Search NASA⌕ Search

SEARCH · Search NASA

Results for “Water infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Drought Prediction for Socio-Cultural Stability Project

The primary objective of this project is to answer the question: "Can existing, linked infrastructures be used to predict the onset of drought months in advance?" Based on our work, the answer to this question is "yes" with the qualifiers that skill depends on both lead-time and location, and especially with the associated teleconnections (e.g., ENSO, Indian Ocean Dipole) active in a given region season. As part of this work, we successfully developed a prototype drought early warning system based on existing/mature NASA Earth science components including the Goddard Earth Observing System Data Assimilation System Version 5 (GEOS-5) forecasting model, the Land Information System (LIS) land data assimilation software framework, the Catchment Land Surface Model (CLSM), remotely sensed terrestrial water storage from the Gravity Recovery and Climate Experiment (GRACE) and remotely sensed soil moisture products from the Aqua/Advanced Microwave Scanning Radiometer - EOS (AMSR-E). We focused on a single drought year - 2011 - during which major agricultural droughts occurred with devastating impacts in the Texas-Mexico region of North America (TEXMEX) and the Horn of Africa (HOA). Our results demonstrate that GEOS-5 precipitation forecasts show skill globally at 1-month lead, and can show up to 3 months skill regionally in the TEXMEX and HOA areas. Our results also demonstrate that the CLSM soil moisture percentiles are a goof indicator of drought, as compared to the North American Drought Monitor of TEXMEX and a combination of Famine Early Warning Systems Network (FEWS NET) data and Moderate Resolution Imaging Spectrometer (MODIS)'s Normalizing Difference Vegetation Index (NDVI) anomalies over HOA. The data assimilation experiments produced mixed results. GRACE terrestrial water storage (TWS) assimilation was found to significantly improve soil moisture and evapotransportation, as well as drought monitoring via soil moisture percentiles, while AMSR-E soil moisture assimilation produced marginal benefits. We carried out 1-3 month lead-time forecast experiments using GEOS-5 forecasts as input to LIS/CLSM. Based on these forecast experiments, we find that the expected skill in GEOS-5 forecasts from 1-3 months is present in the soil moisture percentiles used to indicate drought. In the case of the HOA drought, the failure of the long rains in April appears in the February 1, March 1 and April 1 initialized forecasts, suggesting that for this case, drought forecasting would have provided some advance warning about the drought conditions observed in 2011. Three key recommendations for follow-up work include: (1) carry out a comprehensive analysis of droughts observed over the entire period of record for GEOS-5 forecasts; (2) continue to analyze the GEOS-5 forecasts in HOA stratifying by anomalies in long and short rains; and (3) continue to include GRACE TWS, Soil Moisture/Ocean Salinity (SMOS) and the upcoming NASA Soil Moisture Active/Passive (SMAP) soil moisture products in a routine activity building on this prototype to further quantify the benefits for drought assessment and prediction.

Peters-Lidard, Christa↗

Analysis of the 2019 Midwest US Flooding Using NASA Data

In the wake of Winter Storm Ulmer, an intense "bomb cyclone" that set preliminary low-pressure records, historic flooding occurred in 41 locations across the Midwest United States, causing many streams and rivers - including the Platte, Missouri, and Elkhorn Rivers - to rise to all-time record flood levels in Nebraska. Warm and dry conditions, along with 4-8 inches of snowfall, and over 1" of rain caused over 3-5" of storm water runoff from rapid melting.A rare confluence of circumstances produced the flooding, including extreme cold earlier in the winter that preserved a significant amount of snowfall, a thick layer of ice on waterways, and the large downpour of rain from Winter Storm Ulmer. Unusually warm air caused the snow and ice to rapidly melt, producing record amounts of runoff within a short period of time. This poster presents several data sets from NASA and the USGS (our partner agency) that can be used in analyzing floods and flood areas, including soil moisture, snowfall, floodwater areas, vicinity of urban areas and impervious surfaces, and proximity of strategic or critical infrastructure.

DAAC↗

Use of the Earth Observing One (EO-1) Satellite for the Namibia SensorWeb Flood Early Warning Pilot

The Earth Observing One (EO-1) satellite was launched in November 2000 as a one year technology demonstration mission for a variety of space technologies. After the first year, it was used as a pathfinder for the creation of SensorWebs. A SensorWeb is the integration of variety of space, airborne and ground sensors into a loosely coupled collaborative sensor system that automatically provides useful data products. Typically, a SensorWeb is comprised of heterogeneous sensors tied together with a messaging architecture and web services. Disasters are the perfect arena to use SensorWebs. One SensorWeb pilot project that has been active since 2009 is the Namibia Early Flood Warning SensorWeb pilot project. The Pilot Project was established under the auspices of the Namibian Ministry of Agriculture Water and Forestry (MAWF)/Department of Water Affairs, the Committee on Earth Observing Satellites (CEOS)/Working Group on Information Systems and Services (WGISS) and moderated by the United Nations Platform for Space-based Information for Disaster Management and Emergency Response (UN-SPIDER). The effort began by identifying and prototyping technologies which enabled the rapid gathering and dissemination of both space-based and ground sensor data and data products for the purpose of flood disaster management and water-borne disease management. This was followed by an international collaboration to build small portions of the identified system which was prototyped during that past few years during the flood seasons which occurred in the February through May timeframe of 2010 and 2011 with further prototyping to occur in 2012. The SensorWeb system features EO-1 data along with other data sets from such satellites as Radarsat, Terra and Aqua. Finally, the SensorWeb team also began to examine the socioeconomic component to determine the impact of the SensorWeb technology and how best to assist in the infusion of this technology in lesser affluent areas with low levels of basic infrastructure. This paper provides an overview of these efforts, highlighting the EO-1 usage in this SensorWeb.

Mandl, Daniel↗

An Automatic Light Rain Detection Algorithm on NASA MPLNET Lidar Observations in the Frame of WMO GALION Project

The water cycle strongly influences life on Earth. In particular, the precipitation modifies the atmospheric column thermodynamics through the process of evaporation and serves as a proxy for latent heat modulation. For this reason, a correct precipitation parameterization (especially low-intensity precipitation) at global scale, bedsides improving our understanding of the hydrological cycle, it is crucial to reduce the associated uncertainty of the global climate models to correctly forecast future scenarios, i.e. to apply fast mitigation strategies. In this study we developed an algorithm to automatically detect precipitation from lidar measurements obtained by the National and Aeronautics Space Administration (NASA) Micropulse lidar network (MPLNET) permanent observational site in Goddard. The algorithm, once full operational, will deliver in Near Real Time (latency 1.5h) a new rain mask product that will be publicly available on MPLNET website as part of the new Version 3 Level 1.5 data. The methodology, based on an image processing technique, can detect only light precipitation events (defined by intensity and duration) as the morphological filters used through the detection process are applied on the lidar volume depolarization ratio range corrected composite images, i.e. heavy rain events are unusable as the lidar signal is completely extinguished after few meters in the precipitation or no signal detected because of the water accumulated on the receiver optics. Results from the algorithm, besides filling a gap in precipitation and virga detection by radars, are of particular interest for the scientific community because will help to better understand long-term aerosol-cloud interactions and aerosol atmospheric removal (scavenging effect) by rain as multi-year database being available for several MPLNET permanent observational sites across the globe. Moreover, we developed the automatic algorithm at Universitat Politecnica de Catalunya (UPC) Barcelona, the unique permanent observation station member of MPLNET and the European Aerosol Lidar Network (EARLINET) In the future the algorithm can be then easily applied to any other lidar and/or ceilometer network infrastructure in the frame of World Meteorological Organization (WMO) Global Aerosol Watch (GAW) aerosol lidar observation network (GALION)

Simone Lolli↗

Influence of Averaging Method on the Evaluation of a Coastal Ocean Color Event on the U.S. Northeast Coast

Application of appropriate spatial averaging techniques is crucial to correct evaluation of ocean color radiometric data, due to the common log-normal or mixed log-normal distribution of these data. Averaging method is particularly crucial for data acquired in coastal regions. The effect of averaging method was markedly demonstrated for a precipitation-driven event on the U.S. Northeast coast in October-November 2005, which resulted in export of high concentrations of riverine colored dissolved organic matter (CDOM) to New York and New Jersey coastal waters over a period of several days. Use of the arithmetic mean averaging method created an inaccurate representation of the magnitude of this event in SeaWiFS global mapped chl a data, causing it to be visualized as a very large chl a anomaly. The apparent chl a anomaly was enhanced by the known incomplete discrimination of CDOM and phytoplankton chlorophyll in SeaWiFS data; other data sources enable an improved characterization. Analysis using the geometric mean averaging method did not indicate this event to be statistically anomalous. Our results predicate the necessity of providing the geometric mean averaging method for ocean color radiometric data in the Goddard Earth Sciences DISC Interactive Online Visualization ANd aNalysis Infrastructure (Giovanni).

Acker, James G.↗

Intelligent Observation Strategies for Geosynchronous Remote Sensing for Natural Hazards

Geosynchronous satellites offer a unique perspective for monitoring environmental factors important to understanding natural hazards and supporting the disasters management life cycle, namely forecast, detection, response, recovery and mitigation. In the NASA decadal survey for Earth science, the GEO-CAPE mission was proposed to address coastal and air pollution events in geosynchronous orbit, complementing similar initiatives in Asia by the South Koreans and by ESA in Europe, thereby covering the northern hemisphere. In addition to analyzing the challenges of identifying instrument capabilities to meet the science requirements, and the implications of hosting the instrument payloads on commercial geosynchronous satellites, the GEO-CAPE mission design team conducted a short study to explore strategies to optimize the science return for the coastal imaging instrument. The study focused on intelligent scheduling strategies that took into account cloud avoidance techniques as well as onboard processing methods to reduce the data storage and transmission loads. This paper expands the findings of that study to address the use of intelligent scheduling techniques and near-real time data product acquisition of both the coastal water and air pollution events. The topics include the use of onboard processing to refine and execute schedules, to detect cloud contamination in observations, and to reduce data handling operations. Analysis of state of the art flight computing capabilities will be presented, along with an assessment of cloud detection algorithms and their performance characteristics. Tools developed to illustrate operational concepts will be described, including their applicability to environmental monitoring domains with an eye to the future. In the geostationary configuration, the payload becomes a networked thing with enough connectivity to exchange data seamlessly with users. This allows the full field of view to be sensed at very high rate under the control of ground infrastructure, resulting in improved efficiencies, accuracy and science benefits. Hence a remote sensing payload and its data may become one of millions of connected objects in the emerging Internet of Things (IoT), and be as easily accessible by a users smart phone as any other smart appliance.

NASA's Space Launch System: Affordability for Sustainability

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is charged with delivering a new capability for human exploration beyond Earth orbit in an austere economic climate. But the SLS value is clear and codified in United States (U.S.) budget law. The SLS Program knows that affordability is the key to sustainability and will provide an overview of initiatives designed to fit within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017 within the projected budget. It also has a long-range plan to keep the budget flat, yet evolve the 70-tonne (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through the competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface some 40 years ago. Astronauts train for long-duration voyages on platforms such as the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. To arrive at the launch vehicle concept, the SLS Program conducted internal engineering and business studies that have been externally validated by industry and reviewed by independent assessment panels. In parallel with SLS concept studies, NASA is now refining its mission manifest, guided by U.S. space policy and the Global Exploration Roadmap, which reflects the mutual goals of a dozen member nations. This mission planning will converge with a flexible heavy-lift rocket that can carry international crews and the air, water, food, and equipment they need for extended trips to asteroids and Mars. In addition, the SLS capability will accommodate very large science instruments and other payloads, using a series of modular fairings and adapters to configure the rocket for the mission. The SLS affordability plan includes streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture where the question Why? is often asked and the answer "Because we've always done it that way" is rarely heard. The SLS Program will deliver affordable space transportation solutions for the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021. As this briefing will show, the SLS will offer a global infrastructure asset for robotic and human scouts of all nations.

May, Todd A.↗

Solar System Exploration Augmented by In-Situ Resource Utilization: Human Planetary Base Issues for Mercury and Saturn

Establishing a lunar presence and creating an industrial capability on the Moon may lead to important new discoveries for all of human kind. Historical studies of lunar exploration, in-situ resource utilization (ISRU) and industrialization all point to the vast resources on the Moon and its links to future human and robotic exploration. In references 1 through 9, a broad range of technological innovations are described and analyzed. Figures 1 depicts program planning for future human missions throughout the solar system which included lunar launched nuclear rockets, and future human settlements on the Moon. Figures 2 and 3 present the results for human Mercury missions, including LEO departure masses and round trip Mercury lander masses. Using in-situ resources, the missions become less burdensome to the LEO launch infrastructure. In one example using Mercury derived hydrogen, the LEO mass of the human Mercury missions can be reduced from 2,800 MT to 1,140 MT (Ref. 15). Additional analyses of staging options for human Mercury missions will be presented. Figures 4 shows an option for thermal control for long term in-space cryogenic storage and Figure 5 depicts the potentially deleterious elements emanating from Mercury that must be addressed, respectively. Updated analyses based on the visions presented will be presented. While advanced propulsion systems were proposed in these historical studies, further investigation of nuclear options using high power nuclear thermal and nuclear electric propulsion as well as advanced chemical propulsion can significantly enhance these scenarios. Human bases at Mercury may have to be resupplied from resources from regolith and water resources in permanently shadowed craters at its northern pole.

Mercury↗

Urban remote sensing applications: TIMS observations of the City of Scottsdale

A research program has been initiated between Arizona State University and the City of Scottsdale, Arizona to study the potential applications of TIMS (Thermal Infrared Multispectral Scanner) data for urban scene classification, desert environmental assessment, and change detection. This program is part of a long-term effort to integrate remote sensing observations into state and local planning activities to improve decision making and future planning. Specific test sites include a section of the downtown Scottsdale region that has been mapped in very high detail as part of a pilot program to develop an extensive GIS database. This area thus provides excellent time history of the evolution of the city infrastructure, such as the timing and composition of street repavement. A second area of study includes the McDowell intensive study by state and local agencies to assess potential sites for urban development as well as preservation. These activities are of particular relevance as the Phoenix metropolitan area undergoes major expansion into the surrounding desert areas. The objectives of this study in urban areas are aimed at determining potential applications of TIMS data for classifying and assessing land use and surface temperatures. Land use centers on surface impermeability studies for storm runoff assessment and pollution control. These studies focus on determining the areal abundance of urban vegetation and undeveloped soil. Highly experimental applications include assessment and monitoring of pavement condition. Temperature studies focus on determining swimming pool area and temperature for use in monitoring evaporating and urban water consumption. These activities are of particular relevance as the Phoenix metropolitan area undergoes major expansion into the surrounding desert area.

Christensen, Philip R.↗

Building Climate Resilience at NASA Ames

NASA Ames Research Center, located at the southern end of the San Francisco Bay (SFB) estuary has identified three primary vulnerabilities to changes in climate. The Ames Climate Adaptation Science Investigator (CASI) workgroup has studied each of these challenges to operations and the potential exposure of infrastructure and employees to an increased frequency of hazards. Sea level rise inundation scenarios for the SFB Area generally refer to projected scenarios in mean sea level rather than changes in extreme tides that could occur during future storm conditions. In the Summer of 2014, high resolution 3-D mapping of the low lying portion of Ames was performed. Those data are integrated with improved sea level inundation scenarios to identify the buildings, basements and drainage systems potentially affected. We will also identify the impacts of sea level and storm surge effects on transportation to and from the Center. This information will help Center Management develop future Master Plans. Climate change will also lead to changes in temperature, storm frequency and intensity. These changes have potential impacts on localized floods and ecosystems, as well as on electricity and water availability. Over the coming decades, these changes are going to be imposed on top of ongoing land use and land cover changes, especially those deriving from continued urbanization and increase in impervious surface areas. These coupled changes have the potential to create a series of cascading impacts on ecosystems, including changes in primary productivity and disturbance of hydrological properties and increased flood risk.The majority of the electricity used at Ames is supplied by hydroelectric dams, which will be influenced by reductions in precipitation or changes in the timing or phase of precipitation which reduces snow pack. Coupled with increased demand for summertime air conditioning and other cooling needs, NASA Ames is at risk for electricity shortfalls. To assess the anticipated energy usage as climate changes, the Ames CASI team is collecting historical energy usage data from Ames facilities, historical weather data, and projected future weather parameters from the CASI Climate subgroup. This data will be incorporated into the RETScreen model to predict how energy usage at Ames will change over the coming century.

climate↗

Synergism of He-3 acquisition with lunar base evolution

Researchers have discovered that the lunar surface contains a valuable fusion fuel element that is relatively scarce on Earth. This element, He-3, originates from the solar wind that has bombarded the surface of the Moon over geologic time. Mining operations to recover this resource would allow the by-product acquisition of hydrogen, water, carbon dioxide, carbon monoxide, methane, and nitrogen from the lunar surface with relatively minimal additional resource investment when compared to the costs to supply these resources from Earth. Two configurations for the He-3 mining system are discussed, and the impacts of these mining operations on a projected lunar base scenario are assessed. We conclude that the acquisition of He-3 is feasible with minimal advances in current state-of-the-art technologies and could support a terrestrial nuclear fusion power economy with the lowest hazard risk of any nuclear reaction known. Also, the availability of the by-products of He-3 acquisition from the Moon could significantly reduce the operational requirements of a lunar base and increase the commercialization potential of the base through consumable resupply of the lunar base itself, other components of the space infrastructure, and other space missions.

Crabb, T. M.↗

Large Payload Transportation and Test Considerations

Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure - roads, bridges, airframes, and buildings - necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider how large spacecraft are designed, and where they are manufactured, tested, or launched, could result in unforeseen cost to modify/develop infrastructure, or incur additional risk due to increased handling or elimination of key verifications. During test and verification planning for the Altair project, a number of transportation and test issues related to the large payload diameter were identified. Although the entire Constellation Program - including Altair - was canceled in the 2011 NASA budget, issues identified by the Altair project serve as important lessons learned for future payloads that may be developed to support national "heavy lift" strategies. A feasibility study performed by the Constellation Ground Operations (CxGO) project found that neither the Altair Ascent nor Descent Stage would fit inside available transportation aircraft. Ground transportation of a payload this large over extended distances is generally not permitted by most states, so overland transportation alone would not have been an option. Limited ground transportation to the nearest waterway may be permitted, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing (which includes hypergolic fuels, pyrotechnic devices, and high pressure gasses).

Rucker, Michelle A.↗

Launch Vehicle Demonstrator Using Shuttle Assets

The Marshall Space Flight Center Advanced Concepts Office (ACO) has the leading role for NASA s preliminary conceptual launch vehicle design and performance analysis. Over the past several years the ACO Earth-to-Orbit Team has evaluated thousands of launch vehicle concept variations for a multitude of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). NASA plans to continue human space exploration and space station utilization. Launch vehicles used for heavy lift cargo and crew will be needed. One of the current leading concepts for future heavy lift capability is an inline one and a half stage concept using solid rocket boosters (SRB) and based on current Shuttle technology and elements. Potentially, the quickest and most cost-effective path towards an operational vehicle of this configuration is to make use of a demonstrator vehicle fabricated from existing shuttle assets and relying upon the existing STS launch infrastructure. Such a demonstrator would yield valuable proof-of-concept data and would provide a working test platform allowing for validated systems integration. Using shuttle hardware such as existing RS-25D engines and partial MPS, propellant tanks derived from the External Tank (ET) design and tooling, and four-segment SRB s could reduce the associated upfront development costs and schedule when compared to a concept that would rely on new propulsion technology and engine designs. There are potentially several other additional benefits to this demonstrator concept. Since a concept of this type would be based on man-rated flight proven hardware components, this demonstrator has the potential to evolve into the first iteration of heavy lift crew or cargo and serve as a baseline for block upgrades. This vehicle could also serve as a demonstration and test platform for the Orion Program. Critical spacecraft systems, re-entry and recovery systems, and launch abort systems of Orion could also be demonstrated in early test flights of the launch vehicle demo. Furthermore, an early demonstrator of this type would provide a stop-gap for retaining critical human capital and infrastructure while affording the current emerging generation of young engineers opportunity to work with and capture lessons learned from existing STS program offices and personnel, who were integral in the design and development of the Space Shuttle before these resources are no longer available. The objective of this study is to define candidate launch vehicle demonstration concepts that are based on Space Shuttle assets and determine their performance capabilities and how these demonstration vehicles could evolve to a heavy lift capability to low earth orbit.

Threet, Grady E., Jr.↗

Validation and Error Characterization for the Global Precipitation Measurement

The Global Precipitation Measurement (GPM) is an international effort to increase scientific knowledge on the global water cycle with specific goals of improving the understanding and the predictions of climate, weather, and hydrology. These goals will be achieved through several satellites specifically dedicated to GPM along with the integration of numerous meteorological satellite data streams from international and domestic partners. The GPM effort is led by the National Aeronautics and Space Administration (NASA) of the United States and the National Space Development Agency (NASDA) of Japan. In addition to the spaceborne assets, international and domestic partners will provide ground-based resources for validating the satellite observations and retrievals. This paper describes the validation effort of Global Precipitation Measurement to provide quantitative estimates on the errors of the GPM satellite retrievals. The GPM validation approach will build upon the research experience of the Tropical Rainfall Measuring Mission (TRMM) retrieval comparisons and its validation program. The GPM ground validation program will employ instrumentation, physical infrastructure, and research capabilities at Supersites located in important meteorological regimes of the globe. NASA will provide two Supersites, one in a tropical oceanic and the other in a mid-latitude continental regime. GPM international partners will provide Supersites for other important regimes. Those objectives or regimes not addressed by Supersites will be covered through focused field experiments. This paper describes the specific errors that GPM ground validation will address, quantify, and relate to the GPM satellite physical retrievals. GPM will attempt to identify the source of errors within retrievals including those of instrument calibration, retrieval physical assumptions, and algorithm applicability. With the identification of error sources, improvements will be made to the respective calibration, assumption, or algorithm. The instrumentation and techniques of the Supersites will be discussed. The GPM core satellite, with its dual-frequency radar and conically scanning radiometer, will provide insight into precipitation drop-size distributions and potentially increased measurement capabilities of light rain and snowfall. The ground validation program will include instrumentation and techniques commensurate with these new measurement capabilities.

Bidwell, Steven W.↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

Program Options to Explore Ocean Worlds

Including Earth, roughly a dozen water ocean worlds exist in the solar system: the relict worlds Ceres and Mars, vast oceans inside most of the large Jovian and Saturnian icy moons, and Kuiper Belt Objects like Triton, Charon, and Pluto whose geologies are dominated by water and ammonia. Key pieces of the ocean-world science puzzle – which when completed may reveal whether life is widespread in the cosmos, why it exists where it does, and how it originates – are distributed among them. The eventual exploration of all these worlds will yield humanity’s total tangible knowledge about life in the universe, essentially forever. Thus, their exploration has existential significance for humanity’s self-regard, and indeed perhaps of our place in the natural scheme. The matter of planning how to pursue such a difficult and unprecedented exploration opportunity is therefore historic. The technical challenges are formidable, far harder than at Mars: missions to the Jovian and Saturnian ocean worlds are severely power-limited; trip times can be as much as a half decade and decade, respectively. And the science targets are global-scale oceans beneath kilometers of cryogenic ice. Reaching and exploring them would be a multi-generational undertaking, so again it is essential to plan and prepare. Today, we lack the instrumentation, subsystems, and remote operational-intelligence technologies needed to build and use exploration avatars as good as what we can envision needing. Each ocean world holds a piece of the puzzle, but the three priority targets are Europa at Jupiter, and Enceladus and Titan at Saturn. As with the systematic exploration of Mars, exploring these diverse worlds poses a complex technical and programmatic challenge – a strategic challenge – that needs to be designed and managed if each generation is to see its work bear fruit, and if the space science community is to make most effective use of the public money devoted to the quest. Strategic programs benefit from coherence. In only 15 years, the Mars Exploration Program (MEP) has transformed humanity’s view of Mars as a once and future habitable place, a world quite possibly holding relict evidence of life. Finding such evidence, we would study it to know if that life shared an origin common with Earth life. However, life in the ocean worlds could not have shared our origin, so exploring them opens another level in our quest to understand life in the universe: not only to places with vast salt-water seas known to contain organics and hydrothermal seafloors active today, but to places where anything alive cannot be related to us. MEP’s success – from its presence in the public consciousness to its rewriting of planetary habitability – make it an obvious template and source of lessons learned for a viable ocean worlds exploration program (OWEP). Six attributes of the MEP are analyzed for application to a potential OWEP. From this, five hypothetical programmatic scenarios are compared to the default case, and conclusions drawn. A coherent OWEP should have several parts: first, dedicated continuous investment in enabling technologies; and second, two directed-purpose, medium-class (~$1B) missions per decade that conduct pivotal investigations on a documented roadmap. Science could start in 2035, informing development of decadal flagship missions after Europa Clipper, to the places revealed to hold the most promise. The fastest pace of scientific discoveries would require access to high-performance propulsion infrastructure, e.g., the Space Launch System, Falcon Heavy, and high-power in-space solar electric propulsion, all capable of halving trip time. Not including these boosts, such a program would cost about a half-billion dollars more per year than NASA’s existing mission portfolio; the program architecture funded today cannot deliver a strategic OWEP while also sustaining balance among other solar system exploration priorities and opportunities.

Naderi, F.↗

Assateague Island National Seashore Ecological Forecasting: Characterizing Nearshore Suspended Sediments and Landcover Change Relative to Sediment Bypassing and Catastrophic Events

Assateague Island is located off the coast of Maryland and Virginia and serves as a home to sensitive species and habitats. However, infrastructure development disrupted the natural sediment transport processes of the barrier island, which accelerated erosion of the island’s shoreline. To counteract this, the United States Army Corps of Engineers (USACE) initiated semiannual sediment bypassing operations in 2004. Over time, financial constraints limited the amount of sediment deposition possible, leading to concerns over navigational issues in nearby channels and the possibility of the operations not providing their intended benefits. To address these issues, NASA DEVELOP partnered with the National Park Service NPS and USACE. The team performed time series analyses of nearshore suspended sediment from 2004-2020 and landcover change from 2006-2018 with satellite imagery from Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), and Sentinel-2 MultiSpectral Instrument (MSI). The sediment transport analyses showed that suspended sediment levels are seasonally dependent. Meanwhile, historical land cover trends included a net increase in unconsolidated shore and a net decrease in open water. Land cover change was then forecast to 2021, 2031, and 2046 using the IDRISI TerrSet Land Change Modeler. The model predicted the most drastic land cover changes in the southern portion and the least on the eastern foreshore of the island. As a result, this project allows our partners to understand the impact of sediment bypassing operations more fully and make better-informed decisions regarding the island’s management.

M Colin Marvin↗