Search NASA⌕ Search

SEARCH · Search NASA

Results for “acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 181 records · Page 10

Beam Performance of the Positron Transport Line for CEBAF Positron Upgrade

The Low Energy Recirculator Facility (LERF) at Jefferson Lab, formerly operated for the Free-Electron Laser program, has been proposed as the injector complex for the planned 12 GeV CEBAF positron upgrade (Ce+BAF), with an additional pathway to support a potential 22 GeV CEBAF electron upgrade. In this configuration, LERF would generate and pre-accelerate positrons to 123 MeV, matching the present injection energy into the North Linac. Due to the relatively large emittance expected from the positron source, a comprehensive acceptance study has been performed from LERF through the CEBAF recirculating linacs and beam transport lines to the experimental halls. The objective is to establish the positron phase-space acceptance and provide design feedback to the positron production and capture systems. Furthermore, given CEBAF’s capability to deliver highly polarized beams, spin-tracking simulations have been carried out including magnet imperfections, alignment errors, and synchrotron-radiation–induced energy spread. Particular attention is given to the evolution of the spin tune and the corresponding depolarization mechanisms along the beam delivery path, especially for providing longitudinal polarization at the experimental halls. These results inform injector design choices and assess the overall feasibility of delivering high-polarization positron beams in CEBAF.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Advanced sorbents for modular oxygen production for REMS gasifiers

Under a DOE funded effort, Thermosolv LLC has been developing a sorbent-based oxygen production technology for gasification and oxy-combustion applications. The sorbents utilize oxygen-storage properties of certain perovskites to (1) selectively adsorb oxygen at moderate temperature from compressed air and (2) release the adsorbed oxygen into a vacuum or a sweep gas such as CO2 and/or steam. Through cyclic operations of multiple sorbent beds such a process can be made continuous. Pressure drop across the sorbent bed and other similar design considerations dictate that the sorbent be in the form of a high surface-area-to-volume pellet and yet still possess sufficient crush strength and integrity. Process efficiency is determined by the sorption and desorption kinetics and sorbent capacity. Typical process involves cycle times in the order of 100 seconds, a time too short to fully utilize the full volume of the sorbent and the sorption capacity of the sorbent pellets. As a part of this project, Thermosolv LLC undertook the development of oxygen sorbents as a high-surface area supported sorbent on a light-weight inert support to (1) reduce the cost, (2) increase the productivity, and (3) reduce the overall weight of the reactor. Using a previously developed perovskite (LSCF 1991) with its well-characterized performance, composite sorbent pellets each consisting of an inert core coated by a thin layer of the functional perovskite material were produced. Several low-density, inexpensive inert solids supports in the 1/8”-1/4” size were selected to keep the pressure drop across the sorbent bed in the acceptable range. A number of commercial technologies including spray coating, dip coating, incipient impregnation of porous substrate followed by thermal annealing at various temperatures and duration were employed and tested to produce robust composite supported sorbent pellets. A sense of optimum coating thickness was developed by testing sorbent pellets of various increasing diameter pellets. LSCF-1991extrudates ranging in size from 1/32” to 3/16” were tested in a TGA and in a fixed-bed pressure swing test set-up for sorption/desorption cycles of interest. The data show that for the operational conditions of interest the coating thickness for a supported sorbent pellet needs to be approximately 1/32” (about 0.8 mm). Subsequent work thereby concentrated on developing composite pellets of various substrates, shapes and sizes with coating layer of about this size range. Candidate support materials were chosen based on cost, inertness, mechanical strength, thermal expansion and chemical stability with sorbent material, and in a size range to give an acceptable pressure drop in fixed-bad reactor configurations. Coating application methods used for application of the sorbent onto the support included precipitation, spray coating and dip coating from sorbent slurries and sol gels. For all coated supports where we could successfully apply a uniform coating of desired thickness with an acceptable handling performance in terms of exfoliation, TGA-based cyclic sorption/desorption testing was performed to determine cycling capacity of oxygen. Among nearly twenty different support materials tested, best adhesion performance was obtained from stainless saddle supports. In the bench-scale fixed-bad tests stainless steel saddle support composite pellets with a coating thickness in the 0.6 mm or so range, the composite sorbent pellet performance approached up to 95% of that of the 2 mm parent material pellets. In a parallel approach to reducing the cost of the sorbent, alternate sorbent formulations replacing/reducing the amount of cobalt in the LSCF family were also investigated. Successful formulations that could match the performance of LSCF 1991 were identified based on TGA cyclic tests as LSCF 1919 and LSF 1910. In the range of operational envelop of cycle times and other relevant process operating conditions, the reduced Co formulations showed comparable performance in the bench-scale fixed-bad cyclic operations. As a part of this project, we also attempted substitution of La and Sr with Ca and Ba, and Co with Mn, Ni and Cu with little success, but the overall project goal of reducing sorbent cost in terms of raw material and manufacturing expenses was successful.

01 COAL, LIGNITE, AND PEAT↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Assessment for the Environmental Restoration Disposal Facility (FY 2019 Annual Status Report)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA), composite analysis, and disposal authorization statement (DAS) be annually, and it must consider the results of data collection and analysis from research, field studies, and monitoring as well as update any Radioactive Waste Management Basis documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) has accepted low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells (currently 10) or disposal areas and can accommodate future design expansions as needed. During this reporting period (fiscal year 2019, October 1, 2018, to September 30, 2019). approximately 139,721 U.S. tons of waste was disposed at ERDF. From inception through September 30, 2019, ERDF has received approximately 18.5 million U.S. tons of waste, which equates to consumption of approximately 88% of the disposal volume. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (WAC) that provide specific radionuclide disposal limits, waste from restrictions, and descriptions of acceptable waste packages in compliance with DOE M 435-1.1 requirements. The ERDF WAC stipulates that waste destined for disposal at ERDF be controlled based on source, physical form, and containment concentration and activity levels

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Handled Hot Cell Facility and Other Research Transuranic Waste (Debris)

This acceptable knowledge (AK) Summary Report has been prepared for the Central Characterization Program (CCP) for remote-handled (RH) transuranic (TRU) waste generated and managed by Sandia National Laboratories/New Mexico (SNL/NM) in Albuquerque, New Mexico. The waste described in this report was predominately generated in the SNL/NM Hot Cell Facility (HCF) during the removal and packaging of experimental material and decontamination operations in Building 6580 at Technical Area (TA)-V. The waste stream also includes a very small amount of waste (estimated at less than 1 gram of fuel similar to that used for research at the HCF) originating from classified research at TA-I. In addition, the waste also includes secondary waste termed by SNL/NM as process generated waste (PGW), created during repackaging operations for this waste at the Auxiliary Hot Cell Facility (AHCF). The waste has been stored at the Sandia Pulsed Reactor (SPR) Dense Pack Storage Facility within TA-V or the Manzano Bunkers located at Manzano Base within Kirtland Air Force Base. All of the waste is being repackaged at the AHCF. This report was prepared in accordance with CCP-TP-005, CCP Acceptable Knowledge Documentation (Reference 1), to implement the AK requirements of DOE/WIPP-02-3214, Remote-Handled TRU Waste Characterization Program Implementation Plan (WCPIP) (Reference 2); Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan (WIPP-WAP) (Reference 3); and DOE/WIPP-02-3122, Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC) (Reference 4).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization results for the 2020 tank farm 2H and 3H evaporator overhead samples

The 2020 annual 2H and 3H Evaporator overhead samples were received at Savannah River National Laboratory (SRNL) on December 22, 2020. The delivered samples were analyzed for concentration of cesium-137 ( 137 Cs), strontium-90 (90 Sr) and iodine-129 ( 129 I) to validate compliance with the Effluent Treatment Project Waste Acceptance Criteria (ETP WAC, Rev. 7). The concentration of all three radionuclides, 137 Cs, 90 Sr, and 129 I, in the 2H Evaporator overhead sample were found to be less than the corresponding ETP WAC limits. Radiochemical analysis of the 3H Evaporator overhead sample indicated a 137 Cs content about an order of magnitude higher than the acceptable threshold value, and 90 Sr and 129 I concentrations within the acceptance limits.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultrasonic Jet Bat Deterrent System Advancement

General Electric Renewable Energy (GE) and the Department of Energy (DOE) worked to develop a project with an objective to increase confidence in acoustic ultrasonic bat deterrent technologies in wind turbines, by mitigating stakeholder investment risks that currently hinder the adoption of deterrent technologies. Many wind turbine sites utilize a bat conservation plan that curtail wind turbines and stop energy production. Curtailment is a known bat impact mitigation solution that has an history of environmental regulatory acceptance. To help support a solution that allows for simultaneous bat conservation and energy production with regulatory acceptance of acoustic bat deterrents, GE proposed a study to compare four treatments: control (no curtailment or deterrent), deterrent only, deterrent plus curtailment, and curtailment only. The concept was to provide a direct comparison of bat deterrent and curtailment effectiveness within the same wind farm and bat migration season. This comparison was intended to advocate for the adoption of bat deterrents with a large-scale field study by addressing customer concerns on regulatory acceptance of deterrents. The study was to be hosted at a forested habitat site during a bat migration season, by Stony Creek Energy, LLC (SCE), the owner of the Orangeville Wind Farm (OWF) in the state of New York. Included was a behavioral study plan with two turbines to monitor bat flight paths with thermal imaging cameras.

17 WIND ENERGY↗

Preliminary IHLW Formulation Algorithm Description

This report documents the initial algorithm that could be used by the Waste Treatment and Immobilization Plant (WTP) in batching high-level waste (HLW) and glass-forming chemicals (GFCs) in the HLW melter feed preparation vessel (MFPV) (HFP-VSL-00001 and -00005). Not all Hanford tank waste can be accommodated by the models developed for this report and significant expansion of the model boundaries could be achievable to reduce the WTP mission life and total canister production count. The immobilized HLW (IHLW) must meet a series of constraints to be acceptable for disposal in the Monitored Geologic Repository, which are contained in the Specification 1 of the Contract (DOE 2000), the Waste Acceptance Product Specifications (WAPS, DOE 1996), and the Waste Acceptance System Requirements Document (WASRD, DOE 2007). The IHLW Waste Form Compliance Plan (WCP, 24590-HLW-PL-RT-07-0001, Rev 3) specifies that the formulation algorithm will be developed and used to comply with the constraints associated with glass composition and properties. This report is not an engineering calculation, does not provide design input, and is not an engineering study. Algorithm inputs include the chemical analyses of the blended HLW in the HLW blend vessel (HBV) (HLP-VSL-00028, the volume and composition of the MFPV heel, the volume and composition of the MFPV after waste addition, the volume and composition of MFPV batch after GFC addition, the compositions of individual GFCs, and the mass of glass in each canister. In addition to these inputs, uncertainties in the HLW composition and processing parameters are included in the algorithm. Using the above inputs, the algorithm calculates the following outputs: 1) the volume of HLW to be transferred from the HBV to the MFPV, 2) the mass of each GFC for addition to the MFPV, 3) the composition of the glass that will be produced along with uncertainties, and 4) the predicted properties, with associated uncertainties, of the resulting IHLW. The algorithm uses the property-composition models to calculate properties with associated uncertainties and compares them with various constraints to ensure that a processable feed is formulated and a compliant IHLW is produced. The GFC additions are determined using an optimization approach to provide high confidence that the HLW glass will meet all product quality requirements and key processing constraints. For most HLW batches there are many possible glass compositions that meet all constraints. In these cases, the glass composition is optimized for a series of target component concentrations and target property values. The algorithm also incorporates process measurement and product quality uncertainties, based on the work of Piepel et al. (2005). Estimates of the various process and measurement uncertainties that affect glass compositions and predicted glass properties have been previously reported (Piepel et al. 2005, 2006) and the impacts of these estimated uncertainties on the IHLW composition envelope that meets product quality and processing-related properties with sufficient confidence were evaluated. The details of work performed to date to develop this initial GFC addition and batching algorithm are summarized in Sections 4 and 5. An example data set is used to illustrate the calculations of the algorithm summarized in Section 6. Finally, in Section 7, there is a statement of the required work to achieve a final operational IHLW formulation control algorithm. This report is not an engineering calculation, does not provide design input, and is not an engineering study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Evaluation of Accelerated Basin De-Inventory Material Addition to Sludge Batch 11 (Rev. 1)

The Accelerated Basin De-inventory (ABD) program involves discarding spent nuclear fuel that is currently stored in L-Basin to the Defense Waste Processing Facility (DWPF) for vitrification. The first ABD discards will occur during the preparation of Sludge Batch (SB) 11. Savannah River Mission Completion has requested that the Savannah River National Laboratory assess the technical gaps related to the increased gadolinium poisoning requirement and the impacts of performing the Low Temperature Aluminum Dissolution (LTAD) process in Tank 51 with H-Canyon discards present. The following summarizes the evaluation of the impacts of increasing the quantity of gadolinium (and related topics) from what was previously evaluated in the SRNL studies of gadolinium-poisoned ABD material solubility, the overall ABD flowsheet review, and increasing the fissile mass loading in glass: 1) Based on literature surveys, there is no indication that organic interactions with gadolinium will be significant at the high pH (typically >13) conditions of the Concentration, Storage, and Transfer Facilities. Any interactions of gadolinium with organics in DWPF are not expected to adversely impact DWPF or downstream facilities. Thus, there is little-to-no residual risk from organic interactions with gadolinium [Gap closed]; 2) Adding depleted uranium to ABD material, targeting 235 U enrichment of 4.90% within each transfer window, will mitigate potential impacts from an increase in soluble 235 U enrichment during sludge washing and LTAD. The plan to take advantage of previous transfers and allow 235 U enrichment of >5% during the final transfer window carries a risk that Tank 51 supernate will have a 235 U enrichment of >5%, which should be evaluated for acceptance; 3) Increasing the gadolinium mass ratio to 3.0:1 Gd: 235 U(eq SLU ) should lead to the same or higher partitioning of gadolinium into the solid phase within the DWPF Chemical Process Cell, resulting in both liquid and solid phases with expected partitioning of Gd consistent with the prior solubility study [Gap closed for SB11]; 4) There are no expected impacts on DWPF melt temperature and melter operations due to the minimal ~0.2 weight percent (wt%) increase in Gd concentration relative to previous sludge batches [Gap closed for SB11]; 5) As observed previously, Gd is expected to enter the off-gas system via physical entrainment, but at a slightly higher concentration than what was observed for SB9 melter off-gas pluggage deposits (0.07 wt%) [Gap closed for SB11] ; 6) There are no expected impacts on DWPF recycle or the Recycle Collection Tank glycolate destruction process. [Gap closed for SB11]; 7) Gd is projected to be a trace component in the SB11 glass (<0.5 wt%) and can be ignored for process control. Trace components do not significantly impact glass durability, thus the conclusions of the previous Product Consistency Test evaluation at a fissile mass loading of 2,500 g fissile/m3 glass still applies to SB11. The ~0.1 wt% increase in Gd2O3 concentration relative to the previous study will not impact the predictability of SB11 glass with the DWPF Product Composition Control System (PCCS) models for durability or the acceptability of glass according to the Waste Acceptance Product Specifications (WAPS) criterion for product consistency [Gap closed for SB11]; 8) No additional Toxicity Characteristic Leaching Procedure testing is necessary for SB11 and the hazardous waste specification of the SB11 DWPF waste form is unchanged after the addition of the ABD stream [Gap closed for SB11]. The following summarizes the evaluation of the impacts of adding two-thirds of the ABD material to Tank 51 prior to LTAD: 1) The addition of two-thirds of the ABD increases overall aluminum mass from 1.39×10 4 kg to 1.64×10 4 kg (15.5% ABD Al). The form of the insoluble portion of the Al resulting from ABD addition should be the more readily dissolved Al(OH) 3 and amorphous forms. The portion of the ABD aluminum that is processed by LTAD is expected to be completely soluble, thus requiring that less of the boehmite in the sludge be dissolved to reach the same Al target in the SB. [Gap closed for SB11]; The expected LTAD impact on other components, as related primarily to the components in ABD, are discussed. Gd is expected to remain insoluble during LTAD and not impact the solubility of other components. [Gap closed for SB11]; The addition of two-thirds of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 13,100 kg (63% ABD U) and the projected plutonium mass from 86.0 kg to 89.5 kg (3.9% ABD Pu). The addition of all of the ABD increases overall projected SB11 uranium mass from 4,740 kg to 16,100 kg (70% ABD U) and the projected plutonium mass from 86.0 kg to 90.4 kg (5.3% ABD Pu). The 235 U enrichment will be ≤5%. The fissile uranium will be adequately poisoned by Gd and the fissile Pu will be adequately poisoned by Fe from the sludge. [Gap closed for SB11]; There is a low risk that ABD addition will impact the rheology or pumpability of the slurry. There is a low but higher risk of ABD addition prior to LTAD impacting the settling rate; Based on the evaluation of adding two-thirds of the ABD material and all of the ABD material prior to the LTAD process, there is no volume or mass limit that would need to be imposed on ABD additions prior to LTAD. [Gap closed for SB11]. Revision 1 of this report addresses a variation on the ABD additions and LTAD strategy where sodium hydroxide additions for LTAD may be performed intermittently or concurrently with an ABD addition window. The proposed change does not alter the conclusions of this evaluation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Additive Manufacturing Flaw Assessment Methodology

An evolution fatigue data and flaw tolerance of components produced using the Powder Bed Fusion (PBF) Additive Manufacturing (AM) process is documented in this report. Initial differences in fatigue data for AM components compared to smooth bar fatigue data indicated a need for a more detailed analysis of AM data available in technical literature. The investigation was initiated to support the development of a fatigue analysis methodology for AM components to support the of codification of AM technology for pressure equipment. The project was initiated to collect and analyze stainless steel 304L and 316L AM fatigue test data and corresponding process and quality information to develop S-N and E-N based fatigue data representation. Additional AM fatigue test data including Inconel Ti-6-4 and aluminum alloys were also considered for comparison purposes Metallic AM parts tend to contain various forms of defects distributed throughout the part. If an AM part is subjected to fatigue loading in service, a fatigue analysis needs to be performed during the design process to ensure an acceptable service life for the part. Post-process machining and polishing do not to improve fatigue resistance in any significant degree. The low cycle fatigue regime is of particular interest to this project in support of flaw acceptance criteria currently under development by ASME’s BPTCS/BNCS. Internal defects become exposed as external surface defects during machining for the machining of the AM part to final dimensions. This implies that as long as inherent AM defects are within a controlled limit in terms of both size and distribution characteristics, the corresponding fatigue test data in terms of either S-N (stress life) or E-N (strain life) can be investigated and characterized to establish fatigue properties of AM parts for design and fatigue evaluation purposes. The resulting S-N or E-N curves and their scatter bands can be used to derive fatigue design allowable stress values by capturing the effects of distributed discontinuities within an acceptable limit.

36 MATERIALS SCIENCE↗

Status of SAS4A/SASSYS-1 Software Development and Application (FY2024)

SAS4A/SASSYS-1 is a simulation tool used to perform deterministic analysis of anticipated events as well as design basis and beyond design basis accidents for advanced liquid-metal-cooled nuclear reactors. With its origin as SAS1A in the late 1960s, the SAS series of codes has been under continuous use and development for over fifty years. It has been identified as a critical element of safety analysis capabilities for the U.S. Department of Energy and is utilized within industry to perform the transient safety analyses required to support the licensing of Liquid Metal-cooled Fast Reactors (LMFRs). This report summarizes the code development and update activities carried out during FY2024. In FY2024, programmatic activities focused on key improvements to software useability, such as enhanced user interfaces for reactivity feedback modeling, improvements in stability/useability of the Code Manual, and improvements to the acceptance testing infrastructure, including automation of acceptance testing and generation of the Acceptance Testing Report. To support end user applications, an open training was held, a semi-public forum was maintained, and a practical benchmarking and validation matrix was developed which allowed limitations of existing testing capabilities to be assessed. The existing fuel models were also enhanced with improved modeling capabilities and testing for the oxide and annular fuel models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Site Identification framework and environmental compliance for floating ocean turbines in US Waters (Abstract)

Like all potential marine energy deployment sites, characterizing the site, understanding the environmental interactions with floating tidal technology, and mapping a pathway towards regulatory acceptance will be needed to site and permit ocean current development within the Florida Current. The proposed work will be based on a modeling analysis, a desk-top review and analysis, focusing on the characteristics of the ocean current technology and environmental monitoring information on the marine animals and habitats that are specific to the appropriate latitude, particularly those that are endemic to the offshore Florida area. The analysis will also describe the state and federal authorizations required for deploying a floating tidal energy technology, with an emphasis on how they differ from those in Washington, Alaska, and Maine. Environmentally compliant sites within Florida Current will be selected based on environmental, logistical, and regulatory criteria. Recommendations on monitoring needs and adaptive management practices will be provided. The need to acquire social acceptance for the Orbital Marine Power technology will also be explored and general recommendations prepared to encourage the best acceptance in the communities of interest.

16 TIDAL AND WAVE POWER↗

SEARCHING FOR MESONIC DARK MATTER WITH THE HEAVY PHOTON SEARCH EXPERIMENT

Several highly-sensitive astrophysical experiments over the past couple of decades have demonstrated that the current abundance of visible Standard Model matter cannot explain galactic rotation curves, the expansion history of the Universe, or the apparent warping of light in empty space. Instead, one finds strong agreement with this body of experimental results upon positing the existence of an invisible particulate field, dark matter. Namely, a cold, weakly interacting dark matter component can explain all these phenomena. A number of accelerator-based experiments have been developed to search for the weak couplings/interactions of these particles, many of them concentrating on particle models with masses of tens to thousands of GeV. A relatively new, well-motivated model is a dark sector coupled to the Standard Model via a dark photon. The current abundance of dark matter can be obtained if one assumes that dark matter is coupled to light by a MeV to GeV particle with a U(1) symmetry. The parameter space of these models remains largely unexplored because they are difficult to probe experimentally. In this thesis, I analyze data from the Heavy Photon Search (HPS) detector, whose two detector halves closely surround the electron beam, providing acceptance to far-forward boosted interactions. This forward acceptance to highly boosted particles yields unprecedented sensitivity to MeV-scale invariant masses. I exhaustively optimize the offline reconstruction of the HPS detector. Each reconstruction object, from Silicon Vertex Tracker hits to tracks, is studied to maximize acceptance of dark matter events. I then use the 2021 run data to search for one model of dark-photon-mediated matter, the Strongly Interacting Massive Particle (SIMP). SIMP models provide self-interacting dark matter candidates that can form bound states resembling dark mesons. HPS can detect SIMPs through the decay of a dark vector boson (either a dark ¿ or ¿) into e+e- pairs. I obtain exclusion contours for SIMPs using both an optimized cuts-based selection and a machine-learning-based selection, advancing our knowledge of the nature of dark matter.

O'Dwyer, Rory [Stanford Univ., CA (United States).↗

Physical and Visual Evaluation of Filters for Direct Observation of the Sun and the International Standard ISO 12312-2:2015

We investigated the compliance of 43 commercially available solar filters (eclipse glasses) with the ISO 12312-2:2015 standard by measuring their spectral transmittances (280–2000 nm) and calculating their luminous, solar ultraviolet A, ultraviolet B, and infrared (IR) transmittances. We also evaluated the filters for usability by observing the full midday Sun and rating the view on a seven-point balanced scale, from “far too dark, details seen only with great difficulty” to “far too light, uncomfortable to view the Sun.” The mean ratings of two observers, one experienced and one inexperienced in solar observing, differed by 0.28 (95% confidence interval of the mean = 0.26). The inexperienced observer tended to be less accepting of high transmittances. All 43 solar filters complied with the UV and IR requirements. Eighteen filters passed the luminous transmittance requirements, and 24 were borderline too light or too dark. Seven of the 15 solar filters with a luminous transmittance darker than the requirement were rated as acceptable. One filter that passed and another that was borderline too light were rated as too light or far too light. The ISO 12312-2 limits derive from welding filter standards and do not represent an appropriate evidence base for direct solar viewing. This work provides the evidence base for a maximum 0.0012% and a minimum 0.00004% luminous transmittance for solar filters. The results of this study also support the use of welding filters between shades 12 and 16. Lighter welding filters are more acceptable than solar filters of the same luminous transmittance.

79 ASTRONOMY AND ASTROPHYSICS↗

Demystify the 1.1 Factor for Ultimate Tensile Strength Above Room Temperature in Development of the Code Stress Tables

As the Boiler and Pressure Vessel Code increasingly gains popularity worldwide, it is not uncommon that many users are mystified by the 1.1 factor required for ultimate tensile strength above room temperature in developing the allowable design stresses of Section II Part D Stress Tables. Questions often arise about the origin and purpose of the factor, the reason for it not applied to the yield strength, its due considerations when evaluating an alloy for acceptance to construction use from the perspective of the alloy’s tested tensile strength value, and more. Not knowing reliable sources for explicit explanations, some users tend to misinterpret the factor, abuse its application, incorrectly define their alloy acceptance or qualification criteria, and mistakenly manipulate the safety margin in structural component design.To help the Code users who struggle with these frequent and confusing issues, particularly those in nuclear industry where rigorous criteria are required for component design and alloy acceptance or qualification, this paper is intended to demystify the 1.1 factor and facilitate knowledgeable interpretation and use of the Section II Part D Stress Tables as well as relevant Mandatory Appendices.A brief review is first given on the background of the 1.1 factor, followed by a summary of its application in the Stress Tables. The provenance and purpose of the factor are then discussed in detail with graphic examples. Finally, current applicability and necessity of the factor are considered through a demonstration using example alloys.

Ren, Weiju↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process for a building often implements sampling rates to select equipment for functional acceptance testing when large quantities of equipment are present. While this approach is generally effective in identifying wide-spread issues, it has several key shortfalls. (1) It provides a one-time validation of equipment operation in which the standard documentation is a simple checklist of pass/fail questions. (2) It fails to evaluate equipment not included in the sample rate selection. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. The goal of this presentation will be to highlight the advantages offered by automated functional testing in this critical laboratory setting. These are primarily (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with connected commissioning and the important conversations with the key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Maximizing Efficiency and Quality: Leveraging Automated Testing for Laboratory Commissioning

The traditional commissioning process uses sampling to select equipment for functional acceptance testing when large quantities of equipment are present. Although this approach is generally effective in identifying wide-spread issues, it has several shortcomings: it fails to evaluate equipment not included in the sample, provides only a one-time validation of equipment operation, and the standard documentation is a simple checklist of pass/fail questions. During the construction and commissioning process of the new Research and Innovation Laboratory (RAIL) in Golden, CO, the National Renewable Energy Laboratory team engaged Group14 Engineering to implement a Connected Commissioning process using fault detection and diagnostic software for automated functional acceptance testing. This presentation highlights the advantages offered by automated functional testing in this critical laboratory setting: (1) sampling 100% of BAS-connected equipment during functional testing, (2) testing results backed by data beyond the traditional pass/fail checklist, and (3) an automated test process that can be regularly executed by the building management team for ongoing commissioning throughout the life of the building. The presentation will also cover technical challenges associated with Connected Commissioning and the important conversations with key stakeholders that need to occur well before functional acceptance testing in order to successfully implement the automated testing processes.

automated testing↗

Development of online pulse-finding algorithms for the Mu2e Stopping Target Monitor and an evaluation of the signal to background ratio for the Mu2e stopped-muon rate determination

This thesis presents a determination of the acceptance of the Mu2e Stopping Target Monitor (STM) detector for both signal and background events. The rate of X-rays of a specific energy in the STM is used to determine the rate of stopped muons in the aluminium stopping target, which is used as the normalisation for all Mu2e measurements, particularly the branching ratio for a charged lepton flavour violating (cLFV) process. The acceptance for the 347\,keV $2p-1s$ aluminium signal X-ray is determined to be $(8.03 \pm 0.05) \times 10^{-10}$\,cm$^{-2}$ and the acceptance for the background photons (at 347\,keV) to be $(3.19 \pm 0.21) \times 10^{-8}$\,cm$^{-2}$. This results in a signal-to-background ratio of approximately two which is significantly higher than had previously been estimated. These signal-to-background rates are used to determine the time required to achieve a statistical uncertainty of 10\% on the number of 347\,keV X-rays as a function of the detector resolution and back ground rate. For a resolution of 2\,keV, and the background rate determined in this thesis, approximately one minute of data is required. The three corrections needed to be applied to the measured 347\,keV rate to determine the rate of stopped muons are also determined and potential sources of bias arising from the background shape, background fit range and energy calibration are investigated and found to be insignificant. The raw energy of the particles in the STM detector comes from a 16-bit ADC digitising at $\sim 300$\,MHz. It is not possible to store all the raw digitisations and online algorithms have been developed to rapidly select pulses in the detector and reconstruct their energy. The performance of these algorithms has been characterised with simulated data as a function of detector rate and resolution and optimum operating points for the algorithms have been defined. The integrity of the algorithms has also been demonstrated and characterised on test-beam data at high r ates and with radioactive sources at low rates.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗