Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

MARSAME Release Report for TA-03 Building 16

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that materials associated with technical area 3, Buildings 16 and 18 (collectively known as TA-3-16) (Figure 1) do not meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE 2020) and are to be treated as Low Level Waste (LLW). These conclusions are based on the known history of the building combined with radiation survey data collected in 2020 and 2021, and findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL 2020a). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (MARSAME 2000) and LANL procedures (LANL 2020b). Final approvals for waste disposition will come from LANL’s Waste Management Program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Calendar Year 2019, Revision 0

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): • CAU 90, Area 2 Bitcutter Containment • CAU 91, Area 3 U-3fi Injection Well • CAU 92, Area 6 Decon Pond Facility • CAU 110, Area 3 WMD U-3ax/bl Crater • CAU 111, Area 5 WMD Retired Mixed Waste Pits • CAU 112, Area 23 Hazardous Waste Trenches

54 ENVIRONMENTAL SCIENCES↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, NNSS, NV (CY2020, Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2021)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment, CAU 91, Area 3 U-3fi Injection Well, CAU 92, Area 6 Decon Pond Facility, CAU 110, Area 3 WMD U-3ax/bl Crater, CAU 111, Area 5 WMD Retired Mixed Waste Pits, and CAU 112, Area 23 Hazardous Waste Trenches. This report covers calendar year 2021. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, For Calendar Year 2021 (Revision 1)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report will address all monitoring requirements noted in the RCRA Permit NEV HW0101, except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Weapons Facility Operations #5 Decontamination and Demolition Project

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with Weapons Facility Operations (WFO) #5 that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020) and materials in one building that did not meet the criteria for unrestricted release and are to be treated as low level waste (LLW). These conclusions are based on the known history of the area combined with radiation survey data data collected in 2022 and 2023. The findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

MARSAME Radiological Release Report for Weapons Facility Operations #4 Decontamination and Demolition Project: TA-14-0005, TA-15-0009, TA-15-0202, TA-15-0233, TA-36-0019

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has identified materials associated with Weapons Facility Operations (WFO) #4 that meet the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020) and materials in one building that do not meet the criteria for unrestricted release and are to be treated as low level waste (LLW). These conclusions are based on the known history of the buildings combined with radiation survey data data collected in 2022 and 2023. The findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program. The scope of this final release report includes Technical Area (TA) 14 Building 5 (TA-14-0005), TA-15 Buildings 9, 202, and 233 (TA-15-0009/0202/0233), and TA-36 Building 19 (TA-36-0019). MARSAME provides guidance on statistical sampling for residual radionuclides in bulk materials; smaller, miscellaneous items can be released via the release procedures outlined in LANL Policy 121 Radiation Protection (LANL, 2023).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Calendar Year 2022

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 (Rev. 6) associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches. All post-closure inspections and evaluations were performed in accordance with requirements set out in RCRA Permit NEV HW0101, Rev. 6.

54 ENVIRONMENTAL SCIENCES↗

Off-line Tests of the DM1200 Thermal Catalytic Oxidation (TCO) Unit (Final Report)

The River Protection Project-Waste Treatment Plant (RPP-WTP) Low-Activity Waste (LAW) and High-Level Waste (HLW) feed streams are listed for a variety of hazardous organic compounds. The permitting basis for the WTP systems may necessitate the demonstration of minimum Destruction/Removal Efficiencies (DREs) of such species from any released emissions of up to 99.99%. Results from a previous study on the fate of hazardous organics in the melter itself indicated, not only that DREs for selected test compounds approached 99.99% only at extreme melter conditions, but also that organic compounds not originally present in the feed were actually produced in the melter, In order to ensure that the required DREs for hazardous organics are met, Thermal Catalytic Oxidation (TCO) units were therefore added to both the HLW and LAW off-gas treatment systems, The extent to which these species can be destroyed or removed in the TCO units is therefore an important issue in the design and permitting of the LAW and HLW off-gas treatment systems. A further consideration is that it would be desirable, if possible, to be able to achieve all of the required DRE across the TCO alone. If that is not the case, the DRE would be distributed across several unit operations, which may then become subject to additional operational constraints that may reduce process flexibility. Compliance with the DRE requirements on the basis of the TCO unit alone is also an approach that lends itself to periodic confirmation during operations, since the TCO is located at the back-end of the off-gas treatment system where radioactivity levels are lowest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental awareness program development

Work this summer in the Office of Safety, Environment, and Mission Assurance began with a review of current initiatives and environmental projects at the Langley Research Center (LaRC). This involved researching many of the documents on file which detail problems which have occurred as well as various approaches which have been used to address these problems. A large portion of the time was spent interviewing and working with each of the engineers, industrial hygienists and other professionals connected with the Office of Environmental Engineering. A few of the projects I worked on include: Researching environmental compliance, and pollution prevention efforts; touring many of the facilities at LaRC to observe the environmental efforts in the work place; researching equipment needs for the recycling/reclamation center; writing scripts for in-house training videos; working with the video production department to produce a training video; developing e-mail distribution list; developing environmental coordinator's database; and working with others to research logistics of recycling and waste minimization efforts.

Steinhauer, David A.↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2020)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment. 2) CAU 91, Area 3 U-3fi Injection Well. 3) CAU 92, Area 6 Decon Pond Facility. 4)CAU 110, Area 3 WMD U-3ax/bl Crater. 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits. 6) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2020 (Rev. 2)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment; 2) CAU 91, Area 3 U-3fi Injection Well; 3) CAU 92, Area 6 Decon Pond Facility; 4) CAU 110, Area 3 WMD U-3ax/bl Crater; 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits; 6) CAU 112, Area 23 Hazardous Waste Trenches The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110, the site fence, gate, lock, and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of RCRA Permit NEV HW0101 was issued effective December 10, 2015, and remained in effect until December 10, 2020. At the time of this report submittal, the new RCRA permit application was in review.

54 ENVIRONMENTAL SCIENCES↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication Lessons Learned of Transportation Packaging from the Perspective of a Design Authority - 20322

This paper presents lessons learned regarding fabricating packaging systems from the perspective of a design authority (DA). Capturing and implementing lessons learned is critical for an organization to reduce systematic project risk and thereby promote the likelihood of project success. This paper defines the design authority as the organization responsible for technical design, resolving technical design issues, quality assurance program, and maintenance of the packaging system license. A package system is defined as the packaging, its contents, and auxiliary equipment. Packages are certified by the NRC under 10 CFR 71[1] for transportation by ground. The following lessons learned subjects are presented in the paper: quality assurance, interpretation of drawing dimensional requirements, execution of manufacturing processes, hardware dimensional inspection, and leakage rate testing. All discrepancies presented in this paper have been resolved as described in the appropriate final data package. All described package systems are in compliance with their Safety Analysis Report (SAR) and certificate of conformance requirements. The intent of this paper is to identify opportunities for improving the outcome of future projects and to mitigate fabrication challenges proactively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comprehensive Review of Working Fluids for High-Temperature Heat Pumps: History, Selection, and Evaluation

High-temperature heat pumps (HTHPs) are essential for enhancing energy efficiency across various industrial applications, especially in terms of integrating with renewable energy sources and recovering waste heat. This article thoroughly investigates suitable working fluids for HTHPs, highlighting the evolution from traditional refrigerants to contemporary alternatives with low global warming potential (GWP). It proposes comprehensive selection criteria for these working fluids, pre-selects low-GWP working fluids, and outlines a screening methodology. The pre-selected low-GWP working fluids are evaluated for applications in three typical industrial scenarios involving HTHPs. Furthermore, this study demonstrates that regulatory compliance and environmental impacts significantly influence the development of next-generation refrigerants. The choice of working fluids is closely linked to the types of vapor compression cycles, tailored to the specific industrial applications for HTHPs. This study emphasizes areas for future research, including the development of innovative working fluids; integrated strategies that account for performance, safety, and regulatory standards; alignment of HTHP components; exploration of natural working fluids; and broadening the applications of existing working fluids.

Compression↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Novel Manufacturing Process of Lightweight Automotive Seats: Integration of Additive Manufacturing and Reinforced Polymer Composite

Lightweight automotive seats offer multiple benefits to original equipment manufacturers in terms of cost savings from various aspects, including less material usage, more integrated processes, and compliance with Corporate Average Fuel Economy Standards. Original equipment manufacturers have been focusing on innovative ways to produce light weight automotive seats. The commercially available automotive seats are currently made of multiple metal components combined through welding and fasteners. The use of additive manufacturing and composite structures is particularly useful for light weighting the automotive components. Additive manufacturing (AM) offers multiple advantages over traditional manufacturing processes such as freedom of design thereby enabling complex structural geometries, mass customization and waste minimization, and control over the fiber alignment through deposition in a predetermined pattern. Combining metal inserts with polymer composites through a novel manufacturing process allows design of lightweight and high-performance materials for automotive components.

99 GENERAL AND MISCELLANEOUS↗