Soils at the East River Watershed, Colorado Calculated using the Pedotransfer Function Method.

The purpose of the data package is to present the results of calculations of the following unsaturated-saturated hydraulic parameters of soils of the East River Watershed, Colorado: fully saturated water content (Qs), residual saturation (Qr), van genuchten parameters alpha and n, field capacity (FC), and saturated hydraulic conductivity (Ks). Calculations were conducted for the following soil texture types: sandy_loam, loam, silty_clay_loam, clay_loam, silt loam; the particle size distribution included the percentage of sand, silt, clay, and the bulk density (BD) of soils. Calculations were conducted for the following areas- Lower_Subalpine (6 samples),- Lower_Montane_lower_hillslope (7 samples),- Floodplain_at_base_of_lower_montane_hillslope, (11 samples),- PLM-0 (10 samples),- PLM-1 (10 samples), and - PLM-3 (13 samples)Calculations were conducted using the Pedotransfer Function Method developed by Tóth et al. (2014) with the application of the code ”euptf” in Rstudio. The data are being summarized in the Excel file ”Unsaturated_Saturated_Hydraulic_Parameters_PTF_calculated_EASt_EIver.xls" including two worksheets:“full_data_EAST_RIVER” which includes (a) the input data used for calculations, the soil texture triangle, and the plots of the water retention curves and unsaturated hydraulic conductivity for several types of soil texture, and (b) the summary table with the averaged parameters for each area. The the texture triangle was plotted using the Rstudio "soiltexture." Microsoft Excel software is required to open the Excel file. The metadata and a list of references to the Rstudio libraries used for calculations and data visualization are giving in the Word Readme file.

54 ENVIRONMENTAL SCIENCES↗

JSPEC: A Program for IBS and Electron Cooling Simulation

JSPEC (JLab Simulation Package on Electron Cooling) is an open-source C++ program developed at Jefferson Lab to simulate the evolution of the ion beam under the intrabeam scattering effect and/or the electron cooling effect. JSPEC includes various models of the ion beam, the electron beam, and the friction force, aiming to reflect the latest advances in the field and to provide a useful tool to the community. JSPEC has been benchmarked against other cooling simulation codes and experimental data. It has been used to support the cooler design for JLEIC, an earlier JLab design for the Electron-Ion Collider. A Python wrapper of the C++ code, pyJSPEC, for Python 3.x environment has also been developed and released. It allows users to run JSPEC simulations in a Python environment and makes it possible for JSPEC to collaborate with other accelerator and beam modeling programs, as well as plentiful Python tools in data visualization, optimization, machine learning, etc. In this report, we introduce the features of JSPEC, with a focus on the latest development, and demonstrate how to use JSPEC and pyJSPEC with sample codes and numerical examples.

Accelerator Physics↗

pyJSPEC - A Python Module for IBS and Electron Cooling Simulation

The intrabeam scattering is an important collective effect that can deteriorate the property of a high-intensity beam and electron cooling is a method to mitigate the IBS effect. JSPEC (JLab Simulation Package on Electron Cooling) is an open-source C++ program developed at Jefferson Lab, which simulates the evolution of the ion beam under the IBS and/or the electron cooling effect. The Python wrapper of the C++ code, pyJSPEC, for Python 3.x environment has been recently developed and released. It allows the users to run JSPEC simulations in a Python environment. It also makes it possible for JSPEC to collaborate with other accelerator and beam modeling programs as well as plentiful python tools in data visualization, optimization, machine learning, etc. In this paper, we will introduce the features of pyJSPEC and demonstrate how to use it with sample codes and numerical results.

Zhang, H.↗

Multiscale Patterning from Competing Interactions and Length Scales

We live in an era of complexity marked by impressive new tools powering the scientific method to accelerate discovery, prediction, and control of increasingly complex systems. In common with many disciplines and societal challenges and opportunities, materials and condensed matter sciences are beneficiaries. The volume and fidelity of experimental, computational, and visualization data available, and tools to rapidly interpret them, are remarkable. Conceptual frameworks, including multiscale, multiphysics modeling of this complexity, are fueled by the data and, in turn, guide directions for future experimental and computational strategies. In this spirit, we discuss the importance of competing interactions, length scales, and constraints as pervasive sources of spatio-temporal complexity. We use representative examples drawn from materials and condensed matter, including the important role of elasticity in some technologically important quantum materials.

36 MATERIALS SCIENCE↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ducted Assembly Steady-State Heat Transfer Software (DASSH)

The Ducted Assembly Steady-State Heat transfer software (DASSH) is being developed at Argonne National Laboratory to perform a steady-state thermal fluids calculation to determine the coolant flow and temperature distribution for a hexagonal reactor core configuration with ducted assemblies. DASSH is intended to be used in the early stages of the reactor design process when assembly components can be undefined or are undergoing considerable design changes. DASSH provides a rapid assessment of the temperature and flow distribution to allow quick characterization of the system and identification of problem areas. This document is a guide for DASSH users. It summarizes the core capabilities of DASSH and highlights differences between DASSH and SE2-ANL. Instructions for obtaining and installing DASSH are provided along with some guidelines and recommendations for newer Python users. It covers the structure of the input file, provides directions for running DASSH, describes the various output files produced by the code, and provides instructions for visualizing data. Examples demonstrating various DASSH options are included. DASSH is under active development, so it is anticipated that this guide will grow and evolve as the code is updated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗

Utility-Scale Solar, 2021 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2021 Edition” provides an overview of key trends in the U.S. market, with a focus on 2020. Highlights of this year’s update include: A record of nearly 9.6 GWAC of new utility-scale PV capacity came online in 2020, bringing cumulative installed capacity to more than 38.7 GWAC across 43 states. 89% of all new utility-scale PV capacity added in 2020 uses single-axis tracking. Median installed project costs declined to $\$$1.4/WAC (or $\$$1.1/WDC) in 2020. Project-level capacity factors vary widely, from 9% to 36% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. Utility-scale PV’s LCOE fell to $\$$34/MWh in 2020 ($\$$28/MWh if factoring in the federal investment tax credit, or ITC). PPA prices have largely followed the decline in solar’s LCOE over time, but have stagnated more recently. Prices from a sample of recent contracts average just above $\$$20/MWh (levelized). In 2020, solar’s average market value (defined in the report to include only energy and capacity value) exceeded average wholesale prices in 12 of the 17 balancing authorities analyzed (including 4 of the 7 independent system operators across the United States). Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata for more than 150 PV+battery hybrid projects that are already online or that have secured offtake arrangements. At the end of 2020, there were at least 460 GW of utility-scale solar power capacity within the interconnection queues across the nation, 160 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Adversarial Perturbations Are Not So Weird: Entanglement of Robust and Non-Robust Features in Neural Network Classifiers

Neural networks trained on visual data are well-known to be vulnerable to often imperceptible adversarial perturbations. The reasons for this vulnerability are still being debated in the literature. Recently Ilyas et al. (2019) showed that this vulnerability arises, in part, because neural network classifiers rely on highly predictive but brittle “non-robust” features. In this paper we extend the work of Ilyas et al. by investigating the nature of the input patterns that give rise to these features. In particular, we hypothesize that in a neural network trained in a standard way, non-robust features respond to small, “non-semantic” patterns that are typically entangled with larger, robust patterns, known to be more human-interpretable, as opposed to solely responding to statistical artifacts in a dataset. Thus, adversarial examples can be formed via minimal perturbations to these small, entangled patterns. In addition, we demonstrate a corollary of our hypothesis: robust classifiers are more effective than standard (non-robust) ones as a source for generating transferable adversarial examples in both the untargeted and targeted settings. The results we present in this paper provide new insight into the nature of the non-robust features responsible for adversarial vulnerability of neural network classifiers.

97 MATHEMATICS AND COMPUTING↗

Using Machine Learning to Identify Optimum Prospects for Offshore Geologic CO 2 Storage and Enhanced Oil Recovery in the Gulf of Mexico

The SECARB Offshore Partnership is a government-industry partnership focused on assembling the knowledge base required for secure, long-term, large-scale CO 2 subsea storage in saline formations and mature oil reservoirs. The SECARB Offshore Partnership is evaluating potential storage opportunities in the Central and Eastern planning areas of the outer continental shelf (OCS) of the Gulf of Mexico. The evaluation focuses on active and depleted oil and gas fields and potentially associated CO 2 -enhanced oil recovery (CO 2 -EOR), as well as, deep saline storage resources. As part of Subtask 3.0 (Offshore Storage Resources Characterization) and Subtask 4.0 (Risk Assessment, Simulation, and Modeling), Oklahoma State University (OSU) is developing a machine learning system that employs the SAS Institute’s Viya platform with visual data mining and machine learning to identify and characterize optimum prospects for enhanced oil recovery and stacked storage in saline reservoirs. This report summarizes this effort to date and discusses the many variables that can be used to characterize these storage objectives, as well as, the design vision of the Viya machine learning system.

02 PETROLEUM↗

Land-Based Wind Market Report: 2022 Edition

The U.S. Department of Energy's 2022 edition of its Land-Based Wind Market Report provides an overview of key trends in the U.S. wind power market, with a focus on 2021. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Despite ongoing supply chain challenges, wind energy in 2021 continued to see strong growth, technology improvements, and low prices in the U.S. Key highlights include: Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a strong pace in 2021, with the 13.4 GW of new additions representing a $\$20$ billion investment and 32% of all newly added U.S. generation capacity. Wind energy output rose to account for more than 9% of the entire nation’s electricity supply. At least 247 GW of wind are seeking transmission interconnection; 77 GW of this capacity are offshore wind and 19 GW are hybrid plants that pair wind with storage or solar PV. Wind project performance has increased over the decades: The average capacity factor among recently built projects was nearly 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2011, no turbines employed blades that were 115 meters in diameter or larger, but in 2021, 89% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices averaged $\$800$–$\$950$/kW in 2021, a 5% to 10% increase from the year prior but substantially lower than in 2010. The average installed cost of wind projects in 2021 was $\$1,500$/kW, down more than 40% since the peak in 2010, though relatively stable in recent years. The lowest costs were found in Texas and the (non-ISO) West. Wind energy prices are on the rise, but generally remain low, around $\$20$/MWh in the interior of the country with higher prices in the West and East. After topping out above $\$75$/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped—though supply-chain pressures have resulted in increased prices in recent years. In the interior ‘wind belt’ of the country, recent pricing is around $\$20$/MWh. In the West and East, prices tend to average above $\$30$/MWh. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind increased in 2021, averaging $\$16$/MWh in MISO, $\$19$/MWh in SPP, $\$23$/MWh in NYISO, $\$31$/MWh in ERCOT, $\$33$/MWh in PJM, $\$44$/MWh in ISO-NE, and $\$48$/MWh in CAISO. The average levelized cost of wind energy was $\$32$/MWh for plants built in 2021: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography. The national average stood at $\$32$/MWh in 2021—down substantially historically, though relatively stable in recent years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. The health and climate benefits of wind in 2021 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of over $\$90$/MWh-wind for plants built in 2021.

17 WIND ENERGY↗

Utility-Scale Solar, 2022 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2022 Edition” provides an overview of key trends in the U.S. market, with a focus on 2021. Highlights of this year’s update include: -A record of nearly 12.5 GWAC of new utility-scale PV capacity came online in 2021, bringing cumulative installed capacity to more than 51.3 GWAC across 44 states. -90% of all new utility-scale PV capacity added in 2021 uses single-axis tracking. -Median installed project costs declined to $\$1.35$/WAC (or $\$1.02$/WDC) in 2021. -Project-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$33$/MWh in 2021 ($\$27$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. In 2021, solar’s average market value (defined in the report to include only energy and capacity value) rose by 55% to $\$47$/MWh and exceeded average wholesale prices in 13 of the 17 balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from 67 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -At the end of 2021, there were at least 674 GW of utility-scale solar power capacity within the interconnection queues across the nation, 284 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

A Collaboration Website for Muon Catalyzed Fusion and Muon Beam Production

This project sets up a website to support the nascent Muon Catalyzed Fusion collaboration including development of particle accelerators and transport beamlines for muon beams. The website is envisioned as having the general public information pages and private pages for collaboration members. Multimedia elements like images, text animations, and video lectures, covering a broad spectrum of topics will populate the educational site, covering muon facilities, to comprehensive explorations and seminal documents that define the science of Muon Catalyzed Fusion, Acceleration, Applications, Instrumentation, Beamline Design, and beam dynamics design codes. Ensuring compatibility across devices and operating systems, it also features integration with Google Docs for collaboration, a code repository (GitHub), a blog platform with comments (WordPress), the potential for ChatGPT integration and interactive graph plotting with Python Plotty to enhance data visualization. This project will maintain public and protected private pages, due to the proprietary nature of the work or research in progress. The public sections will be built to foster dissemination of information and highlight recent work within the NK Labs collaboration, including lectures, published papers, and regular blog posts with open commenting. The private section will support unpublished or nonpublic research, by facilitating collaborative efforts through integrated Google Docs and Python Plotty for shared graphing work. Ultimately, this project strives to make complex scientific knowledge more accessible to the public, foster enhanced collaboration, and serve as a platform for sharing cutting-edge research in Muon Catalyzed Fusion and Accelerators.

43 PARTICLE ACCELERATORS↗